CHAPTER IV.

OPERATIONS OF 1838.

~Temporary Barrack on Rock.~

The hazardous nature of the anchorage, and the consequent difficulty of

mooring a vessel in the neighbourhood of the Skerryvore Rock, induced

me, from the first, to consider it as a matter of great importance,

even at a large expenditure of time and money, to erect some temporary

dwelling on the Rock for the accommodation of the people engaged in the

work, with the view of rendering the operations less dependent on the

state of the sea, which varied with every wind. So important, indeed,

did this object appear to me, that I was at times apt to look upon it

as an indispensable step towards ultimate success. That opinion was

amply confirmed during our first season’s operations, by the experience

of the oft-recurring difficulty of returning to the moorings when

driven away by stress of weather, together with the daily risk and loss

of time in landing the workmen in small boats, even in weather when

they could be profitably occupied if once placed on this small _terra

firma_. With this view, I naturally turned to the same plan which had

been adopted at the Bell Rock, where the temporary barrack stood the

test of five winters. That structure, which is represented in Plate

No. V., and is particularly described in the Appendix to my father’s

Account of the Bell Rock Lighthouse, consisted of an open framework

of six logs, about 47 feet long and 13 inches square, assembled in

such a manner as to form by their union a hexagonal pyramid, on the

top of which rested a wooden turret; the whole erection rising to the

height of about 60 feet above the rock. This pyramidal framework was

strongly trussed and tied; and, being open at the lower part, offered

little resistance to the waves. The upper part contained a gallery for

keeping various stores and such materials as could not be safely left

on the Rock, even in the finest weather; but it was framed of lighter

materials, so as to admit of its yielding easily to any extraordinary

waves, without involving injury to the principal part of the structure,

by offering great resistance to the sea. The turret on the top was in

the form of a twelve-sided prism, 12 feet in diameter, and 30 feet

high, and was securely attached, by means of the ties and braces shewn

in the drawing, to the apex of the pyramid, which entered into the

lower part of it. The small space which the turret afforded was, with

the utmost economy of room, divided into three storeys, of which the

lower was entirely taken up by the kitchen and the bread-store, a great

deal of room being occupied by the main beams of the pyramid which

passed through its centre. The next storey was subdivided into two

chambers, of which one was appropriated to the foreman of the works and

the landing-master, while the other was set apart for myself; and the

top storey, which was surmounted by a small lantern and ventilator,

formed a barrack room, capable of containing 30 people. Of the comforts

and discomforts of this habitation I shall at some future time have

occasion to speak. I merely draw attention to its erection at present,

as an operation, which it was most desirable should precede every

other work on the Rock. One of the first proceedings, therefore, was

to obtain estimates for the preparation of this log-house, which, in

order to avoid loss of time in making adjustments on the Rock, was to

be carefully fitted up in the workyard of the contractor before being

shipped. Drawings and a specification were accordingly prepared, and

submitted to several carpenters in Greenock, who gave in offers for the

work; and it was finally commenced in the month of March, by the late

Mr John Fleming, who was the successful offerer.

~Tools and Machinery.~

It was also necessary to provide a large assortment of quarriers’

and masons’ tools of every kind; and many cranes, crabs, anchors,

mooring buoys and other implements were ordered, according to detailed

specifications and drawings. These preparations necessarily occupied

the early part of the year 1838.

~Steam Tender for the Works.~

From the extent of the foul ground round the Skerryvore, and the

absence of good harbours in the neighbourhood, it was foreseen at the

outset that the operation of landing about 6000 tons of materials on

the Rock could not be accomplished by means of sailing vessels with

that degree of certainty or regularity which was desirable, in order to

obtain the full benefit of the short working season which the climate

of the Western Hebrides affords; and the necessity for providing a

steam tender was, therefore, generally admitted. It has already been

stated, that, in order to avoid the expense attending the building

of a vessel for this purpose, application was made at the principal

ports of the kingdom, with the view of purchasing a suitable vessel;

but, although twenty-four vessels of nearly the required dimensions

were offered for sale, not one of them was considered fit for such a

service, the great majority being light craft, such as are generally

used in river and port navigation. It was therefore found necessary to

build a steamer; for which purpose, specifications and drawings were

prepared, and after receiving various tenders from respectable parties,

a contract was entered into with Messrs Menzies and Sons, shipbuilders,

and Messrs J. B. Maxton and Co., engineers, both of Leith, for building

a steamer of 150 tons, with two engines of 30 horse power each.

The use of a steamer, at the very outset of the works, would doubtless

have proved of the greatest service in the erection of the barrack

on the Rock, and would have materially lightened our cares and

toils; but I am not sure that I should have acquired so thorough an

acquaintance with the difficulties and dangers of the Skerryvore, or

that I should have been so well prepared for all the obstacles that

presented themselves in the after parts of the work, had the first

season’s operations been conducted under those advantages which are

always derived from the use of steam-power. As it was, we had much to

bear from the smallness of the Lighthouse Tender, named the _Pharos_,

a vessel of 36 tons, new register, which was all the regular shipping

attendance we possessed during this first season; and the inconvenience

arising from her heavy pitching, was, to landsmen, by no means the

least evil to be endured. But the frequent loss of opportunities, of

which we might easily have availed ourselves, if we had possessed the

command of steam-power, and the danger and difficulty of managing

a sailing vessel in the foul ground near the Rock, and between it

and Tyree, were, perhaps, even more felt by the seamen than by the

landsmen; and if the experience of a single year’s work can form any

ground for an estimate of the length of time required for building the

Skerryvore Lighthouse, with a sailing vessel, I should say, we must

still (even in 1845) have been engaged in the masonry part of the work,

which was finished on the 25th July 1842.

