The basin covers an area of roughly 300 acres, not including the bank

deposits on the streams or the higher level flats. As would be expected

from the nature of the ground, the top gravels do not carry payable

values, but it seems to me almost impossible for the bottom to be other

than rich when it is remembered that tin will not travel far without easy

outlet and good grades, and that for a long period tin-bearing dirt has

been emptying itself into this basin from so many channels. We have been

unable to reach bottom in ordinary trial pits owing to heavy water and

the running nature of the alluvial, and it will now have to be tested by

boring.

Even if it proves only a low-grade show, it is obviously a big mine, and

one that must be worked by dredging or pumping methods. Possibly the

three falls above mentioned would give sufficient power, in which case

the problem of working the “A” deposits would be solved at the same time.

Otherwise it would be necessary to acquire the Kwall Falls, and generate

electric power there.

C

I am not so familiar with this portion of the river, but, generally

speaking, it is of a similar character to “B,” and the same remarks

apply, but with this important exception, that it is down stream and

therefore farther away from the source of the tin. I am not in a position

to say whether it is fed by other tin-bearing streams or rocks further to

the west.

As your Chairman very reasonably suggested, there may be an obstruction

in the shape of rising bedrock or bars about Section 46, in which case

this portion may prove of little value. This can only be disclosed by

continuing the boring operations, and I would here emphasise Mr. Lush’s

opinion that the greatest care should be exercised in taking samples from

holes in these loose gravels where boring has a tendency to concentrate

the heavier mineral at the bottom.

RECOMMENDATIONS

As some difficulty is anticipated in holding the areas as they now stand

after this year, I suggest that they be dealt with as follows:—

(A) The streams and alluvial deposits on this portion are

spread over some six square miles of country, so that my

previous suggestion that the whole should be taken up in one

rectangular mining area is not feasible. A mining area should

be acquired over Sections 49 and 50 as under:—

Commencing at the N’Gell Beacon, thence 2 miles due west,

thence 1 mile due north, thence 2 miles due east, and thence 1

mile due south to the starting point, enclosing an area of 2

square miles.

Mining licences over Nos. 1, 2, and 3 streams should be renewed.

The above four mining areas will not include all the alluvial mentioned

in this report as existing on this portion (A), but if the three streams

are held, the alluvial lying between them will be safe from others, who

would have no water for working it. This is only intended to meet the

case temporarily, and until further surveys have been made and the Mining

Laws revised.

(B) Negotiations should be entered into with the Niger Company

to take over this part of the river, or with a view to an

amalgamation of interests.

A mining licence should then be obtained to commence at a

beacon 10,343 feet due west of the N’Gell beacon, thence 2½

miles due west, thence 1 mile due south, thence 2½ miles due

east, thence 1 mile due north to the starting point, enclosing

an area of 2½ square miles.

(C) I recommend that an exclusive prospecting licence be

applied for, identical with Sections 36 to 40, enclosing an

area of five square miles. If a prospecting licence is not

allowed in any form, the expense of holding this piece of

land under mining licences must be borne until prospecting is

completed.

There remains only the river flowing through Sections 46 and

35. A rectangular prospecting area (or, if refused, a mining

area) ½ mile wide, east and west, by about 1¼ miles long,

north and south, will be sufficient to hold this while its

examination is going on.

With regard to staff and the work for the immediate future, a good

surveyor and assistant must be sent out whose chief duty, apart from the

demarcation of boundaries, would be the determination of grades in the

rivers, measurement of water, survey of falls, and the preparation of

sections showing the alluvial beds as disclosed by the pits and bores.

An experienced man to carry out the boring operations should also be

provided, and the whole work placed in charge of a capable hydraulic

mining engineer.

CONCLUSION

It is above all things desirable to aim at working the whole of the

deposits about this river as one large power proposition, deriving the

power either from falls on the property or from Kwall. Should it be

found impossible to do this (from failure to secure the land and falls

required), then it will have to be proved whether the deposits on the

six square miles of “A” portion justify the expense of harnessing falls

and conveying power to the heads of the streams. If not, as much of the

alluvial as possible must be worked out by the same system of sluicing

as was employed last year, but on an increased scale, and with a more

elaborate method of dealing with the water supply.

I am of opinion that it will take a year with a competent staff to prove

the six miles of land referred to in “A” portion.

