In the beginning of 1862, Mr. Lee, of the firm of Lee and Larned, of

New York, brought over a land steam fire-engine to be placed in the

International Exhibition. This was worked in public at Hodges'

Distillery on the 24th of March previous to the opening of the

Exhibition.

Shand and Mason supplied the London Fire Brigade in April, 1862, with

the eighth land steam fire-engine of their construction. Messrs.

Merryweather and Sons, of London, placed their first land steam

fire-engine in the International Exhibition of 1862, but this, like

the ninth by Shand and Mason, was not in time for the opening, and

consequently could not compete for a prize medal, which was awarded to

Lee and Larned, of New York.

A public trial, however, took place before the jury of the Exhibition,

of which the following is an account extracted verbatim from the

jurors' published reports:--

INTERNATIONAL EXHIBITION, 1862.

SPECIAL JURY FOR FIRE-ENGINES.

J. F. BATEMAN, F.R.S., _London_; Civil Engineer.

CAPT. BENT, _London_; Superintendent of Fire Arrangements in the

Exhibition.

W. M. BROWN, _London_; Superintendent of Westminster Fire Brigade.

EARL OF CAITHNESS, _London_.

J. HAWKSHAW, _London_; Civil Engineer.

C. JENNY, _Austria_; Councillor of Mines in the Imperial Royal Academy

of Mines at Schemnitz.

P. LUUYT, _France_; Engineer to the Imperial Commissioners of Mines.

J. E. McCONNELL, _Wolverton_; late Locomotive Superintendent of the

London and North Western Railway.

O. PIHL, _Norway_; Civil Engineer.

W. M. RANKINE, _Glasgow_; Professor of Mechanics in the University of

Glasgow.

CAPT. SHAW, _London_; Superintendent of the London Fire Brigade.

DUKE OF SUTHERLAND, _London_.

F. B. TAYLOR, _United States_; Mechanical Engineer.

H. THOMAS, _Zollverein_; Manufacturer.

H. TRESCA, _France_; Professor of Mechanics, President of the French

Institute of Civil Engineers.

REPORT OF THE SPECIAL COMMITTEE OF CLASS VIII. ON FIRE-ENGINES.

_After detailing the Trials of Hand-worked Fire-Engines, the Report

states that_,--

The Committee next proceeded to take the necessary steps for trying

the steam fire-engines on the 1st of July, and, as before, invited the

engine builders to a preliminary meeting, that they might receive full

information as to the rules and regulations to be observed.

In compliance with this invitation, the following engine-makers

attended a meeting on the 28th of June, viz:--

Mr. Lee, of the firm of Lee and Larned, Novelty Iron-works,

New York.

Messrs. Merryweather and Son.

Messrs. Shand and Mason.

Mr. Lee declined to produce his steam fire-engine for trial, alleging

various reasons for so doing, and though strongly urged, persisted in

his resolution, and declined the contest.

Messrs. Merryweather and Son expressed themselves ready to produce

their steam fire-engine on the appointed day.

Messrs. Shand and Mason informed the Committee that the engine which

they had intended to work would not be ready owing to an accident, but

requested permission to produce for trial two steam-engines made by

them for the London Fire-Engine Establishment, although they were not

in the Exhibition. All the arrangements having been made for trying

several engines together, the Committee granted this request, as

otherwise only one engine would have been present, and a complete

table of results could therefore not have been obtained.

The Committee assembled in the appointed place at eight o'clock on the

morning of the 1st of July, and found three engines present, viz., one

of Messrs. Merryweather and Son and two of Messrs. Shand and Mason.

After the Committee had examined the boilers and machinery generally,

the engine-makers filled their respective boilers with cold water from

the river, and fires having been laid, the three were lighted at the

same moment, and the makers were ordered to commence working into a

tank at sixty feet distance as soon as they had attained a steam

pressure of 100 lbs. to the square inch.

