CHAPTER VII

DIVERSIONS AND CLOSURES OF STREAMS

1. =Diversions.=--When a stream is permanently diverted the new course

is generally shorter than the old one, and the diversion is then often

called a cut-off. The first result of a cut-off is a lowering of

the water-level upstream and a tendency to scour there, and to silt

downstream of the cut-off. Fig. 23 shows the longitudinal section of a

stream after a cut-off _A B_ has been made. The bed tends to assume the

position shown by the dotted line. If both the diversion and the old

channel are to remain open, the water-level at the bifurcation will be

lowered still more, and the tendency to scour in the diversion will be

reduced.

[Illustration: FIG. 23.]

If the material is soft enough to be scoured by the stream, it is often

practicable to excavate a diversion to a small section and to let it

enlarge itself by scour. This operation is immensely facilitated if

the old channel can be closed at the bifurcation. The question whether

the scoured material will deposit in the channel downstream of the

diversion must be taken into consideration; also the question whether

the diversion will continue to enlarge itself more than is desirable.

The velocity in the diversion will be a maximum if its section is

of the “best form,” _i.e._ if its bed and sides are tangents to a

semicircle whose diameter coincides with the water surface, but this

may not (CHAP. IV., _Art. 6_) be the section which will give most

scour. In order to prevent the enlargement of the diversion taking

place irregularly, the excavation can be made as shown in fig. 24,

water being admitted only to the central gullet. The side gullets

should not be quite continuous, but unexcavated portions should be left

at intervals, so that if the water in scouring out the channel breaks

into the gullet, it will not be able to flow along it until it has

broken in all along.

[Illustration: FIG. 24.]

If a diversion is made, not with the object of lowering the water-level

but merely in order to shorten the channel, the increased velocity

caused by the steepened slope may be inconvenient. In this case a weir

or weirs can be added (CHAP. VIII., _Art. 4_).

If the water contains sufficient silt to enable the abandoned loop to

be silted up within a reasonable time, it may be desirable to do this.

The silting up may, for instance, increase the value of the land. The

loop should be closed at its upper end. Water entering the lower end

will cause a deposit there. When the lower end is well obstructed by

silt, the upper end should be opened.

The set of the stream, due, for instance, to a bend at the point

where a diversion takes off has very little to do with the quantity

of water which goes down the diversion. The only effect of the set of

the stream is a slight rise of the water-level as compared with the

opposite bank. Similarly, the angle at which the diversion takes off

is only of importance in giving, in some cases, a velocity of approach

whose effect is generally small. The distribution of the water between

the diversion and the old channel really depends on their relative

discharging capacities. If the required quantity of water does not flow

down a diversion it can be dredged.

Sometimes a long spur is run out to send the water towards the off-take

of a diversion. The effect of this is very small--it merely causes a

set of the stream,--unless its length is so great that it amounts to

something like a closure dam. It is sometimes said that it is easier

to lead a river than to drive it. This remark is probably based on the

fact that spurs, such as those under consideration, generally produce

little effect, whereas the excavation of a diversion or the deepening

of a branch by dredging it, is more likely to produce some result.

There is, however, no certainty about this. Sometimes too much is

expected of such channels. Calculations are not always made as to the

scouring power of the stream, nor is account always taken of the fact

that as the cut scours its gradient flattens.

2. =Closure of a Flowing Stream.=--The closure of a flowing stream by

means of a dam is usually attended with some difficulty and sometimes

with enormous difficulty. There may be little trouble in running out

dams from both banks for a certain distance, but as soon as the gap

between the dams becomes much less than the original width of the

stream, the water on the upstream side is headed up and there is a rush

of water through the gap, which tends to deeply scour the bed and to

undermine the dams. The smaller the gap becomes the greater is the rush

and scour.

The closure is most easily effected at or near to the place where the

stream bifurcates from another. Then, as the gap decreases in width,

some of the water is driven down the other stream and it does not rise

so much. Eventually all the water goes down the other stream, and

the total rise is only so much as will enable this other stream to

carry the increased discharge. If the closure is not effected near a

bifurcation, the rise of the water will go on even after the closure is

completed, and it will not cease, unless the water escapes or breaks

out somewhere, until it has risen to the same level as that to which it

would have risen if the closure had been at the bifurcation, or perhaps

not quite to the same level, since there may still be a slight slope in

the water surface and a small discharge which percolates through the

dam. Sometimes in such a case it is possible to arrange for temporary

escapes or bifurcations, which will be shallow and therefore easily

closed, after the main closure has been completed.

