CHAPTER VIII

THE TRAINING AND CANALISATION OF RIVERS

1. =Preliminary Remarks.=--When a stream is trained or regularised it

is generally made narrower, but sometimes narrow places have to be

widened. Deepening has also very frequently to be effected. The object

of training is generally the improvement of navigation, but it may be

the prevention of silt deposit. Some natural arms of rivers which form

the head reaches of canals in the Punjab are wide and tortuous, and

they are sometimes trained. Training often includes straightening or

the cutting-off of bends, as to which reference may be made to CHAP.

VII.

2. =Dredging and Excavating.=--When a flowing stream is to be deepened,

the work is usually done by dredgers. Dredgers can remove mud, sand,

clay, boulders, or broken pieces of rock. The “bucket ladder” dredger

is the commonest type. The “dipper” dredger is another. Both these

can work in depths of water ranging up to 35 feet. The “grab bucket”

dredger can work up to any depth and in a confined space. The “suction

dredger” drawls up mud or sand mixed with water. A dredger may be

fitted with a hopper or movable bottom, by means of which it can

discharge the dredged material--this, however, involves cessation

of work while the dredger makes a journey to the place where the

material is to be deposited--or it can discharge into hopper barges or

directly on to the shore by means of long shoots. For small works in

comparatively shallow water the “bag and spoon” dredger, worked by two

men, can be used.

When rock has to be removed under water it is blasted or broken up by

the blows of heavy rams provided with steel-pointed cutters.

In widening a channel the excavation can be carried down in the

ordinary way to below the water-level, a narrow piece of earth, like a

wall, being left to keep the water out. If the channel cannot be laid

dry, the work can be finished by dredging.

Regarding methods by which the stream is itself made to deepen or widen

its channel, reference may be made to CHAP. V.

3. =Reduction of Width.=--If a channel which is to be narrowed is

not a wide one, the reduction in width can be effected by any of the

processes described under bank protection (CHAP. VI.). But in a wide

channel, reduction of the width by any direct process is generally

impracticable. The expense would generally be prohibitive. Earth, if

filled in, is liable to be washed away unless protected all along.

Reduction in the width of a large channel is nearly always effected

either by groynes (fig. 26) or by training walls (fig. 27). Spurs or

short groynes for bank protection have been already described (CHAP.

VI., _Art. 2_). Groynes for narrowing streams are made in the same way

and of the same materials, but are longer. They are at right angles

to the stream or nearly so. Groynes in the river Sutlej have been

mentioned in CHAP. V., _Art. 5_, and are shown in fig. 6, p. 55.

Whether groynes or training walls are used, the object is to confine

the stream to a definite zone and to silt up the spaces at the sides.

These spaces when partly silted can be planted with osiers or with

anything which will grow when partly submerged, and this will assist in

completing the silting.

[Illustration: FIG. 26.]

[Illustration: FIG. 27.]

A training wall can be made of any of the materials used for groynes.

In order to silt up the spaces between each wall and the adjacent bank

of the stream, other walls are run at intervals across them. Usually

the training walls and cross walls are carried up only to ordinary

water-level, sometimes only to low-water level. Floods can thus spread

out and submerge the walls and deposit silt. If the walls are carried

up too high it may be necessary, in order to give room for floods,

to space them too far apart, and this, as will be seen below, is

objectionable.

The difference between training walls and groynes is one of degree

rather than one of kind. The material most commonly used is, in

either case, loose stone--with pitching, if desired, above low-water

level,--but it may be wattled stakes. If the water of the stream

contains silt at all stages of the supply, gaps can be left in training

walls so that silt deposit may occur at all times and not only in

floods. If the walls are of wattled stakes, water will pass through

them, and it may not be necessary to leave any gaps. Groynes are

frequently made with =T=-heads (fig. 26), and they are thus equivalent

to training walls with long gaps in them. The edge of the narrowed

channel usually forms somewhat as shown in the figure. If the groynes

are placed so near together as to give a regular channel, the cost is

not likely to be much less than that of training walls.

