TUNNELING:

A PRACTICAL TREATISE

BY

CHARLES PRELINI, C. E.

AUTHOR OF “EARTH AND ROCK EXCAVATION,” “DREDGES AND DREDGING,”

“EARTH SLOPES, RETAINING WALLS AND DAMS,” ETC. PROFESSOR

OF CIVIL ENGINEERING IN MANHATTAN COLLEGE,

NEW YORK

_167 ILLUSTRATIONS_

SIXTH EDITION, REVISED AND ENLARGED

[Illustration]

NEW YORK

D. VAN NOSTRAND COMPANY

TWENTY-FIVE PARK PLACE

1912

COPYRIGHT, 1912,

BY

D. VAN NOSTRAND COMPANY

NEW YORK

Stanhope Press

F. H. GILSON COMPANY

BOSTON, U.S.A.

PREFACE TO THE SIXTH EDITION

During the few years that have elapsed since the publication of the

first edition of this work, the art of tunneling through different soils

and especially under large bodies of water, has made considerable

progress. During the last ten years, no less than eight subaqueous

tunnels involving the construction of sixteen tubes have been

constructed for the service of the city of New York alone. The reader

will, no doubt, also recall the tunnels under the Boston Harbor, the St.

Clair, the Charles and Detroit Rivers in our own country as well as the

tunnels under the Thames and the Seine in Europe. Engineers, contractors

and workmen have acquired such experience in these difficult underground

and under-river construction that the work is now undertaken without any

of the fear and hesitation that were associated with the earlier

enterprises.

As entirely new methods have been introduced by professional men, it was

found necessary to arrange the presentation of the subject in this sixth

edition so as to give due prominence to these recent methods.

Besides this, other changes have been made in order to give greater

attention to American method of excavating tunnels through rock and

loose soil. This will explain the treatment of the crown-bar and also

the extensive illustration of the heading and bench method as well as

the drift method of driving tunnels which is followed in the United

States.

Space has also been given to important tunnels recently built mainly for

the purpose of illustrating the various methods discussed in the text

and also to bring out more clearly the characteristics of the different

methods of tunnel excavation.

The author hopes that these added features will meet the present

requirements of engineers and students.

CHARLES PRELINI.

MANHATTAN COLLEGE,

NEW YORK CITY.

CONTENTS

PAGE

INTRODUCTORY--THE HISTORICAL DEVELOPMENT OF TUNNEL BUILDING xiii

CHAPTER

I. PRELIMINARY CONSIDERATIONS; CHOICE BETWEEN A TUNNEL AND AN

OPEN CUT; GEOLOGICAL SURVEYS 1

II. METHODS OF DETERMINING THE CENTER LINE AND FORMS AND

DIMENSIONS OF CROSS-SECTION 9

III. EXCAVATING MACHINES AND ROCK DRILLS; EXPLOSIVES AND

BLASTING 22

IV. GENERAL METHODS OF EXCAVATION; SHAFTS; CLASSIFICATION OF

TUNNELS 36

V. METHODS OF TIMBERING OR STRUTTING TUNNELS 47

VI. METHODS OF HAULING IN TUNNELS 59

VII. TYPES OF CENTERS AND MOLDS EMPLOYED IN CONSTRUCTING TUNNEL

LININGS OF MASONRY 66

VIII. METHODS OF LINING TUNNELS 72

IX. TUNNELS THROUGH HARD ROCK; GENERAL DISCUSSION;

REPRESENTATIVE MECHANICAL INSTALLATIONS FOR TUNNEL WORK 84

X. TUNNELS THROUGH HARD ROCK (_continued_); EXCAVATION BY

DRIFTS; THE SIMPLON AND MURRAY HILL TUNNELS 102

XI. TUNNELS THROUGH HARD ROCK (_continued_); EXCAVATION BY

HEADINGS 130

XII. EXCAVATING TUNNELS THROUGH SOFT GROUND; GENERAL

DISCUSSION; THE BELGIAN METHOD 143

XIII. THE GERMAN METHOD--EXCAVATING TUNNELS THROUGH SOFT GROUND

(_continued_); BALTIMORE BELT LINE TUNNEL 155

XIV. THE FULL SECTION METHOD OF TUNNELING; ENGLISH METHOD;

AMERICAN METHOD; AUSTRIAN METHOD 166

XV. SPECIAL TREACHEROUS GROUND METHOD; ITALIAN METHOD;

QUICKSAND TUNNELING; PILOT METHOD 182

XVI. OPEN-CUT TUNNELING METHODS; TUNNELS UNDER CITY STREETS;

BOSTON SUBWAY AND NEW YORK RAPID TRANSIT 195

XVII. SUBMARINE TUNNELING; GENERAL DISCUSSION; THE SEVERN TUNNEL 218

XVIII. SUBMARINE TUNNELING (_continued_); THE COMPRESSED AIR

METHOD; THE MILWAUKEE WATER-WORKS TUNNEL 225

XIX. SUBMARINE TUNNELING (_continued_); THE SHIELD SYSTEM 238

XX. SUBMARINE TUNNELING (_continued_); THE SHIELD AND

COMPRESSED AIR METHOD; THE HUDSON RIVER TUNNEL OF THE

PENNSYLVANIA RAILROAD 263

XXI. SUBMARINE TUNNELING (_continued_); TUNNELS AT VERY SHALLOW

DEPTH; THE COFFERDAM METHOD; THE PNEUMATIC CAISSON METHOD;

