GOOD ROADS FOR FARMERS[6]
Poor roads constitute the greatest drawback to rural life, and for the
lack of good roads the farmers suffer more than any other class. It is
obviously unnecessary, therefore, to discuss here the benefits to be
derived by them from improved roads. Suffice it to say, that those
localities where good roads have been built are becoming richer, more
prosperous, and more thickly settled, while those which do not possess
these advantages in transportation are either at a standstill or are
becoming poorer and more sparsely settled. If these conditions continue,
fruitful farms may be abandoned and rich lands go to waste. Life on a
farm often becomes, as a result of "bottomless roads," isolated and
barren of social enjoyments and pleasures, and country people in some
communities suffer such great disadvantage that ambition is checked,
energy weakened, and industry paralyzed.
Good roads, like good streets, make habitation along them most
desirable; they economize time and force in transportation of products,
reduce wear and tear on horses, harness and vehicles, and enhance the
market value of real estate. They raise the value of farm lands and farm
products, and tend to beautify the country through which they pass; they
facilitate rural mail delivery and are a potent aid to education,
religion, and sociability. Charles Sumner once said: "The road and the
schoolmaster are the two most important agents in advancing
civilization."
[Illustration: TYPICAL MACADAM ROAD NEAR BRYN MAWR, PENNSYLVANIA]
The difference between good and bad roads is often equivalent to the
difference between profit and loss. Good roads have a money value to
farmers as well as a political and social value, and leaving out
convenience, comfort, social and refined influences which good roads
always enhance, and looking at them only from the "almighty dollar"
side, they are found to pay handsome dividends each year.
People generally are beginning to realize that road-building is a public
matter, and that the best interests of American agriculture and the
American people as a whole demand the construction of good roads, and
that money wisely expended for this purpose is sure to return.
Road-making is perfected by practice, experience, and labor. Soils and
clays, sand and ores, gravels and rocks, are transformed into beautiful
roads, streets, and boulevards, by methods which conform with their
great varieties of characters and with nature's laws. The art of
road-building depends largely for its success upon being carried on in
conformity with certain general principles.
It is necessary that roads should be hard, smooth, comparatively level,
and fit for use at all seasons of the year; that they should be properly
located, or laid out on the ground, so that their grades may be such
that animate or inanimate power may be applied upon them to the best
advantage and without great loss of energy; that they should be properly
constructed, the ground well drained, the roadbed graded, shaped, and
rolled, and that they should be surfaced with the best material
procurable; that they should be properly maintained or kept constantly
in good repair.
All the important roads in the United States can be and doubtless will
be macadamized or otherwise improved in the not distant future. This
expectation should govern their present location and treatment
everywhere. Unless changes are made in the location of the roads in many
parts of this country it would be worse than folly to macadamize them.
"Any costly resurfacing of the existing roads will fasten them where
they are for generations," says General Stone. The chief difficulty in
this country is not with the surface, but with the steep grades, many of
which are too long to be reduced by cutting and filling on the present
lines, and if this could be done it would cost more in many cases than
relocating them.
Many of our roads were originally laid out without any attention to
general topography, and in most cases followed the settler's path from
cabin to cabin, the pig trail, or ran along the boundary lines of the
farms regardless of grades or direction. Most of them remain today where
they were located years ago, and where untold labor, expense, and energy
have been wasted in trying to haul over them and in endeavors to improve
their deplorable condition.
The great error is made of continuing to follow these primitive paths
with our public highways. The right course is to call in an engineer and
throw the road around the end or along the side of steep hills instead
of continuing to go over them, or to pull the road up on dry solid
ground instead of splashing through the mud and water of the creek or
swamp. Far more time and money have been wasted in trying to keep up a
single mile of one of these "pig-track" surveys than it would take to
build and keep in repair two miles of good road.
Another and perhaps greater error is made by some persons in the West
who continue to lay out their roads on "section lines." These sections
are all square, with sides running north, south, east, and west. A
person wishing to cross the country in any other than these directions
must necessarily do so in rectangular zigzags. It also necessitates very
often the crossing and recrossing of hills and valleys, which might be
avoided if the roads had been constructed on scientific principles.
[Illustration: A STUDY IN GRADING
[_The old road had a grade of eight per cent; by the improved route the
grade is four per cent_]]
In the prairie state of Iowa, for example, where roads are no worse than
in many other states, there is a greater number of roads having much
steeper grades than are found in the mountainous republic of
Switzerland. In Maryland the old stagecoach road or turnpike running
from Washington to Baltimore makes almost a "bee line," regardless of
hills or valleys, and the grades at places are as steep as ten or twelve
per cent, where by making little detours the road might have been made
perfectly level, or by running it up the hills less abruptly the grade
might have been reduced to three or four per cent, as is done in the
hilly regions of many parts of this and other countries. Straight roads
are the proper kind to have, but in hilly countries their straightness
should always be sacrificed to obtain a level surface so as to better
accommodate the people who use them.
Graceful and natural curves conforming to the lay of the land add beauty
to the landscape, besides enhancing the value of property. Not only do
level, curved roads add beauty to the landscape and make lands along
them more valuable, but the horse is able to utilize his full strength
over them; furthermore, a horse can pull only four-fifths as much on a
grade of two feet in one hundred feet, and this gradually lessens until
with a grade of ten feet in one hundred feet he can draw but one-fourth
as much as he can on a level road.
All roads should therefore wind around hills or be cut through instead
of running over them, and in many cases the former can be done without
greatly increasing the distance. To illustrate, if an apple or pear be
cut in half and one of the halves placed on a flat surface, it will be
seen that the horizontal distance around from stem to blossom is no
greater than the distance over between the same points.
The wilfulness of one or two private individuals sometimes becomes a
barrier to traffic and commerce. The great drawback to the laying out of
roads on the principle referred to is that of the necessity, in some
cases, of building them through the best lands, the choicest pastures
and orchards, instead, as they do now, of cutting around the farm line
or passing through old worn-out fields or over rocky knolls. But if
farmers wish people to know that they have good farms, good cattle,
sheep, or horses, good grain, fruit, or vegetables, they should let the
roads go through the best parts of the farms.
The difference in length between a straight road and one which is
slightly curved is less than one would imagine. Says Sganzin: "If a road
between two places ten miles apart were made to curve so that the eye
could see no farther than a quarter of a mile of it at once, its length
would exceed that of a perfectly straight road between the same points
by only about one hundred and fifty yards." Even if the distance around
a hill be much greater, it is often more economical to construct it that
way than to go over and necessitate the expenditure of large amounts of
money in reducing the grade, or a waste of much valuable time and energy
in transporting goods that way. Gillespie says "that, as a general rule,
the horizontal length of a road may be advantageously increased to avoid
an ascent by at least twenty times the perpendicular height which is
thus to be avoided--that is, to escape a hill one hundred feet high it
would be proper for the road to make such a circuit as would increase
its length two thousand feet." The mathematical axiom that "a straight
line is the shortest distance between two points" is not, therefore, the
best rule to follow in laying out a road; better is the proverb that
"the longest way round is the shortest way home."
The grade is the most important factor to be considered in the location
of roads. The smoother the road surface, the less the grade should be.
Whether the road be constructed of earth, stone, or gravel, steep grades
should always be avoided if possible. They become covered at times with
coatings of ice or slippery soil, making them very difficult to ascend
with loaded vehicles, as well as dangerous to descend. They allow water
to rush down at such a rate as to wash great gaps alongside or to carry
the surfacing material away. As the grade increases in steepness either
the load has to be diminished in proportion or more horses or power
attached. From Gillespie we find that if a horse can draw on a level one
thousand pounds, on a rise of--
1 foot in-- Pounds
100 feet he draws 900
50 feet 810
44 feet 750
40 feet 720
30 feet 640
25 feet 540
24 feet 500
20 feet 400
10 feet 250
It is therefore seen that when the grades are 1 foot in 44 feet, or 120
feet to the mile, a horse can draw only three-fourths as much as he can
on a level; where the grade is 1 foot in 24 feet, or 220 feet to the
mile, he can draw only one-half as much, and on a ten per cent grade, or
520 feet to the mile, he is able to draw only one-fourth as much as on a
level road.