(_Signed_) H. W. LAWS, M.I.M.M.

_3rd September, 1910._

N’GELL STREAM AREAS

_28th December, 1909._

_The Secretary_, NIGER COMPANY, LIMITED, LONDON, W.C.

DEAR SIR,—I beg to hand you herewith Summary of tin returns for the

months of November and December.

_Tin Recovery._—Work ceased on the 14th instant owing to Mr. Carpenter’s

time being completed, and his desire to return to England; otherwise

sluicing on No. 1 stream could have continued to the end of the year.

Sluicing on No. 2 stream was stopped early in November owing to want of

water.

The black tin recovered for November amounted to 12 tons and 2 lbs.,

and from December 1st to 14th, 4 tons 14 cwts. 3 qrs. 12 lbs., making a

total of 30 tons 0 cwts. 1 qr. 3 lbs. for the three months that mining

operations have been carried on, as shown on the summary.

The ground sluiced at No. 1 stream measures approximately 2,736 cubic

yards, worth 10 to 11 lbs. of black tin per cubic yard.

In arriving at these figures, the tin taken from the actual river bed,

where it was impossible to measure the ground sluiced, is excluded, and

this value will be found to be a fair average for the alluvial bank

deposits on the N’Gell areas.

I estimate there is sufficient of this to last for six years on the two

areas we have taken up, but this does not include some fairly extensive

deposits between the three N’Gell streams and outside our small mining

leases, which we have recently found to exist. We have not attempted

to develop these higher deposits, but wherever tried they carry good

values, and if by careful selection we added them to the existing areas,

the proposition would become an important one as far as quantity is

concerned. The difficulty lies in economical working. The present method,

although profitable, is unsatisfactory, at any rate from an engineering

point of view; my experience of the last three months has proved that

sluicing in a small way can only proceed between seasons—in the dry

season only hand-work can be done, and at the height of the rains the

sluices cannot be fixed low enough to receive the sluicing water. It

is essentially an elevating proposition, but without power, fuel, or

water, we are helpless. I therefore recommend you, should an opportunity

occur, to give careful consideration to any amalgamation scheme which our

neighbours on the N’Gell River might think desirable after they become

familiar with their property, especially if they decide to work on a

large scale.

Should no opportunity of the kind occur, I advise you to take the best

out of the three streams and their alluvial banks by our present cheap

sluicing methods and handwork during the next six years or so. A good

engineer and an assistant would be required to supervise, but the former

would only be required at certain seasons and not permanently on the

property. I am preparing a list of plant required to work economically on

these lines on the three streams.

_Export._—The tin won was all first grade, assaying 72 per cent. to 73

per cent. 644 bags, weighing net 19 tons 9 cwts. 3 qrs. 7 lbs., were

despatched in November, and 350 bags, weighing net 10 tons 10 cwts. 1 qr.

24 lbs., were despatched this month, making a total of 30 tons 0 cwts. 1

qr. 3 lbs.

_General._—The plant has been properly laid up and protected from the

weather for the dry season, and a watchman has been placed in charge.

I am, &c.,

(_Signed_) H. W. LAWS.

Since the preparation of the foregoing particulars a report has been

received from the company’s manager giving the first detailed particulars

of the prospecting as follows:—

“_Prospecting._—With regard to this important subject I expect to have a

little more to say when I have a general map ready to forward to you. The

shaft in Section 26 which you asked about in your letter of 26th July was

not got down to bedrock on account of water, and there were no results

to report. In prospecting the streams of the central and northern part

of the 40-mile area, we found tin in many places in various quantities,

and irregularly distributed. Apparently the best stream is that one

which runs through Section 28; while prospecting there we calabashed

out five tons very easily from the bed of the stream, which tin we have

in stock and shall report it to the Government as soon as the mining

lease is applied for. The prospecting by numerous pits shows that the

ground is too irregular in values outside the bed of the stream to make

satisfactory estimates until some sluicing is done, which will be a

relatively easy matter when we have the mining lease. There is another

stream about three miles further north which I think will warrant taking

up, but perhaps not quite so good as that in Section 28.

“In prospecting other streams of the northern part of the 40-mile area we

generally found from a trace of tin to say a pound or so per yard with

limited yardage, and none of them offer much encouragement to the company

for mining purposes.