THE JOINING TOGETHER SECTIONS OF TUNNELS BUILT ON LAND 281

XXII. ACCIDENTS AND REPAIRS IN TUNNELS DURING AND AFTER

CONSTRUCTION 301

XXIII. RELINING TIMBER-LINED TUNNELS WITH MASONRY 315

XXIV. THE VENTILATION AND LIGHTING OF TUNNELS DURING

CONSTRUCTION 325

XXV. THE COST OF TUNNEL EXCAVATION AND THE TIME REQUIRED FOR

WORK 336

LIST OF ILLUSTRATIONS

FIGURE PAGE

1. Diagram Showing Manner of Lining in Rectilinear Tunnels 10

2. B. R. Value’s Device for Locating the Center Line Inside of

a Tunnel 11

3. Triangulation System for Establishing the Center Line of the

St. Gothard Tunnel 12

4. Method of Transferring the Center Line down Center Shafts 13

5. Method of Transferring the Center Line down the Side Shafts 14

6. Method of Laying out the Center Line of Curvilinear Tunnels 15

7. Diagram of Polycentric Sectional Profile 19

8, 9 and 10. Typical Sectional Profiles for Tunnel 20

11. Soft Ground Bucket Excavating Machine; Central London

Underground Railway 22

12. Column Mounting for Percussion Drill; Ingersoll Sargent Drill

Co. 26

13. Sketch of Diamond Drill Bit 27

14. Diagram Showing Sequence of Excavation for St. Gothard

Tunnel 36

15. Diagram Showing Manner of Determining Correspondence of

Excavation to Sectional Profile 38

16. Polar Protractor for Determining Profile of Excavated Cross-

Section 39

17. Joining Tunnel Struts by Halving 48

18. Round Timber Post and Cap Bearing 48

19. Ceiling Strutting for Tunnel Roofs 49

20. Ceiling Strutting with Side Post Supports 49

21. Sill, Side Post and Cap Cross Frame Strutting 49

22. Reinforced Cross Frame Strutting for Treacherous Materials 49

23. Longitudinal Poling-Board System of Roof Strutting 50

24. Transverse Poling-Board System of Roof Strutting 50

25. Shaft with Single Transverse Strutting 52

26. Rectangular Frame Strutting for Shafts 53

27. Reinforced Rectangular Frame Strutting for Shafts in

Treacherous Materials 53

28. Strutting of Timber Posts and Railway Rail Caps 56

29. Strutting Made Entirely of Railway Rails 56

30. Rziha’s Combined Strutting and Centering of Cast Iron 57

31. Cast-Iron Segment of Rziha’s Strutting and Centering 57

32. Cast-Iron Segmental Strutting for Shafts 58

33. Platform Car for Tunnel Work 59

34. Iron Dump-Car for Tunnel Work 60

35. Wooden Dump-Car for Tunnel Work 60

36. Box-Car for Tunnel Work 61

37. Elevator Car for Tunnel Shafts 65

38. Ground Mold for Constructing Tunnel Invert Masonry 67

39. Combined Ground Mold and Leading Frame for Invert and Side

Wall Masonry 67

40. Leading Frame for Constructing Side Wall Masonry 68

41. Plank Center for Constructing the Roof Arch 69

42. Trussed Center for Constructing the Roof Arch 70

43 and 44. A Typical Form of Timber Lining for Tunnels 73

45. Diagram Showing Forms adopted for Side-Wall Foundations 76

46 and 47. Transverse Sections of Tunnels Showing Methods for

Increasing the Thickness of the Lining at Different Points 79

48. Refuge Niche in St. Gothard Tunnel 81

49. East Portal of Hoosac Tunnel 82

50, 51 and 52. Arrangement of Drill Holes in the Heading of

Turchino Tunnel 91

53 and 54. Arrangement of Drill Holes in the Heading of the Fort

George Tunnel 91

55. Diagram Showing Sequence of Excavations in Drift Method of

Tunneling Rock 102

56. Sketches Showing Sequence of Work in Excavating and Lining

the Simplon Tunnel 111

57. General Details of the Brandt Rotary Drills Employed at the

Simplon Tunnel 112

58. Sequence of Excavation in the Murray Hill Tunnel 124

59. Traveling Platform for the Excavation of the Upper Side of

the Murray Hill Tunnel 125

60. Timbering Used in the Murray Hill Tunnel 126

61. Diagram Showing Sequence of Excavation in Heading Method of

Tunneling Rock 132

62. Method of Strutting Roof, St. Gothard Tunnel 135

63. Sketch Showing Arrangement of Tracks, St. Gothard Tunnel 135

64. Arrangement of Drill Holes in the Fort George Tunnel 137

65. Longitudinal Section of the Heading and Bench Excavation at

the Fort George Tunnel 137

66. Diagram Showing the Arrangement of Drill Holes in the

Heading and Bench of the Gallitsin Tunnel 140

67. Diagram Showing Modification of the Heading and Bench Method 140

68 and 68A. Diagrams Showing Sequence of Excavation in the

Belgian Method 145

