MAKING FUSE PARTS
Combination timing and percussion fuses comprise a large number of
small parts made from different metals and alloys, and are produced in
various ways. Some of the parts are made from brass rod or alloys of
copper and aluminum, whereas others are made from hot-pressed forgings
and are machined after being formed to shape. In the following, a brief
description of several different methods of making the most important
fuse parts will be illustrated and described, together with details
regarding the forging tools used for the socket and plug.
[Illustration: Fig. 1. Tools used in forging Brass Fuse Socket]
[Illustration: Fig. 2. Diagram showing Construction of Tools used in
forging Fuse Socket]
=Forging the Fuse Socket.=--The fuse socket, which screws into the nose
of the shrapnel shell and acts as a base for the fuse, is made from a
special forgeable alloy casting containing 40 per cent copper, 58 per
cent zinc, and 2 per cent lead. The first step in this process is to
melt the above constituents in the usual manner and then to cast the
slugs in sand molds, six to eight being gated together. These castings
are made 2¹¹⁄₁₆ inches in diameter by ¹¹⁄₁₆ inch thick, as shown in
Figs. 1 and 2. There are several methods in use for forging the plugs,
but the general principle is the same. In this particular case, a No.
23 Bliss press capable of exerting a pressure of 250 tons is used. The
castings are placed in the furnace where they are allowed to “soak”
at a temperature varying from 1200 to 1300 degrees F., or, in other
words, until they reach a dull red color. One casting at a time is then
quickly removed and placed in the impression of the die shown to the
right in Fig. 1 and in detail in Fig. 2. The working parts of these
dies are made from Jessop’s high-carbon tool steel and one blow of the
press completes the forging, turning out about 3000 in ten hours. The
tools used for this purpose are of interesting construction, as shown
in Fig. 2. They comprise a lower die _A_ machined out to the shape of
the finished forging and carrying an ejector, and lower former _B_
operated by plunger _C_ which ejects the forging if it sticks in the
die. The top member or punch comprises a holder _D_ into which the
punch _E_ is screwed. This is bored out to fit an ejector _F_ which
ejects the forging as the ram of the press ascends. Punch _E_ and
stripper or ejector _F_ are made from high-speed steel, hardened. _G_
shows the cast blank and _H_ the completed forging.
[Illustration: Fig. 3. Tools used for forging Brass Plug]
=Forging Brass Plugs.=--The brass plug shown in Fig. 3 is used as a
temporary cap for the shrapnel to protect it during transportation. It
remains in the fuse socket until the shrapnel shell reaches the field
of operations, when it is removed and replaced by the timing fuse.
This member is made from a special forgeable alloy casting 2 inches
in diameter by ⁷⁄₈ inch thick and is cast in sand molds in a similar
manner to the fuse socket. It is also composed of the same constituents
as the socket and is forged in the same type of press. The construction
of the tools, however, varies somewhat from that of the tools used in
making the socket, as will be seen upon reference to Figs. 3 and 4. The
tools for the plug comprise a lower die _A_ carrying a combined ejector
and forming die _B_. Inserted in this lower forming die is a secondary
ejector _C_ which is operated by plunger _D_. The upper member of this
forging tool consists of a punch-holder _E_ carrying forming punch _F_
which is counterbored to receive an ejector ring _G_. Passing down
through the center of punch _F_ is a center-punch _H_ that is made
in two parts. The lower member is made of high-speed steel, hardened,
whereas the upper portion is ordinary carbon steel. This center-punch
is operated to eject the forging by a plunger _I_ on the up-stroke
of the press through the action of three pins _J_ coming in contact
with the flange on punch _H_. _K_ shows the rough casting and _L_ the
completed forging.
[Illustration: Fig. 4. Diagram showing Construction of Tools for
forging Brass Plug]
=Tooling for Machining Brass Socket.=--The New Britain automatic
chucking machine, referred to in the following, consists essentially of
a multiple-chuck turret with capacity for holding five or six pieces of
work, acted upon simultaneously by four or five tool-holding spindles.