“A part of the N’Gell River, in Sections 49 to 50, I think is suitable

for taking up as a mining lease. The tin, however, appears to be mostly

confined to the river bed, and therefore it is more suitable for

calabashing than for sluicing purposes. Also the parts of streams Nos. 1

and 2, which are in the prospecting area, should be included in the areas

applied for.”

The manager further states, in regard to the drilling operations which

are being carried out on the more remote and westerly portion of

the property, that the results hitherto obtained have not been very

encouraging, but that it is too early to arrive at a definite conclusion

in regard to final results.

Cable advice has been received of the recovery of ten tons of tin during

the month of October. The manager adds that the water is falling rapidly;

this should permit of calabashing on an extended scale. The value of the

tin already won by intermittent working should realise nearly £4,000, a

sum in excess of the outlay in respect of the surveying and prospecting

on which the small staff has been principally occupied.

TIN AREAS OF NIGERIA, LTD.

_Capital._—£60,000 in 240,000 shares of 5s. each.

_Directors._—Assheton Leaver (Chairman), Cyril D’Arcy Leaver,

James Ramsay Parsons, Franklin Stokes Saunders, Lewis Norman

Way.

_Secretary._—Henry Thomas Miller.

_Offices._—St. Bartholomew House, 58 West Smithfield, E.C.

This company owns two alluvial tin properties of about one square mile

each, and when the company was formed they had a further option for an

area of about 1,920 acres, which option has since been exercised, and the

property referred to in it floated as a subsidiary company called the Jos

Tin Area (Nigeria) Limited.

For the purpose of identification the two properties owned by the company

were described as Jos No. 2 and the Fusa property.

Mr. Malcolm has been appointed manager of the properties, and on behalf

of the company has applied for and secured permission to take up a

further area on the Fefan River.

Mr. S. W. Carpenter, who was in the employ of the Niger Company for

five years, has been appointed engineer. Mr. A. Higgins, who has also

joined this company, was formerly in the Public Works Department of

Nigeria, and has been in the country for the past ten years. He will make

his headquarters at Lokoja, in which place the company has contracted

to acquire a site and buildings to be used for trading, with a steam

launch and two barges on the river. In connection with this trading and

transport work, the company have acquired properties in Nigeria belonging

to the firm of Messrs. Siegler & Co., and their place in Lokoja occupies

the best river site there.

This company promoted its first subsidiary company in May 1910, and was

called the Jos Tin Area (Nigeria) Limited. The property was a producing

one.

ANGLO-CONTINENTAL MINES CO., LTD.

_Capital._—£200,000 in 400,000 10s. shares, of which 300,000

are issued and fully paid.

_Directors._—Messrs. W. F. Turner (Chairman), Edmund Davis, J.

Schaar, and H. White.

_Secretary._—Mr. A. W. Berry.

_Offices._—22 Austin Friars, E.C.

This company, in addition to having interests in various West African and

South African concerns, is interested in the Nigerian Tin Fields, and

in addition to holding share interest in various companies, they have a

prospecting right over an area of 50 square miles in the Bauchi district

to the west of the Naraguta area, and to the north and adjoining the area

of the Northern Nigeria (Bauchi) Tin Mines, Limited.

JOS TIN AREA (NIGERIA), LTD.

_Capital._—£110,000 in 440,000 shares of 5s. each.

_Directors._—Assheton Leaver (Chairman), C. D’Arcy Leaver, H.

T. Miller, J. R. Parsons, F. S. Saunders, A. T. Schmidt, L. N.

Way.

_Offices._—58 West Smithfield, E.C.

The company acquired from the Tin Areas of Nigeria Limited, an area of

1,920 acres which were originally held by the Niger Company. Mr. Charles

Scott has been engaged as mine manager, and is now on the property, from

which about 20 tons of black tin were won during May, June, and July.

At the statutory meeting held on 22nd August, the chairman said:

“I may say that I have had the pleasure on two or three occasions of

meeting Mr. H. W. Laws, who was the chief mining engineer of the Niger

Company in Northern Nigeria, and is now their consulting engineer here.

He had for some time the direction of the work on this particular mine.

In the course of friendly conversations with him, he told me that he

was of opinion that our company should get back its capital, together

with interest commensurate with the risk run in all mining enterprises.

