CHAPTER VI. THE BATTLE OF ELLESMERE.

"_The question of a railway is now or never_."--THE LATE MR. R. G.

JEBB, of Ellesmere.

No period, since the wild days of the "railway mania," was more pregnant

of schemes than the later months of 1860. They sprang up like mushrooms

all along the Shropshire border, and some of them, like mushrooms, as

suddenly suffered decay. A facetious Salopian prophet ventured publicly

to predict that "we shall hear next of a railway to Llansilin (a remote

village among the border hills) or the moon." His ratiocination was

hardly exaggerated. A "preliminary prospectus" was actually published

for carrying a railway, at a cost of under 10,000 pounds per mile, from

Shrewsbury, through Kinnerley and Porthywaen, thence "near Llanfyllin and

Llanrhaiadr," to Llangynog, "through the Berwyn hills" to Llandrillo, and

so to Dolgelley and Portmadoc. It was to be worked and maintained by the

West Midland, Shrewsbury and Coast of Wales Railway Co.; the prospects of

mineral and passenger traffic were "most promising," and throughout its

entire length of 90 miles, the promoters pointed out with all the

emphasis which italics can afford, "it has _only one tunnel_, and that

slightly exceeding a mile and half in length." Eventually, a line,

partly following this route, under the less comprehensive title of the

West Shropshire Mineral Railway, and later known as "the Potteries,"

constructed from a station in Abbey Forgate, Shrewsbury, to Llanymynech,

and on to Nantmawr, with a branch from Kinnerley to Criggion, ran for a

time, then fell into abeyance and disrepair, and was in recent years

re-opened under the Light Railways Act as the Shropshire and

Montgomeryshire Railway, an independent company.

But, in its original form, the undertaking was apparently to be no

friendly competitor with the existing Oswestry and Newtown and associated

lines, whose ambition it had, for some time, been to extend its northern

terminus, resting on the Great Western branch at Oswestry, through

Ellesmere to Whitchurch, there to form a more serviceable junction with

the London and North Western from Shrewsbury to Crewe, and the busy hives

of Lancashire. But more formidable opposition was already afoot

elsewhere. The Great Western, none too eager, as we have seen, to assist

independent undertakings in Montgomeryshire, were ready enough to capture

traffic in other quarters, and their answer to the Oswestry and

Whitchurch project was to formulate a scheme for a branch from Rednal to

Ellesmere, with incidental hints about constructing a loop to place

Oswestry on their main line. Draughtsmen were busy everywhere with pens

and plans. Public halls echoed to the optimistic eloquence of promoters

and counter promoters, and powder and shot was being hurriedly got

together for the tremendous fusilade in the Parliamentary committee

rooms, where, for many a long day, there was to rage and sway the battle

for the rights and privileges of bringing the steam engine into the

little town of Ellesmere.

For, though wider schemes were involved in the struggle, Ellesmere was

the pivot on which arguments and contentions centred. In such a

conflict, needless to say, all the old rivalries of "leviathan"

interests, of which we have already heard so much, re-emerged. What was

still called the "Montgomeryshire party"--the men who had brought the

other local railways into existence in spite of well-nigh overwhelming

difficulties--continued to look for association with the North Western

for greater salvation. Others favoured the chance of obtaining increased

facilities for through traffic from the Great Western. Between the two

warring elements, Ellesmere itself, as one of its most estimable and

influential citizens had put it, believed it was "now or never" for them.

In the Parliamentary Committee Rooms, where the evidence occupied

thirteen days, and counsels' speeches several more, the two projects were

stubbornly fought out. Great Western witnesses came forward to aver

that, owing to the haste with which the Shrewsbury and Chester Railway

had been projected, Oswestry had been left too much in the lurch, and the

time was now come for reconsideration of its claims to be brought on to

the main line. Mr. Sergeant Wheeler, with all the command of forensic

eloquence, drew visions of the Shropshire market town as "a great central

place of meeting for the people all round." All that was necessary was

to build a line from Oswestry to Rednal, and then the projected branch

from Rednal to Ellesmere, and Rednal itself might become a second Rugby

or Crewe; who could tell? As to the continuation of such a line from

Ellesmere to Whitchurch, true, Paddington was not enthusiastic, but when

they found that that was the price demanded for any measure of local

support, they were ready to pay it.