The sequence of operations is similar to that of a multiple-spindle
screw machine. A finished piece is removed and a rough blank inserted
at each indexing. The machine is not idle while chucking, there being
one more chuck than spindles.
[Illustration: Fig. 5. Diagram showing First Series of Operations on
Fuse Socket on the New Britain Automatic Chucking Machine]
The shrapnel socket which, as previously explained, is made from a
brass casting and pressed into rough shape, is machined in two settings
in the New Britain No. 24 chucking machine. This machine has four
spindles, and at the first spindle position, as shown in Fig. 5, reamer
_A_ cleans out the hole in the pressed brass blank, counterbore _B_
cleans out the inside, and tool _C_ faces the end. At the second
spindle position, reamer _D_ finishes the central hole, counterbore _E_
faces the bottom, and tool _F_ chamfers the hole.
The under-cutting preparatory to threading is done at the third spindle
position. The operation is performed with tool _G_ working on the
cross-cutting head _H_. When the pressed blank is fed in and reaches
stop _I_, it commences to push the housing _H_ of the cross-cutting
head backward. A pair of stationary fingers _J_ operate in oblique
slots in the housing _H_, and as the housing presses down on these
fingers, the motion gives a cross movement to the under-cutting tool
_G_ and its arbor _K_. In this manner, the under-cutting of the piece
is performed. The fourth spindle operation is simply that of tapping
the threaded interior with a tap _L_.
[Illustration: Fig. 6. Diagram Illustrating Second Series of Operations
on Fuse Socket on New Britain Automatic Chucking Machine]
=Second Operation on Shrapnel Socket.=--Fig. 6 shows the order of
operations performed on the shrapnel socket at the second chucking, the
work being screwed on threaded arbors. At the first spindle position,
pilot _A_ engages the central hole, while tool _B_ turns the external
diameter, tool _C_ chamfers the corner, tool _D_ turns the thread
diameter, tool _E_ faces the shoulder, and counterbore _F_ finish-forms
the nose of the piece. At the second position, these same surfaces
are machined with finishing tools of the same design as those just
described.
At the third spindle position, the shoulder at the end of the threaded
section is under-cut. This is done by a cross-cutting head, similar to
that shown in Fig. 5 and carrying the cutter _G_. At the fourth spindle
position, the final operation--threading--is performed with die _H_.
[Illustration: Fig. 7. First Series of Operations on Fuse Body on No.
73 Seven-spindle New Britain Automatic Chucking Machine]
=Machining Fuse Bodies.=--In Fig. 7 is illustrated an interesting
tooling set-up for machining a fuse body. This is done on the No. 73
seven-spindle New Britain automatic chucking machine. The operations in
this set-up are performed on one end only of the fuse body. Strictly
speaking, this is a seven-spindle machine, but the first four spindles
carry internal spindles running at high speed that co-operate with
the external spindles in machining the work, making this virtually
an eleven-spindle machine. At the first spindle position, the broad
face and stem are machined with cutters _A_ of hollow-mill type, and
centering tool _B_, carried in the inner spindle, centers the work for
drilling.
In the second spindle position, tools _C_ bevel the external diameter
of the flange at the same time that drill _D_ is producing the hole
in the stem. In the third spindle position, roll _D_ supports the
work against the thrust of beveling tool _E_, and the small drill _F_
held in the internal spindle deepens the hole. At the fourth spindle
position, the external spindle carries a hollow-mill _G_ that finishes
the stem diameter, and a counterbore _H_ is carried in the internal
spindle to machine the central hole.
[Illustration: Fig. 8. Machining a Shrapnel Head on the New Britain No.
24 Automatic Chucking Machine]
A cross-cutting head in the fifth spindle position carries a circular
tool _I_ that machines on both sides of the section subsequently to be
threaded, and while this operation is being performed the pilot _J_
steadies the work as well as the tool-holder. In the sixth spindle
position, the small hole is threaded with tap _K_, and the exterior
is threaded with a die, tap and die being of different pitches. In
the seventh spindle position, a holder carries the forming tool _M_
for cutting grooves in the face of the flange, and the same spindle
carries a reamer _N_ that finishes the hole in the stem.
