FIG. 4]

=15. Freight Elevators.=—Freight elevators are either corner-guided

or side-guided, the preference being for the latter, as they are

more easily constructed and adjusted, and during the construction of

the elevator shaft it is usual to build into the brickwork blocks of

wood about the thickness of a brick and of sufficient length for the

attachment of the guides. These are cut wedge-shaped on the ends, so

as to hold more firmly in the brickwork. A diagrammatic plan of a

side-guided and corner-guided elevator is illustrated in Fig. 4 (_a_)

and (_b_), respectively.

Owing to the fact that it is necessary to have considerable hoisting

mechanism, at the head of the elevator shaft, the shaft is extended

above the roof, sometimes as much as 5 or 6 feet, for the minimum

height from the elevator platform at the top floor level to the under

side of the beams carrying the mechanism is about 16 feet, and the

sheaves carrying the rope and other mechanism at the top of the shaft

require several more feet.

=16. Elevator-Shaft Windows.=—Frequently, elevator shafts are lighted

with windows. Where such windows open into the building, they must be

constructed with metallic frame and wire glass; but where they open

outside of the building it is not necessary to do this. Where elevator

shafts are lighted from the top, metallic skylights glazed with heavy

glass should be provided. It is not considered such good practice to

use wired glass for this glazing, the idea being that in case of fire,

as each floor is cut off from the elevator shaft with fireproof doors,

vent may be had from the skylight at the top of the shaft when the

glass is broken, and some of the municipal and state laws stipulate

that the skylight at the top of an elevator shaft shall not be less

than two-thirds the area of the shaft.

As there is some mechanism on the bottom of the elevator platform and

at the foot of the shaft, it is necessary to sink the shaft at least 3

feet below the basement floor level, provided that the elevator runs to

the basement floor.

Hardware, estimating, and mill design · 第 173 / 194 题