69. Sketch Showing Radial Roof Strutting, Belgian Method 147

70. Sketch Showing Roof Arch Center, Belgian Method 147

71. Sketch Showing Method of Underpinning Roof Arch with the

Side Wall Masonry 149

72. Longitudinal Section Showing Construction by the Belgian

Method 149

73. Diagram Showing Sequence of Excavation in Modified Belgian

Method 152

74. Sketch Showing Failure of Roof Arch by Opening at Crown 153

75. Sketch Showing Methods of Repairing Roof Arch Failures 154

76. Diagrams Showing Sequence of Excavation in German Method of

Tunneling 155

77. Diagram Showing Sequence of Excavation in Water Bearing

Material, German Method 156

78. Sketch Showing Work of Excavating and Timbering Drifts and

Headings 157

79. Sketch Showing Method of Roof Strutting 157

80. Sketch Showing Roof Arch Centers and Arch Construction 158

81. Sketch Showing Method of Excavating and Strutting Baltimore

Belt Line Tunnel 162

82. Roof Arch Construction with Timber Centers, Baltimore Belt

Line Tunnel 163

83. Roof Arch Construction with Iron Centers, Baltimore Belt

Line Tunnel 164

84. Diagram Showing Sequence of Excavation in English Method of

Tunneling 167

85. Sketches Showing Construction of Strutting, English Method 168

86 and 87. Sketches of Typical Timber Roof-Arch Centers, English

Method 169

88. Sequence of Excavation in the American Method 172

89. Strutting the Heading in the American Method 172

90. Temporary Timbering of the Roof in the American Method 173

91. Showing Crown Bars Supported by Segmental Arches 173

92. Transversal and Longitudinal Section of a Tunnel Excavated

and Strutted According to the American Method 174

93 and 94. Diagrams Showing Sequence of Excavation in Austrian

Method of Tunneling 177

95, 96 and 97. Sketches Showing Construction of Strutting,

Austrian Method 178

98. Sketch Showing Manner of Constructing the Lining Masonry,

Austrian Method 179

99. Diagram Showing Sequence of Excavation in Italian Method of

Tunneling 183

100. Sketch Showing Strutting for Lower Part of Section 183

101 and 101A. Sketches Showing Construction of Centers, Italian

Method 184

102. Sketch Showing Invert and Foundation Masonry, Italian Method. 185

103. Sketch Showing Longitudinal Section of a Tunnel under

Construction, Italian Method 186

104. Sketch Showing Sequence of Excavation, Stazza Tunnel 186

105. Sketch Showing Method of Strutting First Drift, Stazza

Tunnel 187

106 and 107. Sketches Showing Temporary Strutting Arch

Construction, Stazza Tunnel 187

108. Sketch Showing Preliminary Drainage Galleries, Quicksand

Method 190

109. Sketch Showing Construction of Roof Strutting, Quicksand

Method 190

110. Sketch Showing Construction of Masonry Lining, Quicksand

Method 191

111. Sketch Showing Pilot Method of Tunneling 193

112. Diagram Showing Sequence of Construction in Open-Cut Tunnels 197

113. Sketch Showing Method of Timbering Open-Cut Tunnels, Double

Parallel Trench Method 198

114. Side-Wall Foundation Construction Open-Cut Tunnels 198

115. Wide-Arch Section, Boston Subway 204

116. Double-Barrel Section, Boston Subway 205

117. Four-Track Rectangular Section, Boston Subway 206

118. Section Showing Slice Method of Construction, Boston Subway 206

119. Double-Track Section, New York Rapid Transit Railway 212

120. Park Avenue Deep Tunnel Construction, New York Rapid Transit

Railway 214

121. Harlem River Tunnel, New York Rapid Transit Railway 215

122. Sketch Showing Underground Stream, Milwaukee Water-Works

Tunnel 229

123. Sketch Showing Methods of Lining, Milwaukee Water-Works

Tunnel 232

124. Longitudinal Section of Brunel’s Shield, First Thames Tunnel 241

125. First Shield Invented by Barlow 242

126. Second Shield Invented by Barlow 243

127. Shield Suggested by Greathead for the Proposed North and

South Woolwich Subway 245

128. Beach’s Shield Used on Broadway Pneumatic Railway Tunnel 245

129. Shield for City and South London Railway 246

130. Shield for St. Clair River Tunnel 247

131. Shield for Blackwall Tunnel 248

132. Elliptical Shield for Clichy Sewer Tunnel, Paris 249

133. Semi-Elliptical Shield for Clichy Sewer Tunnel 250

134. Roof Shield for Boston Subway 251

135. Transversal and Longitudinal Section of Prelini’s Shield 252

136. Elevation and Section of Hydraulic Jack, East River Gas

Tunnel 260

137. Cast-Iron Lining, St. Clair River Tunnel 262

138. General Elevations and Sections of Shields 270

139. Plan and Elevation of First Bulkhead Wall in South Tube,

Manhattan 273

140. Typical Cross-Sections of One Tube of Pennsylvania Railroad

Tunnel under the Hudson River 278

141. Sections of Cofferdam, Van Buren St. Tunnel, Chicago 283

142. Showing Working Platforms and Piles Sunk in Dredged Channel 286

143. Showing Sheeting-Piles for the Sides of the Caisson and

Trussed Beam for the Roof 287

144. Showing the Caisson with the Working-Chamber 287

145. Showing the Tunnel Constructed within the Caisson 289

146. Showing Sides of the Caisson and Supports for the Roof 290

147. Showing the Roof of the Caisson Formed by the Upper Half of

the Tunnel 291

148. Showing the Tunnel Completed by Building the Lower Half

within the Caisson 292

149. Transversal Section of the Caissons for the Tunnel under the

Seine River 294

150. Showing the Joining of the Caissons at the Pont Mirabeau

Tunnel under the Seine River 295

151. Cross-Sections and Plans of the Detroit River Tunnel 298

152. Tunneling through Caved Material by Heading 306

153. Tunneling through Caved Material by Drifts 307

154 and 155. Filling in Roof Cavity Formed by Falling Material 307

156. Timbering to Prevent Landslides at Portal 308

157. Shortening Tunnel Crushed by Landslide at Portal 308

158. Extending Tunnel through Landslide at Portal 309

159 and 160. Relining Timber-Lined Tunnel 316

161. Relining Timber-Lined Tunnel, Great Northern Ry 317

162. Relining Timber-Lined Tunnel, Great Northern Ry 318

163. Relining Timber-Lined Tunnel, Great Northern Ry 319

164. Construction of Centering Mullan Tunnel 320

165. Centering Mullan Tunnel 321

166. Relining Timber-Lined Tunnel, Norfolk & Western Ry 322

167. Relining Timber-Lined Tunnel, Norfolk & Western Ry 323

INTRODUCTION

THE HISTORICAL DEVELOPMENT OF TUNNEL BUILDING.

A tunnel, defined as an engineering structure, is an artificial gallery,

passage, or roadway beneath the ground, under the bed of a stream, or

through a hill or mountain. The art of tunneling has been known to man

since very ancient times. A Theban king on ascending the throne began at

once to drive the long, narrow passage or tunnel leading to the inner

chamber or sepulcher of the rock-cut tomb which was to form his final

resting-place. Some of these rock-cut galleries of the ancient Egyptian

kings were over 750 ft. long. Similar rock-cut tunneling work was

performed by the Nubians and Indians in building their temples, by the

Aztecs in America, and in fact by most of the ancient civilized peoples.

The first built-up tunnels of which there are any existing records were

those constructed by the Assyrians. The vaulted drain or passage under

the southeast palace of Nimrud, built by Shalmaneser II. (860-824 B.C.),

is in all essentials a true soft-ground tunnel, with a masonry lining. A

much better example, however, is the tunnel under the Euphrates River,

which may quite accurately be claimed as the first submarine tunnel of

which there exists any record. It was, however, built under the dry bed

of the river, the waters of which were temporarily diverted, and then

turned back into their normal channel after the tunnel work was

completed, thus making it a true submarine tunnel only when finished.

The Euphrates River tunnel was built through soft ground, and was lined

with brick masonry, having interior dimensions of 12 ft. in width and

15 ft. in height.

Only hand labor was employed by these ancient peoples in their tunnel

work. In soft ground the tools used were the pick and shovels, or

scoops. For rock work they possessed a greater range of appliances.

Research has shown that among the Egyptians, by whom the art of

quarrying was highly developed, use was made of tube drills and saws

provided with cutting edges of corundum or other hard, gritty material.

The usual tools for rock work were, however, the hammer, the chisel, and

wedges; and the excellence and magnitude of the works accomplished by

these limited appliances attest the unlimited time and labor which must

have been available for their accomplishment.

