METHODS OF TIMBERING OR STRUTTING TUNNELS.
The purpose of timbering or strutting in tunnel work is to prevent the
caving-in of the roof and side walls of the excavation previous to the
construction of the lining. As the strutting has to resist all the
pressures developed in the roof and side walls, which may be exceedingly
troublesome and of great intensity in loose soils, its design and
erection call for particular care. The method of strutting adopted
depends upon the method of excavation employed; but in every case the
problem is not only to build it strong enough to withstand the pressures
developed, but to do this as economically as possible, and with as
little hindrance as may be to the work which is going on simultaneously
and which will come later. Only the latter general problems of strutting
peculiar to all methods of tunnel work will be considered here. For this
consideration strutting may be classified according to the material of
which it is built, under the heads of timber structures and iron
structures.
[Illustration: FIG. 17.--Joining Tunnel Struts by Halving.]
[Illustration: FIG. 18.--Round Timber Post and Cap Bearing.]
TIMBER STRUTTING.
Timber is nearly always employed for strutting in tunnel work. So long
as it has the requisite strength, any kind of timber is suitable for
strutting, since, it being only temporarily employed, its durability is
a matter of slight importance. Timber with good elastic properties, like
pine or spruce, is preferably chosen, since it yields gradually under
stress, thus warning the engineer of the approach of danger; while oak
and other strong timbers resist until the last moment, and then yield
suddenly under the breaking load. Soft woods, moreover, are usually
lighter in weight than hard woods, which is a considerable advantage
where so much handling is required in a restricted space. Round timbers
are generally employed, since they are less expensive, and quite as
satisfactory in other respects as sawed timbers. In the English and
Austrian methods of strutting, which are described further on, a few of
the principal struts are of sawed timbers.
The various timbers of the strutting are seldom attached by framed
joints, but wedges are used to give them the necessary bearing against
each other. Where framed joints are employed they are made of the
simplest form usually by halving the joining timbers, as shown by Fig.
17. Fig. 18 shows a form of joint used where round posts carry beams of
similar shape. The reason why it is possible to do away with jointed
connections to such a great extent, is that the strains which the
timbers have to resist are either compressive or bending strains, and
because the timbers are so short that they do not require to be spliced.
=Strutting of Headings.=--The method of strutting the heading that is
employed depends upon the material through which the heading is driven.
In solid rock strutting may not be required at all, or only for the
purpose of preventing the fall of loose blocks from the roof, then
vertical props are erected where required, or horizontal beams are
inserted into the side walls, as shown by Fig. 19. These horizontal
beams may be used singly at dangerous places, or they may be placed from
2 ft. to 3 ft. apart all along the heading. In the latter case they
usually carry a lagging of planks, which may be placed at intervals or
close together, and filled above with stone in case the roof of the
excavation is very unstable. Planks used in this manner are usually
called poling-boards. Where the side walls as well as the roof require
support, vertical side posts are employed to carry the roof beams, as
shown by Fig. 20; and, when necessary, poling-boards are inserted
between these posts and the walls of the excavation.
[Illustration: FIG. 19.--Ceiling Strutting for Tunnel Roofs.]
[Illustration: FIG. 20.--Ceiling Strutting with Side Post Supports.]
[Illustration: FIG. 21.--Sill, Side Post and Cap Cross Frame Strutting.]
[Illustration: FIG. 22.--Reinforced Cross Frame Strutting for
Treacherous Materials.]
_Frame Strutting._--In very loose soils not only the roof and side
walls, but also the floor of the heading require strutting. In these
cases frame strutting is employed, as shown by Fig. 21. It consists
simply of a rectangular frame; at the top there is a crown bar supported
by two vertical side posts setting on a sill laid across the bottom of
the heading. These frames are spaced at close intervals, and carry
longitudinal planks or poling-boards. The sill of the frame is sometimes
omitted when the soil is stable enough to permit it, and in its place
wooden footing blocks are substituted to carry the side posts. In soils
where the pressures are great enough to bend the crown bar, a secondary
frame is employed, as shown by Fig. 22, the two inclined roof members,
or rafters, of which support the crown bar at the center.
[Illustration: FIG. 23.--Longitudinal Poling-Board System of Roof
Strutting.]
[Illustration: FIG. 24.--Transverse Poling-Board System of Roof
Strutting.]