[Illustration: Fig. 9. First Series of Operations on Shrapnel Head on
the New Britain Automatic Chucking Machine]
[Illustration: Fig. 10. Second Series of Operations on Shrapnel Head on
the New Britain Automatic Chucking Machine]
=Machining Steel Shrapnel Heads.=--Heads for shrapnel shells made from
cold-drawn steel stampings are machined in two settings on a No. 24
New Britain automatic chucking machine of the four-spindle type, shown
in Fig. 8. This piece, shown in Fig. 9 in its sequence of operations,
is especially difficult to machine on account of the stringy nature
of the metal. The work is held for the first chucking with the small
end out, and in the first spindle position the facing on the end is
distributed between tools _A_ and _B_, while counterbore _C_ roughs out
and chamfers the hole. In the second spindle position, tool _D_ faces
the end, and counterbore _E_ finishes the hole. A cross-cutting head
of a type similar to that previously described is carried in the third
spindle position. This retains a tool _F_ which produces an annular
groove in the nose of the head, the work being supported with pilot
_G_. The fourth and last operation consists in threading the hole with
the tap _H_.
[Illustration: Fig. 11. Diagram showing Tooling Set-up for machining
Fuse Nose on New Britain Automatic Chucking Machine]
[Illustration: Fig. 12. Machining Brass Fuse Socket on 3¹⁄₄-inch
“Gridley” Automatic Turret Lathe--First and Second Series of Operations]
=Second Series of Operations on Shrapnel Heads.=--The set-up for the
series of operations performed at the second chucking is shown in Fig.
10, the work being held on threaded arbors. In the first spindle
position, tools _A_ and _B_ face the shoulder, and counterbore _C_
machines a seat in the inner flange. In the second spindle position,
counterbore _D_ finishes the part roughed out by _C_ in the previous
operation, tool _E_ faces the end, and tool _F_ chamfers the inner
edge. In the third position, a cross-cutting attachment carrying
external cutting tool _G_ is utilized for recessing the external
diameter next to the shoulder. The threading on the external diameter
is accomplished with the die _H_ in the fourth spindle position.
=Machining Shrapnel Fuse Noses.=--The time fuse nose for a shrapnel
shell, which is made from a brass forging, is machined as shown in Fig.
11 on a No 33 New Britain automatic chucking machine at one setting. In
this case, an extra spindle designated as No. 0 is added to the machine
for equalizing or properly locating the forging in the chuck when it
is being tightened. At the first spindle position, tool _A_ takes a
cut from the external diameter, tool _B_ cuts an annular recess in the
face, and counterbore _C_ roughs out the center portion. In the second
spindle position, the same operations are performed with finishing
tools. In the third spindle position, a cross-cutting head carries a
recessing tool _D_ that forms a recess back of the tapped portion. The
hole is then tapped in the fourth spindle position, and in the fifth
spindle position a special counterbore _F_ takes a light finishing cut
from all the surfaces previously machined. The external surfaces of the
fuse nose are machined on a turret lathe.
[Illustration: Fig. 13. Diagram Illustrating First and Second Series of
Operations on Fuse Body on “Gridley” Automatic]
=Machining Shrapnel Fuse Parts on “Gridley” Automatics.=--The machining
of fuse parts for the British shrapnel shell on “Gridley” single- and
multiple-spindle automatics, made by the Windsor Machine Co., Windsor,
Vt., forms the basis of several interesting tooling equipments. A
number of the parts are machined from hot-pressed brass forgings, so
that they must be handled separately. The fuse socket, as has been
previously described, is made from a brass forging and is machined
complete in two operations on a 3¹⁄₄-inch “Gridley” automatic turret
lathe of the single-spindle type. The manner in which the work is
loaded in the chuck and held for the first series of operations is
shown at _A_ in Fig. 12. The rough blank _a_ is first placed over the
spring fingers _b_, which are held in a holder clamped in the turret,
but are free to rotate. When the work is pushed into the chuck, it
forces back spring-ejecting stud _c_, which, as soon as the pressure of
the chuck is released, ejects the work.
As the loading device operates on the first slide of the turret, the
first machining operation takes place on the second slide. This is
a comparatively simple operation and consists in boring the central
recess with a tool _d_ and chamfering with tool _e_. The turret is then
indexed, bringing the internal necking tool _f_ into position. This is
held in a holder and is operated by the forward motion of the forming
slide. Following this, tap _g_ is brought into position to thread
the recess in the socket. The operation of the turret is now stopped
automatically until the operator loads a new piece in the chuck. The
tapping is done with the spindle running in the forward direction on
slow speed. After the hole has been tapped, the spindle is reversed and
operated at a higher speed. The spindle continues to run backward for
loading, and is still running backward, but slowed down, at the time
of the second operation. It is for this reason that the boring tool
_d_ operates on the reverse side of the hole, and tool _e_ is mounted
upside down. At the third operation, the spindle is still running
backward but is speeded to its highest speed while the internal necking
is done with the tool on the reverse side of the hole.
=Second Operation on Fuse Socket.=--The method of holding the fuse
socket for performing the second operation on the 3¹⁄₄-inch “Gridley”
single-spindle automatic turret lathe is shown at _B_ in Fig. 12. The
socket _h_, which has now been threaded, is screwed onto the body of
special arbor _i_, fitting in sleeve _j_ that is gripped by the spring
collet. On the reduced end of arbor _i_ is a nut which serves to clamp
the work up against the face of sleeve _j_. The method of using this
arbor is as follows:
To chuck the work, sleeve _j_ and its auxiliary members are removed
from the spring collet, and the work is screwed onto the nose of
arbor _i_, the position of which is locked by means of a nut on the
stem of the arbor. The entire arbor is then replaced in the collet and
the machining operations performed on the work. This type of arbor is
necessary because of the heavy cutting with the wide forming tool which
would tighten the piece on the threaded nose to such an extent that
it could not be removed when finished. With this device, it is only
necessary to hold the square end of arbor _i_ in a vise, and loosen
the work by relieving the nut on the arbor. In order to facilitate the
work, two arbors of this type are provided with each of the machines
employed.
[Illustration: Fig. 14. Section through a “Gridley” 3¹⁄₄-inch Automatic
Turret Lathe Spindle showing Method of chucking Shrapnel Fuse Body]
The operations performed in the first position consist in forming
the external diameters with tool _k_, facing with the side tool, and
drilling with drill _m_. The second turret face is now skipped and the
third brought into position, presenting self-opening die _n_ which
threads the work. At the fourth indexing of the turret slide, the hole
is reamed with reamer _o_ and tool _p_ chamfers the face, completing
the work. The forming done at the first indexing of the turret slide is
performed on slow speed; the spindle speed, however, changes to high at
the third position and back to slow just before the fourth position.
=Machining the Fuse Body.=--The fuse body is made from a hot-pressed
brass blank, and is machined in two chuckings in “Gridley”
multiple-spindle automatics. The first series of operations is
performed in a “Gridley” 1¹⁄₄-inch multiple-spindle automatic in the
order shown to the left in Fig. 13. The work is loaded in the chuck
by hand. Forming tool _A_ now advances and rough-forms the outer
diameter, whereas flat drill _B_ and trepanning tool _C_ combine to
drill the central hole and trepan the narrow channel. At the second
spindle position, tool _D_ finish-forms and necks the outer surface,
while tool _E_ counterbores the surfaces of the recess. Die _F_ at the
third spindle position now threads the body, and at the fourth spindle
position forming tool _G_ turns down the outer end of the thread while
a floating trepanning tool _H_ finishes the counterbored and trepanned
surfaces. It should be mentioned here that the hot-pressing of this
brass part makes it extremely difficult to machine, so that the edges
of the tools dull rapidly.
