2. Plane off the groove of one piece and nail it on the top of the
frame, so that the smooth edge and the ends project 1" over the front
side and ends of the cabinet.
3. Nail the rest of the flooring on for the top, being sure that each
joint matches tightly. The last piece must also project 1" over the back
side.
Casing: