Sec. IV. INDIAN AND COLONIAL PRACTICE

_A Manual on Earthwork_, edited by Colonel Maclagan, R.E., gives much

interesting information as to Pise-building and a number of valuable

hints:

_Shutter-ties._--"Cross pieces, as the work proceeds, become so firmly

embedded in the wall, that there is great difficulty in extracting them,

to remedy which iron bars have been substituted. Even these thin iron

bars become so tightly jammed when surrounded by the compact pise earth,

that much labour and risk of injury to the work is incurred in

extricating them, and the expedient of setting them in a bed of sand has

been successfully resorted to. They are then drawn out with care, the

sand also is removed, and the holes which they leave are subsequently

filled with the same earth of which the wall is made, and rammed hard.

"The heads of the opposite uprights are held together by ropes, but in

practice in this country[6] it has been found that, under the immense

pressure exerted upon the plank sides by the earth firmly rammed in the

interior, the ropes are so liable to stretch, and to break, that it is

advisable to use iron rods or bars in this position also. When ropes are

used, the distance between the side planks is measured by gauge rods,

and the ropes tightened when requisite to preserve the proper breadth of

wall. The use of iron connecting rods renders this unnecessary."

[Footnote 6: India.]

_Soil._--"Soil of a medium quality, that is neither very stiff nor very

sandy, is considered best adapted for pise. It may be said that that

which would make good bricks will answer well for this description of

work.

"When the earth is very dry, a sprinkling of water will be necessary."

_Foundations._--"It is usual to begin the work upon a foundation of

brick or masonry; but there seems to be no reason why the pise might not

be used from the commencement, even for foundations under ground; being

carefully guarded from all chance of injury by running water."

_The Building._--"The casing being prepared and erected, and the upper

surface of the old work, when above the first stage, being sprinkled

with water, the earth, well mixed and slightly moistened, is thrown in,

and spread in thin layers of 4 or 5 in. These should, when rammed, be

reduced to one-half their original thickness. The rammers should be of

hard wood and very smooth. The successive layers are similarly treated,

and thus the work proceeds until the top of the casing is reached. The

ends of each portion should be finished with a slope, to which will be

joined the portion next to be added longitudinally. These joinings

should not, in the successive courses, be above those of the lower

stage, but as in masonry and brickwork, should 'break joint.' The seams

are all distinctly perceptible when the work is complete."

[Headnote: Plastering]

_Plastering._--"The wall may have a coating of plaster, or the surface

may be simply smoothed and dressed with a shovel, or similar implement.

When it is to be plastered, it is necessary that the wall should first

be thoroughly dry. If dry only externally whilst damp within, it has

been found that the moisture is apt subsequently to attack the plaster

and cause it to fall off in flakes. Without plaster, good Pise work is

found successfully to withstand exposure to the weather, and after the

lapse of many years to be so compact and hard as to be picked down with

difficulty."

_Protection._--"Where the wall is not that of a roofed building, it

should be provided with a coping, having a good projection to protect it

from rain."

_Rods versus Bars._--"The substitution of iron connecting bars for the

wooden ones has been mentioned above. The evils of the wooden

arrangement were found to be: the starting of the wedges, the fracture

of the tenons, the tight jamming of the bars in the wall, and the injury

to the walls and to the bars themselves from the force requisite to be

applied for extracting them. The lower iron connecting bars are made

3-1/2 in. by 1/2 in.; the upper, 1 in. by 1/3 or 1/4 in. each, having

holes 1/2 in. by 1/4 in., with corresponding pins.

"The mode of setting the bars and arranging the work on each successive

elevation of the casing is to cut on the surface of the completed part

of the wall a groove 1 in. wider than the bar, filling it in, after

placing the bar, with sand, to the level of the wall's surface. The side

boarding being set up, the vacant space left along the bevelled edge of

the previous course is filled up with moist clay to retain the first

layer of the new course. The end pieces are secured by iron bars or

rods, with screws and nuts."[7]

[Footnote 7: "A convenient arrangement might be: to make the

lower and upper connecting bars alike, to raise the side boarding

a few inches above the upper bars, which, when embedded, might be

allowed to remain and become the lower ones of the next course;

the external apparatus being shifted by taking out the pins and

slipping off the stanchions and planks to be reapplied to the

upper bars already in position to receive them."]