~Employment and Wages of Workmen.~

About the middle of April, arrangements were made with Mr Charles

Neilson, a builder in Aberdeen, to select granite masons for the works

at the Skerryvore, as it was expected that the operation of dressing

stones for the Tower would be begun in the ensuing summer; and it was

also obvious, that their services would be required in excavating

seats for the supports of the Barrack-house on the Rock. Masons were

accordingly selected, and engaged on the terms stated in the following

letter to Mr James Scott, the Foreman, who was sent to Aberdeen to

assist in choosing the men:--“Although it is difficult to fix the

precise number of men who may be required, during the progress of the

works, as this must, in some measure, depend upon the produce of the

quarries at Hynish, and of those to be opened in Mull, you may, in the

mean time, engage thirty masons or stone-cutters, twelve quarriers,

and three or four smiths, for two years of certain employment. With

regard to the rate of wages to be paid to the men, this will, in some

measure, depend upon the demand for the season at Aberdeen; it is, at

all events, expected, that they will on no account exceed the rate of

3s. 10d. per day for masons, and 2s. 6d. per day for quarriers, as paid

last season during the long day, or from the 1st of February till 31st

of October; and for the short day during the remaining three months,

3s. for the masons, and 2s. for the quarriers, from 1st November till

31st January.

“It is intended that subsistence money shall be paid to such of the

families or relatives of the workmen as may require it; and that their

wages shall be fully settled monthly, deducting the subsistence money

advanced to their relatives. A Store will be kept at the works by the

Lighthouse Board, from which provisions will be served out at stated

periods, to be fixed by the storekeeper; and these provisions shall be

sold to the workmen at the cost prices at which such stores are laid

in. Barrack accommodation or lodgings, with cooking, will also, as

formerly, be allowed to the men free of expense.”

~Progress of the outfit for the season’s operations.~

Early in the month of May the preparation of the wooden barrack for

the Rock had been completed, and the whole had been set up in the

workyard at Greenock; and when I visited it for the last time about the

5th of that month, I found it all ready for shipment, excepting some

additional iron ties, which I ordered for securing the turret to the

top of the pyramid, which were to be applied at the level of the floor

of the upper or barrack-room storey. I also found that the moorings,

including the mushroom anchors and chains, and the workyard materials,

consisting of several cranes, trucks, a janker for the transport of

timber, and a Woolwich sling-cart for carrying stones to the various

sheds, were in the course of preparation. A large assortment of

masons’ and quarriers’ tools was at the same time ready for shipment

at Aberdeen. Early in June, a vessel called the Duke of Montrose was

chartered to carry coals to Tyree, both for household purposes and for

the work; and two small portable smiths’ forges were prepared for use

on the Rock.

~Embark for Skerryvore.~

In providing the means of efficiently carrying on so many complicated

operations in a situation so difficult and remote, it is impossible,

even with the greatest foresight, to avoid omissions; while delay of

a most injurious kind may result from very trivial wants. Even the

omission of a handful of sand, or a piece of clay, might effectually

stop for a season the progress of plans, in the maturing of which

hundreds of pounds had been expended. Accordingly, although I had

bestowed all the forethought which I could give to the various details

of the preparation for the season (of which I found it absolutely

indispensable to be personally aware, even to the extent of the cooking

dishes), new wants were continually springing up, and new delays

occasioned, so that it was not until the evening of the 23d of June

that I could embark at Tobermory in the _Pharos_ Lighthouse Tender,

commanded by Mr Thomas Macurich, with all the requisites on board for

commencing the season’s operations. Next morning we moored off Hynish

Point about three o’clock, and, from the roughness of the passage, were

not unwilling to land at that early hour. Here I found that Mr Scott,

the foreman of the workyard, had, notwithstanding the unworkable nature

of the Rock, more particularly afterwards noticed, procured about sixty

fine blocks of gneiss, as the produce of the Tyree quarries, which

had been wrought for upwards of 15 months; and had at the same time

completed the masonry of a range of buildings for stores and barracks,

capable of containing upwards of 100 men, and had built about 100 feet

in length of a landing-pier, reaching nearly to low-water mark. A

magazine for gunpowder, of which a considerable stock was required for

quarrying purposes, had also been built; and a piece of garden ground

had been inclosed and stocked for the use of the people to be employed

at the works. Measures had also been taken for inclosing the ground,

which had been feued by the Board from the Duke of Argyll. This day

being Sunday, nothing was done at Hynish, and we waited until next

morning before sailing for the Rock.

_25th June._--Sailed in the _Pharos_ from Hynish Bay this morning about

six, with Mr Scott, the foreman of the workyard, and one or two masons

on board; but, having a foul wind during the early part of the day,

and the weather falling afterwards calm, it was not until three in the

morning of the 26th that we reached the Rock.

~Lay down Moorings, and try to land on the Rock.~

_26th June._--Our first step was to lay down moorings for the tender

as near the Rock as seemed to be consistent with safety. The position

chosen by Mr Macurich, who commanded the vessel, was to the S.S.E. of

the Rock, about a quarter of a mile off, and in 13 fathoms water, on

an irregular rocky bottom. About half-past five I attempted a landing

on the Rock, but there was a great deal too much sea. The vessel was

pitching the bowsprit under at her moorings, and the surf broke into

the creek where landings are generally made, in such a manner as to

render it quite impossible to get near the Rock. After hanging on our

oars in the boat for nearly an hour, in the hope of a smooth lull

between the heavy seas, we returned to the vessel, and, as the wind

still freshened from the S.E., we reefed the mainsail and set the first

jib, and steered for the Mull shores, where, about ten at night, we

came to an anchor in Loch Loich, not far from the Island of Iona.