A closure is, of course, far more easily effected where the bed is hard

than where it is soft. Very often it is best to close temporarily at

such a place or near a bifurcation, even if the permanent dam has to be

elsewhere, and then to construct the permanent dam in the dry channel,

or in the still water, and remove the temporary one or cut a gap in it.

Generally the best method to adopt in a closure is to cover the bed

of the channel beforehand--unless it is already hard enough--with a

mattress or floor, such that it cannot be scoured as the gap closes.

A floor may consist of a number of stones or sandbags dropped in from

boats or by any suitable means, and placed with care so that there

shall not be gaps or mounds. Sandbags should be carefully sewn up. A

mattress may be made of fascines laid side by side and tied together,

floated into position, weighted and sunk. Even a carpet made of matting

or cloth and suitably weighted has sufficed in some cases. If the

scour is likely to be such that stones or sandbags will be carried

away, the stones may be placed in nets, baskets, or crates. Sandbags

may also be placed in nets. Probably the long rolls of wire-netting

filled with stones, described in CHAP. VI., _Art. 3_, would be better

than anything, and the diameter could be reduced somewhat. The floor or

mattress need not usually extend right across the stream. It must cover

a width much greater than--perhaps twice as great as--the width of the

gap is likely to be when scour begins. Its length, measured parallel

to the direction of the stream, must be such that severe eddies in

the contracted stream will have ceased before the stream reaches its

downstream edge. It need not extend to any considerable distance

upstream of the line of the dam.

The dams when started from the banks can generally be of simple earth

or gravel, or loose stones, but before they have advanced far they

will probably require protection at the ends by stones, or by staking

and brushwood, or by fascines. As soon as the dams have advanced well

onto the mattress and their ends have been well protected, it is best

to cease contracting the stream from the sides and to contract it

from the bottom by laying a number of sandbags across the gap so as to

form a submerged weir. In this way the rush of water is spread over

a considerable width of the stream. The weir is then raised until it

comes up above water. Leakage can be stopped by throwing in earth, or

gravel, or bundles of grass on the upstream side. Sometimes it is best

to construct the mattress over the whole width of the stream, and to

effect the closure entirely by a weir, carrying each layer right across

before adding another. The banks of the stream, if not hard, can be

protected by sandbags, stones, staking or fascining.

The chief cause of failures of attempts to close flowing streams is

neglect to provide a proper floor or mattress. The stones or other

materials may be of insufficient weight or not closely laid, or the

extent of the floor may be insufficient. In a soft channel and deep

water loose stones in almost any quantity may fail unless a mattress of

fascines is laid under them. Another cause of failure is running short

of materials, such as sandbags. Allowance should be made for every

contingency, including making good any failure of parts of the work.

Enormous sums of money have been wasted, and vast inconvenience, loss

and trouble incurred, in futile attempts to close breaches in banks, or

gaps in dams.

Sometimes the gap is closed by sinking a barge loaded with stones, or

by sinking a “cradle” or large mattress made of fascines, taken out to

the site by four boats, one supporting each corner, and then loaded

with stones and sunk. Another method is to run out a floating mattress

of fascines from one side of the gap to the middle and sink it, then

to proceed similarly on the other side, and so on.

An excellent plan, when it can be adopted, is to have more than one

line of operations, so that the heading up of the water is divided

between them.

In India closures of streams having depths of 6 or 8 feet are effected

by means of rough trestles made from trunks of small trees and placed

at intervals in the stream like bridge piers, one leg of the trestle

inclined upstream and one downstream. Each pair of adjacent trestles

is connected by a number of rough, horizontal poles. Against these are

placed bundles of brushwood. Earth is at the same time collected and

is rapidly added at the last. The chief danger is the undermining of

the bed by scour. This is prevented by driving in stakes and placing

brushwood against them. Closures of small channels or of breaches in

the banks of canals are effected by means of staking and brushwood.

Where dangerous breaches are liable to occur, it is a good plan to have

a barge, fitted up with a small pile-driver and carrying a supply of

sheet piles, ready at a convenient spot.

Hurdle dykes, first used on the Mississippi, were employed on the

Indus in 1902 to close partially the main channel of the river.