It is the more common practice in driving headings through soft soils to
use inclined poling-boards to support the roof. Fig. 23 shows one method
of doing this. The method of operation is as follows: Assuming the
poling-boards _a_ and _b_ to be in place, and supported by the frames
_A_, _B_, _C_, as shown, the first step in continuation of the work is
to insert the poling-board _c_ over the crown bar of frame _C_, and
under the block _m_. Excavation is then begun at the top, and as fast as
the soil is removed ahead of it the poling-board _c_ is driven ahead
until its rear end only slightly overhangs the crown bar of frame _C_.
The remainder of the face of the heading is then excavated nearly to the
front end of the poling-board _c_, and another frame is set up. By a
succession of these operations the heading is advanced. The
poling-boards at the sides of the heading are placed in a similar manner
to the roof poling-boards. A second method of using inclined
poling-boards is shown by Fig. 24. Here the poling-boards run
transversely, and are supported by the arrangement of timbering shown.
The chief advantage of using these inclined poling-boards, particularly
in the manner shown by Fig. 23, is that the excavators work under cover
at all times, and are thus safe from falling fragments or sudden
cavings.
_Box Strutting._--In very treacherous soils, such as quicksand, peat,
and laminated clay, box strutting is commonly employed. The method of
building this strutting is to set up at the face of the work a
rectangular frame, and use it as a guide in driving a lagging or boxing
of horizontal planks into the soft soil ahead. These planks have sharp
edges, and are driven to a distance of 2 ft. or 3 ft. into the face of
the heading, so as to inclose a rectangular body of earth. This earth is
excavated nearly to the ends of the planks, and then another frame is
inserted close up against the new face of the excavation, which supports
the planks so that the remainder of the earth included by them may be
removed. These two frames, with their plank lagging, constitute a “box;”
and a series of these boxes, one succeeding another, form the strutting
of the heading.
=Strutting the Face.=--In some cases it is found necessary to strut the
face of the heading in order to prevent it from caving in. This is
generally done by setting plank vertically, and bracing them up by means
of inclined props whose feet abut against the sill of the nearest cross
frame. This strutting is erected while the workmen are placing the side
and roof strutting, and is removed to permit excavation.
=Full Section Timber Strutting.=--For strutting the full section two
forms of timbering are employed, known as the polygonal system and the
longitudinal system.
Longitudinal strutting consists of a timber structure so arranged as to
have all the principal members supporting the poling-boards parallel to
the axis of the tunnel. This system of strutting is peculiar to the
English method of tunneling. The longitudinal timbers rest on this
finished masonry at one end, and are carried on a cross frame or by
props at the other end. At intermediate points the longitudinals are
braced apart by struts in planes transverse to the tunnel axis. This
construction makes a very strong strutting framework, since the
transverse struts act as arch ribs to stiffen the longitudinals; but the
use of transverse poling-boards requires the excavation of a larger
cross-section than is necessary when longitudinal poling-boards are
employed, and this increases the cost both for the amount of earth
excavated and the greater quantity of filling required.
In polygonal strutting the main members are in a plane normal to the
axis of the tunnel. They form a polygon whose sides follow closely the
sectional profile of the excavation. These polygonal frames are placed
at more or less short intervals apart, and are braced together by short
longitudinal struts lying close to the sides of the excavation, and
running from one frame to the next, and also by longer longitudinal
members which extend over several frames. The polygonal system of
strutting is peculiar to the Austrian method of tunneling, and is fully
described in a succeeding chapter. One of its distinctive
characteristics is that the poling-boards are inserted parallel to the
tunnel axis. Polygonal strutting is generally held to be stronger than
longitudinal strutting under uniform loads, but it is more liable to
distortion when the loads are unsymmetrical.
[Illustration: FIG. 25.--Shaft with Single Transverse Strutting.]
[Illustration: FIG. 26.--Rectangular Frame Strutting for Shafts.]
[Illustration: FIG. 27.--Reinforced Rectangular Frame Strutting for
Shafts in Treacherous Materials.]
=Strutting of Shafts.=--Tunnel shafts are strutted both to prevent the
caving-in of the sides and to divide them into compartments. When the
material penetrated is very compact, and caving is not likely, a single
series of transverse struts, one above the other, running from the top
to the bottom of the shaft, as shown by Fig. 25, is used to divide it
into two compartments. In softer material, where the sides of the shaft
require support, Fig. 26 shows a form of strutting commonly employed. It
consists of vertical corner posts braced apart at intervals by four
horizontal struts placed close to the walls of the shaft. The longer
side struts are also braced apart at the center by a middle strut which
divides the shaft into two compartments. A lagging of vertical plank is
placed between the walls of the shaft and the horizontal side struts. In
very loose soils the form of strutting shown by Fig. 27 is employed.