Messrs. Merryweather's engine attained the pressure named in 12

minutes 10 seconds, Messrs. Shand and Mason's large engine in 18

minutes 30 seconds, the small engine in about 30 minutes, some

mismanagement having occurred which compelled them to draw the fire in

the latter and light it a second time. Messrs. Merryweather's engine

commenced working as arranged when the steam-gauge indicated a

pressure of 100 lbs., and was 2 minutes and 50 seconds at work before

water passed through the nose-pipe. Notwithstanding this very serious

defect, this engine had poured 500 gallons of water into a tank 60

feet distant in 17 minutes and 15 seconds from the time at which the

fire was lighted. After the difficulty of drawing the water had been

surmounted, this engine worked well, and threw an admirable jet,

losing 15 lbs. steam-pressure during the first trial. After three

trials this engine became disabled; it was, however, repaired on the

ground in about an hour and a half, and resumed work at the ninth

trial, continuing to work well until the thirteenth, when it became

again disabled, and was withdrawn by the maker, to the great regret of

the Committee, who were thus left to continue the experiments with

only two engines, both made by one firm.

Messrs. Shand and Mason's large engine was 18 minutes 30 seconds

getting up steam to 100 lbs., and when started drew water instantly,

losing during the first trial 5 lbs. of steam-pressure.

This engine was severely tested, and worked without accident

throughout the day, the seventeenth trial lasting no less than 63

minutes, during which the steam and water were both kept to a pressure

of 90 lbs. on the square inch throughout, working through a 1-3/8 inch

nose-pipe.

At the eighteenth and last trial this engine threw a good vertical

jet.

Messrs. Shand and Mason's small engine did not raise the steam to 100

lbs. in less than 30 minutes, owing, of course, partly to the

mismanagement already mentioned, and partly to the nature of the

boiler and fire-box, which, according to the makers' account, are not

adapted for raising steam in the shortest possible time. After the

engine got to work the steam-pressure was well sustained, and the

engine continued working the entire day without accident, concluding

in the evening by throwing a good vertical jet.

During the time occupied by the trials the direction of the wind was

W.N.W. to W. by N., pressure 2-1/2 to 4-1/2 lbs. on the square foot.

The barometer stood at 29.97 inches.

_Summary._

On the whole the Committee find as follows:--

Messrs. Merryweather and Son have produced, at a price of 700_l._, a

steam fire-engine, weighing, according to the makers' account, 65

cwt., with jets and lamps, but without water, coal, suction-pipes,

hose, or other gear, and capable, if no accidents occur, of throwing

in an available stream the following average quantities of water per

minute:--

Distance. Angle. Quantity.

61 feet. 10 deg. 230 gallons.

85 " 21 deg. 124 "

Messrs. Shand and Mason have produced an engine, at a cost of 650_l._,

weighing, according to their statement, 55 cwt., with jets and lamps,

but without water, coals, suction-pipes, hose, or other gear, and

capable of throwing in an available stream the following average

quantities of water per minute:--

Distance. Angle. Quantity.

61 feet. 10 deg. 250 gallons.

63 " 18 deg. 165 "

82 " 14 deg. 172 "

85 " 21 deg. 137 "

102 " 11 deg. 94 "

104 " 17 deg. 19 "

Messrs. Shand and Mason have also produced, at a price of 370_l._, an

engine which, under the same conditions, weighs 35 cwt., and is

capable of throwing in an available stream the following average

quantities per minute:--

Distance. Angle. Quantity.

61 feet. 10 deg. 142 gallons.

63 " 18 deg. 133 "

82 " 14 deg. 56 "

85 " 21 deg. 27 "

The best performance during the five trials from which this last

average was taken being forty-six gallons, and the lowest five gallons

per minute.

At greater distances, in consequence of the wind, this engine could

not deliver a stream, but continued working without accident

throughout the day, and concluded in the evening by throwing a good

vertical jet.

SUTHERLAND, CHAIRMAN.

E. M. SHAW, HON. SEC.

* * * * *

Shand and Mason's tenth land steam fire-engine was supplied to the

London Brigade in June, 1862, and their twelfth, in February, 1863,

upon orders given on the 4th January, 1862. But as the Committee of

the London Fire Brigade were now negotiating with Government to take

the duty of extinguishing fires off their hands, no orders for

steam-engines were given out by them after the above date.

* * * * *

STEAM FIRE-ENGINE COMPETITION,

CRYSTAL PALACE, LONDON, 1863.

Towards the close of 1862, several engineers and other gentlemen

interested in the improvement of steam fire-engines, offered prizes to

be awarded at competitive trials to take place in London. The

following is the Committee's published account of these trials which

were held in the grounds of the Crystal Palace Company on the 1st,

2nd, and 3rd July, 1863.

