SEWERS.

The arrangement of the sewers in the streets in the vicinity of the

Terminal Site, previous to the beginning of the construction, and the

drainage area tributary to those sewers, is shown by Fig. 2. The main

sewer for this district was in Eighth Avenue, and was a 6-ft. circular

brick conduit within the Terminal area. The sewers leading to it from

the west, in 31st, 32d, and 33d Streets, were elliptical, 3 by 2 ft.,

and egg-shaped, 4 ft. by 2 ft. 8 in., although in no case did they drain

more than one block, and they were on a heavy grade. Draining into

Eighth Avenue from the east, the one on 31st Street was 4 ft. by 2 ft.

8 in., egg-shaped, and drained a length of two blocks, and those on 32d

and 33d Streets were circular, 4 ft. in diameter, and drained the

territory for three blocks, or as far east as Fifth Avenue. There were

no sewers in Seventh Avenue within the Terminal area, except small

vitrified pipes, each less than 200 ft. in length.

It was desirable that the size and number of the sewers in the streets

and avenues surrounding the Terminal should be reduced to a minimum, on

account of the difficulty of caring for them during construction and

also to reduce the probability of sewage leaking into the underground

portion of the work after its completion. With this in view, the plan

was adopted of building an intercepting sewer down Seventh Avenue from

north of 33d Street to the 30th Street sewer, which, being a 4-ft.

circular conduit, was sufficiently large to carry all the sewage coming

from east of Seventh Avenue and south of 34th Street. It was decided to

build this sewer of cast iron where it crossed the proposed construction

work, and also to replace with cast iron the brick sewers on 31st, 32d,

and 33d Streets from Seventh Avenue to a point east of the west end of

the standard tunnel section, and also the sewer on Eighth Avenue from

the north side of 33d Street to the south side of 31st Street. This

arrangement permitted: first, the removal of the sewer in 32d Street

between Seventh and Eighth Avenues, which was necessary, as that street

was to be excavated; second, the reduction of the sewer in Eighth Avenue

from a 6-ft. to a 5-ft. circular conduit; and, third, assuming that the

sewage and drainage from the Terminal would be pumped directly to the

sewers in the avenues, the reduction of the sewers in 31st and 33d

Streets, from Seventh to Ninth Avenue, to 15-in. vitrified pipes, except

west of the Service Building in 31st Street, to accommodate which

section, a larger sewer was required. The sewer in 32d Street, from

Ninth to Eighth Avenue, of course, could be dispensed with in any

arrangement, as all the area tributary to it was to be excavated.

[Illustration:

Fig. 2.

PLAN SHOWING LAYOUT OF SEWER IN CATCHMENT AREA ABOUT TERMINAL STATION]

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Site of the Terminal Station. Paper No. 1157 · 第 4 / 12 题