This is practically the same construction as is shown by Fig. 26, with
the addition of an interior polygonal horizontal bracing in each half of
the shaft. Referring to Fig. 27, the timbers _a_, _a_, etc., are
vertical and continuous from the top to the bottom of the shaft; and the
horizontal timbers, _b_, _b_, etc., are spaced at more or less close
intervals vertically. The lagging planks may be laid with spaces between
them, or close together, or, in case of very loose material, with their
edges overlapping. The manner of constructing the strutting is also
governed by the stability of the soil. In firm soils it is possible to
sink the shaft quite a depth without timbering, and the timbering can
be erected in sections of considerable length, which is always an
advantage, but in loose soils the timbering has to follow closely the
excavation.
The solid wall shaft struttings which have been described are
discontinued at the point where the shaft intersects the tunnel
excavation; and from this point to the floor of the tunnel an open
timbering is employed, whose only duty is to support the weight of the
solid strutting above. This timbering is made in various forms, but the
most common is a timber truss or arch construction which spans the
tunnel section.
=Quantity of Timber.=--The quantity of timber employed in strutting a
tunnel varies with the character of the material through which the
tunnel is excavated: it is small for solid-rock tunnels, and large for
soft-ground tunnels. In the Belgian method of excavation a smaller
quantity of timber is used than in any of the other ordinary methods.
For single-track tunnels excavated by this method there will be needed
on an average about 3 to 3¹⁄₃ cu. yds. of timber per lineal foot of
tunnel. Practical experience shows that about four-fifths of the timber
once used can be employed for the second time. In any of the methods in
which the whole tunnel section is excavated at once, the average amount
of timber required per lineal foot is about 8.7 cu. yds. Of this amount
about two-thirds can be used a second time. In the Italian method, in
which the upper half and the lower half are excavated separately, about
5 cu. yds. of timber are required per lineal foot of tunnel, about
one-half of which can be employed a second time. For quicksand tunnels
the amount of timbering required per lineal foot varies from 3 to 5
cubic yds. Shaft strutting requires from 1 to 1¹⁄₂ cu. yds. of timber
per lineal foot.
=Dimensions of Timber.=--The dimensions of the principal members
composing the strutting of headings, full section, and shafts, are given
in Table I. The planks used for lagging or the poling-boards are usually
from 4 ins. to 6 ins. wide, with a length depending upon the method of
strutting employed.
TABLE I.
Showing Sizes of Various Timbers Used in Strutting Tunnels Driven
Through Different Materials.
+---------------------------------+-----------+----------------------+
| | ROCK. | SOFT SOILS. |
| +-----+-----+--------+------+------+
| |Hard.|Soft.|Compact.|Loose.| Very |
| | | | | |loose.|
| +-----+-----+--------+------+------+
| | ins.| ins.| ins. | ins. | ins. |
|Headings: | | | | | |
| Cap-pieces and vertical struts | 6 | 8 | 10 | 12 | 14 |
| Sills | | | 8 | 10 | 12 |
| Struts | 5 | 5 | 6 | 7 | 8 |
| Distance apart of the frames in | | | | | |
| feet | 6 | 4.5| 3 | 2.6 | 2.6 |
| | | | | | |
|Strutting of the tunnel, | | | | | |
|longitudinal strutting: | | | | | |
| Crown bars | 12 | 14 | 14 | | |
| Props vertical or inclined | | | | | |
| supporting the crown bars | 10 | 12 | 14 | | |
| Sills | 8 | 8 | 10 | | |
| Cap-pieces or saddles | 10 | 12 | 14 | | |
| Struts to stiffen the structure | 6 | 8 | 10 | | |
| Distance apart of the frames (in| | | | | |
| feet) | 4.5 | 4 | 3 | | |
| | | | | | |
|Polygonal strutting: | | | | | |
| Cap-pieces and contour pieces | 8 | 10 | 12 | 14 | 16 |
| Vertical struts on top | 10 | 12 | 14 | 16 | 18 |
| Vertical struts below | 12 | 14 | 16 | 20 | 24 |
| Intermediate sills | 12 | 14 | 16 | 20 | 24 |
| Lower sills | | | 12 | 16 | 18 |
| Raking props | 10 | 10 | 10 | 12 | 12 |
| Distance apart of the frames (in| | | | | |
| feet) | 6 | 4.5 | 4 | 3 | 3 |
| | | | | | |
|Shafts: | | | | | |
| Horizontal beams forming the | | | | | |
| frame | 8 | 8 | 10 | 12 | 14 |
| Transverse beams | 8 | 8 | 8 | 10 | 12 |
| Vertical struts between the | | | | | |
| frames | 8 | 8 | 10 | 12 | 12 |
| Struts to reënforce the frame | | 6 | 8 | 8 | 8 |
| Distance apart of the strutting | | | | | |
| (in feet) | 6 | 4.5 | 4 | 3 | 2.6 |
+---------------------------------+-----+-----+--------+------+------+
IRON STRUTTING.