As a chain is no stronger than its weakest link, just so the greatest
load which can be hauled over a road is the load which can be hauled
through the deepest mud hole or up the steepest hill on that road. The
cost of haulage is, therefore, necessarily increased in proportion to
the roughness of the surface or steepness of the grade. It costs one and
one-half times as much to haul over a road having a five per cent grade
and three times as much over one having a ten per cent grade as on a
level road. As a perfectly level road can seldom be had, it is well to
know the steepest allowable grade. If the hill be one of great length,
it is sometimes best to have the lowest part steepest, upon which the
horse is capable of exerting his full strength, and to make the slope
more gentle toward the summit, to correspond with the continually
decreasing strength of the fatigued animal.
So far as descent is concerned, a road should not be so steep that the
wagons and carriages cannot be drawn down it with perfect ease and
safety. Sir Henry Parnell considered that when the grade was no greater
than one foot in thirty-five feet, vehicles could be drawn down it at a
speed of twelve miles an hour with perfect safety. Gillespie says:
"It has been ascertained that a horse can for a short time double his
usual exertion; also, that on the best roads he exerts a pressure
against his collar of about one thirty-fifth of the load. If he can
double his exertion for a time, he can pull one thirty-fifth more, and
the slope which would force him to lift that proportion would be, as
seen from the above table, one of one in thirty-five, or about a three
per cent grade. On this slope, however, he would be compelled to double
his ordinary exertion to draw a full load, and it would therefore be the
maximum grade." Mr. Isaac B. Potter, an eminent authority upon roads,
says:
"Dirty water and watery dirt make bad going, and mud is the greatest
obstacle to the travel and traffic of the farmer. Mud is a mixture of
dirt and water. The dirt is always to be found in the roadway, and the
water, which comes in rain, snow, and frost, softens it; horses and
wagons and narrow wheel tires knead it and mix it, and it soon gets into
so bad a condition that a fairly loaded wagon cannot be hauled through
it.
"We cannot prevent the coming of this water, and it only remains for us
to get rid of it, which can be speedily done if we go about it in the
right way. Very few people know how great an amount of water falls upon
the country road, and it may surprise some of us to be told that on each
mile of an ordinary country highway three rods wide within the United
States there falls each year an average of twenty-seven thousand tons of
water. In the ordinary country dirt road the water seems to stick and
stay as if there was no other place for it, and this is only because we
have never given it a fair opportunity to run out of the dirt and find
its level in other places. We cannot make a hard road out of soft mud,
and no amount of labor and machinery will make a good dirt road that
will stay good unless some plan is adopted to get rid of the surplus
water. Water is a heavy, limpid fluid, hard to confine and easy to let
loose. It is always seeking for a chance to run down a hill; always
trying to find its lowest level."
An essential feature of a good road is good drainage, and the principles
of good drainage remain substantially the same whether the road be
constructed of earth, gravel, shells, stones, or asphalt. The first
demand of good drainage is to attend to the shape of road surface. This
must be "crowned," or rounded up toward the center, so that there may be
a fall from the center to the sides, thus compelling the water to flow
rapidly from the surface into the gutters which should be constructed on
one or both sides, and from there in turn be discharged into larger and
more open channels. Furthermore, it is necessary that no water be
allowed to flow across a roadway; culverts, tile, stone, or box drains
should be provided for that purpose.
In addition to being well covered and drained, the surface should be
kept as smooth as possible; that is, free from ruts, wheel tracks,
holes, or hollows. If any of these exist, instead of being thrown to
the side the water is held back and is either evaporated by the sun or
absorbed by the material of which the road is constructed. In the latter
case the material loses its solidity, softens and yields to the impact
of the horses' feet and the wheels of vehicles, and, like the water
poured upon a grindstone, so the water poured on a road surface which is
not properly drained assists the grinding action of the wheels in
rutting or completely destroying the surface. When water is allowed to
stand on a road the holes and ruts rapidly increase in number and size;
wagon after wagon sinks deeper and deeper, until the road finally
becomes utterly bad, and sometimes impassable, as frequently found in
many parts of the country during the winter season.
Road drainage is just as essential to a good road as farm drainage is to
a good farm. In fact, the two go hand in hand, and the better the one
the better the other, and vice versa. There are thousands of miles of
public roads in the United States which are practically impassable
during some portion of the year on account of bad drainage, while for
the same reason thousands of acres of the richest meadow and swamp lands
lie idle from year in to year out.
The wearing surface of a road must be in effect a roof; that is, the
section in the middle should be the highest part and the traveled
roadway should be made as impervious to water as possible, so that it
will flow freely and quickly into the gutters or ditches alongside. The
best shape for the cross section of a road has been found to be either a
flat ellipse or one made up of two plane surfaces sloping uniformly from
the middle to the sides and joined in the center by a small, circular
curve. Either of these sections may be used, provided it is not too flat
in the middle for good drainage or too steep at the gutters for safety.
The steepness of the slope from the center to the sides should depend
upon the nature of the surface, being greater or less according to its
roughness or smoothness. This slope ought to be greatest on earth roads,
perhaps as much in some cases as one foot in twenty feet after the
surface has been thoroughly rolled or compacted by traffic. This varies
from about one in twenty to one in thirty on a macadam road, to one in
forty or one in sixty on the various classes of pavements, and for
asphalt sometimes as low as one in eighty.
Where the road is constructed on a grade or hill the slope from the
center to the sides should be slightly steeper than that on the level
road. The best cross section for roads on grades is the one made up from
two plane surfaces sloping uniformly from the center to the sides. This
is done so as to avoid the danger of overturning near the side ditches,
which would necessarily be increased if the elliptical form were used.
The slope from the center to the sides must be steep enough to lead the
water into the side ditches instead of allowing it to run down the
middle of the road. Every wheel track on an inclined roadway becomes a
channel for carrying down the water, and unless the curvature is
sufficient these tracks are quickly deepened into water courses which
cut into and sometimes destroy the best improved road.
In order to prevent the washing out of earth roads on hills it
sometimes becomes necessary to construct water breaks; that is, broad
shallow ditches arranged so as to catch the surface water and carry it
each way into the side ditches. Such ditches retard traffic to a certain
extent, and often result in overturning vehicles; consequently they
should never be used until all other means have failed to cause the
water to flow into the side channels; neither should they be allowed to
cross the entire width of the road diagonally, but should be constructed
in the shape of the letter V. This arrangement permits teams following
the middle of the road to cross the ditch squarely and thus avoid the
danger of overturning. These ditches should not be deeper than is
absolutely necessary to throw the water off the surface, and the part in
the center should be the shallowest.
Unfortunately farmers and road masters have a fixed idea that one way to
prevent hills, long and short, from washing is to heap upon them
quantities of those original tumular obstructions known indifferently as
"thank-you-ma'ams," "breaks," or "hummocks," and the number they can
squeeze in upon a single hill is positively astonishing. Quoting Mr.
Isaac B. Potter:
"Side ditches are necessary because the thousands of tons of
water which fall upon every mile of country road each year,
in the form of rain or snow, should be carried away to some
neighboring creek or other water channel as fast as the rain
falls and the snow melts, so as to prevent its forming mud
and destroying the surface of the road. When the ground is
frozen and a heavy rain or sudden thaw occurs, the side
ditch is the only means of getting rid of the surface water;
for no matter how sandy or porous the soil may be, when
filled with frost it is practically water-tight, and the
water which falls or forms on the surface must either remain
there or be carried away by surface ditches at the sides of
the road.
"A side ditch should have a gradually falling and even grade
at the bottom, and broad, flaring sides to prevent the
caving in of its banks. It can be easily cleared of snow,
weeds, and rubbish; the water will run into it easily from
each side, and it is not dangerous to wagons and foot
travelers. It is therefore a much better ditch than the
kind of ditch very often dug by erosion along the country
roadside."
Where the road is built on a grade some provision should be made to
prevent the wash of the gutters into great, deep gullies. This can be
done by paving the bottom and sides of the gutters with brick, river
rocks, or field stone. In order to make the flow in such side ditches as
small as possible it is advisable to construct outlets into the adjacent
fields or to lay underground pipes or tile drains with openings into the
ditches at frequent intervals.