~Driven to Mull.~

_27th June._--Next day also being unsuitable for attempting to reach

the Skerryvore, the vessel lay in North Bay, and the early part of the

day was spent in a careful examination of the granite Rocks of the

district called _Ross of Mull_, with the view of establishing quarries

there; as our experience of the unsatisfactoriness of working the Tyree

quarries during fifteen months had frequently led me to anticipate the

necessity of soon seeking a supply of materials in some other quarter.

In this district an almost inexhaustible supply of flesh-coloured

granite was found, not certainly of the hardest description, but

singularly equal and homogeneous in its texture. I therefore made a

general survey of the neighbouring localities, with a view to select

the best position for opening quarries and establishing a landing

place or wharf for shipping the materials, as well as for erecting

barracks for the workmen. In the afternoon, I embarked at the call of

Mr Macurich, to attempt another landing on the Skerryvore; but as the

wind soon fell calm, we did very little good until evening, when some

progress was made in stretching across towards the Rock.

~First day’s work on the Rock.~

_28th June._--At nine this morning, we reached our moorings at the

Rock, but there was still so much surf that a landing could not be

attempted till mid-day, when I went with Mr Macurich in the boat, and

with some difficulty contrived to spring on the Rock, after which the

boat returned to the vessel for the rest of the party. While left

alone on this sea-beaten Rock, on which I had landed with so much

difficulty, and as I watched the waves, of which every succeeding

one seemed to rise higher than the last, the idea was for a few

minutes forcibly impressed on my mind, that it might, probably, be

found impracticable to remove me from the Rock, and I could not avoid

indulging in those unaccountable fancies which lead men to speculate

with something like pleasure upon the horrors of their seemingly

impending fate. These reflections were rendered more impressive by

the thought that many human beings must have perished amongst those

rocks. A consideration, however, of the rarity of an opportunity of

landing on the Rock, and the necessary shortness of our stay, soon

recalled me to my duty, and before the boat returned with a few of the

workmen, I had projected some arrangements as to the first step to

be taken in erecting the framework of the barrack-house. The second

landing was more easily effected, as the tide had fallen, and the

landing-place was more sheltered, so that we were the more emboldened

to make a fair commencement of operations. It was a day of great bustle

and interest, the work consisting in chalking out and marking on the

Rock with paint, the sites of the Lighthouse-Tower, and the wooden

barrack, and the positions for cranes, crabs, and ring-bolts for guys

and other tackling, as well as ascertaining such dimensions as would

enable me at once to proceed to fit up the log-house, or barrack, at

our next landing. In that way, we spent four hours on the Rock, much

to the annoyance of the seals and the innumerable sea-fowl, which we

drove from their favourite haunts. During the whole day, the sun had

great power; and the smell from the cast-away feathers and the soil

of the sea-fowl was extremely disagreeable. I was amazed to find that

those animals should select, as their place of repose, a rock in the

Atlantic, intersected by deep gullies which are never dry, with only

one pinnacle, about 5 feet in diameter, raised about 16 feet above the

sea. while the greater part is only 5 feet above high water. Yet, in a

crevice of this Rock, I found an egg resting on a few downy feathers,

which the first wave must have infallibly washed away! After the day’s

work on the Rock, we sailed for Tyree, but did not reach the workyard

till next morning at nine; and a long day of bustle and hurry was spent

there in preparing provisions, timber, ring-bolts, chains and all

sorts of tackling for the operations connected with the erection of

the barrack on the Rock. On the evening of the 30th June, I sailed for

Greenock, whence I trusted soon to return to the Skerryvore with the

whole of the materials, to commence operations.

~Shipment of all the materials at Glasgow and Greenock.~

~Reach Tyree.~

~Driven to Mull.~

~Return to Tyree.~

It seldom happens that human expectations are fully realised,

especially in matters which excite a strong interest in the mind, and

thus lead one to desire a more rapid progress than usual. But this is

peculiarly true in all arrangements which depend on the co-operation of

many persons; and so I experienced on my visit to Greenock and Glasgow,

where I had given orders for shipping all the machinery and apparatus

required for carrying on the works, such as cranes, trucks, boats,

blocks and tackle, anchors, coals, grindstones, stucco, pavement,

mats and fascines for blasting, clay for puddling, shear-poles, and

innumerable small utensils, some of no great value, but all necessary

to the success of the work. The great bulk of those materials were

despatched by a vessel called the _New Leven_, and part by the _Mary

Clark_, on the 24th July; but it was not until the 30th that the

_Pharos_ Lighthouse tender was fully loaded, on the morning of which

day I again embarked at Greenock for the Skerryvore Rock. The weather

proving somewhat unfavourable, we were forced (being very heavily

laden) to pass through the Crinan Canal, instead of going round the

Mull of Kintyre, so that it was not till the morning of the 4th August

that we landed at Hynish, in Tyree. Here I found some farther progress

had been made in building the barracks for the men, some of the houses

being already roofed and slated. The quarries, too, had turned out

stones sufficient for about four of the lowest courses of the Tower, a

quantity which might be estimated at about 7920 cubic feet. Next day

(August 5th), the wind blowing strong from the S.S.W., we were forced

to leave Hynish Bay, and retreat before a very heavy sea to Tobermory.

We immediately sailed again, and made for Loch Erin, a small creek

in the Island of Coll, as being nearer to Hynish and better adapted

for enabling us to take advantage of any sudden improvement in the

weather. On our arrival at this singular natural haven, at nine in the

evening, I was glad to find the _New Leven_, before mentioned as having

loaded materials at Greenock lying already there, waiting a favourable

change of wind. Next morning we weighed anchor, and sailed along with

that vessel for Hynish, where she was immediately discharged of her

cargo, which was chiefly intended for the workyard there, and took in

materials for the erection of the barrack on the Skerryvore Rock.