=Second Series of Operations on Fuse Body.=--The method of holding the
fuse body while the second series of operations is being performed
is shown in Fig. 14. The work-spindles _A_ of the machine are fitted
with special nose-pieces _B_, the inner surface of which is chamfered
to receive the spring collet _C_, which is threaded to the end of
draw-back rod _D_. The work is not gripped directly by the spring
collet, but is first screwed into a special bushing _E_, having thin
walls as shown. This bushing is not split but springs sufficiently
to permit it to be closed in on the work and released when the
collet pressure is removed. A flange _G_ attached to the end of the
spindle nose serves as a stop for the work and a gaging point for the
operations. The regular collet closing mechanism is used, but as may be
seen in the left-hand end, the finger holders are reversed. When the
clutch ring _H_ is pushed forward by the chuck-closer gripping fingers
_I_ swivel and draw rod _D_ backward through contact with flange _J_.
When the clutch ring _H_ is moved backward, the gripping fingers
release rod _D_, relieving the pressure of the collet on bushing _E_
and the work.
[Illustration: Fig. 15. Diagram illustrating Set-up for machining
Timing Train Rings on “Gridley” Automatic]
Referring again to Fig. 13, the second series of operations on the
fuse body is shown to the right of the illustration. At the first
spindle position, forming tool _I_ advances and forms the exterior
diameters, while drill _J_ drills the hole in the end. At the second
spindle position, the rear part of the work is supported by a roll
back-rest, while the regular turner _K_ takes a cut across and chamfers
the shoulder. At the same time counterbore _L_ comes in, cleans up
the drilled hole and faces the bottom. At the third spindle position,
the diameter _M_ is threaded with a plain die. At the fourth spindle
position, a tool _N_ operated from the turret cuts a series of
concentric grooves in the flange of the fuse body. The grooving tool is
cut away to clear the forming tool _O_ which takes a light cut over the
grooved face, finishing the body as illustrated.
=Machining the Stationary Timing Train Ring.=--The machining operations
on the stationary timing train ring are shown to the left in Fig.
15, and as can be seen are of a comparatively simple nature. This
fuse part is made from a Tobin bronze bar in a 2³⁄₈-inch “Gridley”
multiple-spindle automatic. At the first spindle position, a drill held
on the turret drills the hole, and a forming tool on the cross-slide
forms it to shape and breaks it down for the cut-off tool. At the
second spindle position, the piece is reamed, and at the third position
it is faced off with an under-cutting tool. In the fourth spindle
position, not shown, the finished piece is cut off, and the stock is
fed out.
=Machining the Graduated Timing Train Ring.=--The machining operations
on the graduated timing train ring are almost identical with the
stationary ring and are shown diagrammatically to the right in Fig.
15. This part is also made from a bar of Tobin bronze in a 2³⁄₈-inch
“Gridley” multiple-spindle automatic. The only difference in the
operations on this part is in the use of a combination floating
counterbore, and facing tool provided with a roller pilot.
[Illustration: Fig. 16. Diagram Illustrating Set-ups for machining
Closing Cap and Bottom Closing Screw on “Gridley” 1³⁄₄-inch
Multiple-spindle Automatic]
=Machining the Closing Cap and Bottom Closing Screw.=--The closing cap
and bottom closing screw for the shrapnel timing fuse are made from
brass rod with a comparatively simple tool set-up as shown in Fig. 16.
The machine used is a 1³⁄₄-inch “Gridley” multiple-spindle automatic.
The machining operations on the closing cap are shown to the left in
the illustration, and consist in drilling, counterboring, forming,
threading, and cutting off. The operations on the bottom closing
screw, shown to the right of this illustration, are counterboring,
forming, recessing, threading, and cutting off.
[Illustration: Fig. 17. Method of machining Fuse Hammer on a No.
2 Model G Brown & Sharpe Automatic Screw Machine equipped with an
Eight-hole Turret]
=Making Fuse Parts on Brown & Sharpe Automatic and Hand Screw
Machines.=--A brief description of two of the many interesting set-ups
on Brown & Sharpe automatic and hand screw machines for making timing
fuse parts is given in the following. Timing fuse parts are made from
several different materials. The screws and other small members as a
rule are made from brass rod, whereas the parts such as the capsules,
primer cups, etc., are made from sheet brass. Other members, such as
the fuse body or stem, are made from different alloys and metals such
as copper, copper aluminum, aluminum, etc.