The Committee consisted of the following gentlemen, viz.:--

_Chairman._

HIS GRACE THE DUKE OF SUTHERLAND.

_Members._

THE RIGHT HON. THE EARL OF CAITHNESS.

LORD RICHARD GROSVENOR, M.P.

J. G. APPOLD, ESQ.

J. T. BATEMAN, ESQ.

W. M'BROWNE, ESQ.

T. R. CRAMPTON, ESQ.

W. M. CROSSLAND, ESQ.

W. FAIRBAIRN, ESQ.

T. HAWKSLEY, ESQ.

J. E. McCONNELL, ESQ.

HENRY MAUDSLAY, ESQ.

J. MATHEWS, ESQ.

J. NASMYTH, ESQ.

J. PENN, ESQ.

WILLIAM SMITH, ESQ.

_Hon. Sec._

CAPTAIN E. M. SHAW.

The engines were divided into two classes, the large class consisting

of those weighing over 30 cwts., and not exceeding 60 cwts. and the

small class of those not exceeding 30 cwts.

The prizes offered were 250_l._ for the best engine, and 100_l._ for

the second best, in each class.

The chief points to which the Committee directed their attention, in

addition to the consideration of cost and weight, were those relating

to the general efficiency of the machines as fire-engines, combining

among other points of excellence--

Rapidity in raising and generating steam.

Facility of drawing water.

Volume thrown.

Distance to which it can be projected with the least amount of loss.

Simplicity, accessibility, and durability of parts.

LARGE CLASS.

FIRST TRIAL.

Delivering 1000 gallons into a tank at a true distance of 67 feet, and

27 deg. from the horizon. Depth from which water was drawn, 4 feet 6

inches. The water in the boiler being cold when the signal was given

to commence, each engine commencing to work on attaining steam

pressure of 100lb. to the square inch.

+---+-----------------+--------------+----------+---------+--------+

| | | | Time of | Time of | |

|No.| MAKER. | Weight. | raising | filling | Total |

| | | | Steam to | Tank. | Time. |

| | | | 100lbs. | | |

+---+-----------------+--------------+----------+---------+--------+

| | | T. c. q. lbs.| ' " | ' " | ' " |

| 1 | Easton & Amos, | 2 18 3 12 | 13 14 | 6 16 | 19 30 |

| | London | | | | |

| | | | | | |

| 2 | Merryweather & | 2 18 0 8 | 10 25 | 9 42 | 20 7 |

| | Son, London | | | | |

| | | | | | |

| 3 | Shand & Mason, | 2 17 1 0 | 10 51 | 12 19 | 23 10 |

| | London | | | | |

| | | | | | |

| 4 | Butt and Co., | 2 14 0 4 | 16 30 | 6 48 | 23 18 |

| | United States | | | | |

| | | | | | |

| 5 | Roberts, London | 1 19 1 4 | 11 40 | 20 24 | 32 4 |

| | | | | | |

| | | | |

| | Nichols | 2 10 1 4 | Did not work. |

| | (Manhattan) | | |

| | United States | | |

| | | | |

| | Gray & Son, | 1 18 1 4 | Did not work. |

| | London | | |

+---+-----------------+--------------+----------+---------+--------+

MERRYWEATHER AND SON began to work at 100 lbs., fell directly to 40

lbs., and continued so throughout; stopped and steam rose to 130 lbs.

SHAND AND MASON--Suction-pipe choked; left off working about 2

minutes.

SECOND TRIAL.

Delivering 1000 gallons into tank at same distance commencing with

full steam.

+-----+--------------------+------------+--------+---------+

| | | Steam at | Steam | Time of |

| No. | NAME. | Beginning. | during | filling |

| | | | Work. | Tank. |

+-----+--------------------+------------+--------+---------+

| | | | | ' " |

| 1 | Shand & Mason | 100 | | 3 0 |

| | | | | |

| 2 | Butt & Co. | 100 | | 3 3 |

| | | | | |

| 3 | Merryweather & Son | 145 | | 3 7 |

| | | | | |

| 4 | Roberts | 80 | | 12 30 |

+-----+--------------------+------------+--------+---------+

Roberts did not fill the tank.

THIRD TRIAL.

Delivering into large tank at a horizontal distance of 40 feet, a

vertical height of 40 feet, a true distance of 56 feet, and at an

angle of 45 degrees from the horizon, the depth from which water was

drawn being 16 feet 4 inches.