The Romans should doubtless rank as the greatest tunnel builders of

antiquity, in the number, magnitude, and useful character of their

works, and in the improvements which they devised in the methods of

tunnel building. They introduced fire as an agent for hastening the

breaking down of the rock, and also developed the familiar principle of

prosecuting the work at several points at once by means of shafts. In

their use of fire the Romans simply took practical advantage of the

familiar fact that when a heated rock is suddenly cooled it cracks and

breaks so that its excavation becomes comparatively easy. Their method

of operation was simply to build large fires in front of the rock to be

broken down, and when it had reached a high temperature to cool it

suddenly by throwing water upon the hot surface. The Romans were also

aware that vinegar affected calcareous rock, and in excavating tunnels

through this material it was a common practice with them to substitute

vinegar for water as the cooling agent, and thus to attack the rock both

chemically and mechanically. It is hardly necessary to say that this

method of excavation was very severe on the workmen because of the heat

and foul gases generated. This was, however, a matter of small concern

to the builders, since the work was usually performed by slaves and

prisoners of war, who perished by thousands. To be sentenced to labor on

Roman tunnel works was thus one of the severest penalties to which a

slave or prisoner could be condemned. They were places of suffering and

death as are to-day the Spanish mercury mines.

Besides their use of fire as an excavating agent, the Romans possessed a

very perfect knowledge of the use of vertical shafts in order to

prosecute the excavation at several different points simultaneously.

Pliny is authority[1] for the statement that in the excavation of the

tunnel for the drainage of Lake Fucino forty shafts and a number of

inclined galleries were sunk along its length of 3¹⁄₂ miles, some of the

shafts being 400 ft. in depth. The spoil was hoisted out of these shafts

in copper pails of about ten gallons’ capacity by windlasses.

[1] “Tunneling,” Encly. Brit., 1889, vol. xxiii., p. 623.

The Roman tunnels were designed for public utility. Among those which

are most notable in this respect, as well as for being fine examples of

tunnel work, may be mentioned the numerous conduits driven through the

calcareous rock between Subiaco and Tivoli to carry to Rome the pure

water from the mountains above Subiaco. This work was done under the

Consul Marcius. The longest of the Roman tunnels is the one built to

drain Lake Fucino, as mentioned above. This tunnel was designed to have

a section of 6 ft. × 10 ft.; but its actual dimensions are not uniform.

It was driven through calcareous rock, and it is stated that 30,000 men

were employed for eleven years in its construction. The tunnels which

have been mentioned, being designed for conduits, were of small section;

but the Romans also built tunnels of larger sections at numerous points

along their magnificent roads. One of the most notable of these is that

which gives the road between Naples and Pozzuoli passage through the

Posilipo hills. It is excavated through volcanic tufa, and is about 3000

ft. long and 25 ft. wide, with a section of the form of a pointed arch.

In order to facilitate the illumination of this tunnel, its floor and

roof were made gradually converging from the ends toward the middle; at

the entrances the section was 75 ft. high, while at the center it was

only 22 ft. high. This double funnel-like construction caused the rays

of light entering the tunnel to concentrate as they approached the

center, and thus to improve the natural illumination. The tunnel is on a

grade. It was probably excavated during the time of Augustus, although

some authorities place its construction at an earlier date.

During the Middle Ages the art of tunnel building was practiced for

military purposes, but seldom for the public need and comfort. Mention

is made of the fact that in 1450 Anne of Lusignan commenced the

construction of a road tunnel under the Col di Tenda in the Piedmontese

Alps to afford better communication between Nice and Genoa; but on

account of its many difficulties the work was never completed, although

it was several times abandoned and resumed. For the most part,

therefore, the tunnel work of the Middle Ages was intended for the

purposes and necessities of war. Every castle had its private

underground passage from the central tower or keep to some distant

concealed place to permit the escape of the family and its retainers in

case of the victory of the enemy, and, during the defense, to allow of

sorties and the entrance of supplies.

The tunnel builders of the Middle Ages added little to the knowledge of

their art. Indeed, until the 17th century and the invention of gunpowder

no practical improvement was made in the tunneling methods of the

Romans. Engravings of mining operations in that century show that

underground excavation was accomplished by the pick or the hammer and

chisel, and that wood fires were lighted at the ends of the headings to

split and soften the rocks in advance. Although gunpowder had been

previously employed in mining, the first important use of it in tunnel

work was at Malpas, France, in 1679-81, in the tunnel for the Languedoc

Canal. This tunnel was 510 ft. long, 22 ft. wide, and 29 ft. high, and

was excavated through tufa. It was left unlined for seven years, and

then was lined with masonry.

With the advent of gunpowder and canal building the first strong impetus

was given to tunnel building, in its modern sense, as a commercial and

public utilitarian construction, since the days of the Roman Empire.

Canal tunnels of notable size were excavated in France and England

during the last half of the 17th century. These were all rock or

hard-ground tunnels. Indeed, previous to 1800 the soft-ground tunnel was

beyond the courage of engineer except in sections of such small size

that the work better deserves to be called a drift or heading than a

tunnel. In 1803, however, a tunnel 24 ft. wide was excavated through

soft soil for the St. Quentin Canal in France. Timbering or strutting

was employed to support the walls and roof of the excavation as fast as

the earth was removed, and the masonry lining was built closely

following it. From the experience gained in this tunnel were developed

the various systems of soft-ground subterranean tunneling since

employed.

