Mix Mortar Thoroughly

Start the first course of stones about three inches from the board form

and fill in the space between with mortar. The correct mixture for this

mortar is six parts of clean sand to one part of cement. After a little

experimentation you will find the correct consistency, but be sure that

it is well mixed. As one expert says, “Mix the stuff with your hoe until

your back is broken and then mix it some more.” Wet the stones

thoroughly before setting in the mortar.

The end of each stone should be firmly bedded in the mortar, and as soon

as several courses of rock have been laid, tamp the mortar well down.

Small pieces of rock may be pushed into the mortar if you wish to make

it go farther.

When you build your wooden form, of course you put up the door and

window frames. They can’t be cut out of the walls afterward as with a

log cabin. Drive numerous long spikes into the outer surfaces of these

frames. This gives you something to “tie” to when you reach that height

with your masonry.

Building a stone house is slow work, and since you’ll have to leave your

work at times, remember that all mortar that has been laid the day

before must be thoroughly wet before fresh mortal is applied on top of

it. And the entire walls ought to be wet down at least twice daily for a

week or more after completion.

When you have reached the top course of stones, set in a row of threaded

iron bolts two feet apart and long enough to allow three inches of the

threaded end to stick up. On these you must bolt 2×4’s, so that you have

something to nail the rafters to.

[Illustration: Window and door frames are set into the masonry as it

proceeds, with long spikes protruding to “tie” them firmly.]

2″×6″ WINDOW FRAME

SPIKES TIE FRAME TO MASONRY

When the walls have set, remove the interior wooden forms and go over

the inside walls to fill up any air holes. These are not important

unless they are too large. The rest of the job is done just as in

finishing any other house. You’ll probably want to cover the interior

with some material, because concrete is pretty cold and might remind

someone of the time he was arrested for speeding.

The cost of a stone house depends on the amount of material you can find

lying around the neighborhood and the cost of labor. Some stone cabins,

with most of the labor hired, have been built for approximately $2.50

per square foot of floor space. This includes labor, materials,

built-ins, electrical wiring and fixtures, and plastered walls. If you

find it necessary to hire skilled stone masons or to transport your

material considerable distance, the cost will be higher. You can, of

course, lower it by doing a larger amount of the work yourself.

Remember that stone work is slow work, so allow yourself plenty of time.

The first course or so of stone will drop into place pretty fast, but

don’t forget that Rome was not built in a day—and Rome was built of

stone.

For making colored concrete, for floors, hearths, etc., a topping

containing the color is put on over the previously-poured base. This

topping consists of _five gallons_ of water per sack of cement, _one_

cubic foot of sand and 1½ cubic feet of coarse aggregate. You may use

factory-colored cement, or mix it on the job by passing the dry cement

and coloring matter through a screen with a ⅛-inch mesh until well

mixed.

An excellent treatment for colored concrete is to rub the surface

thoroughly with equal parts of paraffin oil and benzine. This closes the

pores and brings out the color uniformly.

In considering such permanent types of construction as stone, the great

advantage of concrete should not be overlooked. Walls of this material

are poured between wood, plywood or metal forms in the manner previously

described for foundation walls.

Perhaps you object because the finished structure would not be “in

keeping” with a woods atmosphere. But one method is possible whereby a

facing of natural stone backed by poured concrete combines the

advantages of concrete with a stone house “look.” This is called a Flagg

Masonry Wall after its originator, Ernest Flagg, New York architect. The

illustration shows the method of pouring such a wall.

For a beach house the smooth, modern lines of the concrete walls are

quite appropriate for the clean, clear atmosphere of a beach site.

Concrete is fireproof, termite proof, requires little or no maintenance,

and is not subject to decay. In a house that is often not in use, like a

beach or mountain retreat, the value of a material of these

characteristics is obvious.

[Illustration: This is a detailed plan of the Flagg masonry wall,

showing forms, concrete fill and outer covering of stonework.]

FURRING STRIPS

LATH & PLASTER, OR ONE OF THE PLASTERBOARDS, OR PLYWOOD

FORM LUMBER OR PLYWOOD

CONCRETE

STONE

Sunset's Cabin Plan Book · 第 25 / 54 题