The size of side ditches should depend upon the character of the soil
and the amount of water they are expected to carry. If possible they
should be located three feet from the edge of the traveled roadway, so
that if the latter is fourteen feet wide there will be twenty feet of
clear space between ditches.
The bottom of the ditch may vary in width from three to twelve inches,
or even more, as may be found necessary in order to carry the largest
amount of water which is expected to flow through it at any one time.
Sometimes the only ditches necessary to carry off the surface water are
those made by the use of the road machines or road graders. The blade of
the machine may be set at any desired angle, and when drawn along by
horses, cuts into the surface and moves the earth from the sides toward
the center, forming gutters alongside and distributing the earth
uniformly over the traveled way. Such gutters are liable to become
clogged by brush, weeds, and other debris, or destroyed by passing
wagons, and it is therefore better, when the space permits, to have the
side ditches above referred to, even if the road be built with a road
machine.
In order to have a good road it is just as necessary that water should
not be allowed to attack the substructure from below as that it should
not be permitted to percolate through it from above. Especially is the
former provision essential in cold climates, where, if water is allowed
to remain in the substructure, the whole roadway is liable to become
broken up and destroyed by frost and the wheels of vehicles. Therefore,
where the road runs through low wet lands or over certain kinds of
clayey soils, surface drainage is not all that is necessary. Common side
drains catch surface water and surface water only. Isaac Potter says:
"Many miles of road are on low, flat lands and on springy
soils, and thousands of miles of prairie roads are, for many
weeks in the year, laid on a wet subsoil. In all such cases,
and, indeed, in every case where the nature of the ground is
not such as to insure quick drainage, the road may be vastly
benefited by under drainage. An under drain clears the soil
of surplus water, dries it, warms it, and makes impossible
the formation of deep, heavy, frozen crusts, which are found
in every undrained road when the severe winter weather
follows the heavy fall rains. This crust causes nine-tenths
of the difficulties of travel in the time of sudden or
long-continued thaws.
"Roads constructed over wet undrained lands are always
difficult to manage and expensive to maintain, and they are
liable to be broken up in wet weather or after frosts. It
will be much cheaper in the long run to go to the expense
of making the drainage of the subjacent soil and
substructure as perfect as possible. There is scarcely an
earth road in the United States which cannot be so improved
by surface or subdrainage as to yield benefits to the
farmers a hundred times greater in value than the cost of
the drains themselves.
"Under drains are not expensive. On the contrary, they are
cheap and easily made, and if made in a substantial way and
according to the rules of common sense a good under drain
will last for ages. Use the best tools and materials you can
get; employ them as well as you know how, and wait results
with a clear conscience. Slim fagots of wood bound together
and laid lengthwise at the bottom of a carefully graded
drain ditch will answer fairly well if stone or drain tile
cannot be had, and will be of infinite benefit to a dirt
road laid on springy soils."
Subdrains should be carefully graded with a level at the bottom to a
depth of about four feet, and should have a continuous fall throughout
their entire length of at least six inches for each one hundred feet in
length. If tile drains cannot be had, large, flat stones may be
carefully placed so as to form a clear, open passage at the bottom for
the flow of the water. The ditch should then be half filled with rough
field stones, and on these a layer of smaller stones or gravel and a
layer of sod, hay, gravel, cinders, or straw, or, if none of these can
be had, of soil. If field stones or drain tile cannot be procured,
satisfactory results may be attained by the use of logs and brush.
If there be springs in the soil which might destroy the stability of the
road, they should, if possible, be tapped and the water carried under or
along the side until it can be turned away into some side channel. Such
drains may be made of bundles of brush, field stones, brick, or drain
tiles. They should be so protected by straw, sod, or brush as to prevent
the soil from washing in and clogging them.
Most of the roads in this country are of necessity constructed of earth,
while in a few of the richer and more enterprising communities the most
important thoroughfares are surfaced with gravel, shell, stones, or
other materials. Unless some new system for the improvement of public
roads is adopted, the inability of rural communities to raise funds for
this purpose will necessarily cause the construction of hard roads to be
very gradual for some time to come. Until this new system is adopted the
most important problem will be that of making the most of the roads
which exist, rather than building new ones of specially prepared
materials. The natural materials and the funds already available must be
used with skill and judgment in order to secure the best results. The
location, grades, and drainage having been treated in the preceding
pages, the next and most important consideration is that of constructing
and improving the various kinds of roads.
Of earth roads, as commonly built, it suffices to say that their present
conditions should not be tolerated in communities where there are any
other materials with which to improve them. Earth is the poorest of all
road materials, aside from sand, and earth roads require more attention
than any other kind of roads, and as a rule get less. At best, they
possess so many defects that they should have all the attention and care
of which their condition is susceptible. With earth alone, however, a
very passable road can be made, provided the principles of location,
drainage, and shape of surface, together with that of keeping the
surface as smooth and firm as possible by rolling, be strictly adhered
to. In fact a good earth road is second to none for summer travel and
superior to many of the so-called macadam or stone roads.
"Water is the great road destroyer," and too much attention cannot be
given to the surface and subdrainage of earth roads. The material of
which their surfaces are composed is more susceptible to the action of
water and more easily destroyed by it than any other highway material.
Drainage alone will often change a bad road into a good one, while on
the other hand the best road may be destroyed by the absence of good
drains.
The same can be said of rolling, which is a very important matter in
attempting to build or maintain a satisfactory earth road. If loose
earth is dumped into the middle of the road and consolidated by
traffic, the action of the narrow-tired wheels cuts it or rolls it into
uneven ruts and ridges, which hold water, and ultimately results, if in
the winter season, in a sticky, muddy surface, or if it be in dry
weather, in covering the surface with several inches of dust. If,
however, the surface be prepared with a road machine and properly rolled
with a heavy roller, it can usually be made sufficiently firm and smooth
to sustain the traffic without rutting, and resist the penetrating
action of the water. Every road is made smoother, harder, and better by
rolling. Such rolling should be done in damp weather, or if that is not
possible, the surface should be sprinkled if the character of the soil
requires such aid for its proper consolidation.
In constructing new earth roads all stumps, brush, vegetable matter,
rocks, and bowlders should be removed from the surface and the resulting
holes filled in with suitable material, carefully and thoroughly tamped
or rolled, before the road embankment is commenced. No perishable
material should be used in forming the permanent embankments. Where
possible the longitudinal grade should be kept down to one foot in
thirty feet, and should under no circumstances exceed one in twenty,
while that from center to sides should be maintained at one foot in
twenty feet.
Wherever the subgrade soil is found unsuitable it should be removed and
replaced with good material rolled to a bearing, _i.e._, so as to be
smooth and compact. The roadbed, having been brought to the required
grade and crown, should be rolled several times to compact the surface.
All inequalities discovered during the rolling should be leveled up and
rerolled. On the prepared subgrade, the earth should be spread, harrowed
if necessary, and then rolled to a bearing by passing the unballasted
road roller a number of times over every portion of the surface of the
section.
In level countries and with narrow roads, enough material may be
excavated to raise the roadway above the subgrade in forming the side
ditches by means of road machines. If not, the required earth should be
obtained by widening the side excavations, or from cuttings on the line
of the new roadway, or from pits close by, elevating graders and modern
dumping or spreading wagons being preferably used for this purpose. When
the earth is brought up to the final height, it is again harrowed, then
trimmed by means of road levelers or road machines and ultimately rolled
to a solid and smooth surface with road rollers gradually increased in
weight by the addition of ballast.
No filling should be brought up in layers exceeding nine inches in
depth. During the rolling, sprinkling should be attended to wherever the
character of the soil requires such aid. The cross section of the
roadway must be maintained during the last rolling stage by the addition
of earth as needed. On clay soils a layer of sand, gravel, or ashes
spread on the roadway will prevent the sticking of the clay to the
roller. As previously explained, the finishing touches to the road
surface should be given by a heavy roller.
Before the earth road is opened to traffic, deep and wide side ditches
should be constructed, with a fall throughout their entire length of at
least one in one hundred and twenty. They should be cleaned and left
with the drain tiling connections, if any, in good working order.