_Ramming._--"Gentle and quick ramming has been found most effectual."

_Report on the Pise-work executed at the Etah Jail during 1867-8.

By Mr. H. Sprenger, Assistant Engineer_

"The boxes in which the pise-work at the Etah Jail is being executed

consist of two wooden frames 10 ft. long and 2-1/2 ft. broad, made of

planks, which are nailed on to stout battens. They are held together by

four pairs of posts 3 in. by 3 in., which are connected above and below

with tie-bars of flat iron 1-1/2 in. by 1/4 in. The tie-bars have at

each end a certain number of 1/2 in. holes punched in them to receive

pins for the purpose of preventing the posts from slipping off. By

changing the pins, walls of any given dimension can be obtained, wedges

of hard wood, with longitudinal slots, are introduced between the posts

and the pins, to adjust the breadth of the boxes to a standard gauge.

After the boxes are fixed and adjusted, they are secured in their

position by ropes passing over them, and tied to stakes on each side.

Any deflection from the vertical should be corrected at the commencement

of the work, as it is impossible to alter the position of a box after it

is half full. Any earth which is suitable for brick-making will do for

pise-work. On being dug out it is passed through a screen with 1/2-in.

meshes, and thrown into the boxes in even layers of 6 in. in depth.

[Headnote: The Right Quantity of Water]

"Generally fresh earth contains sufficient moisture to ensure good

consolidation; but if it is found that it jumps up under the rammers, it

should, on being thrown into the boxes, be sprinkled with a little water

out of a tin can with a rose. The watering should be as uniform as

possible, as if it is applied unequally it will liquefy the earth, which

will commence oozing out under the rammers. Pise-work executed with too

much water is worse than if done with dry earth, as, on account of the

elasticity of the wet earth, the effect of the ramming is deadened, and

the earth remains unconsolidated. The men should be prohibited to keep

time in ramming, as it causes vibration, which is injurious to the

stability of the wall. On working over a lower course, it is as well to

let the lower tie-bars about 4 in. into the same to give the boxes a

firm hold on the old work, thereby the joints become imperceptible, and

the upper edge of the lower course is prevented from chipping off.

"The implements used are three different kinds of rammers. The earth is

first beaten down with a V-shaped rammer, and then surfaced with one

with a flat bottom. The sides of the boxes are consolidated with a

spade-shaped rammer. When commencing the pise-work at Etah, considerable

difficulty was experienced in extricating the lower tie-bars. These

were, therefore, supplied with holes 3 in. apart throughout their whole

length. A pin was inserted, against which a crow-bar with a long slot

and well bent at the end was made to work. An equal pressure could

thereby be exerted against the tie-bars; they were thus extracted with

great facility without injuring them or the face of the wall, which was

not the case formerly."

_Supplementary Note by Mr. E. Battie, Executive Engineer,

5th Division, Grand Trunk Road_

"The work at Etah has generally been concluded in the following manner:

In the morning the boxes were taken down, and again put up and filled

during the day; they were left during the night, so that the earth might

detach itself from the sides. It is not advisable to allow a course to

dry thoroughly, as the upper one will not bind well into it, but

probably show a crack. If the earth is well rammed, and only the proper

quantity of moisture admitted, a second course can be commenced

immediately."

* * *

The Report of the Rhodesia Munitions and Resources Committee issued in

1918 contains an interesting paper by Mr. John Hynd on Pise-building,

from which the following is extracted:

[Headnote: Pise Buildings at Empandeni]

"_Pise de Terre Buildings_

"_The Spectator_ took this matter up some two years ago and wrote as

follows:

"'Various schemes of land settlement are in the air. . . . All of them

must, however, be concerned with cheap buildings. That is a _sine qua

non_.' . . .