Key:

A--No. of Deliveries Open.

B--Length of Hose.

C--Average Steam Pressure.

D--Average Water Pressure.

E--No. of Gallons Delivered.

+-----+-----------+---------+---+---+--------+----+----+-------+-------+

| | | | | |Size of | | | |Time of|

|No.| Name. | Time. | A | B |Nozzle. | C | D | E |Raising|

| | | | | | | | | |Steam. |

+---+-------------+---------+---+---+--------+----+----+-------+-------+

| | |hr. m. s.| | | | | | | |

| 1 | Merryweather| 1 24 55 | 2 |440| 1-1/2 | 91 | 89 |16,086 |10' 32"|

| | & Son | | | | | | | | to |

| | | | | | | | | | 80lbs.|

| | | | | | | | | | |

| 2 | Shand | 2 0 0 | 2 |440| 1-1/2 &| 96 | 62 |12,917 |11' 21"|

| | & Mason | | | | 1-3/8 | | | | to |

| | | | | | | | | |120lbs.|

| | | | | | | | | | |

| 3 | Roberts | 2 0 0 | 1 |420| 1-1/4 | 75 | 75 | 9,936 |11' 20"|

| | | | | | | | | | to |

| | | | | | | | | | 80lbs.|

| | | | | | | | | | |

| 4 | Butt & Co. | 0 46 50 | 2 |440| 1-1/2 | 78 | 78 | 8,280 |14' 10"|

| | | | | | | | | | to |

| | | | | | | | | | 45lbs.|

| | | | | | | | | | |

| 5 | Easton & | 1 32 35 | 2 |440| 1-3/8 | 98 | 41 | 3,036 |12' 30"|

| | & Amos | | | | | | | | to |

| | | | | | | | | | 90lbs.|

| | | | | | | | | | |

| 6 | Nichols | 0 4 55 | 2 |420| 1-1/2 | -- | -- | None. |13' 09"|

| | (Manhattan) | | | | | | | | to |

| | | | | | | | | | 45lbs.|

+---+-------------+---------+---+---+--------+----+----+-------+-------+

MERRYWEATHER AND SON--Fire lighted at 4h. 1m. 55s.; gauge moved at 4h.

8m. 20s.; engine started at 4h. 12m. 27s.; water drawn in about 10

revolutions; pumps not primed, valve box leaked slightly, and engine

worked satisfactorily in every respect.

SHAND AND MASON--Fire lighted at 11h. 25m. 46s.; gauge moved at 11h.

32m. 53s.; engine started at 11h. 37m. 7s.; pump primed at 11h. 45m.

48s.; drew water at 11h. 47m.; water first through the nozzle at 11h.

48m. 59s.; in hood at 11h. 49m. 19s.; shifted nozzle (3-1/4m. delay);

high wind.

ROBERTS--Fire lighted at 11h. 17m.; engine, started at 11h. 28m. 20s.

BUTT AND CO.--Fire lighted at 5h. 55m. 10s.; started engine at 6h. 9m.

20s.; repeatedly stopped from slide valves not acting, and stopped

entirely at 6h. 46m., from cylinder cover breaking.

EASTON AND AMOS--Fire lighted at 2h. 2m. 35s.; gauge moved 2h. 10m.;

started engine at 2h. 15m. 5s.; pumps primed, worked till 2h. 54m.

5s.; stopped to shift plungers; went to work again, and stopped

entirely at 3h. 35m. 10s., from two fire bars falling out.

NICHOLS (Manhattan)--Fire lighted at 10h. 51m. 14s.; gauge moved at

10h. 59m. 20s.; drew water directly; steam up to 140lbs. at 11h. 8m.

45s.; stopped two minutes; started again; made a few revolutions, and

fly-wheel broke.

FOURTH TRIAL

Vertical Jet against Tower.

+-----+--------------------+---------+-----------------+

| No. | Name. | Size | Greatest Height |

| | | of Jet. | Thrown. |

+-----+--------------------+---------+-----------------+

| 1 | Shand & Mason | 22/16 | 180 ft. |

| | | | |

| 2 | Merryweather & Son | 26/16 | 180 ft. |

| | | | |

| 3 | Roberts | 14/16 | 150 ft. |

| | | | |

| 4 | Lee & Co | 21/16 | 55 ft. |

+-----+--------------------+---------+-----------------+

GRAY'S engine lighted fire at 7h. 7m. 40s.; steam 9lbs. at 7h. 17m.