Clay soils, as a rule, absorb water quite freely and soften when
saturated, but water does not readily pass through them; hence they are
not easily subdrained. When used alone, clay is the least desirable of
all road materials, but roads constructed over clay soils may be treated
with sand or small gravel, from which a comparatively hard and compact
mass is formed which is nearly impervious to water. Material of this
character found in the natural state, commonly known as hardpan, makes,
when properly applied, a very solid and durable surface. In soil
composed of a mixture of sand, gravel, and clay, all that is necessary
to make a good road of its kind is to "crown" the surface, keep the ruts
and hollows filled, and the ditches open and free.
[Illustration: Sand Clay Road in Richland County, South Carolina
[_Sand soil with nine inches of clay and two inches cover of sand_]]
Roads are prone to wear in ruts, and when hollows and ruts begin to make
their appearance on the surface of an earth road great care should be
used in selecting new material, with which they should be immediately
filled, because a hole which could have been filled at first with a
shovel full of material would soon need a cart full. It should, if
possible, be of a gravelly nature, entirely free from vegetable earth,
muck, or mold. Sod or turf should not be placed on the surface, neither
should the surface be renewed by throwing upon it the worn-out material
from the gutters alongside. The last injunction, if rightly observed and
the proper remedy applied, would doubtless put an end to the deplorable
condition of thousands of miles of earth roads in the United States.
A road-maker should not go to the other extreme and fill up ruts and
holes with stone or large gravel. In many cases it would be wiser to
dump such material in the river. These stones do not wear uniformly with
the rest of the material, but produce bumps and ridges, and in nearly
every case result in making two holes instead of one. Every hole or rut
in a roadway, if not tamped full of some good material like that of
which the road is constructed, will become filled with water, and
finally with mud and water, and will be dug deeper and wider by each
passing vehicle.
The work of maintaining earth roads will be much increased by lack of
care in properly finishing the work. The labor and money spent in
rolling a newly-made road may save many times that amount of labor and
money in making future repairs. After the material has been placed it
should not be left for the traffic to consolidate, or for the rains to
wash off into the ditches, but should be carefully formed and surfaced,
and then, if possible, rolled. The rolling not only consolidates the
material, but puts the roadbed in proper shape for travel immediately.
If there is anything more trying on man or beast than to travel over an
unimproved road, it must be to travel over one which has just been
"worked" by the antiquated methods now in vogue in many of the states.
The traveled way should never be repaired by the use of plows or scoops.
The plow breaks up the compact surface which age and traffic have made
tolerable. Earth roads can be rapidly repaired by a judicious use of
road machines and road rollers. The road machine places the material
where it is most needed, and the roller compacts and keeps it there.
The labor-saving machinery now manufactured for road-building is just as
effectual and necessary as the modern mower, self-binder, and thrasher.
Road graders and rollers are the modern inventions necessary to
permanent and economical construction. Two men with two teams can build
more road in one day with a grader and roller than fifty men can with
picks and shovels, and do it more uniformly and more thoroughly.
Doubtless the best way to keep an earth road, or any road, for that
matter, in repair is by the use of wide tires on all wagons carrying
heavy burdens. Water and narrow tires aid each other in destroying
streets, macadam, gravel, and earth roads. Narrow tires are also among
the most destructive agents to the fields, pastures, and meadows of
farms, while on the other hand wide tires are road-makers; they roll and
harden the surface, and every loaded wagon becomes in effect a road
roller. Nothing so much tends to the improving of a road as the
continued rolling of its surface.
Tests recently made at the experiment stations in Utah and Missouri show
that wide tires not only improve the surface of roads, but that under
ordinary circumstances less power is required to pull a wagon on which
wide tires are used. The introduction in recent years of a wide metallic
tire which can be placed on any narrow-tired wheel at the cost of two
dollars each, has removed one very serious objection to the proposed
substitution of broad tires for the narrow ones now in use.
Repairs on earth roads should be attended to particularly in the spring
of the year, but the great mistake of letting all the repairs go until
that time should rot be made. The great want of the country road is
daily care, and the sooner we do away with the system of "working out"
our road taxes, and pay such taxes in money, the sooner will it be
possible to build improved roads and to hire experts to keep them
constantly in good repair. Roads could then secure attention when such
attention is most needed. If they are repaired only annually or
semiannually they are seldom in good condition but when they are given
daily or weekly care they are almost always in good condition, and,
moreover, the second method costs far less than the first. A portion of
all levy tax money raised for road purposes should be used in buying
improved road machinery, and in constructing each year a few miles of
improved stone or gravel roads.
The only exceptions to the instructions given on road drainage are found
in the attempt to improve a sand road. The more one improves the
drainage of a sand road the more deplorable becomes its condition.
Nothing will ruin one quicker than to dig a ditch on each side and drain
all the water away. The best way to make such a road firm is to keep it
constantly damp. Very bushy or shady trees alongside such roads prevent
the evaporation of water.
The usual way of mending roads which run over loose sandy soils is to
cover the surface with tough clay or mix the clay and sand together.
This is quite an expensive treatment if the clay has to be transported a
great distance, but the expense may be reduced by improving only eight
or ten feet or half of the roadway.
Any strong, fibrous substance, and especially one which holds moisture,
such as the refuse of sugar cane or sorghum, and even common straw,
flax, or swamp grass, will be useful. Spent tan is of some service, and
wood fiber in any form is excellent. The best is the fibrous sawdust
made in sawing shingles by those machines which cut lengthwise of the
fiber into the side of the block. Sawdust is first spread on the road
from eight to ten inches deep, and this is covered with sand to protect
the road against fire lighted from pipes or cigars carelessly thrown or
emptied on the roadbed. The sand also keeps the sawdust damp. The dust
and sand soon become hard and packed, and the wheels of the heaviest
wagons make but little impression upon the surface. The roadbed appears
to be almost as solid as a plank road, but is much easier for the teams.
The road prepared in this manner will remain good for four or five years
and will then require renewing in some parts. The ordinary lumber
sawdust would not be so good, of course, but if mixed with planer
shavings might serve fairly well.
Roads built of poles or logs laid across the roadway are called corduroy
roads, because of their corrugated or ribbed appearance. Like earth
roads, they should never be built where it is possible to secure any
other good material; but, as is frequently the case in swampy, timbered
regions, other material is unavailable, and as the road would be
absolutely impassable without them at certain seasons of the year, it is
well to know how to make them. Roads of this character should be fifteen
or sixteen feet wide, so as to enable wagons to pass each other. Logs
are superior to poles for this purpose and should be used if possible.
The following in regard to the construction of corduroy roads is from
Gilmore's _Roads, Streets, and Pavements_:
"The logs are all cut the same length, which should be that of the
required width of the road, and in laying them down such care in
selection should be exercised as will give the smallest joints or
openings between them. In order to reduce as much as possible the
resistance to draft and the violence of the repeated shocks to which
vehicles are subjected upon these roads, and also to render its surface
practicable for draft animals, it is customary to level up between the
logs with smaller pieces of the same length but split to a triangular
cross section. These are inserted with edges downward in the open
joints, so as to bring their surface even with the upper sides of the
large logs, or as nearly so as practicable.
"Upon the bed thus prepared a layer of brushwood is put, with a few
inches in thickness, with soil or turf on top to keep it in place. This
completes the road. The logs are laid directly upon the natural surface
of the soil, those of the same or nearly of the same diameter being kept
together, and the top covering of soil is excavated from side ditches.
"Cross drains may usually be omitted in roads of this kind, as the
openings between the logs, even when laid with utmost care, will furnish
more than ample water way for drainage from the ditch on the upper to
that on the lower side of the road. When the passage of a creek of
considerable volume is to be provided for, and in localities subject to
freshets, cross drains or culverts are made wherever necessary by the
omission of two or more logs, the openings being bridged with planks,
split rails, or poles laid transversely to the axis of the road and
resting on cross beams notched into the logs on either side."
The essential requirement of a good road is that it should be firm and
unyielding at all times and in all kinds of weather, so that its surface
may be smooth and impervious to water. Earth roads at best fulfil none
of these requirements, unless they be covered with some artificial
material. On a well-made gravel road one horse can draw twice as large a
load as he can on a well-made earth road. On a hard smooth stone road
one horse can pull as much as four horses will on a good earth road. If
larger loads can be hauled and better time made on good hard roads than
on good earth ones, the area and the number of people benefited are
increased in direct proportion to the improvement of their surface.