"The material used for the walls at Empandeni is one-third sand,

one-third ant-heap, and one-third soil, all pulverised and put through a

sieve. Water is then added. The mixture must be neither too wet nor too

dry, just sufficiently damp to bind; a good indication of the correct

consistency being that when squeezed hard by the hand it shows a

tendency to bind. Sufficient of the loose mixture is thrown into the

form to fill it to a depth of about 3 in., and this is thoroughly rammed

before the next layer is put in. Most thorough ramming is essential.

When the frame is rammed full, it is taken apart and shifted along to

make another section and so on until the first layer is complete. The

first layer is, as a rule, sufficiently dry to permit the starting of

the next about three hours after laying. Door and window frames are put

in as the work proceeds, and must be well braced while ramming. In the

top layer hoop iron or fencing wire is let in for fastening down the

wall plates. Arsenite of soda or Atlas Compound is used in the first

layer or two to keep out white ants. The floor can be made of timber,

cement concrete, or rammed earth, and the roof thatched or covered with

corrugated iron as is most convenient.

"The following Pise de terre buildings have been erected at Empandeni:

"A large schoolroom 75 ft. by 28 ft. by 12 ft. high, walls 14 in. thick;

seven boys' dormitories, each 30 ft. by 20 ft. by 12 ft.; twelve

single-room houses, each 16 ft. by 12 ft.; six fowl houses, each 20 ft.

by 10 ft.; a large fowl house 250 ft. long, front walls 7 ft. and back

walls 5 ft. high. This building is divided into fifteen compartments.

"From the foregoing description it is quite evident that cheap and

efficient buildings of this nature can be erected at a very low cost.

"On a farm it is not necessary to employ any skilled labour, as the

doors and windows can be purchased ready-made, and the frame-work,

clamps, etc., put together by the farmer himself. For a roof of thatch

all the necessary material, except iron ridging, if this is used, can as

a rule be procured on the farm.

"Should a cement concrete floor, which is cheaper than a wood one, be

desired, there would be an extra expenditure for cement, the amount

required being about two bags per twelve square yards. Such a floor

should be laid before the walls of the building are commenced, and it is

essential that the site is thoroughly well rammed and consolidated,

particularly below where walls will come, before laying the concrete, to

prevent cracks developing through settlement. The concrete raft should

be carried at least 6 in. beyond the outside walls of the building, and

if the work is properly done, a special ant-course will be unnecessary.

The concrete can be left rough below the walls to give a bond, and it

might be advisable to lay some pieces of hoop iron in it which would be

left projecting to be bedded into the walls.

"Another good type of floor would probably be that suggested in _The

Spectator_, viz. road material laid down and tarred in the same manner

as roads are now made in many places.

"A number of rooms and houses have been erected on the Globe and Phoenix

Mine on much the same principle as Pise de terre buildings, but the

system developed there is different as regards the mixture, which

consists of two parts ant-heap or ordinary dagga which must not be too

sandy, and three parts ashes or clinker sieved free from fine dust.

"A very full description of the method employed on this mine was

forwarded by the courtesy of the Manager to the Committee, and it is

interesting to note from this that the walls are made waterproof by

first making them smooth with dagga plaster, then, when quite dry,

giving one good coat of boiling hot tar. A coat of limewash is applied

three days later. That this is effective is well evidenced by the fact

that the buildings erected have successfully withstood our last

abnormally heavy rainy season.

"The Globe and Phoenix system is the result of a number of experiments

carried out on that mine. Their mixture, which is stated to be

ant-proof, contains more moisture than Pise de terre, and each course is

reinforced with old wire rope, or other suitable scrap. The material is

left in a heap for one or two days before being used.

"Circular huts have been built on the mine of the same material, the

forms being made of two rings of corrugated iron in three or more

sections joined up with cleats at the end laps and held in position with

cross bolts and distance pieces. The inner ring is 9 in. less radius

than the outer one."