~First good day’s work on the Rock.~

_7th August._--We this morning took on board various tools and

implements for the Rock, together with workmen to the number of four

carpenters, sixteen masons and quarriers, and a smith, along with Mr

George Middlemiss, as foreman. Having sailed with a northerly wind, we

made a landing about noon, and had what may be called our first entire

day of work on the Rock. Our work was by no means easy, as we had to

erect _shear-poles_ and fix _crabs_ for landing the materials, and to

lash every article that was landed, with great care down to ring-bolts

on the Rock, which a few of the masons were fixing, while the rest of

the people were discharging the vessel. All this was attended with a

good deal of trouble, and it required my constant attention to keep

everything going on in a fair train, so as to prevent one party of

workmen requiring to wait for another; but, after eight hours of very

hard work, I had the satisfaction of seeing all the materials which

had been landed left in a secure state. The extreme smoothness of the

surface of the Rock greatly impeded the landing of materials; for as

yet we had no tramways on which wheeled trucks could be moved, and the

transport by hand of heavy materials over so irregular and slippery a

surface was attended with considerable danger. A short trial was this

day made of boring one of the holes for the stancheons or bats, by

which the timbers of the Barrack were to be secured to the Rock; and

I found, that with a jumper of 3¹⁄₂ inches diameter, a depth of about

3 inches was bored in one hour. The commencement of the operations

involved much labour and considerable discomfort; but it invariably

happened throughout the work, that in spite of all the fatigue and

privation attending a day’s work on this unsheltered Rock, the landsmen

were for the most part sorry to exchange it for the ship, which rolled

so heavily as to leave few free from sea-sickness, and to deprive most

of the workmen of sleep at night, even after their unusually great

exertions during the day.

On leaving the Rock at night we had the greatest difficulty in boarding

the _Pharos_ with two boats containing upwards of thirty-two persons,

as the vessel rolled so heavily, that there was great danger of the

boats being thrown right upon her deck. Next morning (8th August) we

landed, with some sea running, about nine o’clock, before which hour it

was impracticable, owing to the surf in the landing creek. Our first

work was to prepare the tackling for landing the heavy materials from

the _New Leven_, which came up about eleven o’clock, and was made fast

by a warp to the _Pharos_. We next took means for fixing the smith’s

forge on the Rock and preparing the fixtures for the crab, which stood

on the point of rock to the westward (see Plate III.), and served

chiefly for raising the beams of the log-house into their places. The

greater part of the day, till half-past eight in the evening (when it

became dark), was spent in lining off with accuracy the site of the

supports of the wooden barrack, and in landing and fixing by strong

lashings to the Rock, all the principal timbers and iron fixtures.

The spot in which the framework of the first barrack was placed, will

be seen by reference to Plate III. The Rock was at this place a good

deal lower than the site afterwards adopted for the barrack. The high

water of spring-tides rose 2¹⁄₂ feet upon the legs or main beams; but

this site had many advantages, as it left more room for operations at

or near the Tower itself than could have been obtained in any other

position.

~Sudden gale, and great peril to the vessels.~

~Reach Hynish in safety.~

We also made some progress in erecting a wooden shed round the smith’s

forge, to protect him and his fire from the wind and the spray of the

sea. As we left the Rock in the boats, speculating on the prospect

of getting the whole of the materials discharged in the course of

next day, it was remarked that the northern sky was very clear, and

that the wind had entirely fallen. The great and sudden stillness of

the air, which permitted every ripple on the ocean to be heard, was

regarded by Mr Macurich and the seamen generally, as the forerunner of

a change; and the moon, which rose red and fiery, confirmed their fears

of a gale. Nor were they wrong in their forebodings. About midnight

there was a stiff breeze from the S.E., which induced the master of

the _New Leven_ to hoist sail, cast loose from us, and run; and had

not the seaman on watch on the deck of the _Pharos_ fallen asleep in

consequence of excessive fatigue, there can be little doubt we should

have been at once called to follow her example, if, indeed, we had

not led the way. No sooner, however, did Mr Macurich become aware of

the state of the wind, which was blowing very strong at S.S.E. right

into the landing place, than he roused me about two o’clock. At this

time there was a very heavy sea; the little vessel was pitching her

forecastle under, and we had to contend with a strong tide combined

with the wind against us in working clear of the Rock, from which our

moorings were not more than a quarter of a mile to windward; while

from the place where we lay, half of the horizon was foul ground, all

lying to our leeward. We soon set sail, but in vain tried to weather

the sunk rock Bo-Rhua, whose large black mass (after having imagined

ourselves past it) we discovered encircled by a wreath of white foam

within less than a cable’s length of us. The heavy seas we encountered

had greatly deceived us as to our progress, and thick blinding showers

of rain made it difficult to see far beyond the vessel’s head. Such

was the precarious and dangerous position of the vessel, that had an

attempt been made to _tack_ her amidst the surf which came rolling off

the Rock, she would most probably have missed stays, the consequence of

which would have been the inevitable loss of the vessel and of every

soul on board. In this dilemma we were obliged to resort to a less

dangerous expedient, by _wearing_ the ship and running her through the

narrow passage between Bo-Rhua and the sunk rocks, about 300 yards to

the W.N.W. of it, although this was a most hazardous attempt, as we had

then little or no knowledge of that dangerous and intricate passage.