In Oswestry there was, naturally enough, a general approval of any step

which would place the town on the Great Western main line, and no small

point was made of the fact that it would be better to have one station

than two. Moreover, Mr. R. J. Croxon. whose words were weighted with the

influence of a family solicitor, private banker and town clerk, was of

opinion that, apart from anything else, to carry a line, as Mr. Whalley

proposed, for two miles by the side of the turnpike to Whittington would

be "very dangerous to people driving along," and the attention of the

Trustees ought to be called to it. But, unfortunately for Mr. Croxon and

those who shared his fears in this regard, it was the business of the

local surveyor to examine the plans, and he was "engaged on the other

side." Thus even among Oswestrians was opinion divided between the rival

routes, and men like Alderman Thomas Minshall and Alderman Peploe

Cartwright, who had stood shoulder to shoulder in the fight for

independent interests in the making of the Oswestry and Newtown Railway,

were now inclined to regard each others' sympathies with some suspicion.

Further down the proposed line the weight was thrown rather more

decisively in favour of the Whalley scheme. Whitchurch had petitioned

against the Great Western proposals, though Captain Cust, who gave

evidence for the larger company, was moved to dismiss this effort as the

work of "Captain Clement Hill and lot of ragamuffins." Attempts were

even made to disparage the local undertaking by reference to Mr. Savin,

who had agreed to carry out the line on similar terms of lease already

adopted elsewhere, as a "haberdasher, not in a position to subscribe

millions towards railway projects." In Ellesmere the argument that the

Great Western scheme would bring the agricultural area into close touch

with the North Wales coalfields was quickly answered by the counter-plea

that the independent company could also build a branch from that spot to

Ruabon or Wrexham, and powers to that effect "would be applied for as

soon as what may be called the main line from Oswestry to Whitchurch was

carried." Even the larger landowners through whose estates the rival

engineers had marched with their instruments differed in their point of

approach. Sir John Kynaston, Bart., of Hardwicke, near Ellesmere, who,

as someone said, "if he had been left alone, was willing, like Marcus

Curtius, to sacrifice himself for the public good, was brought and

instructed to give evidence about embankments," one of which, on Mr.

Whalley's line, by the way, it was supposed (though in error) would shut

out his view of the Vale of Llangollen, and "destroy the happiness of his

existence for the remainder of his days." Sir John Hanmer, Bart., M.P.,

on the other hand, was inclined to become rhapsodic. He looked upon a

railway "as a fine work of art," which any painter might be glad to

include in his landscape--only, of course, it must not cut off a landed

proprietor from his woods and his other wild grounds, as the Great

Western scheme proposed to do, and against this he not only objected but

petitioned.

[Picture: The late CAPT. R. D. PRYCE, Chairman of the Cambrian Railways

Co., 1884-1886; The late HON. GEORGE T. KENYON, M.P., First Chairman of

the Wrexham and Ellesmere Railway Co.]

In the end the Committee declared the preamble of the Montgomeryshire

party, for their Oswestry, Ellesmere, and Whitchurch Railway to be

proved, and that of the Great Western not proved, though the Chairman

regretted to add that the finding was not unanimous. In the lobbies

rumour had it that it was, in fact, only arrived at by the casting vote

of that gentleman himself. Be that as it may, it sufficed. Once again

"independent" effort, astutely engineered, had triumphed over the

all-powerful interests of a great and wealthy company, and amongst those

who had hoped and feared and hoped again for the success of the Oswestry

Ellesmere and Whitchurch scheme enthusiasm knew no bounds.

In Ellesmere a great and excited crowd awaited news from London at the

Bridgewater Hotel. They watched for the omnibus from Gobowen, which it

was expected might bear the fateful tidings. But either the omnibus

failed to arrive, or, if it did, it had no intelligence to impart.

Shortly afterwards, however, a special messenger came post haste along

the road from Oswestry, and in a moment the news flashed through the

little town. "Victory"! An attempt was made to ring the bells, but the

churchwarden could not be found, and no one else had authority to pull

the ropes. So that the concourse fell back on the time-honoured

procession, and led by a drum and fife band, and headed by the Bailiffs,

the cheering throng paraded the streets while cannon booming from the

market place startled the countryside for a mile or more around.

Oswestry, assembled in public meeting, put to flight its town clerk's

gloomy prognostications with hilarious speeches, and outside the more

dignified civic circles popular demonstration took still more picturesque

form.