Moreover, it is evident that a farm four or five miles from the market
or shipping point located on or near a hard road is virtually nearer the
market than one situated only two or three miles away, but located on a
soft and yielding road. Hard roads are divided here into three
classes--gravel, shell, and stone.
Although it is impracticable, and in many cases impossible, for
communities to build good stone roads, a surface of gravel may
frequently be used to advantage, giving far better results than could be
attained by the use of earth alone. Where beds of good gravel are
available this is the simplest, cheapest, and most effective method of
improving country roads.
[Illustration: GRAVEL ROAD NEAR SOLDIERS' HOME, DISTRICT OF
COLUMBIA]
In connection with the building and maintenance of gravel roads the most
important matter to consider is that of selecting the proper material. A
small proportion of argillaceous sand, clayey, or earthy matter
contained in some gravel enables it to pack readily and consolidate
under traffic or the road roller. Seaside and river gravel, which is
composed usually of rounded, waterworn pebbles, is unfit for surfacing
roads. The small stones of which they are composed, having no angular
projections or sharp edges, easily move or slide against each other, and
will not bind together, and even when mixed with clay may turn
freely, causing the whole surface to be loose, like materials in a
shaken sieve.
Inferior qualities of gravel can sometimes be used for foundations; but
where it becomes necessary to employ such material even for that purpose
it is well to mix just enough sandy or clayey loam to bind it firmly
together. For the wearing surface or the top layer the pebbles should,
if possible, be comparatively clean, hard, angular, and tough, so that
they will readily consolidate and will not be easily pulverized by the
impact of traffic, into dust and mud. They should be coarse, varying in
size from half an inch to an inch and one-half.
Where blue gravel or hardpan and clean bank gravel are procurable, a
good road may be made by mixing the two together. Pit gravel or gravel
dug from the earth as a rule contains too much earthy matter. This may,
however, be removed by sifting. For this purpose two sieves are
necessary, through which the gravel should be thrown. The meshes of one
sieve should be one and one-half or two inches in diameter, while the
meshes of the other should be three-fourths of an inch. All pebbles
which will not go through the one and one-half inch meshes should be
rejected or broken so that they will go through. All material which
sifts through the three-fourths inch meshes should be rejected for the
road, but may be used in making side paths. The excellent road which can
be built from materials prepared in this way is so far superior to the
one made of the natural clayey material that the expense and trouble of
sifting is many times repaid.
The best gravel for road-building stands perpendicular in the bank; that
is, when the pit has been opened up the remainder stands compact and
firm and cannot be dislodged except by use of the pick, and when it
gives way falls in great chunks or solid masses. Such material usually
contains tough angular gravel with just enough cementing properties to
enable it to readily pack and consolidate, and requires no further
treatment than to place it properly on the prepared roadbed.
Some earth roads may be greatly improved by covering the surface with a
layer of three or four inches of gravel, and sometimes even a thinner
layer may prove of very great benefit if kept in proper repair. The
subsoil of such roadway ought, however, to be well drained, or of a
light and porous nature. Roads constructed over clay soils require a
layer of at least six inches of gravel. The gravel must be deep enough
to prevent the weight of traffic forcing the surface material into weak
places in the clay beneath, and also to prevent the surface water from
percolating through and softening the clay and causing the whole roadway
to be torn up.
Owing to a lack of knowledge regarding construction, indifference, or
carelessness in building or improving, roads made of gravel are often
very much worse than they ought to be. Some of them are made by simply
dumping the material into ruts, mud holes, or gutter-like depressions,
or on unimproved foundation, and are left thus for traffic to
consolidate, while others are made by covering the surface with inferior
material without any attention being paid to the fundamental principles
of drainage. As a result of such thoughtless and haphazard methods the
road usually becomes rougher and more completely covered with holes than
before.
In constructing a gravel road the roadbed should first be brought to the
proper grade. Ordinarily an excavation is then made to the depth of
eight to ten inches, varying in width with the requirements of traffic.
For a farm or farming community the width need not be greater than ten
or twelve feet. A roadway which is too wide is not only useless, but the
extra width is a positive damage. Any width beyond that needed for the
traffic is not only a waste of money in constructing the road, but is
the cause of a never-ending expense in maintaining it. The surface of
the roadbed should preferably have a fall from the center to the sides
the same as that to be given the finished road, and should, if possible,
be thoroughly rolled and consolidated until perfectly smooth and firm.
A layer, not thicker than four inches, of good gravel, such as that
recommended above, should then be spread evenly over the prepared
roadbed. Such material is usually carried upon a road in wheelbarrows or
dump carts, and then spread in even layers with rakes, but the latest
and best device for this purpose is a spreading cart.
If a roller cannot be had, the road is thrown open to traffic until it
becomes fairly well consolidated; but it is impossible properly to
consolidate materials by the movement of vehicles over the road, and if
this means is pursued constant watchfulness is necessary to prevent
unequal wear and to keep the surface smooth and free from ruts. The work
may be hastened and facilitated by the use of a horse roller or light
steam roller; and of course far better results can be accomplished by
this means. If the gravel be too dry to consolidate easily it should be
kept moist by sprinkling. It should not, however, be made too wet, as
any earthy or clayey matter in the gravel is liable to be dissolved.
As soon as the first layer has been properly consolidated, a second,
third, and, if necessary, fourth layer, each three or four inches in
thickness, is spread on and treated in the same manner, until the road
is built up to the required thickness and cross section. The thickness
in most cases need not be greater than ten or twelve inches, and the
fall from the center to the sides ought not to be greater than one foot
in twenty feet, or less than one in twenty-five.
The last or surface layer should be rolled until the wheels of heavily
loaded vehicles passing over it make no visible impression. If the top
layer is deficient in binding material and will not properly
consolidate, a thin layer, not exceeding one inch in thickness, of sand
or gravelly loam or clay, should be evenly spread on and slightly
sprinkled if in dry weather, before the rolling is begun. Hardpan or
stone screenings are much preferred for this purpose if they can be had.
The tendency of material to spread under the roller and work toward the
sides can be resisted by rolling that portion nearest the gutters first.
To give the surface the required form and to secure uniform density, it
is necessary at times to employ men with rakes to fill any depressions
which may form.
In order to maintain a gravel road in good condition, it is well to keep
piles of gravel alongside at frequent intervals, so that the person who
repairs the road can get the material without going too far for it. As
soon as ruts or holes appear on the surface some of this good fresh
material should be added and tamped into position or kept raked smooth
until properly consolidated.
If the surface needs replenishing or rounding up, as is frequently the
case with new roads after considerable wear, the material should be
applied in sections or patches, raked and rolled until hard and smooth.
Care must be taken that the water from higher places does not drain upon
or run across the road. The side ditches, culverts, and drains should be
kept open and free from debris.
In many of the Eastern and Southern States road stones do not exist;
neither is it possible to secure good coarse gravel. No such material
can be secured except at such an expense for freight as to practically
preclude its use for road-building. Oyster shells can be secured
cheaply in most of these states, and when applied directly upon sand or
sandy soil, eight or ten inches in thickness, they form excellent roads
for pleasure driving and light traffic. Shells wear much more rapidly
than broken stone or gravel of good quality, and consequently roads made
of them require more constant attention to keep them in good order. In
most cases they should have an entirely new surface every three or four
years. When properly maintained they possess many of the qualities found
in good stone or gravel roads, and so far as beauty is concerned they
cannot be surpassed.
The greatest obstacles to good stone road construction in most places in
the United States are the existing methods of building and systems of
management, whereby millions of dollars are annually wasted in improper
construction or in making trifling repairs on temporary structures.
[Illustration: OYSTER-SHELL OBJECT-LESSON ROAD
[_In course of construction, near Mobile, Alabama_]]
The practice of using too soft, too brittle, or rotten material on roads
cannot be too severely condemned. Some people seem to think that if a
stone quarries easily, breaks easily, and packs readily, it is the
very best stone for road-building. This practice, together with that of
placing the material on unimproved foundations and leaving it thus for
traffic to consolidate, has done a great deal to destroy the confidence
of many people in stone roads. There is no reason in the world why a
road should not last for ages if it is built of good material and kept
in proper repair. If this is not done, the money spent is more than
wasted. It is more economical, as a rule, to bring good materials a long
distance by rail or water than to employ inferior ones procured close at
hand.