In 1862 Mr. Rziha employed old iron railway rails for strutting the
Naensen tunnel, and his example was successfully followed in several
tunnels built later where timber was scarce and expensive. The
advantages which iron strutting is claimed to possess over the more
common wooden structure are: its greater strength; the smaller amount of
space which it takes up; and the fact that it does not wear out, and
may, therefore, be used over and over again.
[Illustration: FIG. 28.--Strutting of Timber Posts and Railway Rail
Caps.]
[Illustration: FIG. 29.--Strutting made entirely of Railway Rails.]
=Iron Strutting in Headings.=--In strutting the headings the cross
frames have a crown bar consisting of a section of old railway rail
carried either by wood or iron side posts. When wooden side posts are
used their upper ends have a dovetail mortise, and are bound with an
iron band, as shown by Fig. 28. The base of the rail crown bar is set
into the dovetail mortise and fastened by wedges. When iron side posts
are employed they usually consist of sections of railway rails, and the
crown bar is attached to them by fish-plate connections, as shown by
Fig. 29. The iron cross frames are set up as the heading advances, and
carry the plank lagging or poling-boards, exactly in the same manner as
the timber cross frames previously described.
[Illustration: FIG. 30.--Rziha’s Combined Strutting and Centering of
Cast Iron.]
[Illustration: FIG. 31.--Cast-Iron Segment of Rziha’s Strutting and
Centering.]
=Full Section Iron Strutting.=--The iron strutting devised by Mr. Rziha
for full section work is shown by Fig. 30. Briefly described, it
consists of voussoir-shaped cast-iron segments, which are built up in
arch form. Fig. 31 shows the construction of one of the segments, all of
which are alike, with the exception of the crown segment, which has a
mortise and tenon joint which is kept open by filling the mortise with
sand. The segments are bolted together by means of suitable bolt-holes
in the vertical flanges, and when fully connected form an arch rib of
cast iron. This arch rib, A, Fig. 30, carries a series of angle or
T-iron frames bent into approximately voussoir shape, as shown at B,
Fig. 30. Above these frames are inserted the poling-boards, running
longitudinally, and spanning the distance between consecutive arch ribs.
By removing the bent iron frames the cast-iron rib forms a center upon
which to construct the masonry. Finally, to remove the cast-iron rib
itself, the sand is drawn out of the mortise and tenon joint in the
crown segment, which allows the joint to close, and loosen the segments
so that they are easily unbutted.
The illustration, Fig. 30, shows longitudinal poling-boards; more often
longitudinal crown bars of railway rails span the space between
connective arch ribs, and support transverse poling-boards. In building
the masonry, work is begun at the bottom on each side, the bent iron
frames being removed one after another to give room for the masonry. As
each frame is removed, it is replaced with a sort of screw-jack to
support the poling-boards until the masonry is sufficiently completed to
allow their removal. The interior bracing of the arch rib shown at _a a_
and _b b_ consists of railway rails carried by brackets cast on to the
segments. A similar bracing of rails connects the successive arch ribs.
These lines of bracing serve to carry the scaffolding upon which the
masons work in building the lining.
[Illustration: FIG. 32.--Cast-Iron Segmental Strutting for Shafts.]
=Iron Shaft Strutting.=--In soft-ground shaft work, the use of an iron
strutting, consisting of consecutive cast-iron rings, has sometimes
been employed to advantage. Fig. 32 shows the construction of one of
these rings, which, it will be seen, is composed of four segments
connected to each other by means of bolted flanges. The holes shown in
the circumferential web of the ring are to allow for the seepage from
the earth side walls. The method of placing this cylindrical strutting
is to start with a ring having a cutting-edge. By means of excavation
inside the ring, and by ramming, the ring is sunk into the ground a
distance equal to its height. Another ring is then fastened by special
hooks on top of the first one, and the sinking continued until the
second ring is down flush with the surface. A third ring is then added,
and so on until the entire shaft is excavated and strutted. As in timber
shaft strutting, the solid iron ring strutting is carried down only to
the top of the tunnel section, and below this point there is an open
timber or iron supporting framework.