The return of a number of witnesses who had gone up to London to give

evidence against the local scheme and in support of the Great Western was

awaited at the Oswestry station by a hostile crowd. Some delay in their

arrival home was occasioned by an untoward incident even before they

finally left London. Seating themselves in a first-class compartment in

the rear of the train at Paddington, they waited at first patiently and

then impatiently for it to start. At last, unable to understand the

delay, one of them put out his head and asked a passing official when the

train was going. "It _has_ gone" was the laconic reply. The coach which

they had chosen was not attached to the rest of the train, and they were

not so meticulously careful about examining tickets on the Great Western

system as they are to-day. When the belated passengers did eventually

reach Oswestry, the crowd was still there. What was more, they had had

time to organise what was deemed a suitable reception. Among the

witnesses was a gentleman who, it appeared, had at one time been very

short of pence, and, it was alleged, had left his abode without paying

the rent. Somehow or another this little fact had been raked up and a

number of wags had cut the shape of a latch-key out of a sheet of tin.

As he alighted from the train this was dangled before him at the end of a

long pole, with a pendant inscription, "Who left the key under the door?"

The promoters of the new undertaking, of which Mr. George Lewis became

first secretary, with offices in Oswald Chambers, Oswestry, had every

reason for satisfaction. Royal assent was given to their Bill in August,

1861, authorising a capital of 150,000 pounds in 10 pound shares, with

50,000 pounds on loan, the work to be completed within five years. There

were, however, still tough battles to be waged over subsequent efforts to

obtain sanction for certain deviations and extensions, against which the

Great Western continued to fight tooth and nail with a counter-offensive

of their own. No fewer than three distinct schemes were now before the

public, with all sorts of loops and junctions at Rednal or Mile End, near

Whittington, and branches from Bettisfield to Wem, or to Yorton, and from

Ellesmere to Ruabon. But it is an easier task to draw plans on a map

than to carry them out. The Wem branch never matured, the link with

Denbighshire only after many years, and then to Wrexham and not Ruabon.

So far as the main issue was concerned, however, the Great Western again

failed to prove their preamble, and another signal was given for local

rejoicings over the result. Not only at Oswestry and Ellesmere and other

places along the route of the new line, but as far afield as Montgomery

and Llanfyllin, where a branch line of their own was being promoted to

Llanymynech, hats were thrown into the air and healths were drunk to the

victory for local enterprise. Oswestry parish church bells rang for two

days, and the Rifle Corps band blew itself dry outside the houses of Mr.

Savin, Mr. George Owen and others. Mr. Savin himself, returning from

London, during these proceedings, met "with a reception at Oswestry such

as no man ever received before." Carried shoulder high through the

streets of the town, accompanied by a surging throng of cheering

admirers, armed with torches, to the tune of "See the Conquering Hero

comes," he was addressed in congratulatory vein by several of his

fellow-citizens, and it was only when a first and second attempt to fly

from the embarrassment of so tumultuous a welcome had failed, that he

succeeded, on a third, in making his escape. The "small haberdasher,"

who had been deemed incapable of organising railway schemes, had indeed

become something very like a railway king!

But we are anticipating events. At the end of August, 1861, the first

sod had been cut at Ellesmere, where it was proposed to begin the

construction, proceeding first in the direction of Whitchurch. The

ceremony was performed by Sir John Hanmer and Mr. John Stanton, in a

field belonging to Mr. W. A. Provis, "not far from the workhouse," and a

spade and barrow, suitably inscribed, was presented to Sir John by

Messrs. Savin and Ward, the contractors. There was the usual ceremonial,

inclusive of banqueting and speech-making, and banners, emblazoned with

such appropriate mottoes as "Whalley for ever," "Hurrah for Sir John

Hanmer and John Stanton, Esquire," floated in the breeze. One ingenious

gentleman, elaborating the topical theme, had erected a flag which, we

are told, "attracted special attention from its significance and

quaintness," representing a donkey cart with two passengers on one side

and a steam engine and carriages on the other, to personify "Ellesmere of

yesterday," and "Ellesmere of to-day," with the philosophic addendum,

"Evil communications corrupt good manners," "Aye, says the preacher,

every valley shall be raised and every hill shall be brought low." "Aye,

says the teacher, let us bless the bridge that carries us safely over,"

"Aye, aye, quoth honest nature." The application to evil communications

might, in such a connection, be a little ambiguous, but presumably nobody

imagined it to refer to the Oswestry, Ellesmere and Whitchurch Railway!