The durability of roads depends largely upon the power of the materials
of which they are composed to resist those natural and artificial forces
which are constantly acting to destroy them. The fragments of which they
are constructed are liable to be attacked in cold climates by frost, and
in all climates by water and wind. If composed of stone or gravel, the
particles are constantly grinding against each other and being exposed
to the impact of the tires of vehicles and the feet of animals.
Atmospheric agencies are also at work decomposing and disintegrating
the material. It is obviously necessary, therefore, that great care be
exercised in selecting for the surfacing of roads those stones which are
less liable to be destroyed or decomposed by these physical, dynamical,
and chemical forces.
Siliceous materials, those composed of flint or quartz, although hard,
are brittle and deficient in toughness. Granite is not desirable because
it is composed of three materials of different natures, viz., quartz,
feldspar, and mica, the first of which is brittle, the second liable to
decompose rapidly, and the third laminable or of a scaly or layerlike
nature. Some granites which contain hornblende instead of feldspar are
desirable. The darker the variety the better. Gneiss, which is composed
of quartz, feldspar, and mica, more or less distinctly slaty, is
inferior to granite. Mica-slate stones are altogether useless. The
argillaceous slates or clayey slates make a smooth surface, but one
which is easily destroyed when wet. The sandstones are utterly useless
for road-building. The tougher limestones are very good, but the softer
ones, though they bind and make a smooth surface very quickly, are too
weak for heavy loads; they wear, wash, and blow away very rapidly.
The materials employed for surfacing roads should be both hard and
tough, and should possess by all means cementing and recementing
qualities. For the Southern States, where there are no frosts to contend
with, the best qualities of limestone are considered quite satisfactory
so far as the cementing and recementing qualities are concerned; but in
most cases roads of this class of material do not stand the wear and
tear of traffic like those built of trap rock, and when exposed to the
severe northern winters such material disintegrates very rapidly. In
fact, trap rock, "nigger heads," technically known as diabase, and
diorites, are considered by most road engineers of long experience to be
the very best stones for road-building. Trap rocks as a rule possess all
the qualities most desired for road stones. They are hard and tough, and
when properly broken to small sizes and rolled thoroughly, cement and
consolidate into a smooth, hard crust which is impervious to water, and
the broken particles are so heavy that they are not readily broken or
washed away.
Unfortunately the most useful stones for road-building are the most
difficult to prepare, and as trap rocks are harder to break than any
other stones they usually cost more. The foundation or lower courses may
be formed of some of the softer stones like gneiss or limestone, but
trap rock should be used for the wearing surface, if possible, even if
it has to be brought from a distance.
As to the construction of macadam roads, Mr. Potter says:
"In the construction of a macadam road in any given locality, the
question of economy generally compels us to use a material found near at
hand, and where a local quarry does not exist field stone and stone
gathered from the beds of rivers and small streams may often be made to
serve every purpose. Many of the stones and boulders thus obtained are
of trap rock, and in general it may be said that all hard field and
river stones, if broken to a proper size, will make fairly good and
sometimes very excellent road metal. No elaborate test is required to
determine the hardness of any given specimen. A steel hammer in the
hands of an intelligent workman will reveal in a general way the
relative degree of toughness of two or more pieces of rock. Field and
river stone offer an additional advantage in that they are quickly
handled, are generally of convenient size, and are more readily broken
either by hand or by machine than most varieties of rock which are
quarried in the usual way.
"It is a simple task to break stone for macadam roadways, and by the aid
of modern inventions it can be done cheaply and quickly. Hand-broken
stone is fairly out of date and is rarely used in America where any
considerable amount of work is to be undertaken. Stone may be broken by
hand at different points along the roadside where repairs are needed
from time to time, but the extra cost of production by this method
forbids its being carried on where extended work is undertaken.
Hand-broken stone is generally more uniform in size, more nearly cubical
in shape, and has sharper angles than that broken by machinery, but the
latter, when properly assorted or screened, has been found to meet every
requirement.
"A good crusher driven by eight horsepower will turn out from forty to
eighty cubic yards of two-inch stone per day of ten hours, and will cost
from four hundred dollars upward, according to quality.
"Some crushers are made either stationary, semistationary, or portable,
according to the needs of the purchaser, and for country-road work it is
sometimes very desirable to have a portable crusher to facilitate its
easy transfer from one part of the township to another. The same
portable engine that is used in thrashing, sawing wood, and other
operations requiring the use of steam power may be used in running a
stone crusher, but it is best to remember that a crusher will do its
best and most economical work when run by a machine having a horsepower
somewhat in excess of the power actually required.
"As the stone comes from the breaker the pieces will be found to show a
considerable variety in size, and by many practical road-makers it is
regarded as best that these sizes should be assorted and separated,
since each has its particular use. To do this work by hand would be
troublesome and expensive, and screens are generally employed for that
purpose. Screens are not absolutely necessary, and many road-makers do
not use them; but they insure uniformity in size of pieces, and
uniformity means in many cases superior wear, smoothness, and economy.
Most of the screens in common use today are of the rotary kind. In
operating they are generally so arranged that the product of the crusher
falls directly into the rotary screen, which revolves on an inclined
axis and empties the separate pieces into small bins below the crusher.
A better form for many purposes includes a larger and more elaborate
outfit, in which the stone is carried by an elevator to the screen and
by the screen emptied into separate bins according to the respective
sizes. From the bins it is easily loaded into wagons or spreading carts
and hauled to any desired point along the line of the road.
"The size to which stone should be broken depends upon the quality of
the stone, the amount of traffic to which the road will be subjected,
and to some extent upon the manner in which the stone is put in place.
If a hard, tough stone is employed it may be broken into rough cubes or
pieces of about one and a half inches in largest face dimensions, and
when broken to such a size the product of the crusher may generally be
used to good advantage without the trouble of screening, since dust
'tailings' and fine stuff do not accumulate in large quantities in the
breaking of the tougher stone.
"If only moderate traffic is to be provided for, the harder limestones
may be broken so the pieces will pass through a two-inch ring, though
sizes running from two and a quarter to two and a half inches will
insure a more durable roadway, and if a steam roller is used in
compacting the metal it will be brought to a smooth surface without much
trouble. As a rule, it may be said that to adhere closely to a size
running from two and a quarter to two and a half inches in largest face
dimensions, and to use care in excluding too large a proportion of
small stuff as well as all pieces of excessive size, will insure a
satisfactory and durable macadam road."
Macadam insisted that no large stone should ever be employed in
road-making, and, indeed, most modern road builders practice his
principle that "small angular fragments are the cardinal requirements."
As a general rule it has been stated that no stone larger than a walnut
should be used for the surfacing of roads.
Stone roads are built in most cases according to the principles laid
down by John L. Macadam, while some are built by the methods advocated
by Telford. The most important difference between these two principles
of construction relates to the propriety or necessity of a paved
foundation beneath the crust of broken stone. Telford advocated this
principle, while Macadam strongly denied its advantages.
In building roads very few iron-clad rules can be laid down for
universal application; skill and judgment must be exercised in designing
and building each road so that it will best meet the requirements of the
place it is to occupy. The relative value of the telford and macadam
systems can most always be determined by the local circumstances,
conditions, and necessities under which the road is to be built. The
former system seems to have the advantage in swampy, wet places, or
where the soil is in strata varying in hardness, or where the foundation
is liable to get soft in spots. Under most other circumstances
experienced road builders prefer the macadam construction, not only
because it is considered best, but also because it is much cheaper.
The macadam road consists of a mass of angular fragments of rock
deposited usually in layers upon the roadbed or prepared foundation and
consolidated to a smooth, hard surface produced by the passage of
vehicles or by use of a road roller. The thickness of this crust varies
with the soil, the nature of the stone used, and the amount of traffic
which the road is expected to have. It should be so thick that the
greatest load will not affect the foundation. The weight usually comes
upon a very small part of the surface, but is spread over a large area
of the foundation, and the thicker the crust the more uniformly will
the load be distributed over the foundation.