He also told me that he considered the mine could go on producing

indefinitely anything up to 200 tons of tin per annum, without any

capital expenditure, but he added that he thought that would be a very

wrong policy to pursue, and that the right thing to do was to have, as

we intend having, a thorough survey made of the property, and then come

to a conclusion as to the best method of working it. I think that it

is very satisfactory to hear this from Mr. Laws, because it points to

the fact that we have really got a sound property, and one which, if

properly managed, will prove to be a sound speculative investment. It is

a property which must be regarded as a low-grade proposition. Although,

of course, it is more fascinating to have a property which may be called

a very rich one, yet a large low-grade property is really far more

satisfactory from the shareholders’ point of view than a property which

is simply rich in patches, because with a large low-grade proposition it

is a case of “cut and come again” and as often as you like. There is

always something to go away with. Mr. Lush, in a report which he gave us

at the time of the flotation of this mine, estimated that we could reckon

upon having 500 acres containing 2 lbs. of tin per cubic yard, and if

that estimate is realised—and I have no reason to anticipate that it will

not be realised—and the profits are made that he foreshadowed might be

made, you have a very handsome property, and one containing apparently

something over half a million sterling worth of tin.”

BISICHI TIN COMPANY (NIGERIA), LTD.

_Capital._—£200,000 in £1 shares.

_Directors._—The Earl of Wharncliffe, Sir William Wallace,

K.C.M.G., William Scott Coutts, Samuel Watkin Carlton, James

Gardiner.

_Secretary._—Stanley Aldous.

_Offices._—51 and 52 Fenchurch Street, E.C.

This company was formed to acquire and work mining rights over a property

known as the Bisichi Valley Tin Area, comprising an area of three square

miles in extent, situated in the Bauchi Tin Fields. It is located about

12 miles south-east of Jos, at the head-waters of the river Gongola, on

the main transport route from Keffi to Naraguta.

Mr. Laws, the general mining manager of the Niger Company, in his report,

says:

“One of the most pleasing features of this property is its constant

supply of water for sluicing and power purposes, and the ample head of

water given by the three falls for hydraulicing.”

In the Bisichi Valley there is a large alluvial deposit of light sandy

material which is quite free from clay, and is extremely friable, and

consequently capable of cheap and rapid concentration.

Black oxide of tin occurs abundantly in the river beds and adjacent

alluvial flats, and is of very good quality, there being practically no

iron or other impurity associated with it. The tin-bearing alluvial is

all on the surface, and varies in depth from a few inches to some 20 feet

in the vicinity of the river.

Systematic tests of the alluvial by trial pits were commenced this year,

and up to the present the great proportion of the alluvial of the river

Bisichi has been tested.

The tested ground averages 4 yards in depth, and contains approximately

2,120,000 cubic yards of payable alluvial wash. The latter varies in

value from traces to 129 lbs. of black tin per cubic yard, the average

value being 7.27 lbs. of black tin per cubic yard. The total contents

of the tested portion therefore amounts to 6,800 tons, exclusive of the

river bed deposits, which the Niger Company’s engineers estimate to

contain about 1,000 tons.

The nature of the river-bed wash does not lend itself to accurate

sampling, but Mr. Laws, judging by actual returns from similar deposits

on this field, considers this estimate of 1,000 tons a moderate one, and

states that it may be taken that some 7,800 tons of black tin (containing

over 70 per cent. of pure metal) have been developed to date. Taking

the costs as estimated by Mr. Laws at £45 per ton, the above tonnage

contained in the area already proved, shows an available profit of over

£350,000.

Payable tin-bearing alluvial exists on other portions of the Bisichi

Valley area, but as it has not yet been measured or tested, no exact

estimate can be made of quantities and values. The ground already tested

represents about one-tenth of the total area; but the very high values

and quantities so far disclosed cannot be taken to apply to the whole

area, as it is natural that the course of the main stream should carry

better values and deeper ground than the remainder of the land where the

alluvial would be more patchy and shallower. It will be seen, however,

that the estimated working costs per ton have been placed by Mr. Laws at

a figure which will permit of lower grade ground being worked than that

already referred to.

Mr. Laws advises the immediate erection of an hydraulicing plant capable

of dealing efficiently with wash dirt sufficient to produce 800 tons

of black tin annually, an ample head of water being available for this

purpose throughout the year.

He also states that it would be quite possible to commence work on the

property immediately by ground sluicing; but he is strongly of opinion

that this policy would be unwise, as the disturbance of the ground might

tend to interfere with the economical working on a large scale such as is

proposed.