The allusion to bridges was rather more germane; for, in building the

line towards Whitchurch, which was the first section taken in hand, the

engineers were faced with a bridging problem of a peculiar nature, and

only less in magnitude than that which had confronted the constructors of

the famous Liverpool and Manchester Railway thirty years earlier. Partly

in order to avoid interfering with Sir John Hanmer's property, and partly

because they deemed it the better way, the engineers decided to carry the

line over Whixall Moss, a wide area of bog land lying between Bettisfield

and Fenns Bank. This, it was supposed, might even be drained by making

the railway across its quivering surface, but hopes of this sort were not

to be realised, for it remains to-day a wild, but picturesque stretch of

heather and silver birches, where the peat-digger plies his trade with,

perhaps, as much profit as the farmer would in tilling it. But as to its

power to bear the weight of passing trains the engineers had little

doubt. The canal already crossed it, and though in making soundings the

surveyors once lost their 35 foot rod in the morass, this, was near the

canal bank, and it did not deter them in their efforts to discover a

means of securing the railway from similar disaster. The average depth

of the moss was found to be twelve feet, but there were areas where it

was only nine feet deep, and at most 17 feet, and when the bottom was

reached it was discovered to be sand.

So, proceeding merrily, Mr. George Owen first drained the site of the

line by means of deep side and lateral drains filled with brushwood and

grig. He then laid strong faggots three feet thick and from eight to

twelve feet long, and over these placed a framework of larch poles

extending the entire width of the rails. The poles were then interlaced

with branches of hazel and brushwood and upon this the sleepers and rails

were laid, the whole being ballasted with sand and other light material.

And, in the end it proved a triumph for courage and ingenuity. Though

there might be some slight oscillation, heavy trains have been running

over this interesting two or three mile stretch for many a long year

without the slightest mishap.

Not to be outdone by little Ellesmere, another "first sod" was turned at

Oswestry on September 4th, 1862, by Miss Kinchant of Park Hall, and Miss

Lloyd, daughter of the Mayor of the borough, on the Shelf Bank field,

hard by the existing terminus of the Oswestry and Newtown Railway, with

which the new line was to be connected. The streets were in gala dress,

and while the leading citizens fared sumptuously on the Wynnstay Arms

bowling green, and disported themselves at a "rural fete," tea was served

to "the poorer women of the town and neighbourhood." In addition to the

residents many came from Ellesmere in wagons drawn by a decorated

traction engine,--significant emblem of the new power which was shortly

to bring the two neighbouring and ever friendly places within a quarter

of an hour's distance of each other.

Work now went ahead on both sections of the line, under the personal

supervision of Messrs. Thomas and John Savin and Mr. John Ward, and by

the spring of 1863 the railway was ready for traffic over the eleven

miles between Ellesmere and Whitchurch. The honour of being the first

passengers to make the journey belongs, appropriately enough, to the late

Capt. Jebb and his company of Rifles, who, by courtesy of the

contractors, were driven to Whitchurch on April 20th, a few other friends

accompanying them. The official trial trip was made shortly after, in a

train drawn by "two heavy engines," the "Montgomery" and the "Hero," and

in crossing Whixall Moss, we are told, "the deflection was almost

inappreciable." Captain Tyler was now able to pass the line as entirely

satisfactory, and, early in the morning on the first Monday in May, a

little group of Ellesmerians assembled at their new station to witness

the first regular train leave for Whitchurch. No doubt their hearts

swelled with pride, but beyond the usual exhibition of such emotion as so

notable an event inspired, there was no public acclaim.

Another twelve months were to elapse before the remaining section, from

Ellesmere to Oswestry, was ready for traffic. In July 1864, however,

this link was forged, and the event synchronizing with the completion of

the work at the other end of the chain, from Borth to Aberystwyth, it

threw open the whole length of what was about to become, under the

Consolidation Act, the main line of the Cambrian Railways.

[Picture: Advertisement for the Ceremony of Cutting the First Sod]

CHAPTER VII. THE COAST SECTION.