Macadam earnestly advocated the principle that all artificial
road-building depended wholly for its success upon the making and
maintaining of a solid dry foundation and the covering of this
foundation with a durable waterproof coating or roof of broken stone.
The foundation must be solid and firm; if it be otherwise the crust is
useless. A road builder should always remember that without a durable
foundation there is no durable road. Hundreds of miles of macadam roads
are built in the United States each year on unimproved or unstable
foundations and almost as many miles go to pieces for this same reason.
Says Macadam:
"The stone is employed to form a secure, smooth, water-tight flooring,
over which vehicles may pass with safety and expedition at all seasons
of the year. Its thickness should be regulated only by the quality of
the material necessary to form such a flooring and not at all by any
consideration as to its own independent power of bearing weight.... The
erroneous idea that the evils of an underdrained, wet, clayey soil can
be remedied by a large quantity of materials has caused a large part of
the costly and unsuccessful expenditures in making stone roads."
The evils from improper construction of stone roads are even greater
than those resulting from the use of improper material. Macadam never
intended that a heterogeneous conglomeration of stones and mud should be
called a macadam road. The mistake is often made of depositing broken
stone on an old road without first preparing a suitable foundation. The
result, in most cases, is that the dirt and mud prevent the stone from
packing and by the action of traffic ooze to the surface, while the
stones sink deeper and deeper, leaving the road as bad as before.
Another great mistake is often made of spreading large and small stones
over a well-graded and well-drained foundation and leaving them thus for
traffic to consolidate. The surface of a road left in this manner is
often kept in constant turmoil by the larger stones, which work
themselves to the surface and are knocked hither and thither by the
wheels of vehicles and the feet of animals. These plans of construction
cannot be too severely condemned.
The roadbed should be first graded, then carefully surface-drained. The
earth should then be excavated to the depth to which material is to be
spread on and the foundation properly shaped and sloped each way from
the center so as to discharge any water which may percolate through.
This curvature should conform to the curvature of the finished road. A
shouldering of firm earth or gravel should be left or made on each side
to hold the material in place, and should extend to the gutters at the
same curvature as the finished road. The foundation should then be
rolled until hard and smooth.
Upon this bed spread a layer of five or six inches of broken stone,
which stone should be free from any earthy mixture. This layer should be
thoroughly rolled until compact and firm. Stone may be hauled from the
stone-crusher bins or from the stone piles in ordinary wheelbarrows or
from wagons, and should be distributed broadcast over the surface with
shovels, and all inequalities leveled up by the use of rakes. If this
method of spreading is employed, grade stakes should be used so as to
insure a uniformity of thickness. After the stakes are driven the height
of the layer is marked on their sides, and if thought necessary a piece
of stout cord is stretched from stake to stake, showing the exact height
to which the layer should be spread. Spreading carts have been recently
invented which not only place the stone where it is needed without the
use of shovels, but spread it on in layers of any desired thickness and
at the same time several inches wider than the carts themselves.
If the stones have been separated into two or three different sizes, the
largest size should compose the bottom layer, the next size the second
layer, etc. The surface of each course or layer should be thoroughly and
repeatedly rolled and sprinkled until it becomes firm, compact, and
smooth. The first layer, however, should not be sprinkled, as the water
is liable to soften the foundation. The rolling ought to be done along
the side lines first, gradually working toward the center as the job is
being completed. In rolling the last course it is well to begin by
rolling first the shoulderings or the side roads if such exist.
A coat of three-quarter inch stone and screenings, of sufficient
thickness to make a smooth and uniform surface, should compose the last
course, and, like the other layers, should be rolled until perfectly
firm and smooth. As a final test of perfection, a small stone placed on
the surface will be crushed before being driven into the material.
If none of the stones used be larger than will pass through a two-inch
ring, they can be spread on in layers as above described without
separating them by screens. Water and binding material--stone screenings
or good packing gravel--can be added if found necessary for proper
consolidation. Earth or clay should never be used for a binding
material. Enough water should be sprinkled on to wash in and fill all
voids between the broken stones with binding material and to leave such
material damp enough to insure a set.
If a road is built of tough, hard stone, and if the binding material has
the same characteristics, a steam roller is essential for speedy
results. A horse roller may be used to good advantage if the softer
varieties of stone are employed. For general purposes a roller weighing
from eight to twelve tons is all that is necessary. Heavier weights are
difficult to handle upon unimproved surfaces unless they be constructed
like the Addison roller, the weight of which can be increased or
lightened at will by filling the drum with water or drawing the water
out. This roller can be made to weigh as much as eight tons and, like
several other very excellent ones now on the market, is provided with
anti-friction roller bearings, which lighten the draft considerably.
Every stone road, unless properly built with small stones and just
enough binding material to fill the voids, presents a honeycombed
appearance. In fact, a measure containing two cubic feet of broken stone
will hold in addition one cubic foot of water, and a cubic yard of
broken macadam will weigh just about one-half as much as a solid cubic
yard of the same kind of stone. Isaac Potter says:
"To insure a solid roadway and to fill the large proportion of voids or
interstices between the different pieces of broken stone, some finer
material must be introduced into the structure of the roadway, and this
material is usually called a binder, or by some road-makers a 'filler.'
"There used to be much contention regarding the use of binding material
in the making of a macadam road, but it is now conceded by nearly all
practical and experienced road-makers, both in Europe and America, that
the use of a binding material is essential to the proper construction of
a good macadam road. It adds to its solidity, insures tightness by
closing all of the spaces between the loose, irregular stones, and binds
together the macadam crust in a way that gives it firmness, elasticity,
and durability."
Binding material to produce the best results should be equal in hardness
and toughness with the road stone; the best results are therefore
obtained by using screenings or spalls from the broken stone used.
Coarse sand and gravel can sometimes be used with impunity as a binder,
but the wisdom of using loam or clay is very much questioned. When the
latter material is used for a binder the road is apt to become very
dusty in dry weather, and sticky, muddy, and rutty in wet weather.
The character of the foundation should never take the place of proper
drainage. The advisability of underground or subdrainage should always
be carefully considered where the road is liable to be attacked from
beneath by water. In most cases good subdrains will so dry the
foundation out that the macadam construction can be resorted to.
Sometimes, however, thorough drainage is difficult or doubtful, and in
such cases it is desirable to adopt some heavy construction like the
telford; and, furthermore, the difficulty of procuring perfectly solid
and reliable roadbeds in many places is often overcome by the use of
this system.
In making a telford road the surface for the foundation is prepared in
the same manner as for a macadam road. A layer of broken stone is then
placed on the roadbed from five to eight inches in depth, depending upon
the thickness to be given the finished road. As a rule this foundation
should form about two-thirds of the total thickness of the material. The
stone used for the first layer may vary in thickness from two to four
inches and in length from eight to twelve inches. The thickness of the
upper edges of the stones should not exceed four inches. They are set by
hand on their broadest edges lengthwise across the road, breaking joints
as much as possible. All projecting points are then broken off and the
interstices or cracks filled with stone chips, and the whole structure
wedged and consolidated into a solid and complete pavement. Upon this
pavement layers of broken stones are spread and treated in the same way
as for a macadam road.
Stone roads should be frequently scraped, so as to remove all dust and
mud. Nothing destroys a stone road quicker than dust or mud. The hand
method of scraping with a hoe is considered best. No matter how
carefully adjusted the machinery built for this purpose may be, it is
liable to ravel a road by loosening some of the stones. The gutters and
surface drains should be kept open, so that all water falling upon the
road or on the adjacent ground may promptly flow away. Says Spalding, a
road authority:
"If the road metal be of soft material which wears easily, it will
require constant supervision and small repairs whenever a rut or
depression may appear. Material of this kind binds readily with new
material that may be added, and may in this manner frequently be kept in
good condition without great difficulty, while if not attended to at
once when wear begins to show it will very rapidly increase, to the
great detriment of the road. In making repairs by this method the
material is commonly placed a little at a time and compacted by passing
vehicles. The material used for this purpose should be the same as that
of the road surface and not fine material, which would soon reduce to
powder under the loads which come upon it. By careful attention to
minute repairs in this manner a surface may be kept in good condition
until it wears so thin as to require renewal.