The alignment of training walls or groynes should be such as will give

the best channel consistent with economy in cost. The best channel is

generally that which is most free from sharp bends. It is assumed for

the present that no cuts or diversions of such lengths as to materially

alter the gradient are to be made, but that a certain amount of choice

of alignment is afforded by the reduced width of the trained channel

and by small diversions or easings of bends. It is sometimes said that

straight reaches are objectionable because the stream will tend to

wander from side to side and cause shoals, whereas in a bend there will

be no such tendency. The difficulty as to shoaling will be greatest at

low water, but it is likely to be serious only when the width between

the training walls is too great. If the width cannot be reduced to such

an extent as to do away with the trouble, it may be better to adopt a

curved course. The width between the training walls should generally be

the same throughout, whether the reaches are straight or curved, but

in view of the preceding remarks it may be desirable, where a reach

cannot be otherwise than straight and where shoaling is feared, to give

the straight portion a reduced width with of course a greater depth,

and similarly to reduce the width at reverse changes of curvature. In

curves which are at all sharp the curvature should be rather sharper in

the middle of the curve than at the ends (CHAP. IV., _Art. 8_).

4. =Alteration of Depth or Water-Level.=--When the width of a stream

is altered, the depth of water--the gradient being supposed to be

unchanged--must alter in the opposite manner. A narrowing of the

channel by training necessitates an increase in the depth of water,

and the same remark applies if an arm of the stream is closed. The

increase in depth may be effected either by raising the water-level or

by lowering the bed--as may be convenient--or both. If the bed is to be

lowered and is of hard clay, it may be necessary to dredge it and, when

this has been done, training may be unnecessary. If the bed is of soft

mud, a dredged channel is likely to fill up again, and training alone

will be the method to adopt. If the bed is moderately hard, say compact

sand, it may be suitable to train the channel first and then to dredge

if necessary. In any case, shoals of hard material may have to be

dredged or rocks, whether these form shoals or lateral obstructions,

to be blasted or otherwise broken up (_Art. 2_). In cases where it

is desired to raise the water-level without any lowering of the bed,

training is of course necessary. In any case in which the bed is likely

to scour to a lower level than is desired, or if the bed is to be

raised, the measures described in CHAP. V., _Art. 6_, may be adopted,

but they are hardly likely to be suitable and satisfactory in all cases.

5. =Training and Canalising.=--The steps so far described, together

with any of those described in CHAPS. V. and VI., exhaust the list

of what can be done so long as only the cross-section of a stream is

dealt with. This is often called the “regulation” of a stream, though

“training” is a more satisfactory term.[10]

[Illustration: FIG. 28.]

A mere alteration of the cross-section of a stream will not always

afford a solution of the problem to be solved. Frequently a change

of gradient is required. The gradient can be steepened by means of

straightenings, or flattened by introducing weirs, or perhaps by

adopting a course somewhat more circuitous than was intended. This

extended scope of operations is known as canalising in the case of a

river, and remodelling in the case of a canal.

Suppose that it is desired to alter the cross-section of a stream,

at ordinary water-level, so as to reduce the width and increase the

depth (fig. 28). If the mean depth is doubled, the new width will be

about equal to 1/(3·2) of the old width (_Hydraulics_, CHAP. VI.,

_Art. 2_). If this gives too narrow a channel, it may be desirable to

flatten the gradient. If it gives too wide a channel, the gradient can

be steepened or a greater depth adopted. While the width and depth of

the stream will be fixed so as to be suitable for the navigation, the

ratio of depth to velocity should be so arranged, if this is possible,

as to minimise trouble connected with silting or scour (CHAP. IV.,

_Art. 6_). A remodelled channel is, in short, designed in exactly the

same way as a new channel. The depth of water exercises the greatest

effect on the discharge, and the gradient the least. The weak point in

a scheme which includes weirs is the difficulty of dealing with floods.

A scheme perfect in all other respects may be vitiated because of the

obstruction, caused by weirs, to the passage of floods. The difficulty

is got over by means of movable weirs. The whole subject of weirs is

dealt with in CHAP. X.

Training or canalising should not be effected in any reach of a

stream without regard to other reaches. A mere local lowering of the

water-level by dredging may accentuate the effect of a shoal at the

upper end of the reach.

When the water-level is raised by a weir or by narrowing the

channel--though in the latter case the raising may not be permanent--it

is generally best to commence the work from the upstream end. The

raising of the water-level will then not interfere with the execution

of the rest of the work. But in a case of widening, where the

water-level upstream of the work is lowered, the work can conveniently

be begun at the downstream end, and the remark applies also to a case

of straightening, provided that the new channel is not so small that

it at first causes no lowering. In any case in which there is a doubt

whether the whole of the scheme will be carried out, the reach to be

dealt with first can be decided on according to circumstances. There is

no general reason for selecting an upstream or downstream reach, except

that any raising or lowering of the water-level will extend upstream of

the reach and not downstream of it (CHAP. I., _Art. 4_).

Training walls and groynes, if made with stakes or fascines or any

materials except stone, require careful watching and maintenance.

River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them. · 第 8 / 15 章