"_When they saw the Crimean Campaign they seemed about to be engaged

in against the sea, he thought it had been very much to the advantage

of the Welsh Coast line, if, on the formation of the Board the

Directors had been put through a series of questions in early English

history, and if their engineer had been directed to report to them on

the maritime events of the reign of Canute_."--EDWARD, THIRD EARL OF

POWIS.

No Chapter in the story of the Cambrian is more intimately touched with

the spirit of romance, none more prolific of pathetic humour, than that

which concerns what is to-day termed the Coast Section. For the moment,

however, all was sunshine and success. The continuation of the line from

Borth to Aberystwyth was completed for traffic, as we have just seen, in

the summer of 1864, and on that auspicious day when trains began to run

through from Whitchurch to the new terminus on the banks of the Rheidol

the rejoicings in Aberystwyth were such as to eclipse even those who had

marked earlier stages of the construction of the various railways now

linked in one long chain. Indeed, the triumphal procession which made

its way to the coast was bent on more than one celebration. The day was

also to mark the opening of the hotel which Mr. Savin had built at Borth,

and when the train finally arrived at Aberystwyth at a quarter past three

it was accorded a civic welcome; the Mayor, Mr. Morgan, and Corporation

tendering to Messrs. Thomas and John Savin an address, in which thanks

were poured out upon these "benefactors" to the locality. A move was

then made to the promenade, where Mrs. Edwards drove the first pile in

the new pier, and, after much processioning, the great assembly sat down

at the Belle Vue Hotel for a banquet of which, surely, the like has never

been seen in the town since! Here his Worship, supported by Earl Vane,

Capt. E. L. Pryse, M.P., Mr. Thomas Barnes, M.P., Capt. R. D. Pryce, the

Contractors, Engineers, and many other ardent workers for or well-wishers

of the undertaking, presided over a flow of oratory, the report of which

occupied over five columns of the newspapers, and visions of a new

Aberystwyth swam before the eyes of the guests, wonderful and beatific!

Such, indeed, was the sumptuousness of the repast, and the wealth of

oratory, that it was eleven at night before the company could be

persuaded to take their places in the return train, and at three o'clock

the next morning a jovial party arrived home at Oswestry, tired and

sleepy, though happy and glorious.

But the "Crimean campaign" of girdling the coast of Merionethshire and

penetrating onward to the distant peninsula of Lleyn, which was part of

the Aberystwyth and Welsh Coast scheme, was yet only in its earlier

stages, and already the difficulties of the undertaking had had their

sobering effects. The original idea of Mr. Piercy was to build a huge

bridge from Ynyslas across the estuary of the Dovey to Aberdovey, whence

it was proposed to run a service of steam boats to Ireland. Work was

begun with seeking a foundation in the shifting sands. Men were engaged

with the boring rods, but they could only labour at low tide, and in the

long intervals when the water was high, adjacent hostelries afforded a

too attractive method of spending enforced leisure, so that often, it is

said, when the waters had receded enough to renew operations, some of the

borers were too bemused to know whether they were on the solid earth or

not. At any rate, no sure foundation could be found, either by Philip

drunk or by Philip sober, and it was reluctantly concluded that another

means of bridging the gulf must be sought.

Adopting the wise Tennysonian counsel, the promoters eventually decided

to "take the bend," and Parliamentary power was sought for this deviation

of the original scheme. It was opposed by the Great Western Railway as

inimical to their project of carrying a line from Bala to Barmouth and so

forming a connection with the Welsh Coast, and their antagonism was only

disposed of after a compromise had been made in the Parliamentary

Committee Room, by which the great company obtained power to build the

bridge themselves, if they wished, within ten years, and the tolls on the

deviation were to be charged only for the same distance as if the traffic

had been carried by the bridge. So the line was carried round to cross

the Dovey at a narrow point near Glandyfi and connect the coast line with

the other railway there.

Hence the existence of, perhaps, the most beautifully situated of all

railway stations, formerly called Glandovey Junction, but changed in

recent years to Dovey Junction to avoid confusion with the adjacent

Glandovey station, at the same time transformed into Glandyfi. Being

only intended for changing trains the station is peculiar in having no

exit, and the very few passengers who ever alight here for other purposes

than entering another train have, presumably to make their way as best

they can along the line. Another feature of this station is that its

buildings and adjuncts lie in three counties. The station itself is in

Montgomeryshire. The stationmaster's house, just over the river bridge

is in Merioneth, and from the signalbox the signalman works an up distant

signal which is planted in the soil of Cardiganshire!