A more anxious night I never spent; there being upwards of thirty

people on board, with the prospect, during several hours, of the vessel

striking every minute. And here I must award due praise to Mr Macurich

for the coolness and intrepidity which he on this occasion displayed,

and the calmness with which he gave his orders to the crew; and as

I stood in the companion, telling him the time at intervals of five

minutes, so as to enable him the better to judge of the vessel’s way

through the water, I could not but remark the necessity for silence on

the part of the master of a vessel in cases of difficulty. The workmen

were told to be getting ready for landing, but we did not make them

aware of the full extent of the danger; and to avoid confusion, they

were not permitted to come on deck. We had no sooner cleared the sunk

rocks already alluded to, than we were in fear of the great reef of

Boinshly, and the heavy seas which were breaking over the foul ground

all round it. In this way we spent a night of almost uninterrupted

anxiety until daylight, and at eight in the morning we came to the

moorings in Hynish Bay, after a hard struggle against wind and tide

and a very heavy sea, which made us hang _dead_ a long time off Hynish

Point. At one time I feared we should have been forced, as I had been,

when returning from my first unsuccessful and discouraging attempt to

land on the Skerryvore in 1836, to go round the west side of Tyree

and Coll, which is a very foul coast; and when we did round Hynish

Point, it was almost at the expense of our boat, which the heavy sea

had nearly swept away from us. After all this anxiety about our safety

and discomfort from rain, wind, and spray, during five or six hours,

we were not sorry to set foot even on the wild shores of Tyree; and I

trust there were none who did not gratefully acknowledge the protecting

care of Almighty God, in preserving us through such peril.

~Detained by bad weather four days at Hynish.~

~Return to the Rock, and have six days of good weather.~

It was not until Monday the 13th that a landing was again effected on

the rock, as the wind continued to blow strongly from the south; and

the intervening four days were spent in Hynish Bay, landing in the

morning, and again returning to the vessel in the evening. During this

time I was engaged in making drawings of some of the lower courses of

the Lighthouse Tower, with a view to fix finally upon dimensions, from

which working drawings and wooden moulds for cutting the stones could

be made. The only alleviation of my impatience at being detained at

Hynish was the satisfaction of seeing some 20 feet of the pier founded

at low water. Late in the evening of the 13th August we again landed on

the Rock, when we found time, before dark, to complete the fixture of

the smith’s forge, which I had been forced to leave unfinished. Even

the short period of work this evening was curtailed by a very heavy

shower, which drenched us to the skin--a great evil, where there are

many people to be accommodated in a small vessel, without room for much

spare clothing, or the means of getting any thing quickly dried. After

this we had an uninterrupted tract of good weather for six days; and as

we landed every morning at four o’clock, and remained on the Rock until

eight, taking only half an hour for breakfast, and the same time for

dinner, we had thus the work of twenty-eight persons for about ninety

hours.

~Erection of the Pyramid of the wooden Barrack.~

After carefully setting out the radial directions in which the six

legs, or main beams were to stand, our next step was to lay off their

approximate distances from the centre of the Barrack, and to clear a

space in the solid Rock of sufficient extent to admit of adjusting the

exact positions of the bats before boring the holes. This operation

involved the necessity of blasting parts of the Rock by very small

shots, the bores being about 1¹⁄₂ inch diameter, and 15 inches in

depth, and so directed as to have the effect of throwing off a thin

superficial crust without shaking the solid part below. The materials

thus quarried in forming the seats for each post were thrown, by means

of tackle, into the deepest pools, to prevent their being driven by the

sea against the timbers of the barrack, and so injuring them.

[Illustration: No. 4.]

[Illustration: No. 5.]

~Mode of determining the length of the Beams, and the sites for their

fixtures.~

For ascertaining the exact length of each of the six beams, which

formed by their union a pyramid of about 21° 30′ of inclination, and,

at the same time, for determining its exact place, in reference to the

centre of the hexagon, both of which elements necessarily varied with

the level of the irregular surface of the Rock, I used the following

simple arrangement:--Each beam being of the greatest length that could

be required, the level and distance from the centre were ascertained

for the longest beam, which, of course, had the lowest seat or rest,

by means of a wooden frame, shewn in the diagram (No. 4), in which

_a a_ is a vertical rod of iron firmly batted into the rock, so as

to coincide with the centre of the pyramid to be formed by the main

beams, and of sufficient length to exceed the greatest variation of

level between the different points where the beams are likely to stand;

_c c_ is a horizontal board which can be freely turned about _a a_

horizontally, and resting upon a small shoulder _d_, and which is equal

in length to the radius of the hexagon, on the horizontal plane at the

level of the lowest beam. On this board is a spirit-level _s_, which

regulates its horizontality; _e e_ is the approximate position of the

lower end of the beam; _f f_ is a _pitched board_, representing the

section of the permanent beam, on a vertical plane passing through

the axis of the pyramid, and also shewing its inclination towards

the centre of the pyramid. As this _pitched board_ is capable of

being moved up or down by sliding through a groove at _g_, it may be

successively applied to the rough surface at _e e_ in the course of

cutting it down, and thus be made truly to represent the position of

the beam, and, at the same time, give the inclination of the surface

_e e_, which must be at right angles to the axis of the beam _f f_.