[Headnote: Pise Buildings for Settlers]

_Extracts from a paper on Pise in the "Farmers' Handbook,"

issued by the Department of Agriculture, New South Wales, 1911_

"Pise is a material readily obtainable by the settler, of which cheap

and durable buildings can be easily and substantially erected.

"For the construction of pastoral or agricultural buildings, especially

in districts remote from railways, or from towns in which other building

materials are cheap or easily procurable, pise is particularly well

adapted. In the country earth is plentiful and readily obtainable; in

the city or town such is not the case, and this fact, combined with the

very bulky nature of the material, prohibits its use in such centres of

population.

"To the selector or settler, who, like many of our successful pioneers,

is not burdened with a superfluity of hard cash, but who possesses an

abundant capital of energy, combined with a certain amount of handiness,

pise has an additional advantage (which it shares with slabs, wattle and

daub, etc.) over most other building materials, in that it affords him

an opportunity of erecting his homesteading largely as the result of his

own labour.

"As a building material, pise is infinitely superior and more durable

than slabs, galvanised iron, or weather-boards. In fact it is

questionable whether it is not more suitable for our climate, and

therefore to be preferred to brickwork; for pise buildings, properly

protected and finished, are quite as durable and much cooler than

buildings constructed with solid brick walls. This statement may be

questioned by some whose knowledge of pise is limited to buildings so

badly planned that the very elementary principles of building

construction have been neglected. This neglect, which is all too common,

makes things bad enough, but when to it is added, as is sometimes the

case, indifferent workmanship, combined with the use of unsuitable

material, the result does not call for admiration, and it is not

surprising that a bad impression is created. With no other knowledge of

pise it is only natural to condemn it because of such specimens, but

under similar circumstances other better-known building materials of

proved excellence would also be condemned. Brickwork would just as

readily be condemned if its building qualities had to be estimated by

the appearance presented by a brick building which had been constructed

of badly-burnt bricks laid by unskilful tradesmen on an imperfectly

thought-out plan. Just as with other building materials, the

possibilities of this material can only be judged by an examination of

properly planned and constructed examples of the pise-builder's art.

Such are found here and there throughout the country, pleasing to look

at, affording comfort and satisfaction to their owners. A properly

constructed pise building can be finished to suit the taste of the most

fastidious. Even without plaster the walls can be 'floated' down and a

'skin' obtained on them which, when limewashed, resembles stonework.

When plastered inside and out they possess the advantages of a stone

house, and are erected at a fraction of the cost.

"Some idea may be formed of the durability of pise by the fact that

there is a stable built of pise which has been in constant use for over

sixty years, and which at the present time is in good order. The good

condition of this stable is the more surprising because the external

walls are unprotected from the weather, and it is generally recognised

that pise-work, especially if unplastered, should be protected from the

direct action of rain. Pise buildings are said to have a life of a

century and a half.

"The stability of pise buildings is beyond question, as is proved by the

following instance:--At Lambrigg, a second-story brick building, with

14-in. walls, and containing ten rooms, is built upon a lower story of

pise. The bricklayer who had the contract for erecting the brick portion

of the house refused, as it was built upon pise, to guarantee his work.

Some time after the completion of the house he visited it, and after a

thorough examination of the building, declared that it was the most

substantial brick house in the district, as it had not a crack in it,

a feature which was somewhat unusual in that locality. Another case

bearing on the same subject is that of a residence at Temora. When this

building was being constructed the workmen omitted to leave holes for

the bolts which were to secure the verandah plates to the walls, as it

was thought these could readily be bored out afterwards with an auger.

On attempting to bore out these holes on the completion of the building,

and when the pise-work had become drier, the operation of boring proved

so difficult as to be practically impossible, and had to be abandoned.

