CHAPTER VII.

TYPES OF CENTERS AND MOLDS EMPLOYED IN CONSTRUCTING TUNNEL LININGS OF

MASONRY.

The masonry lining of a tunnel may be described as consisting of two or

more segments of circular arches combined so as to form a continuous

solid ring of masonry. To direct the operations of the masons in

constructing this masonry ring, templates or patterns are provided which

show the exact dimensions and form of the sectional profile which it is

desired to secure. These patterns or templates will vary in number and

construction with the form of lining and the method of excavation

adopted. Where the excavation is fully lined on all four sides, the

masonry work is usually divided into three parts,--the invert or floor

masonry, the side-wall masonry, and the roof-arch masonry. At least one

separate pattern has to be employed in constructing each of these parts

of the lining; and they are known respectively as ground molds, leading

frames, and arch centers, or simply centers. In the following paragraphs

the form and construction usually employed for each of these three kinds

of patterns is described.

=Ground Molds.=--Ground molds are employed in building the tunnel

invert. They are generally constructed of 3-inch plank cut exactly to

the form and dimensions of the invert masonry as shown in Fig. 38. To

permit of convenience of handling in a restricted space, they are

generally made in two parts, which are joined at the middle by means of

iron fish-plates and bolts. Either one or two ground molds may be

employed. Where two molds are used they are set up a short distance

apart, and cords are stretched from one to the other parallel to the

axis of the tunnel, by which the masons are guided in their work.

Extreme care has to be taken in setting the molds to ensure that they

are fixed at the proper grade, and are in a plane normal to the axis of

the tunnel. Where only one ground mold is employed, the finished masonry

is depended upon to supply the place of the second mold, cords being

stretched from it to the single mold placed the requisite distance

ahead. The leveling and centering of the molds is accomplished by means

of transit and level.

[Illustration: FIG. 38.--Ground Mold for Constructing Tunnel Invert

Masonry.]

[Illustration: FIG. 39.--Combined Ground Mold and Leading Frame for

Invert and Side Wall Masonry.]

Two modifications of the form of ground mold shown by Fig. 39 are

employed. The first modification is peculiar to the English method of

excavation, and consists in combining the ground mold with the leading

frame for the lower part of the side walls, as shown by Fig. 39. The

second modification is employed where the two halves or sides of the

invert are built separately, and it consists simply in using one-half of

the mold shown by Fig. 38. When the last method of constructing the

invert masonry is resorted to, extreme care has to be observed in

setting the half-mold in order to avoid error.

[Illustration: FIG. 40.--Leading Frame for Constructing Side Wall

Masonry.]

=Leading Frames.=--As already stated, leading frames are the patterns,

or molds, used in building the side walls of the lining. Like the ground

mold they are usually built of plank; one side being cut to the curve of

the profile, and the other being made parallel to the vertical axis of

the tunnel section. The vertical side usually has some arrangement by

which a plumb bob can be attached, as shown by Fig. 40, to guide the

workmen in erecting the frame. The combined leading frame and ground

mold shown in Fig. 39 has already been described. The use of this frame

is possible only where the masonry is begun at the invert and carried up

on each side at the same time. This mode of construction is peculiar to

the English method of tunneling; in all other methods the form of

separate ground frame shown by Fig. 40 is employed. The ground frames

are lined in and leveled up by transit and level; and, as in setting the

ground frames, care must be taken to secure accuracy in both direction

and elevation.

=Arch Centers.=--The template or form upon which the roof arch is built

is called a center. Unlike the ground molds and leading frames, the arch

centers have to support the weight of the masonry and the roof pressures

during the construction of the lining, and they, therefore, require to

be made strong. Owing to the fact that the pressures are indeterminate,

it is impossible to design a rational center, and resort is had to those

constructions which past experience has shown to work satisfactorily

under similar conditions. In a general way it can always be assumed that

the construction should be as simple as possible, that the center should

be so designed that it can be set up and removed with the least possible

labor, and that the different pieces of the framework and lagging should

be as short as possible, for convenience in handling.

Tunnel centers are usually composed of two parts,--a mold or curved

surface upon which the masonry rests, and a framework which supports the

mold. The curved surface or mold consists of a lagging of narrow boards

running parallel to the tunnel axis, which rests upon the arched top

members of two or more consecutive supporting frames. The supporting

frame is built in the form of a truss, and must be made strong enough to

withstand the heavy superimposed loads, consisting of the arch masonry

during construction, and of the roof pressures which are transferred to

the center when the strutting is removed to allow the masonry to be

placed. The framework of the center is supported either by posts resting

upon the floor of the excavation, or upon the invert masonry when this

is built first, as in the English and Austrian methods, or it may be

supported directly upon the ground where the arch masonry is built

first, as in the Belgian method of tunneling.