It was by the development of the steam railway, however, that the art of

tunneling was to be brought into its present prominence. In 1820-26 two

tunnels were built on the Liverpool & Manchester Ry. in England. This

was the beginning of the rapid development which has made the tunnel one

of the most familiar of engineering structures. The first railway tunnel

in the United States was built on the Alleghany & Portage R. R. in

Pennsylvania in 1831-33; and the first canal tunnel had been completed

about 13 years previously (1818-21) by the Schuylkill Navigation Co.,

near Auburn, Pa. It would be interesting and instructive in many

respects to follow the rise and progress of tunnel construction in

detail since the construction of these earlier examples, but all that

may be said here is that it was identical with that of the railway.

The art of tunneling entered its last and greatest phase with the

construction of the Mont Cenis tunnel in Europe and the Hoosac tunnel in

America, which works established the utility of machine rock-drills and

high explosives. The Mont Cenis tunnel was built to facilitate railway

communication between Italy and France, or more properly between

Piedmont and Savoy, the two parts of the kingdom of Victor Emmanuel II.,

separated by the Alps. It is 7.6 miles long, and passes under the Col di

Fréjus near Mont Cenis. Sommeiller, Grattoni, and Grandis were the

engineers of this great undertaking, which was begun in 1857, and

finished in 1872. It was from the close study of the various

difficulties, the great length of the tunnel, and the desire of the

engineers to finish it quickly, that all the different improvements were

developed which marked this work as a notable step in the advance of the

art of tunneling. Thus the first power-drill ever used in tunnel work

was devised by Sommeiller. In addition, compressed air as a motive power

for drills, aspirators to suck the foul air from the excavation, air

compressors, turbines, etc., found at Mont Cenis their first application

to tunnel construction. This important rôle played by the Mont Cenis

tunnel in Europe in introducing modern methods had its counterpart in

America in the Hoosac tunnel completed in 1875. In this work there were

used for the first time in America power rock-drills, air compressors,

nitro-glycerine, electricity for firing blasts, etc.

There remains now to be noted only the final development in the art of

soft-ground submarine tunneling, namely, the use of the shield and metal

lining. The shield was invented and first used by Sir Isambard Brunel in

excavating the tunnel under the River Thames at London, which was begun

in 1825, and finished in 1841. In 1869 Peter William Barlow used an iron

lining in connection with a shield in driving the second tunnel under

the Thames at London. From these inventions has grown up one of the most

notable systems of tunneling now practiced, which is commonly known as

the shield system.

In closing this brief review of the development of modern methods of

tunneling, to the presentation of which the remainder of this book is

devoted, mention should be made of a form of motive power which promises

many opportunities for development in tunnel construction. Electricity

has long been employed for blasting and illuminating purposes in tunnel

work. It remains to be extended to other uses. For hauling and for

operating certain classes of hoisting and excavating machinery it is one

of the most convenient forms of power available to the engineer. Its

successful application to rock-drills is another promising field. For

operating ventilating fans it promises unusual usefulness.

TUNNELING

CHAPTER I.

PRELIMINARY CONSIDERATIONS. CHOICE BETWEEN A TUNNEL AND OPEN CUT.

GEOLOGICAL SURVEYS.

CHOICE BETWEEN A TUNNEL AND AN OPEN CUT.

When a railway line is to be carried across a range of mountains or

hills, the first question which arises is whether it is better to

construct a tunnel or to make such a détour as will enable the

obstruction to be passed with ordinary surface construction. The answer

to this question depends upon the comparative cost of construction and

maintenance, and upon the relative commercial and structural advantages

and disadvantages of the two methods. In favor of the open road there

are its smaller cost and the decreased time required in its

construction. These mean that less capital will be required, and that

the road will sooner be able to earn something for its builders. Against

the open road there are: its greater length and consequently its heavier

running expenses; the greater amount of rolling-stock required to

operate it; the heavy expense of maintaining a mountain road; and the

necessity of employing larger locomotives, with the increased expenses

which they entail. In favor of the tunnel there are: the shortening of

the road, with the consequent decrease in the operating expenses and

amount of rolling-stock required; the smaller cost of maintenance,

owing to the protection of the track from snow and rain and other

natural influences causing deterioration; and the decreased cost of

hauling due to the lighter grades. Against the tunnel, there are its

enormous cost as compared with an open road and the great length of time

required to construct it.

To determine in any particular case whether a tunnel or an open road is

best, requires a careful integration of all the factors mentioned. It

may be asserted in a general way, however, that the enormous advance

made in the art of tunnel building has done much to lessen the strength

of the principal objections to tunnels, namely, their great cost and the

length of time required for their construction. Where the choice lies

between a tunnel or a long détour with heavy grades it is sooner or

later almost always decided in favor of a tunnel. When, however, the

conditions are such that the choice lies between a tunnel or a heavy

open cut with the same grades the problem of deciding between the two

solutions is a more difficult one.