[Headnote: Builders' Aversions]

"The merits of pise-work have been recognised in France, India, Mexico,

and California for years past, and seeing its equal suitability for our

climate, it is surprising that these merits have not led to its being

more extensively used. The principal reason for this seems to be because

our builders are averse to undertaking this class of work, and in

consequence the bulk of it is placed in the hands of untrained men, who,

whilst quite fitted to carry out the pise-work, are not competent to

undertake the other constructive work of a building. However, they do

not hesitate to do this, as well as to undertake the more important work

(though unrecognised as being so) of planning out the building. The

result is in most cases an improperly planned and defectively

constructed building, which appeals to no one, but has a tendency to

bring pise into disrepute.

"The reason for a builder's unwillingness to undertake pise-work is not

far to seek. For the successful carrying out of his work a builder

relies upon skilled tradesmen; our tradesmen are trained in cities and

towns, and as pise is not a suitable material for such places, tradesmen

do not become familiar with it. A good builder with a reputation to lose

shrinks from placing that reputation at the mercy of a pise-builder, who

is not recognised as a tradesman, and in whom, in consequence of this,

a builder is likely to have little or no confidence.

"The actual erection of pise-work presents so little difficulty that it

can be done by any one who has sufficient strength to shovel earth and

wield a rammer, provided he will exercise care to see that the moulds or

boxes into which the earth is shovelled are kept plumb and in straight

lines. The average settler, even with no previous knowledge of pise-work

or building construction, need have no hesitation in undertaking the

pise-work of his own buildings if he works to a well-thought-out plan

drawn up by somebody competent to do so.

"The necessity of having a plan prepared by some one who understands the

principles and requirements of simple building construction, before

undertaking the erection of any building, cannot be too strongly

emphasised. This great need, which is often overlooked by the settler,

cannot be economically dispensed with. The securing of a properly

prepared plan is of the greatest value towards obtaining a building of

the maximum strength and durability, combined with the best appearance

and greatest convenience, for the least cost. Even when a settler

undertakes the pise-work of his own building, it will only be in rare

instances that he will not have the advantage of trained supervision

during its erection. The services of a tradesman will invariably be

found necessary to make doors and window-frames, construct the roof,

etc. This workman can be engaged when the building is started, and

whilst preparing the timbers of the roof, in readiness for the time when

they will be required on the completion of the pise-work, can supervise

the fixing of the door and window frames, and see they are set

correctly, and in their proper places.

"Pise walls are constructed in sections, the extent of which is

regulated by the supply of casings available.

"Into the moulds formed by the boxes the earth is shovelled in layers of

4 or 5 in., and then rammed until thoroughly solid before another layer

is put in. On the completion of the section, _i.e._ when the mould is

full and well rammed, the keys or pins are knocked out of the 'bolts,'

and the 'boxes' taken apart and erected on another portion of the

building. The top of that portion of the pise-work on which it is

proposed to erect another section should be well moistened and covered

with wet bags some hours before the mould is formed. The bottom of the

mould should overlap the top of the pise-work by about 6 in. After the

'boxes' are put together, the top layer of pise should be loosened with

a pick so as to form a bond with the section about to be built, and if

this section adjoins one already built, the ends of the latter should be

bevelled off so as not to form a straight joint.

"Material which is too sandy will fret away, and one containing clay

will crack when dry. Soils containing these defects should be avoided.

There is, however, such a wide range of soils which are suitable that a

holding of any size on which suitable soils cannot be found will be the

exception. It is possible to remedy the defects found in one soil by

mixing it with another soil, but very rarely will such a course be

necessary.

[Headnote: Number of Men Required]

"The plant required will depend upon the number of men to be employed.

Three is the least number that can be economically employed--two

attending to the boxes and ramming, and one carting earth from its

location to the building and assisting generally. The plant required for

this number of men is given below. If more are engaged, additional plant

of the same character will be found advantageous.

"The necessary plant will consist of--2 wooden rammers, 1 iron shod

rammer, 2 straight boxes, 2 angle boxes, 3 casings for blocking up the

ends of boxes, bolts and keys for same, 12 gauge rods, washers--a

liberal supply of 3/4-in. washers, 2 shovels, 1 spade, a horse and dray

or other means for transporting the material to the building (if

required)."