In this way, by repeated trials, the surface was truly dressed to its

proper inclination, and the length ascertained which required to be

cut from the beam, so as to make it rest on that surface when in its

true position. Hence, also, in the case of all the other beams, the

length which the pitch-board _f f_ was moved upwards through the groove

_g_, beyond the level _c c_, indicated the quantity to be cut from

the end of any given beam.[17] The surface of the Rock, dressed for

the seat of the beam, being thus brought to its proper inclination,

the sliding-board correctly set and the centre line _a a_ of the

beam carefully marked on the Rock, a square board (see fig. No. 5)

representing the cross section of one of the beams, was then put down

at the proper distance, so as to cover the space indicated by the

_pitch-board_ as the site of the beam, and with its centre coinciding

with the radius already traced on the dressed seat or bed. When so

placed, the small round knobs, or ears, _d_ _d_ (No. 5) on this board,

shewed the position of the holes to be bored for the bats or side

fixtures, which, as afterwards shewn in figure (No. 8, p. 88), spread

outwards from the axis of the beam, and thus formed a kind of dovetail.

In order to make the holes capable of receiving the bats and, at the

same time, embracing the timbers of the barrack, a quoin of wood (Nos.

6 and 7) _e_, was put down, with bevelled faces or grooves _g_, cut in

it for directing the motion of the jumper or boring iron _i_, thus:--

[Illustration: No. 6.]

[Illustration: No. 7.]

These holes were bored with jumpers, 3¹⁄₂ inches in diameter, and were

sunk 2 feet deep in the rock. The boring of each hole took upwards of

eight hours, in consequence of the hardness of the material, which

is gneiss, a stone considerably more difficult to bore than even

the granite of Aberdeenshire. The bats or stancheons, although very

accurately forged, were occasionally found not to fit truly, owing to

unavoidable twists in the holes, which arose from _dries_ or veins in

the Rock crossing the line of the hole, and thus disturbing the motion

of the jumper. This gave us much trouble, and shewed that, had we

determined, as I at first contemplated, to cut a lewis-hole, swelling

towards the base, the work would have been almost impracticable. The

mode which I had proposed for executing this operation was to bore a

number of very small holes, inclined at the proper angle, all round the

outside of this lewis chamber, and then to cut out between them; but

this, as our after experience in cutting the foundation of the Tower

proved, would have occupied an extent of time which we should have been

very unwilling to bestow upon a merely temporary erection like the

wooden barrack. Even as it was, and with all the retrenchments that

could be safely adopted, the preparation of the seats for the six outer

or main beams, and those for the six inner braces, employed twelve men

for four days.

[17] The accented letters _e′_, _c′_, _f′_, _g′_, _o′_, _s′_,

in the figure (No. 4), page 85, denote the various parts of the

gauging-rule, when applied to the beam, opposite that to which the

letters _e_, _c_, _f_, _g_, _o_, _s_, in the text, refer.

[Illustration: No. 8.]

After the seats for the timbers had been dressed in this manner, the

carpenters were employed cutting the beams to their respective lengths,

the piece to be cut off being measured, as already stated, by the

length through which the sliding-board _f f_ (No. 4, p. 85) had been

raised above its position on the level platform on which the pyramid

had been erected in the workyard at Greenock. At the same time, the

stancheons (_k k_) in the figure (No. 8, p. 88), and the glands or

collars _e_ _e_ (in figure No. 8), were let into grooves in the beam,

and the holes admitting the screwed bolts _a_ _a_, to pass through the

two stancheons and the beam between them, were bored with an auger,

and widened with a red hot iron. The tops of the beams _b_ _b_ (see

fig. No. 9), having been already fitted in the workyard at Greenock,

so as to meet a hexagonal quoin of hardwood _e_, round which they were

assembled as shewn in the figure (No. 9), straps of iron _d d_, were

made to pass over the top of the whole, and were secured to the beams

with bolts, and a spike at _a_ was driven into the centre to wedge the

timbers tightly up, so as to fill a ring which embraced the exterior

of the whole. It was obvious, that if the sliding-board (described on

p. 85) had indicated the true inclination of the seat on the Rock for

the end of the beam to rest on, as well as its radial distance from

the centre of the pyramid and the corresponding length of the beams,

the top of each beam must necessarily meet in its exact place around

the central hexagonal quoin. The operation of determining the positions

and lengths of such beams on a rugged rock, and placing them with the

accuracy requisite, to insure their _mitering_ truly at the top, was

attended with a good deal of trouble; and I have judged it advisable to

give these details, as they may prove useful to others who may have a

similar work in hand.

[Illustration: No. 9.]

After a good deal of trouble, owing to the lowness of the Rock and

the smallness of its surface, the six main beams, each nearly 50 feet

long, were raised on end by means of shear-poles, and the iron straps

which passed over the top of them, and the ring which embraced the

whole so as to secure them at the top, were fixed with much care. The

temporary guys were removed on the afternoon of the 18th August. A

plummet suspended from the centre of the quoin, after all the six beams

were in their places and the stancheons had been run up with lead, came

within half-an-inch of the centre bar, which was about 40 feet below

the point of suspension, thus indicating an angular deviation of less

than 4′. This is a very good approximation, under all the circumstances

with which we had to contend; and it is chiefly to be imputed to the

very accurate measures pursued in the workyard of the contractor at

Greenock, by Mr George Middlemiss, foreman of the carpenters (who then

acted as superintendent of the contract works), and whose intelligence

and zeal made him, at all times, able and ready to do full justice to

all my suggestions for incurring as little loss of time on the Rock

as possible. The operation of fixing these six beams, which formed,

by their union, a hexagonal pyramid of about 44 feet high, and about

34 feet in diameter at the base, occupied only six days, including

the cutting of the seats and the boring of the holes in the Rock.

Much labour and time were consumed in the mere moving of beams, each

weighing about 13 cwt., over the rugged surface of the Rock, for which

purpose we could only use a small set of shear-poles, with crabs and

blocks, and tackle purchase; and it sometimes happened, that merely

for the purpose of moving a beam, it was necessary to place a special

ring-bolt for holding a _snatch-block_ for a few minutes, in spite of

all the care and forethought which had been bestowed, in selecting

the most advantageous positions for placing them, before the work of

raising the beam was begun. Nor was the necessity for securing every

loose material by means of lashings to the Rock, before leaving for the

night, an insignificant source of delay; for we were sometimes forced

by the waves or the darkness, which drove us from our work, to lower a

beam which was just ready for being fixed and to replace it in a safe

situation.

