CHAPTER X

SPECIFICATIONS FOR BRITISH 18-POUNDER QUICK-FIRING SHRAPNEL SHELL

The following paragraphs, abstracted from the official specifications,

give all the information contained in these specifications relating to

the manufacture and inspection of the British 18-pounder, quick-firing

shrapnel shell.

=Body.=--The body of the shell is made of cast or forged steel of

the best quality for the purpose, turned or ground to the form and

dimensions, and having the edge of the base rounded. If made of cast

steel, the casting must be clean, of uniform transverse thickness,

free from flaws, blow-holes, and other defects. The use of chaplets is

prohibited. If made of forged steel, the body must be forged hollow,

and free from forging marks and flaws. Should the shells be subjected

to heat-treatment, this must be carried out in batches consisting of

shells of the same cast. An undercut groove, with two projecting waved

ribs, will be turned on the body. Three chisel cuts may be made across

the waved ribs in the groove for the driving band, at an angle to the

longitudinal axis of the projectile to allow the air in the channels

between the ribs to escape when the band is being pressed on. The top

is threaded to receive the socket, and a groove for the fuse cover

provided. The steel body alone must weigh 6 pounds 5 ounces 12 drams,

plus or minus 2 ounces.

=Driving Band.=--The driving band is made from a ring of drawn or

electro-deposited copper, pressed into, and in contact with, the bottom

and undercut of the groove in the shell all around, and accurately

turned to the form required. The weight must be 4 ounces 12 drams, plus

or minus 2 ounces.

=Socket.=--The socket is made of composition metal, known as Class “C,”

threaded externally below the shoulder to fit the body, and internally

to receive the fuse, the bottom being bored to receive the top of the

central tube. The junction of the socket and central tube is soldered

to prevent the resin getting into the tube and socket. A hole is to be

bored in the side, threaded and fitted with a steel fixing screw. The

weight must be 8 ounces 8 drams.

=Central Tube.=--The central tube may be made of brass, copper, delta

metal, or gun metal. The lower end is to have a shoulder to rest on,

and to be threaded to enter the steel disk, the bottom being reduced in

diameter to fit the neck of the cup. Weight, 2 ounces 12 drams.

[Illustration: Fig. 1. Construction of British 18-pounder Quick-firing

Shrapnel Shell]

=Steel Disk.=--A steel disk, of the form shown in Fig. 2, will rest

on the shoulder in the bottom of the body, a hole being bored and

threaded through the center of the disk to receive the central tube.

Weight, 9 ounces 8 drams.

=Tin Cup.=--The cup in the base of the shell to contain the bursting

charge will be made of tinned plate to the form and dimensions shown in

Fig. 2, the parts being soldered together. Weight, 1 ounce 12 drams.

=Gages.=--Contractors may send their gages at any time to the chief

inspector, Woolwich Arsenal, London, England, to be checked and

compared with the standard gages.

=Screw Threads.=--The screw threads must, unless otherwise stated, be

of the British standard fine screw thread, and conform to the chief

inspector’s standard gages.

=Preliminary Examination of Contractor’s Work.=--The bodies, after

completion of machining, will be submitted at the contractor’s works,

to an inspector, for preliminary examination. Bodies made of cast steel

must also be submitted for a hydraulic test under a pressure of 100

pounds per square inch. Any shell which shows the slightest leak, or

fails to satisfy the conditions, will be rejected.

=Assembling.=--The tin cup, steel disk, and central tube are to be

placed in position and the shell filled with mixed metal bullets, 41

per pound (composed of seven parts of lead and one of antimony), the

interstices between the bullets being filled with resin, which must be

perfectly pure, and filtered when in a liquid state through a sieve

having 32 meshes per inch. The socket is then screwed onto the body as

tightly as possible, the threads having been previously coated with

Pettman’s cement or red lead.

=Marking and Plugs.=--The shells are to be marked on the side, above

the driving band. Plugs for the protection of the fuse holes in transit

will be supplied, free of charge, on demand, by the ordnance officer to

whom delivery is to be made.