0s.; got to work at 7h. 23m. 40s. to blow fires; at 7h. 27m. 0s. water

through hose. Owing to some of the pipe connected with the steam gauge

breaking, no further experiments could be made.

SMALL CLASS.

FIRST TRIAL.

Delivering 1000 gallons into a tank at a true distance of 50ft. and

37 deg. from the horizon. Depth from which water was drawn, 4ft. 6in. The

water in the boilers being cold when the signal was given to commence,

each engine commencing to work on attaining steam pressure of 100lbs.

to the square inch.

+---+---------------+---------------+-----------+---------+--------+

| | | | Time of | Time of | |

|No.| Name. | Weight. | raising | filling | Total |

| | | | Steam | Tank. | Time. |

| | | | to 100lbs.| | |

+---+---------------+---------------+-----------+---------+--------+

| | | T. c. q. lbs.| ' " | ' " | ' " |

| 1 | Shand & Mason | 1 9 2 0 | 11 36 | 5 24 | 17 0 |

| | | | | | |

| 2 | Lee & Co | 1 10 0 0 | 11 55 | 6 3 | 17 58 |

| | | | | | |

| 3 | Merryweather | 1 10 1 12 | 12 15 | 9 14 | 21 29 |

| | & Son | | | | |

+---+---------------+---------------+-----------+---------+--------+

Owing to a broken bolt, there was great leakage in water cylinder of

Lee and Co's. engine.

SECOND TRIAL.

Delivering 1000 gallons into tank at same distance, commencing with

full steam.

+-----+--------------------+------------+--------+---------+

| | | Steam | Steam | Time |

| No. | Name. | at | during | filling |

| | | Beginning. | Work. | Tank. |

+-----+--------------------+------------+--------+---------+

| | | | | ' " |

| 1 | Shand & Mason | 85 | -- | 5 49 |

| | | | | |

| 2 | Lee & Co. | 125 | -- | 5 50 |

| | | | | |

| 3 | Merryweather & Son | 100 | -- | 6 17 |

+---------------------------------------+--------+---------+

The leakage in Lee and Co's. engine was remedied.

THIRD TRIAL.

Delivering into large tank, commencing with Full Steam. At a

horizontal distance of 40ft., a vertical height of 40ft., a true

distance of 56ft., and at an angle of 45 deg. from the horizon; the depth

from which water was drawn being 16ft. 4in.

Key

A--Number of Deliveries open.

B--Average Steam Pressure.

C--Average Water Pressure.

D--No. of Gallons Delivered.

+--------------+---+---------+---+--------+---------+-----+----+------+

| | | | | Length | Size of | | | |

| Name. |No.| Time. | A | of | Nozzle. | B | C | D |

| | | | | Hose. | | | | |

+--------------+---+---------+---+--------+---------+-----+----+------+

| | | h. m. s.| | | in. | | | |

| Shand & | 1 | 1 0 0 | 1 | 420 | 1 & | 146 | 80 | 8142 |

| Mason | | | | | 1-1/4 | | | |

| | | | | | | | | |

| Merryweather | 2 | 1 0 0 | 1 | 420 | 7/8 | 86 | 45 | 4885 |

| & Son | | | | | | | | |

| | | | | | | | | |

| Lee & Co. | 3 | 1 0 0 | 1 | 420 | 3/4 | 80 | 60 | 4278 |

| | | | | | | | | |

+--------------+---+---------+---+--------+---------+-----+----+------+

SHAND AND MASON--Steam ready at 150 lbs.; started at 7h. 3m. 32s.;

stopped at 7h. 12m. 5s. to put on an additional length of hose; worked

well throughout.

MERRYWEATHER AND SON--Steam ready at 110 lbs.; commenced work at 3h.

43m. 30s.; pumps primed.

LEE AND CO.--Steam ready, started at 2h. 1m. 0s.; worked well, without

any stoppage.

AWARDS.

At a meeting of the Committee held on the 8th July, 1863, his Grace

the Duke of Sutherland in the Chair, the following prizes were

awarded:--

LARGE CLASS.