In describing the various methods of tunneling in succeeding chapters,

the center construction and method of supporting the center peculiar to

each will be fully explained, and only a few general remarks are

necessary here. Centers may be classified according to their

construction and composition into plank centers, truss centers, and iron

centers.

[Illustration: FIG. 41.--Plank Center for Constructing the Roof Arch.]

One of the most common forms of plank centers is shown by Fig. 41. It

consists of two half-polygons whose sides consist of 15 in. × 4 ft.

planks having radial end-joints. These two half-polygons are laid one

upon the other so that they break joints, as shown by the figure, and

the extrados of the frame is cut to the true curve of the roof arch. The

planks commonly used for making these centers are 4 ins. thick, making

the total thickness of the center 8 ins. Plank centers of the

construction described are suitable only for work where the pressures to

be resisted are small, as in tunnels through a fairly firm rock,

although there have been instances of their successful use in

soft-ground tunnels.

Where heavy loads have to be carried, trussed centers are generally

employed, the trusses being composed of heavy square beams with scarfed

and tenoned joints, reinforced by iron plates. Different forms of

trusses are employed in each of the different methods of tunneling, and

each of these is described in succeeding chapters; but they are

generally either of the king-post or queen-post type, or some

modification of them. The king-post truss may be used alone, with or

without the tie-beam, as shown by Fig. 42; but generally a queen-post

truss is made to form the base of support for a smaller king-post truss

mounted on its top. This arrangement gives a trapezoidal form to the

center, which approaches closely to the arch profile. Owing to the

character of the pressures transmitted to the center, the usual tension

members can be made very light.

[Illustration: FIG. 42.--Trussed Center for Constructing the Roof Arch.]

The combined center and strutting system devised by Mr. Rziha has

already been described in a previous chapter. In recent European tunnel

work quite extensive use has also been made of iron centers consisting

of several segments of curved I-beams, connected by fish-plate joints so

as to form a semi-circular arch rib. The ends or feet of these I-beam

ribs have bearing-plates or shoes made by riveting angles to the

I-beams. Centers constructed in a similar manner, but made of sections

of old railway rail, were used in carrying out the tunnel work on the

Rhine River Railroad in Germany. The advantages claimed for iron centers

are that they take up less room, and that they can be used over and over

again.

_Setting Up Centers._--According to the method of excavation followed in

building the tunnel, the centers for building the roof arch may have to

be supported by posts resting on the tunnel floor; or where the arch is

built first, as in the Belgian and Italian methods, they may be carried

on blocking resting on the unexcavated earth below. Whichever method is

employed, an unyielding support is essential, and care must be taken

that the centers are erected and maintained in a plane normal to the

tunnel axis. To prevent deflection and twisting, the consecutive centers

are usually braced together by longitudinal struts or by braces running

to the adjacent strutting. Only skilled and experienced workmen should

be employed in erecting the centers; and they should work under the

immediate direction of the engineer, who must establish the axis and

level of each center by transit and level.

_Lagging._--By the lagging is meant the covering of narrow longitudinal

boards resting upon the upper curved chords of the centers, and spanning

the opening between consecutive centers. This lagging forms the curved

surface or mold upon which the arch masonry is laid. When the roof arch

is of ashlar masonry the strips of lagging are seldom placed nearer

together than the joints of the consecutive ring stones, but in brick

arches they are laid close together. Besides the weight of the arch

masonry, the lagging timbers support the short props which keep the

poling-boards in place after the strutting is removed and until the arch

masonry is completed.

_Striking the Centers._--The centers are usually brought to the proper

elevation by means of wooden wedges inserted between the sill of the

center and its support, or between the bottom of the posts carrying the

center and the tunnel floor. These wedges are usually made of hard wood,

and are about 6 ins. wide by 4 ins. thick by 18 ins. long. To strike the

center after the arch masonry is completed, these wedges are withdrawn,

thus allowing the center to fall clear of the masonry. Usually the

center is not removed immediately after striking, so that if the arch

masonry fails the ruins will remain upon the center. The method of

striking the iron center devised by Mr. Rziha has been described in the

previous chapter on strutting.