PHILADELPHIA, JUNE 1ST, 1910.

I have signed the Report of the A. S. C. E. Rail Committee,--"Approved

in connection with the attached report," as I feel that the report is

too condensed, and assumes that all are familiar with the Rail

situation, especially what has been done by the other Societies.

The work undertaken by this Committee has been delegated by The American

Railway Association to the Rail Committee of The American Railway

Engineering and Maintenance of Way Association, and it therefore seems

appropriate to give the results of their work, up to date, to our

members in convenient form for reference, especially as our rail

specifications have not been worked to, and they have offered a better

specification that will be worked to, and no doubt largely used by the

members of this Society. The specification is attached to this report.

In presenting this specification to the Annual Meeting at Chicago in

March last, the Committee said:[C]

"A new specification should not be proposed at this time without

careful consideration. So far as we know, no railroad company has

purchased rails under the specifications approved by the American

Railway Association and referred to us; nor do we know of any

railway company that has succeeded in buying rails during the past

two years according to a specification entirely satisfactory to the

railroad company. We believe that all of the specifications under

which rails have been rolled have been compromises on the part of

both parties, with the general result that neither party is

entirely satisfied. Our experience during the year has brought to

our attention some defects in all of the specifications now before

us, and acting under the impression that there is a distinct

feeling that we should revise our specifications, we offer the

attached specifications for your consideration. Our Association has

no specification for Open-Hearth Steel Rails, and in order to

comply with the instructions, a specification for Open-Hearth Steel

Rails is included.

"We believe it necessary to submit a sliding scale for the

percentages of carbon and phosphorus, which provides for increasing

the carbon as the phosphorus decreases. The fixing of this scale

properly is a matter requiring care, and we admit that our

knowledge on the subject is limited. The American Railway

Association specification calls attention to this matter in the

following words: 'When lower phosphorus can be secured, a proper

proportionate increase in carbon should be made.' The amount of

increase is not provided for in the specifications, and this

appears to us to be necessary in order to secure uniformity of

practice; otherwise, the fixing of these percentages becomes a

matter of special arrangement. Bessemer rails are being furnished

regularly with phosphorus under the maximum allowed, and where this

is done, the carbon should be raised above the higher limit now

fixed in our specifications, or a soft and poor wearing rail will

result; yet this condition has not been fully guarded against in

rails furnished under existing specifications. The lower and upper

limits for carbon have heretofore been fixed with the intention

that the mills furnish rails with a composition as near between the

two limits as possible. The mills, however, in order to meet the

prescribed drop tests with the least difficulty, keep both the

carbon and manganese as nearly as possible to the lower limits,

with the corresponding result that a generally poor-wearing rail is

furnished.

"Some roads have prescribed the limits of deflection to be allowed

under the drop test. With our present knowledge, we believe that we

should fix a minimum deflection to eliminate brittle rails and to

secure greater uniformity of product; also maximum deflection to

eliminate soft rails. We are not able at the present time to fix

these limits, but our ultimate object will be to determine and fix

such limits for the specifications.

"With reference to the amount of discard, time of holding in ladle,

size of nozzles, and other such details of manufacture or

machinery, we are of the opinion that the physical and chemical

tests required should be prescribed, and that we should see that

the material submitted for acceptance meets the prescribed tests.

We should not dictate to the manufacturers the amount of crop which

shall be removed from the top of the ingot, as this should vary

with the care and time consumed at the various mills. The railroads

should not be asked to take anything but sound material in their

rails. The mills can furnish such sound material if the proper care

and sufficient time are taken in the making of the ingots.

Information derived from the tests being made at the Watertown

Arsenal shows definitely that sound rails cannot be made from

unsound ingots, and that, therefore, the prime requisite in

securing a sound rail is to first secure the sound ingot.

"We recommend that the present Specifications for Steel Rails be

withdrawn from the Manual of Recommended Practice of the

Association, as no longer representing the current state of the

art.

"We submit herewith, as Appendix 'A,' a form for specifications. It

will have to be amended from time to time as we receive further

information on the subject."

The specifications referred to above were modified and presented at the

Meeting in _Supplement to Bulletin No. 121_, of March, 1910, and in this

final form are attached hereto.

These specifications do not represent the work of any one Society or the

work of any one Committee, but are the result of all the work of the

different Societies, as the members of all are so interwoven that

whatever work is done in any one Society, or by the Committee of a

Society, has very naturally and fortunately been carried into the

others.

At the Chicago Meeting these specifications were accepted without a

single change, and this is very unusual and shows how generally

acceptable they were, as the members of all Rail Committees were present

at the Meeting. The main points in this specification were discussed and

agreed upon by the members of the Committee and the Rail Committee of

the manufacturers who have co-operated with them in this work.

In the matter of Rail Sections, the Rail Committee of The American

Railway Engineering and Maintenance of Way Association has not arrived

at any definite conclusions. The new sections "A" and "B" of The

American Railway Association have not given as good results as was

expected of them, and the whole matter is yet under consideration. The

Committee reported as follows:[D]

"The instructions of the American Railway Association require us to

study the A. R. A. sections 'A' and 'B' in use and submit a single

type for standard. Owing to the conditions existing in 1908, very

little rail was laid, and practically none of the A. R. A.

sections, in such manner as to give the needed information. This

year, several roads have laid A. R. A. sections of rail, with a

view of determining the relative merits of the respective sections.

These rails have been in the track so short a time that we are not

justified in drawing any conclusions as to which of the A. R. A.

types, 'A' or 'B,' or if either, is better than the A. S. C. E.

sections.

"_Bulletin No. 116_, issued October, 1909, gives the statistics for

rail failures for six months from October 31, 1908, to April 30,

1909, as reported to the Committee. These statistics do show that

the difference in section can be entirely annihilated by difference

in chemical composition and by the treatment in furnace and mill.

"The results so far obtained from the heavy base A. R. A. sections

are disappointing, as we have received some rail from the mills of

the new section which was as bad as we did with the old

A. S. C. E. section, showing that the quality of the rail does not

depend entirely upon the section.

"The tests to be inaugurated by the Committee, combined with the

results of the tests at Watertown and the performance of the rail

in the track, will give us valuable data to aid us in coming to a

final conclusion."

A careful study of the results already obtained, on both Bessemer and

open-hearth steel rails, indicates that the next necessary step will be

the use of a much heavier rail, and I think the sooner this is admitted

and trial lots of say 1,000 tons each of 110-lb., 120-lb. and 130-lb.

rails rolled, of Bessemer and open-hearth steel, and put in service

under the most severe conditions, the sooner we will get rid of the

present difficulties with our rails.

Transactions of the American Society of Civil Engineers, Vol. LXX, Dec. 1910 Final Report of Special Committee on Rail Sections, Paper No. 1177 · 第 6 / 8 题