~Pyramid completed.~

On Saturday the 18th August, the pyramid having been successfully

erected, the men were busied for two hours, before embarking for the

vessel, in collecting and lashing all the loose materials to the Rock,

for the sky gave some indications of a change. As we took to the boats,

I looked at the result of our labours with some satisfaction, not

unmingled with gratitude.

~Mode of living while erecting the Barrack.~

During the week, while we had been engaged in fitting up the main

timbers of the barrack, the weather had been very fine; and except the

long hours of toil and the sea-sickness on board the vessel, there was

nothing to complain of; but the economy of our life while moored for

days off the Rock, was somewhat singular. We landed at four o’clock

every morning to commence work, and generally breakfasted on the Rock

at eight, at which time the boat arrived with large pitchers of tea,

bags of biscuit, and _canteens_ of beef. Breakfast was despatched in

half an hour and work again resumed, till about two o’clock, which hour

brought the dinner, differing in its materials from breakfast only in

the addition of a thick pottage of vegetables, and the substitution

of beer for tea. Dinner occupied no longer time than breakfast, and

like it, was succeeded by another season of toil, which lasted until

eight and sometimes till nine o’clock, when it was so dark that we

could scarcely scramble to the boats, and were often glad to avail

ourselves of all the assistance we could obtain from an occasional

flash of a lantern and from following the voices. Once on the deck of

the little tender and the boats hoisted in, the materials of breakfast

were again produced under the name of supper; but the heaving of the

vessel damped the animation which attended the meals on the Rock, and

destroyed the appetite of the men, who, with few exceptions, were so

little _sea-worthy_ as to prefer messing on the Rock even during rain,

to facing the closeness of the forecastle. As I generally retired to

the cabin to write up my notes, when that was practicable, and to wait

the arrival of my own refection, I was sometimes considerably amused

by the regularity with which the men chose their mess-masters, and the

desire which some displayed for the important duties of carving and

distributing the rations. Even the short time that could be snatched

from the half-hour’s interval at dinner, was generally devoted to a

nap; and the amount of hard labour and long exposure to the sun, which

could hardly be reckoned at less than 16 hours a-day, prevented much

conversation over supper: yet, in many, the love of controversy is so

deeply rooted, that I have often, from my small cabin, overheard the

political topics of the day, with regard to Church and State, very

gravely discussed on deck, over a pipe of tobacco. Perhaps the great

heat below, where upwards of twenty people were confined, might in some

measure account for this wakefulness on board the Tender.

~Shoals of Medusæ seen.~

One beautiful morning, during our stay of six days at the Rock, we

had a visit from a shoal of small fish, whose novel appearance made

me take them for a fleet of some species of Nautilus. Those animals

came in such numbers, that the pale blue silky membranes or sails,

which wafted them before a gentle breeze over the glassy surface of

the ocean, literally covered the water as far as we could see. One of

those animals I sent in a small phial to my friend, Professor Fleming,

then of King’s College, Aberdeen, who assigns to it the Linnean name of

_Medusa velilla_, and says it is noticed by Dr Walker and Mr Pennant,

as a native of Scotland.

~Driven by a gale to Mull.~

~Return to Hynish, and are driven to Coll.~

~Return to the Rock.~

The threatening of the previous night was fully verified by the

succeeding Sunday morning, as a strong southerly wind with heavy

showers, forced us to part from our moorings at the Rock at break of

day, and make sail for Hynish Bay, where we anchored at seven. On

Monday I landed at Hynish; but as the wind, which had increased to a

strong gale, was still rising and inclining more to E., Mr Macurich

summoned me to the boat, when, with much difficulty, and at the expense

of shipping several seas, we reached the vessel which was pitching the

bowsprit under. This soon forced us to run for the Sound of Mull, where

we were detained until Saturday the 25th, on the morning of which day

we again made Hynish Bay; but the wind, which had been less violent

when we started from Tobermory the night before, again commencing to

blow strong from the same unpropitious quarter, we had only time to

land at Hynish, and take on board a salted sheep (which proved a rather

unpalatable addition to our provisions), when we were forced to seek

shelter in our old quarters at Loch Erin in Coll. As we entered Loch

Erin, we saw the _Regent_ (the General Lighthouse Tender) leave the

Sound of Mull, and again put back to Tobermory. Next day (the 26th

August) we left Loch Erin, and boarded the Regent; but the weather

proving boisterous, we were again forced into our old anchorage, while

the _Regent_ proceeded with the Engineer, who was then on his annual

voyage, to Barrahead Lighthouse, without attempting to go near the

Skerryvore. From this date the weather did not prove favourable for

a landing until the 30th, when the wind being N.W., we sailed from

Loch Erin at daybreak, and reached the Skerryvore at ten. We now

discharged all the remaining materials which had been shipped for the

Rock with a view to complete the pyramid of the barrack, which it was

intended should stand the test of a winter, deferring the fixing of the

habitable part till next spring.

~Driven to Tyree.~

~Return to the Rock.~

~Horizontal braces fixed.~

~Driven to Mull.~

~Heavy gale.~

~Timber cast on Tyree.~

~Return to Rock, and farther progress of barrack.~

_31st August._--The last day of August was one of considerable

discomfort. Our landing at four in the morning was attended with great

difficulty and some danger; and throughout the day we were a good

deal incommoded by a thick drizzling rain, which continued without

intermission. About mid-day the sea rose so much as to render it no

longer prudent to delay leaving the Rock, and we therefore embarked.