=Delivery.=--(a). The shells will be covered with a thin coating of

vaseline or other similar anti-corrosive grease, which must be of

such a nature as not to interfere with the gaging, and they will

then be delivered unpainted, for inspection and proof. The shells

must be perfectly cleaned out, empty, complete in every respect, and

dry internally. (b). Such marking as may be necessary to identify

the steelmaker’s cast number, and, in case of heat-treatment, the

batch number, must be maintained by the contractor upon every shell

throughout manufacture. (c). The shell must be delivered in lots for

purposes of proof. A lot for this purpose will consist, as far as

possible, of shells of the same cast, and, when heat-treatment is

employed, of shells of the same batch number, and must not contain more

than 121 shells. (d). When the number of shells in a cast or batch is

less than 100, two casts or batches may be grouped together for this

purpose.

=Main Examination after Delivery.=--(a). Any shell of a lot which fails

to pass the chief inspector’s gages, or fails to satisfy the chief

inspector of its serviceability, will be rejected. (b). If at any time

during the examination it is found that defects of any nature, other

than errors of machining, which involve rejection of defective shells,

amount to 5 per cent of the number of the shells in the lot, the “lot”

will be rejected, (c). One or more shells selected from the lot will

be taken to pieces, and the body broken, if necessary, to ascertain

that the details of manufacture and component parts are correct, and

that the material is sound. Should they be incorrect, or the material

unsound, in any particular, the lot will be rejected. The driving

band will be cut out, and should it appear not to have been pressed

thoroughly home into the undercut and groove throughout, the lot will

be rejected. (d). If, at any time during the examination of a lot,

it is found that 5 per cent of the shells in the lot depart from the

approved design, further examination of the lot will be suspended. The

whole of the lot must be re-examined by the firm and those shells which

are incorrect eliminated. Those shells in which the departure can be

rectified may be brought to the approved design by the firm. The lot

may then be re-submitted.

=Tests.=--At least 1 per cent of the shells of every cast will be

subjected to tensile tests. Test pieces will be cut from the shell

blank, or from the finished shell at the option of the chief inspector,

and must be capable of standing the following minimum tests:

+-------------------+-------------------------------------+

|Tenacity, Tons per | Elongation in a Test Piece 2 Inches |

| Square Inch | in Length, or such Piece as can be |

+ -------+----------+ cut from the Shell, provided that |

| Yield | Breaking | |

| Point | Stress | Length / √Area = 4 |

+--------+----------+-------------------------------------+

| 36 | 56 | 8 per cent |

+--------+----------+-------------------------------------+

If any one or more of the conditions in this clause are not complied

with, the lot, or lots, of shell affected, will be rejected, and must

not be re-submitted. The contractor will supply, free of charge, the

necessary “Class C” metal for testing, if requested by the chief

inspector to do so. The pieces should not be less than 7 inches in

length, nor less than 1 inch in diameter, and will be required to stand

the following test:

+-------------------+-------------------------------------+

|Tenacity, Tons per | |

| Square Inch | |

+--------+----------+ Elongation in a Test Piece 2 Inches |

|Yield | Breaking | long and 0.564 Inch in Diameter |

|Point | Stress | |

+--------+----------+-------------------------------------+

| 6 | 12 | 10 per cent |

+--------+----------+-------------------------------------+

=Proof.=--(a). A percentage of the shell will be fired for recovery

from an 18-pounder Q. F. gun, with such a charge as will give a chamber

pressure not less than 15 tons per square inch. Should the shell so

fired set up above the high diameter of body, or break up in the gun,

or should any portion of the driving band separate from the shell

before first graze or impact, or should the recovered shell show that

the shock of discharge had distorted the disk supporting the bullets,

or cause such alteration of the internal parts as would interfere with

the correct action of the shell, or should any of the components be

incorrect, the lot will be rejected, provided always that the pressure

did not exceed the specification proof pressure by 0.5 ton. If the

pressure did exceed this limit, a second proof must be taken at the

government’s expense before the lot is rejected. The pressure of the

round, if not taken, will be assumed to be that of the last round fired

with the same charge in which pressure was taken. Further, should the

shell be reported unsteady in flight, and be found on recovery to be

without its driving band, or with the driving band loose or slipped in

its seating, then the driving band of a similar number of shells to

that taken for firing proof may be cut out to ascertain whether they

have been properly pressed on; if they have not been pressed down to

the satisfaction of the chief inspector, the lot will be rejected. If

found correct, such shells will be rebanded by the contractor free of

charge.