Messrs. Merryweather & Sons, 1st Prize, 250_l._

Messrs. Shand & Mason 2nd Prize, 100_l._

Mr. W. Roberts, highly commended.

SMALL CLASS.

Messrs. Shand & Mason 1st Prize, 250_l._

Messrs. W. Lee & Co. 2nd Prize, 100_l._

(Signed) On behalf of the Committee,

SUTHERLAND, CHAIRMAN.

E. M. SHAW, HON. SEC.

From the above trials it was found that the first prize large-class

engine weighed 6504 lbs., and delivered in one hour 11,366 gallons,

being at the rate of 196 gallons for each hundred-weight of the

engine; while the first prize small-class engine delivered in the same

time 8142 gallons, or 276 for each hundred-weight of the engine,

showing that the latter engine delivered nearly one-half more water in

proportion to its weight, than was delivered by the large one, the

conditions of the two trials being the same.

As the greatest amount of power in the smallest possible bulk and

weight, was considered most available for use at London fires, the

Committee of the London Fire Brigade, although not in a position, for

the reasons already stated, to purchase additional steam fire-engines,

commenced hiring Shand, Mason, and Co.'s prize engines, and at the

close of 1865 had four such in use in this manner.

The Metropolitan Fire Brigade, an extension of the late London Fire

Brigade, has now (May, 1866) the following steam fire-engines in

use:--The Floating Steam Fire-engine, by Shand and Mason, in 1855; a

Land Steam Fire-engine by Easton and Amos, which was worked at the

Crystal Palace trials, and is now used in a barge as a floating

engine; one by Roberts, which was also worked at the Crystal Palace;

three by Merryweather and Sons; and fifteen of Shand, Mason, and Co.'s

Land Steam Fire-engines.

METROPOLITAN FIRE BRIGADE.

The disastrous results of the great fire at Tooley-street, in 1861, at

which Mr. Braidwood lost his life, fully demonstrated the inadequacy

(in men and appliances) of the fire brigade supported by the insurance

offices, and as these bodies declined extending their establishment so

as to meet the wants of the whole of the metropolis, a Parliamentary

inquiry was instituted, which resulted in the passing of the following

Act:--

ANNO VICESIMO OCTAVO & VICESIMO NONO

VICTORIAE REGINAE.

CAP. XC.

An Act for the Establishment of a Fire Brigade within the

Metropolis. [5th July, 1865.]

WHEREAS it is expedient to make further provision for the

protection of life and property from fire within the

metropolis: Be it enacted by the Queen's most Excellent

Majesty, by and with the advice and consent of the Lords

Spiritual and Temporal, and Commons, in this present

Parliament assembled, and by the authority of the same, as

follows:

_Preliminary._

1. This Act may be cited for all purposes as the

"Metropolitan Fire Brigade Act, 1865."

2. For the purposes of this Act the "Metropolis" shall mean

the City of _London_ and all other parishes and places for

the time being within the jurisdiction of the Metropolitan

Board of Works:

"Insurance Company" shall include any persons corporate or

unincorporate, or any person carrying on the business of

fire insurance.

3. The expression "Metropolis Local Management Acts" shall

mean the Acts following; that is to say, "The Metropolis

Management Act, 1855," "The Metropolis Management Amendment

Act, 1856," and "The Metropolis Management Amendment Act,

1862."

_Establishment and Duties of Fire Brigade._

4. On and after the first day of _January_ one thousand

eight hundred and sixty-six the duty of extinguishing fires

and protecting life and property in case of fire shall

within the metropolis be deemed for the purposes of this Act

to be entrusted to the Metropolitan Board of Works; and with

a view to the performance of that duty it shall be lawful

for them to provide and maintain an efficient force of

firemen, and to furnish them with all such fire engines,

horses, accoutrements, tools, and implements as may be

necessary for the complete equipment of the force, or

conducive to the efficient performance of their duties.

5. The said Board, hereinafter referred to as the Board, may

take on lease, purchase, or otherwise acquire stations for

engines, stables, houses for firemen, and such other houses,

buildings, or land as they may think requisite for carrying

into effect the purposes of this Act, and may from time to

time sell any property acquired by or vested in them for the

purposes of this Act:

The Board may also contract with any company or persons

authorized to establish the same for the establishment of

telegraphic communication between the several stations in

which their fire engines or firemen are placed, and between

any of such stations and other parts of the metropolis.