But this connection only came later, in August 1867, when the six miles

of line from Aberdovey to the Junction was carried along the estuary

shore and through the four tunnels which, until the Mid-Wales Railway was

absorbed in 1904, remained the only ones on the whole system. For a

considerable time after the coast line was opened passengers were carried

from Aberdovey by ferry to Ynyslas. At high tide the boat could make for

the station, but when the water was low it berthed on the Cardiganshire

side, at a lower landing place, whence travellers and baggage proceeded

by a little branch into Ynyslas station.

The first sod on the Merionethshire side had been cut, in April 1862, by

Mrs. Foulkes of Aberdovey, on the Green near the Corbett Arms Hotel at

Towyn, without formal ceremony, but in the presence of Mr. Piercy and Mr.

Savin, and "a few scores of persons who cheered lustily." We may hope

that even this mild demonstration did something to hearten the promoters

in their herculean task. For several miles along the shore the line had

to be protected against the assault of the high tides that periodically

sweep Cardigan Bay, and it was soon only too evident that ordinary

ramparts were no sure buttress against Atlantic rollers. More than once

the permanent way was washed by the waves and engineer and contractor,

viewing the dismal wreckage, must have felt that noble references to the

moral of Canute, however pungent, were not altogether inapropos.

There were toilers at this work, however, who had never heard of the

Danish King and bode not of what the maritime history of England might

teach. To them the arrival of the first trial train on the banks of the

Dysynni was more pertinently an occasion for "celebration," and sixty

pounds being quickly collected for the purpose, and as quickly spent,

rumour has it that, alas! the festivities ended for some in a few

reflective hours, we may hope profitably, if not too comfortably, spent

in the local lock-up.

But even when the Dysynni had been safely bridged,--not without anxious

days when piles refused to become embedded in the shingly bed of the

river--the troubles of the constructors were far from concluded. Beyond

Llwyngwril, to which the line was opened for traffic in November,

1863,--the engines and coaches had been brought by barge across the Dovey

from Ynyslas--there lay a still more formidable barrier to rapid

progress. For the cliffs hereabouts, which, with their steep declivity

down to the rock-strewn shore, left scarcely a foothold for the wandering

mountain sheep, were enough to daunt the heart of any but the most

courageous and determined engineer. Here, again, the problem rose as to

whether they should be tunnelled or the line carried along their sloping

edge, supported by sea-walls, as was the high road above. But the high

road itself shaved the edge of the precipice so closely that, it is

related, in the old coaching days, many people preferred leaving the

vehicle at the top of the hill to swinging down such a slope. Eventually

choice fell on the latter alternative, sailors being employed to assist

in the work by reason of their greater experience on such seagirt ledges!

It was, indeed, a hazardous venture; for the extreme narrowness of the

ground to work upon, sometimes tapering away to practically no ground at

all, hampered the task at every step, and the difficulty of building a

track along which heavy trains could run at high speed was never quite

surmounted. Even to-day trains descending the 1 in 60 decline are

carefully regulated in speed, no bad arrangement, after all, since this

stretch of line commands, on a clear day, one of the finest peeps of the

whole charming panorama of scenery along the coast of North Wales.

But engineer and contractor had something better to do than admire the

view. Below them and beyond, even when Barmouth Junction was reached in

July, 1865, there lay another obstacle which could not be avoided by any

but the widest detour. Trains could, and were eventually carried around

the narrow neck of the Dovey; they must cross the estuary of the Mawddach

almost at its widest point in order to gain the Barmouth shore.

Meanwhile, the line was carried along the southern bank of the river, by

what is now the Dolgelley branch, to Penmaenpool, and the public had to

remain content with such facilities as this localised service could

provide.

And a wonderful service it appears to have been! Old inhabitants still

tell tales of how goods trains would pull up at remote wayside spots

while driver and guard went trapping hares that made good prices in the

neighbouring markets, where no inconvenient questions were asked

concerning their capture. Or it might be that, now and again, a waggon

load of beer barrels was consigned to some village inn. It was then the

business of those in charge so to marshal the train that the "stuff" was

placed in convenient proximity to the engine, and, in the seclusion of

some cutting, a halt would be made for some mysterious reason. To

clamber over the tender into the adjacent waggon was a simple matter.