[Illustration: Fig. 18. Diagram Illustrating Method of Machining a Fuse
Nut on a No. 6 Brown & Sharpe Hand Screw Machine]
=Set-up for Making Fuse Hammers.=--The method of making a fuse hammer
on a No. 2 Model G Brown & Sharpe automatic screw machine provided
with a special eight-hole turret is shown diagrammatically in Fig.
17. This part is made from ⁷⁄₈-inch round brass rod and is finished
complete in the screw machine. First, the stock is fed out to the stop
in the turret. Second, the end is centered and faced with tools held
in tool-holder _A_. The body is then formed with a circular tool _B_
working from the front cross-slide; at the same time the turret is
revolved, bringing tap drill _C_ into operation. The forming tool is
working at the same time as the drills. The turret is again revolved
and drill _D_ for finishing the middle hole is brought in and completes
its operation. At the next index of the turret, drill _E_ finishes the
bottom hole. The turret is now indexed and a recessing tool-holder
carrying tool _F_ advances and is brought into operation to recess the
work by a pusher on the cross-slide. The turret is again indexed and
a reamer _G_ is advanced to bottom and ream the holes. Upon the next
index of the turret, tap _H_ threads the work, which is finally cut off
with circular tool _I_. The stock is rotated at 973 R. P. M. forward
and backward for drilling and turning, and at 421 R. P. M. forward for
threading. The stock is cut off rotating backward. The surface speed
for the forming tools is 220 feet per minute and 31 feet per minute for
the tap.
=Tool Set-up for Making Fuse Nut.=--The fuse nut on the Russian timing
fuse is made from 1⁷⁄₈-inch round brass rod in a No. 6 wire-feed Brown
& Sharpe hand screw machine as shown in Fig. 18. First the stock is
fed out to length, being gaged by a stop in a vertical slide, which is
held in the turret. The turret is then indexed and drill _A_ drills the
large hole. The turret is now revolved and the combination drill _B_ is
advanced. The turret is again revolved and counterbore _C_ faces and
counterbores the work. Upon the next index of the turret, a vertical
slide tool-holder carrying recessing tool _D_ is advanced. This
tool-holder is operated by a handle attached to the holder. The turret
is again indexed and tap _E_ threads the work. After this the turret is
indexed and the work is recessed with a tool-holder _F_ carrying two
cutters which balance each other in cutting. The seventh operation is
performed from both the front and rear cross-slides with tools _G_ and
_H_. The eighth operation is cutting off. This is performed with a
special vertical slide tool-holder held in the turret and operated by
a handle. The stock for these operations is rotated at 352 R. P. M.,
giving a surface speed for the forming tools of 180 feet per minute and
66 feet per minute for the tap.
=Making Fuse Parts on Hand Screw Machines.=--The demand for shrapnel
fuse parts has been so great that time has not been taken in all
cases to tool up automatic screw machines before production has been
started. In order to get parts out quickly while automatic machines
are being tooled up, hand screw machines have been made use of. These
machines are also used to a large extent on small orders and to help
out production in general. Fig. 19 shows an F. E. Wells & Son Co. hand
screw machine working on shrapnel fuse parts. The capacity of this
machine is for ⁷⁄₈-inch diameter rod and it will tap or drill ¹⁄₂ inch
diameter. Shrapnel fuse parts are produced on this machine at the rate
of from 25 to 100 pieces per hour.