There were to be three dykes, each dyke consisting of three lines of

very long piles--some were 60 feet long,--driven into the bed of the

stream, which was to be protected with mattresses made of fascines and

extending right across it, with their heads above flood-level. The

idea was not to wholly stop the flow of the water, but to obstruct it

so much that silt would deposit, the channel become choked up, and the

water find a course down another channel. The work was begun in March

1902, and was in progress in May of the same year when an unusually

early flood put a stop to it. The dykes had at this time advanced

considerable distances from the right bank of the stream, but none

had been completed. Two dykes out of the three were for the most part

carried away. The river, however, took a new course, starting from a

point far upstream, the western channel became a creek, and the remains

of the dykes were soon embedded in silt.

In any case in which the provision of a proper mattress has been

omitted, or when the mattress has been destroyed, or when a breach has

occurred in an embankment, whenever, in short, it is evident that the

gap cannot be closed until some other escape for the water is provided,

it may be possible to provide such an escape by cutting partly through

the dam or embankment on the downstream side at another place, and

thoroughly protecting the place and extending the protection downstream

and away from the dam or embankment. The water can then be let in, and

the closure of the old gap attempted. If a closure is effected, the

protected gap can then be closed. Sometimes it may be desirable to make

such a protected gap beforehand and with deliberation.

Dams for closing streams which are dry can be made similarly to flood

embankments (CHAP. XII., _Art. 7_). Sand does very well, provided it is

protected by a covering of clay or by fascining.

3. =Instances of Closures of Streams.=--In 1904 the Colorado River

broke into the Salton Sink--a valley covering 4000 square miles.

Unsuccessful attempts were made to close the stream by two rows of

piles with willows and sandbags between them, by a gate 200 feet long,

supported on 500 piles, and by twelve gates each 12 feet wide. A

“rock-fill” dam was then constructed on a mattress 100 feet wide and

1·5 feet thick. The river, which was 600 feet wide, broke through, but

was stopped by the construction of three parallel rock-fill dams in the

gap (_Min. Proc. Inst. C.E._, vol. clxxi.).

[Illustration: FIG. 25.]

At the site of the railway bridge over the river Tista in Bengal, it

was necessary to close the main stream (fig. 25), which flowed at the

left side of the channel, while the bridge had been built at the right.

The bed was of sand, width 500 feet, depth 6 feet, and discharge 3700

cubic feet per second. The first attempt to close the stream was made

at M N, a floor of stone 200 feet long, 20 feet wide, and 2 feet

thick, being laid in the middle of the stream, and dams of earth,

sandbags, and stones being run out from each bank. As the gap decreased

in width the bed was torn up and the work failed. The heading up was 3

feet 9 inches. It was recognised later that the site should have been

at the bifurcation higher up, and that the stone floor should have been

laid on a mattress.

In the next working season the dams C D and E F G were made. The dam C

D was of earth. Two walls, each consisting of a double line of bamboos

with the spaces between the lines filled with bundles of grass weighted

with earth, were run out 50 feet in advance of the earthwork near the

lines of the toes of the slopes. Along the line of the upper wall a

mattress of broken bricks 10 feet in width, and 1 foot thick, was laid,

and was kept 50 feet in advance of the wall. A total length of 1000

feet of embankment was made in five months and pitched on its upstream

side. The end was strongly protected by a mass of stone. The embankment

F G was of earth. The dam E F consisted of three lines of piles driven

10 feet into the bed. A mattress weighted with stones extended for 20

feet upstream of the dam and 40 feet downstream. A gap of 150 feet was

left at D E, and was not protected by a floor of any kind. A channel,

parallel to F G and extending to K, had been dug to a width of 200

feet. During the floods the heading up at D E was about 2·5 feet, and

the water was 30 feet deep. The line E F was greatly damaged and was

repaired. The cut F G K gradually enlarged, and by the end of the

floods more water was going down it than down the main stream. The gap

D E was finally closed by means of a line of bamboos and grass, the

bed being protected by a carpet, 100 × 50 feet, made of common cloth

weighted with sandbags. The success of the operations turned on the

scouring out of the cut F G K. It is remarkable that the gap D E did

not become wholly unmanageable in the floods (_Min. Proc. Inst. C.E._,

vol. cl.).

River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them. · 第 7 / 15 章