"In case the road be of harder material, that will not so readily
combine when a thin coating is added, repairs may not be frequent, as
the surface will not wear so rapidly, and immediate attention is not so
important. It is usually more satisfactory in this case to make more
extensive repairs at one time, as a larger quantity of material added at
once may be more readily compacted to a uniform surface, the repairs
taking the form of an additional layer upon the road.
"Where the material of the road surface is very hard and durable, a
well-constructed road may wear quite evenly and require hardly any
attention, beyond ordinary small repairs, until worn out. It is now
usually considered the best practice to leave such a road to itself
until it wears very thin, and then renew it by an entirely new layer of
broken stone placed on the worn surface and without in any way
disturbing that surface.
"If a thin layer only of material is to be added at one time, in order
that it may unite firmly with the upper layer of the road, it is usually
necessary to break the bond of the surface material before placing the
new layer, either by picking it up by hand or by a steam roller with
short spikes in its surface, if such a machine is at hand. Care should
be taken in doing this, however, that only the surface layer be loosened
and that the solidity of the body of the road be not disturbed, as might
be the case if the spikes are too long."
In repairing roads the time-honored custom of waiting until the road has
lost its shape or until the surface has become filled with holes or ruts
should never be tolerated. Much good material is wasted by spreading a
thick coat over such a road and leaving it thus for passing vehicles to
consolidate. The material necessary to replace defects in a road should
be added when the necessities arise and should be of the best quality
and the smallest possible quantity. If properly laid in small patches
the inconvenience to traffic will be scarcely perceptible. If such
repairs are made in damp weather, as they ought to be, little or no
difficulty is experienced in getting a layer of stone to consolidate
properly. If mud fills the rut or hole to be repaired, it should be
carefully removed before the material is placed.
Wide tires should be used on all heavy vehicles which traverse stone
roads. A four or five inch stone or gravel road will last longer without
repair when wide tires are used than an eight or ten inch road of the
same material on which narrow tires are used.
Not only should brush and weeds be removed from the roadside, but grass
should be sown, trees planted, and a side path or walk be prepared for
the use of pedestrians, especially women and children, going to and
coming from church, school, and places of business and amusement.
Country roads can be made far more useful and attractive than they
usually are, and this may be secured by the expenditure of only a small
amount of labor and money. Although such improvements are not necessary,
they make the surroundings attractive and inviting and add to the value
of property and the pleasure of the traveler.
If trees are planted alongside the road they should be far enough back
to admit the wind and sun. Most strong growing trees are apt to extend
their roots under the gutters and even beneath the roadway if they are
planted too close to the roadside. Even if they be planted at a safe
distance those varieties should be selected which send their roots
downward rather than horizontally. The most useful and beautiful tree
corresponding with these requirements is the chestnut, while certain
varieties of the pear, cherry, and mulberry answer the same purpose.
Where there is no danger of roots damaging the subdrainage or the
substructure of the road, some other favorite varieties would be elms,
rock maples, horse-chestnuts, beeches, pines, and cedars. Climate,
variety of species selected, and good judgment will determine the
distance between such trees. Elms should be thirty feet apart, while the
less spreading varieties need not be so far. The trunks should be
trimmed to a considerable height, so as to admit the sun and air. Fruit
trees are planted along the roadsides in Germany and Switzerland, while
mulberry trees may be seen along the roads in France, serving the
twofold purpose of food for silkworms and shade. If some of our many
varieties of useful, fruitful, and beautiful trees were planted along
the roads in this country, and if some means could be devised for
protecting the product, enough revenue could be derived therefrom to pay
for the maintenance of the road along which they throw their grateful
shade.
The improvement of country roads is chiefly an economical question,
relating principally to the waste of effort in hauling over bad roads,
the saving in money, time, and energy in hauling over good ones, the
initial cost of improving roads, and the difference in the cost of
maintaining good and bad ones. It is not necessary to enlarge on this
subject in order to convince the average reader that good roads reduce
the resistance to traffic, and consequently the cost of transportation
of products and goods to and from farms and markets is reduced to a
minimum.
The initial cost of a road depends upon the cost of materials, labor,
machinery, the width and depth to which the material is to be spread
on, and the method of construction. All these things vary so much in the
different states that it is impossible to name the exact amount for
which a mile of a certain kind of road can be built.
The introduction in recent years of improved road-building machinery has
enabled the authorities in some of the states to build improved stone
and gravel roads quite cheaply. First-class single-track stone roads,
nine feet wide, have been built near Canandaigua, New York, for $900 to
$1,000 per mile. Many excellent gravel roads have been built in New
Jersey for $1,000 to $1,300 per mile. The material of which they were
constructed was placed on in two layers, each being raked and thoroughly
rolled, and the whole mass consolidated to a thickness of eight inches.
In the same state macadam roads have been built, for $2,000 to $5,000
per mile, varying in width from nine to twenty feet and in thickness of
material from four to twelve inches. Telford roads fourteen feet wide
and ten to twelve inches thick have been built in New Jersey for $4,000
to $6,000 per mile. Macadam roads have been built at Bridgeport and
Fairfield, Connecticut, eighteen to twenty feet wide, for $3,000 to
$5,000 per mile. A telford road sixteen feet wide and twelve inches
thick was built at Fanwood, New Jersey, for $9,500 per mile. Macadam
roads have been built in Rhode Island, sixteen to twenty feet wide, for
$4,000 to $5,000 per mile.
Massachusetts roads are costing all the way from $6,000 to $25,000 per
mile. A mile of broken stone road, fifteen feet wide, costs in the state
of Massachusetts about $5,700 per mile, while a mile of the same width
and kind of road costs in the state of New Jersey only $4,700. This is
due partly to the fact that the topography of Massachusetts is somewhat
rougher than that of New Jersey, necessitating the reduction of many
steep grades and the building of expensive retaining walls and bridges,
and partly to the difference in methods of construction and the
difference in prices of materials, labor, etc.
Doubtless the state of New Jersey is building more roads and better
roads for less money per mile than any other state in the Union. Its
roads are now costing from twenty to seventy cents per square yard.
Where the telford construction is used they sometimes cost as much as
seventy-three cents per square yard. The average cost of all classes of
the roads of that state during the last season was about fifty cents per
square yard. The stone was, as a rule, spread on to a depth of nine
inches, which, after rolling, gave a depth of about eight inches. At
this rate a single-track road eight feet wide costs about $2,346 per
mile, while a double-track road fourteen feet wide costs about $4,106
per mile, and one eighteen feet wide costs about $5,280 per mile. Where
the material is spread on so as to consolidate to a four-inch layer the
eight-foot road will cost about $1,173 per mile, the fourteen-foot road
about $2,053 per mile, while the one eighteen feet wide will cost about
$2,640 per mile.
[Illustration: EARTH AND MACADAM ROADS
[_Built by convict labor in Mecklenburg County, North Carolina_]]
The total cost of maintaining roads in good order ranges, on account of
varying conditions, between as wide limits almost as the initial cost of
construction. Suffice it to say that all money spent on repairing earth
roads becomes each year a total loss without materially improving
their condition. They are, as a rule, the most expensive roads that can
be used, while on the other hand stone roads, if properly constructed of
good material and kept in perfect condition, are the most satisfactory,
the cheapest, and most economical roads that can be constructed.
The road that will best suit the needs of the farmer, in the first
place, must not be too costly; and, in the second place, must be of the
very best kind, for farmers should be able to do their heavy hauling
over them when their fields are too wet to work and their teams would
otherwise be idle.
The best road for the farmer, all things being considered, is a solid,
well-built stone road, so narrow as to be only a single track, but
having a firm earth road on one or both sides. Where the traffic is not
very extensive the purposes of good roads are better served by narrow
tracks than by wide ones, while many of the objectionable features of
wide tracks are removed, the initial cost of construction is cut down
one-half or more, and the charges for repair reduced in proportion.
FOOTNOTES:
[6] By Hon. Maurice O. Eldridge, Assistant Director Office of Public
Road Inquiries.