Provided no unforeseen difficulties arise, Mr. Laws is of opinion that

the whole of the plant would be in operation within nine months.

If Mr. Laws’ advice is taken, he estimates that working cost would amount

to about £10 per ton on ore of the value already found, but, as stated

above, to allow for working a larger quantity of lower grade ground,

working costs should be placed at £15 per ton of ore. The price of the

ore in the market at Liverpool may be taken at £90 per ton, which, after

deducting £15 for working costs, and £30 per ton for transport and

contingencies, would leave a margin of profit of £45 per ton of ore.

Although it is proposed in the earlier stages of development to equip the

mine with plant capable of producing 800 tons annually, any increase on

this rate of working will depend on surveys determining the head of water

available.

WEST AFRICAN MINES, LTD.

_Capital._—£100,200 in £1 shares, of which 100,000 are ordinary

shares and 200 founders’ shares; all are issued and fully paid.

_Directors._—Rt. Hon. Lord Harris (Chairman), Edmund Davis,

Friedrich Eckstein, H. Strakosah, R. G. Fricker (Managing

Director).

_Secretaries._—The Consolidated Goldfields of South Africa,

Limited.

_Offices._—8 Old Jewry, E.C.

This company, which is managed by the Consolidated Goldfields of South

Africa, Limited, has secured an interest in a tin business in Nigeria.

The company have sent out Mr. Balfour, who has had experience in tin

dredging in the Straits Settlements. The tin property which is here

referred to was floated in conjunction with the Anglo-Continental Mines,

Limited, and was called the Northern Nigerian (Bauchi) Tin Mines,

Limited.

BENUE (NORTHERN NIGERIA) TIN MINES, LTD.

_Capital._—£10,000 in £1 shares; 8,500 are issued and fully

paid, the balance are under option at par till 31st March, 1911.

_Directors._—Charles E. Pearson (Chairman), C. L. W. Wallace,

H. Kemble, G. F. Jones.

_Secretary._—J. H. Dormer.

_Offices._—21 Great Winchester Street, E.C.

The company originally held a prospecting mining licence over an area of

ten square miles, situated in the Benue River district, Northern Nigeria.

Mr. Harry Kemble, accompanied by an experienced engineer, left for

Nigeria early this year. The following circular was issued to the

shareholders on 29th August 1910:

“I beg to inform you that Mr. Kemble, writing from Naraguta, on 21st

July, reports as follows:—

“‘Please inform my brother-directors I have acquired four square miles of

very rich tin area, as stated in my cable of the 19th inst. It is mainly

in the streams, and will be almost entirely recovered by calabash washing

(_i.e._ natives washing the alluvial in calabashes).’”

In a cable from Mr. Kemble, dated 8th August, he states that he has

acquired a further six square miles, also rich, and on 21st August he

cabled that he has acquired “another square mile extremely rich.”

With regard to the exact locality of these areas, Mr. Kemble says: “Mr.

Knight will have plans, report, &c., ready for sending home as soon as

possible.”

The following was issued to shareholders on 15th September 1910:

“Referring to my circular of 29th August, in which I informed you that

Mr. H. Kemble reported having secured in all eleven square miles of very

rich tin area, in a letter just received from Mr. Kemble, dated 3rd

August, he states that as a test they have washed 3,000 lbs. of tin in

five days’ work. With reference to seven square miles which Mr. Kemble

has secured for the company, he says:

“‘(1) Property on which camp is built lies nearly half-way between Bauchi

Town and Naraguta. It is two miles long by half-mile wide, taking in

the Ademi River in its length. There are other smaller streams on the

property running into the Ademi, and also containing tin. One square

mile. (2) Property on the river known locally as the Kogin Zungur, one

day’s march due south of Bauchi Town, and commencing quarter-mile

south-west of the town of Zungur, is six miles long and one wide. Mr.

Knight reports it rich in tin. Six square miles. It is impossible for Mr.

Knight to make detailed plans yet, as all his time must be devoted to

getting hold of further concessions.’”

GEL TIN LODE AND ALLUVIAL COMPANY, LTD.

_Capital._—£100,000 in 400,000 shares of 5s. each; present

issue 240,000 shares.

Nigeria and its tin fields · 第 6 / 10 段