It is generally assumed that when the cut required will have a vertical

depth exceeding 60 ft. it is less expensive to build a tunnel unless the

excavated material is needed for a nearby embankment or fill. This rule

is not absolute, but varies according to local conditions. For instance,

in materials of rigid and unyielding character, such as rock, the

practical limit to the depth of a cut goes far beyond that point at

which a tunnel would be more economical according to the above rule. In

soils of a yielding character, on the other hand, the very flat slope

required for stability adds greatly to the cost of making a cut.

It may be noted in closing that the same rule may be employed in

determining the location of the ends of the tunnel, for assuming that it

is more convenient to excavate a tunnel than an open cut when the depth

exceeds 60 ft., then the open cut approaches should extend into the

mountain- or hill-sides only to the points where the surface is 60 ft.

above grade, and there the tunnel should begin. If, therefore, we draw

on the longitudinal profile of the tunnel a line parallel to the plane

of the tracks, and 60 ft. above it, this line will cut the surface at

the points where the open-cut approaches should cease and the tunnel

begin. This is a rule-of-thumb determination at the best, and requires

judgment in its use. Should the ground surface, for example, rise only a

few feet above the 60 ft. line for any distance, it is obviously better

to continue the open cut than to tunnel.

THE METHOD AND PURPOSE OF GEOLOGICAL SURVEYS.

When it has been decided to build a tunnel, the first duty of the

engineer is to make an accurate geological survey of the locality. From

this survey the material penetrated, the form of section and kind of

strutting to be used, the best form of lining to be adopted, the cost of

excavation, and various other facts, are to be deduced. In small tunnels

the geological knowledge of the engineer should enable him to construct

a geological map of the locality, or this knowledge may be had in many

cases by consulting the geological maps issued by the State or general

government surveys. When, however, the tunnel is to be of great length,

it may be necessary to call in the assistance of a professional

geologist in order to reconstruct accurately the interior of the

mountain and thereby to ascertain beforehand the different strata and

materials to be excavated, thus obtaining the data for calculating both

the time and cost of excavating the tunnel.

The geological survey should enable the engineer to determine, (1) the

character of the material and its force of cohesion, (2) the inclination

of the different strata, and (3) the presence of water.

=Character of Material.=--The character of the material through which

the proposed tunnel will penetrate is best ascertained by means of

diamond rock-drills. These machines bore an annular hole, and take away

a core for the whole depth of the boring, thus giving a perfect

geological section showing the character, succession, and exact

thickness of the strata. By making such borings at different points

along the center line of the projected tunnel, and comparing the

relative sequence and thickness of the different strata shown by the

cores, the geological formation of the mountain may be determined quite

exactly. Where it is difficult or impracticable to make diamond drill

borings on account of the depth of the mountain above the tunnel, or

because of its inaccessibility, the engineer must resort to other

methods of observation.

The present forms of mountains or hills are due to weathering, or the

action of the destructive atmospheric influences upon the original

material. From the manner in which the mountain or hill has resisted

weathering, therefore, may be deduced in a general way both the nature

and consistency of the materials of which it is composed. Thus we shall

generally find mountains or hills of rounded outlines to consist of soft

rocks or loose soils, while under very steep and crested mountains hard

rock usually exists. To the general knowledge of the nature of its

interior thus afforded by the exterior form of the mountain, the

engineer must add such information as the surface outcroppings and other

local evidences permit.

For the purposes of the tunnel builder we may first classify all

materials as either, (1) hard rock, (2) soft rock, or (3) soft soil.

Hard rocks are those having sufficient cohesion to stand vertically when

cut to any depth. Many of the primary rocks, like granite, gneiss,

feldspar, and basalt, belong to this class, but others of the same group

are affected by the atmosphere, moisture, and frost, which gradually

disintegrate them. They are also often found interspersed with pyrites,

whose well-known tendency to disintegrate upon exposure to air

introduces another destructive agency. For these reasons we may divide

hard rocks into two sub-classes; viz., hard rocks unaffected by the

atmosphere, and those affected by it. This distinction is chiefly

important in tunneling as determining whether or not a lining will be

required.

Soft rocks, as the term implies, are those in which the force of

cohesion is less than in hard rocks, and which in consequence offer less

resistance to attacks tending to break down their original structure.

They are always affected by the atmosphere. Sandstones, laminated clay

shales, mica-schists, and all schistose stones, chalk and some volcanic

rocks, can be classified in this group. Soft rocks require to be

supported by timbering during excavation, and need to be protected by a

strong lining to exclude the air, and to support the vertical pressures,

and prevent the fall of fragments.