(b). The shells fired for proof may, after recovery, be broken to

ascertain the soundness of their material. Should any of the material

be unsound in any respect, the lot will be rejected.

[Illustration: Fig. 2. Details of British 18-pounder Shrapnel Shell]

=Re-submission.=--(a). A rejected lot must not be re-submitted unless

the rejection is due to failure of the driving band, or to rectifiable

gaging defects. (b). Shells put out at any period of inspection

for remediable defects may be re-submitted for further examination

after the defects have been rectified. It is to be understood that

the examination of such shells at that time will be incomplete, and

that they are liable to rejection after rectification. (c). If the

contractor wishes to re-invoice a lot rejected for failure of driving

bands, he must remove the shells and re-band them before they are

again submitted, (d). Rejected shells will, if considered necessary,

be marked with a small rejection mark, so that they can be readily

identified if redelivered.

=Replacement of Proof.=--The contractor will be required to replace,

free of charge, all shells expended in proof and examination, which,

whether fired or otherwise tested, will be the property of the

government.

=Packing.=--All packages are to be so marked that the goods contained

therein may be readily identified with the invoice. Unless it is

specified in the contract that the packing cases or other packing

material are to become the property of the war department, they will

remain the property of the contractor, who is responsible for their

removal.

Should they not be removed within two months of the acceptance at the

stores, they will be disposed of, and under such circumstances the

contractor will not be entitled to make any claim for compensation. The

packing cases must be marked “Returnable” or “Non-returnable.”

=Inspection.=--The shells may be inspected at any time during

manufacture by, and after delivery will be subject to testing by, and

to the final approval of, the chief inspector, Royal Arsenal, Woolwich,

England, or an officer deputed by him. In cases of defects occurring in

manufacture which necessitate repairs, the contractor shall bring the

same to the notice of the inspecting officer, and shall obtain from him

written authority to proceed with such repairs as may entail patching,

burning, electric welding, or other similar processes.

WEIGHT OF 18-POUNDER SHRAPNEL SHELL PARTS

Weights (avoirdupois)

Part Pounds Ounces Drams

Steel body 6 5 12 }

Driving band 4 12 } ± 2 oz.

Metal socket 8 8

Steel disk 9 8

Brass tube 2 12

Tin cup 1 12

Bullets, about 327 of alloyed metal,

41 per pound 7 14 13¹⁄₂

Resin 13 11

Total weight empty (unpainted)* 16 13 8¹⁄₂ ± 11 drams

Bursting charge 2 8

Paint 5¹⁄₂

Fuse 1 7 10

--------------------------------

Total weight 18 8 ± 5 drams

* To regulate weight of shell, a few buckshot may be used.

=Plug for Fuse Hole.=--The plug is to be made of a copper alloy, and to

the form and dimensions shown on the drawing, threaded externally on

the body, and a square recess, tapered, is to be formed in the top. The

screw threads must, unless otherwise stated, be of the British standard

fine screw thread, and conform to the standard gages of the chief

inspector, Royal Arsenal, Woolwich, England. Contractors may send their

screw gages to the chief inspector, to be compared with the standard

gages.

Any plug of a delivery which fails to pass the inspecting officers’

gages, or shows flaws or sponginess on the surface, or fails to

satisfy the chief inspector, Woolwich, as to its serviceability, will

be rejected. If at any time during the examination it is found that

defects of any nature, other than errors of machining, which involve

rejection of the defective plugs, amount to 5 per cent of the number of

plugs in the delivery, the whole order will be rejected. If at any time

during the examination of a delivery it is found that 5 per cent of the

plugs in the delivery will depart from the approved design, further

examination of the plugs will be suspended; the whole of the delivery

must be re-examined by the firm, and those plugs which are incorrect to

design eliminated. Those plugs in which the departure can be rectified

may be brought to the approved design by the firm. The delivery may

then be re-submitted for examination. The contractor will be required

to replace free of charge all plugs expended in test and examination,

which will become the property of the government.

Shrapnel shell manufacture · 第 10 / 13 章