Still simpler, in expert hands, was the process of forcing up the hoop of

one of the barrels, tapping it and drawing it till the engine bucket

foamed alluringly, then plugging it up again, and drawing back the hoop

into its original position. On delivery the consignee might complain of

short weight, but that it was a question for the brewer and the company

to settle as best they could. None of the running staff knew anything

about it; and, as for the lateness of the train, well, was any train ever

punctual in those days, and who bothered about half an hour's delay?

Besides, there was something more important to bother about. Actions in

Chancery had begun to distract the attention of worried directors, and

these retarded progress with the construction of the line. So it was not

until June 1869 that the Cambrian continued beyond Penmaenpool, and, even

when Dolgelley was eventually approached, passengers had to alight at a

platform some little distance from the town. Only when the Great Western

Railway from Ruabon was completed did the trains from Barmouth Junction

run into Dolgelley station proper.

Many and difficult as were the engineering problems involved in the

construction of the coast line none aroused greater interest or put

scientific skill and courage to a severer test than that, to which we

have already briefly alluded, of carrying the railway over the sand and

river current into Barmouth. To the lay mind it appeared an almost

insuperable task, and there were those who did not hesitate to whisper

their doubts as to its practicability, one well-known local gentleman

being reported to have gone as far as publicly to undertake to eat the

first engine which ever crossed that formidable gulf. But engineers and

craftsmen set to work with a will, and before long what had appeared an

impossibility was rapidly taking shape as an actuality. Eight hundred

yards in length, the greater portion was constructed on timber piles,

over 500 in number, in 113 spans, driven into the sand. The navigable

channel, at the Barmouth end, was crossed by an iron-work construction,

of seven fixed and one opening span. The latter was of the drawbridge

type, and when lifted at one end by means of large screws was carried on

wheels and could be drawn back over the adjoining span.

It was a lengthy as well as a cumbersome operation, and when, in 1899,

the ironwork portion of the viaduct had become too weak for the

constantly increasing loads of developing traffic, it was completely

renewed with a modern steel structure of four spans, one of which was a

spring span, revolving on the centre pier and giving two clear openings.

The piers carrying the girders are formed of columns 8ft. in diameter

sunk through the sand down to solid rock, which was reached at a depth of

about 90 feet below high water mark. The columns are steel cylinders

filled with concrete, and were sunk into position by means of compressed

air on the diving bell principle, and owing to the depth below water at

high tide, the men excavating inside were finally working under a

pressure of three atmospheres, or 45 lbs. to the square inch. The

contractors were the Cleveland Bridge and Engineering Co. Ltd., of

Darlington. In 1906, and the following two or three years, the timber

portion of the viaduct was also completely renewed in the same material,

the contractor in this case being Mr. Abraham Williams of Aberdovey, who

had built, or helped to build, many of the old wooden bridges on the

coast line. The total cost of the renewals was approximately 60,000

pounds, and it is no small achievement that they were carried out without

a moment's stoppage in the traffic.

[Picture: Barmouth Bridge. Reproduced from the "Great Western

Magazine."]

But even the original viaduct, old-fashioned as it may seem now, was a

wonder in those days, and the fact that it carried (and still carries) a

footpath as well as the railway, provides Barmouth with a promenade

unrivalled in character and in range of panorama of river and mountains

and sea anywhere in this country. For a time before it was completely

finished a carriage was drawn over the bridge by horses, but in 1867 it

was opened for regular traffic, and in the first train which crossed it

into Barmouth rode the gentleman, who was under contract to make a meal

of the locomotive. If he had forgotten his rash undertaking, he was very

soon to receive a startling reminder. On safe arrival on the northern

shore, the story goes, he was politely escorted by an official to a table

laid for one, and was courteously requested to elect whether he would

have the engine roast or boiled. Alas! for the frailty of human nature,

more especially where a sense of humour might stand us in good stead.

The sceptic, disillusioned, is stated to have failed to appreciate the

joke!

Once the estuary was bridged, north of Barmouth, the constructional

problems were simpler of solution, and when the contractors reached

Minffordd, they were able to take advantage of an earlier engineering

enterprise, no less remarkable than any railway building. In former days

the sea had covered what is now called the Traeth, the broad valley of

the Glaslyn, stretching from the hillocks of Penrhyndeudraeth to

Moel-y-Gest, overlooking Portmadoc. The tides then surged several miles

up this vale, and washed the walls of Llanfrothen churchyard, while

vessels bore their freights almost up to Pont Aberglaslyn. In 1791 Mr.