Soft soils are composed of detrital materials, having so little cohesion

that they may be excavated without the use of explosives. Tunnels

excavated through these soils must be strongly timbered during

excavation to support the vertical pressure and prevent caving; and they

also always require a strong lining. Gravel, sand, shale, clay,

quicksand, and peat are the soft soils generally encountered in the

excavation of tunnels. Gravels and dry sand are the strongest and

firmest; shales are very firm, but they possess the great defect of

being liable to swell in the presence of water or merely by exposure to

the air, to such an extent that they have been known to crush the

timbering built to support them. Quicksand and peat are proverbially

treacherous materials. Clays are sometimes firm and tenacious, but when

laminated and in the presence of water are among the most treacherous

soils. Laminated clays may be described as ordinary clays altered by

chemical and mechanical agencies, and several modifications of the same

structure are often found in the same locality. They are composed of

laminæ of lenticular form separated by smooth surfaces and easily

detached from each other. Laminated clays generally have a dark color,

red, ocher or greenish blue, and are very often found alternating with

strata of stiatites or calcareous material. For purposes of construction

they have been divided into three varieties.

Laminated clays of the first variety are those which alternate with

calcareous strata and are not so greatly altered as to lose their

original stratification. Laminated clays of the second variety are those

in which the calcareous strata are broken and reduced to small pieces,

but in which the former structure is not completely destroyed; the clay

is not reduced to a humid state. Laminated clays of the third variety

are those in which the clay by the force of continued disturbance, and

in the presence of water, has become plastic. Laminated clays are very

treacherous soils; quicksand and peat may be classed, as regards their

treacherous nature, among the laminated clays of the third variety.

=Inclination of Strata.=--Knowing the inclination of the strata, or the

angle which they make with the horizon, it is easy to determine where

they intersect the vertical plane of the tunnel passing through the

center line, thus giving to a certain extent a knowledge of the

different strata which will be met in the excavation. On the inclination

of the strata depend: (1) The cost of the excavation; the blasting, for

instance, will be more efficient if the rocks are attacked perpendicular

to the stratification; (2) The character of the timbering or strutting;

the tendency of the rock to fall is greater if the strata are horizontal

than if they are vertical; (3) The character and thickness of the

lining; horizontal strata are in the weakest position to resist the

vertical pressure from the load above when deprived of the supporting

rock below, while vertical strata, when penetrated, act as a sort of

arch to support the pressure of the load above. The foregoing remarks

apply only to hard or soft rock materials.

In detrital formations the inclination of the strata is an important

consideration, because of the unsymmetrical pressures developed. In

excavating a tunnel through soft soil whose strata are inclined at 30°

to the horizon, for instance, the tunnel will cut these strata at an

angle of 30°. By the excavation the natural equilibrium of the soil is

disturbed, and while the earth tends to fall and settle on both sides at

an angle depending upon the friction and cohesion of the material, this

angle will be much greater on one side than on the other because of the

inclination of the strata; and hence the prism of falling earth on one

side is greater than on the other, and consequently the pressures are

different, or in other words, they are unsymmetrical. These

unsymmetrical pressures are usually easily taken care of as far as the

lining is concerned, but they may cause serious cave-ins and badly

distort the strutting. Caving-in during excavation may be prevented by

cutting the materials according to their natural slope; but the

distortion of the strutting is a more serious problem to handle, and one

which oftentimes requires the utmost vigilance and care to prevent

serious trouble.

=Presence of Water.=--An idea of the likelihood of finding water in the

tunnel may be obtained by studying the hydrographic basin of the

locality. From it the source and direction of the springs, creeks,

ravines, etc., can be traced, and from the geological map it can be seen

where the strata bearing these waters meet the center line. Not only

ought the surface water to be attentively studied, but underground

springs, which are frequently encountered in the excavation of tunnels,

require careful attention. Both the surface and underground waters

follow the pervious strata, and are diverted by impervious strata. Rocks

generally may be classed as impervious; but they contain crevices and

faults, which often allow water to pass through them; and it is,

therefore, not uncommon to encounter large quantities of water in

excavating tunnels through rock. As a rule, water will be found under

high mountains, which comes from the melted ice and snow percolating

through the rock crevices.

Some detrital soils, like gravel and sand, are pervious, and others,

like clay and shale, are impervious. Detrital soils lying above clay are

almost certain to carry water just above the clay stratum. In tunnel

work, therefore, when the excavation keeps well within the clay stratum,

little trouble is likely to be had from water; should, however, the

excavation cut the clay surface and enter the pervious material above,

water is quite certain to be encountered. The quantity of water

encountered in any case depends upon the presence of high mountains near

by, and upon other circumstances which will attract the attention of the

engineer.

A knowledge of the pressure of the water is desirable. This may be

obtained by observing closely its source and the character of the strata

through which it passes. Water coming to the excavation through rock

crevices will lose little of its pressure by friction, while that which

has passed some distance through sand will have lost a great deal of its

pressure by friction. Water bearing sand, and, in fact, any water

bearing detrital material, has its fluidity increased by water pressure;

and when this reaches the point where flow results, trouble ensues. The

streams of water met in the construction of the St. Gothard tunnel had

sufficient pressure to carry away timber and materials.