LABOR

Labor, assumed to be one-fourth cost of all materials

= $584.15 × .25 = $146.04

_Summary_

Fixtures $315.00

Water-supply system 84.00

Drainage 185.15

Labor 146.04

-------

Total cost of plumbing $730.19

Hardware, estimating, and mill design · 第 160 / 194 题