Madocks, following the example of earlier builders of sea walls in the

district, purchased the Tan-yr-allt estate, and soon set to work to make

dry land of a large part of the ocean bed. He erected what, in the

locality, is commonly called a "cob," the great embankment which runs

across the mouth of the former estuary, shut out the sea and recaptured

4,500 acres from its rapacious maw. Behind the shelter of this

embankment (along the top of which the Festiniog Railway runs), the new

line was comparatively easily carried over the marshy ground, and no

greater gulf had to be bridged than the narrow channel in which the

river, flowing down from the bosom of Snowdon, some eight or nine miles

away, is now confined.

But there were other difficulties to be faced--difficulties not so easily

overcome as even mountain torrents and sandy estuaries. The hand of the

law was heavy upon the constructors, and even when the line was

practically ready for opening, so long a delay took place in settling

outstanding claims that the track became almost derelict. For these were

anxious days for railway promoters. The rosy promise of rich revenues

from remote Welsh lines failed to mature, and Mr. Savin, heavily weighted

with the immensity of his undertakings, and crushed by the costly

construction of his great hotels, sank under the burden. He faced his

financial embarrassments with characteristic pluck, but it was a dark

hour in the annals of British finance far beyond the boundaries of the

Principality, amidst which came the sensational failure of the Overend

and Gurney Bank, and, so far as the Welsh Coast Railway in particular was

concerned, the interminable legal wrangles not only cost money, but

postponed the hour at which the line could earn its keep.

Even under these adverse circumstances trains did occasionally run,

carrying pigs from Pwllheli, or a small load of coal or timber for some

outlying farmer or builder, or a passenger or two willing to take the

risk of an adventurous journey liable at any moment to be brought to a

sudden termination by the barriers of the bailiffs. But even bailiffs

are human; and at night, when they slept, or were turned away by subtle

hospitality at some neighbouring hostelry, journeys could be made,

dashing down from Portmadoc to Barmouth and back with all the

exhilaration of a secret expedition.

Eventually assistance came to the hard-pressed promoters, and the line

was officially opened for traffic from Barmouth to Pwllheli on October

10th, 1867. But the number of trains often depended on the state of the

exchequer, and sometimes quaint incidents would occur to break the

monotony of events. One driver arriving from Pwllheli at Portmadoc, in

the early days, discovering that there was no "staff" available to enable

him to proceed to Penrhyndeudraeth according to regulations, was in

considerable perplexity as to what to do, when an ingenious sub-official

bethought him of a scheme, and fetching an old carpenter's auger, wrapped

it round with paper, and thus armed by what perpetrated to be the badge

of authority to go forward, the driver blew his whistle and off the train

went on its hazardous way.

On another occasion an official of the line visiting one station master

on this section was startled, in reply to his cheery inquiry as to

whether all was well with him, to learn that "the only drawback was that

he had the devil in his parlour." On his exclamation of incredulous

alarm, the stationmaster said that he would show the official, if he

would come and see. Entering the station house with some trepidation, he

beheld in the middle of the parlour one of the iron fire-brackets, used

to prevent water troughs from freezing in cold weather, popularly known

among railway men as "devils." It seems that the builders had neglected

to put in a grate, and the poor man had had to fall back on this

diabolical method of keeping himself warm! The matter, no doubt, was

quickly righted, for stationmasters, even then, were important

functionaries, often wearing tall silk hats, though some of them were

regarded as passing rich on 15/- or 16/- a week.

It was something, however, that, in the face of all these difficulties,

financial and constructive, a line should be completed along this

wandering coast at all. Only in one respect, indeed, did the original

project fall short of attainment. The great objective of which the

shareholders heard so much in earlier days--Porth Dinlleyn--was never

reached. The line still terminates at Pwllheli, where, up to 1901, the

station lay at arm's length from the town close to the harbour, which, in

hot weather, used sometimes to alarm arriving visitors by its fishy

odours. In 1901 power was obtained to carry the line into the centre of

the town, where a new and commodious station now serves this popular

health resort, the gateway to the mysterious fastnesses of Lleyn.