[Illustration: Fig. 19. Machining Fuse Parts on F. E. Wells & Son’s
Hand Screw Machine]
[Illustration: Fig. 20. Drilling Percussion Primers on a Leland-Gifford
Ball Bearing Sensitive Drilling Machine]
=Drilling Percussion Primers for Fuses.=--The percussion primer, used
in the American combination fuse shown in Fig. 3, Chapter I, is made
in a Brown & Sharpe automatic screw machine from brass rod in two
operations. Following the screw machine operations, four holes about
¹⁄₃₂ inch in diameter are drilled through this bushing, employing a
special “snap index” jig in a high-speed ball-bearing drilling machine
made by the Leland-Gifford Co. of Worcester, Mass. (See Fig. 20.) The
extremely small size of this part makes it difficult to handle, so
the jig was designed with a special loading arm to facilitate rapid
handling. The jig consists of a platform base bolted to the table of
the drilling machine. Upon this is the index ring, which is turned
by handles _J_ and indexed for the four drilling positions by spring
plunger _I_. The center of rotation is in the center of the four holes
in the part. _B_ is the loading lever, with a nest _A_ at the end into
which the work is slipped. This lever swings on stud _C_. The work is
located in the swinging arm _B_ when it is in the position shown in the
illustration, with the arm _B_ resting against stop _D_. The arm is
then swung under the drill until it reaches stop _E_. It is maintained
in this position by spring plunger _H_ that bears against lever _F_,
fulcrumed on stud _G_. The side of this lever bears against the work
and holds it firmly while the drilling is proceeding. The drill is
guided by four bushings in plate _L_, mounted on the index ring. The
operation consists in rotating the index ring to the four stations for
drilling the respective holes. By means of this quick-indexing ring,
and the high speed at which the Leland-Gifford drilling machine runs,
it is possible to drill as many as 6000 pieces, or 24,000 holes in ten
hours.
[Illustration: Fig. 21. Drilling Fuse Plugs on “Avey” Drilling Machine]
[Illustration: Fig. 22. Graduating Timing Fuse Rings on Dwight-Slate
Marking Machine]
=Drilling Timing Fuse Plugs.=--An application of a regular No. ¹⁄₂
“Avey” drilling machine, built by the Cincinnati Pulley Machinery Co.,
Cincinnati, Ohio, to the drilling of brass timing fuse plugs is shown
in Fig. 21. The requirements are to drill three No. 55 (0.052 inch)
holes through the dome of the plug; a number of pieces are shown on
the table of the machine. These three holes practically run together
at the inside of the dome, making it necessary to drill one hole at
a time. The fixture used for this purpose is of unique construction.
The body _A_ is made of an aluminum casting, whereas the operating
mechanism is of hardened tool steel. The drill spindle is operated by
a foot treadle, connection being secured through rod _B_, passing down
through the fixture and fastened to the spindle sleeve by the L-shaped
piece and yoke _C_. The work _E_ is held on a special work-spindle
located inside the fixture that is indexed one-third revolution through
the medium of rod _B_ upon the raising of the drill spindle sleeve.
The work holding-down and ejecting mechanism is supported in aluminum
bracket _F_. Attached to this bracket is a supporting arm for the lower
crank of lever _G_, which holds a segment gear. Bracket _D_ carries
the drill bushing.
After drilling the third hole, the operator depresses lever _G_,
rotating the segment gear meshing in rack teeth in rod _H_, which
lifts the latter up to eject the work and at the same time through
a connection, not shown, raises the holding-down rod. The ejector,
not shown, which is spring-controlled, returns to a neutral position
immediately upon the ejection of the work, while the holding-down
rod is still raised. The work, after being discharged, falls into a
chute and is carried to the rear of the machine. The operation of this
fixture is rapid, the production being from 9000 to 10,000 pieces in
ten hours.
=Graduating Fuse Timing Ring.=--As has been previously stated, the
adjustable ring on the timing fuse is graduated in seconds, starting
at zero and running to twenty-one seconds. As shown in Fig. 22, the
graduating of this timing ring is performed in the Dwight-Slate marking
machine built by Noble & Westbrook, Hartford, Conn. The main arbor of
the machine carries the stamping roll _A_ and is turned by the handle
shown. The timing ring to be graduated and marked is held at _B_. The
two gears _C_ prevent the stamp from “creeping” ahead or slipping
on the work. The work-holding arbor, as shown, is held in a bracket
and is raised to the stamp roll by pressure on the foot treadle. Two
operations are required for stamping and graduating the timing ring.
The first is marking the graduations and the second is putting on the
figures.