After lying at our moorings until half-past two, in what, to landsmen,

was a most distressing sea, we slipped and ran for Hynish Bay, which

we reached at 5¹⁄₂ P.M. The weather continued boisterous until next

evening (1st September), when the wind went round to the north, and

at eight all the men were summoned on board; but although we sailed

at daybreak, we could not reach the moorings with daylight; and it

was not till the morning of the 4th September, about four o’clock,

that we could again land on the Rock. We succeeded, in spite of a

very unfavourable day, in remaining till three o’clock, during which

time we fixed the whole of the horizontal braces, and got everything

which we had not been able to secure in its place firmly lashed to the

ring-bolts on the Rock, after which we were forced to leave it for

Mull. The gale continued to blow very hard, without any intermission,

for some days; and on the 6th, some wreck-timber, covered with

goose-barnacles, came ashore among the surf at the beach at Hynish, but

no trace of its history was ever found, nor did any rumour reach us

of a shipwreck having occurred on this coast. It was not till the 8th

that we could again attempt to reach the Skerryvore; when, sailing from

Mull with a fair wind, and taking on board at Hynish nine masons, and

Mr C. Barclay, foreman of the quarriers, we again landed on it at 2¹⁄₂

P.M. We succeeded in getting up the mortar gallery (see Plate V.), and

in fixing some of the diagonal braces, and left the Rock about eight.

A marrot perched on the vessel’s side this afternoon, much fatigued

and evidently desirous to get on board; but the sailors, from some

superstitious dread, would not admit the poor bird.

_10th September._--We landed at four o’clock, and had a long and good

day’s work until daylight left us. We were now within twenty-four

hours at most of completing all that could be expected to be done this

season; and it was with no small anxiety that I observed a change of

wind from N.E. to S.S.W., accompanied by a fall of the sympiesometer;

as in the event of a change of weather at that season, it seemed very

uncertain when we might again land, and still more uncertain whether

our work, in its incomplete state, could resist the winter’s seas.

~Last day’s work on Rock this season.~

~Precaution for the benefit of shipwrecked seamen.~

~View from top of pyramid.~

_11th September._--This was our last day’s work on the Rock this

season. We landed at four o’clock with very great difficulty, and some

danger of having our boats swamped; and we were forced, owing to the

heavy sea which broke upon it, to leave the Rock at high water; but,

about one o’clock, we were enabled to return, as the sea fell a little.

By dint of great exertions, we got the last of the diagonal braces

fixed, and the bats run up with lead and painted, for their protection

against corrosion. We also contrived to remove the greater part of

the tools from the Rock, but some we were forced to leave to their

fate. To the upper part of the pyramid we lashed a water-tight chest,

containing biscuits and a cask of water, to serve as a means of support

to any shipwrecked mariners who might chance to reach the Rock. I also

caused some spars to be lashed at various levels, by way of testing the

effects of the sea; but to how little purpose, the sequel will shew.

Before leaving the Rock, I climbed to the top of the pyramid, from

which I now, for the first time, got a bird’s eye view of the various

shoals which the stormy state of the sea so well disclosed; and my

elevation above the Rock itself decreased the apparent elevation of

the rugged ledge so much, that it seemed to me as if each successive

wave must sweep right over its surface, and carry us all before it

into the wide Atlantic. So loud was the roaring of the wind among the

timbers of the barrack, and so hoarse the clamour of the waves, that

I could not hear the voices of the men below; and I, with difficulty,

occasionally caught the sharp tinkle of the hammers on the Rock. When I

looked back upon the works of the season, upon our difficulties, and,

I must add, dangers, and the small result of our exertions--for we had

only been 165 hours at work on the Rock between the 7th August and

the 11th September--I could see that, in good truth, there were many

difficulties before us; but there was also much cause for thankfulness,

in the many escapes we had made.

After a somewhat precarious embarkation in the boats, and shipping

several seas in our way, we reached the vessel, and immediately set

sail with three cheers, rejoicing to have thus concluded our season’s

work.

~Destruction of the barrack during a gale.~

~Letter from Mr Hogben.~

After spending a few days at Hynish in making various arrangements

for the operations of the next season, which were to embrace the

extension of the pier, the completion of the barracks and the erection

of sheds and workshops for carrying on the dressing of the materials

for the Lighthouse Tower, I left Tyree with the pleasing belief that

the successful termination of our first season’s labours might be

taken as an omen of future success. But how uncertain are even the

most rational sources of satisfaction which Time can furnish! On the

12th November, I received from Mr Hogben, the clerk and store-keeper

at Tyree, the unwelcome intelligence that the Barrack-house had been

destroyed, as was supposed, by the heavy sea of the 3d November; and

as his letters contain all the facts of the case in so far as they

could be collected at the time, I cannot do better than quote them

at full length:--“_Skerryvore Lighthouse Works, Tyree, 5th November

1838._--Dear Sir,--I am extremely sorry to inform you, that the barrack

erected on Skerryvore Rock has totally disappeared. It was seen on

the 31st of October, when I observed no change in its appearance. On

the two following days the weather was showery, with haze, so that

the Rock was not seen; and on the 3d it rained almost all day, with

strong breezes. In the evening the wind increased to a gale, with a

great swell, and an extraordinary high tide. Yesterday (Sunday the

4th) the weather was moderate, but the swell prevented the Rock being

seen from the low ground. Mr Scott and Charles Barclay, however,

having gone to the top of Ben Hynish, got a momentary glimpse of the

Rock through the spray, and both were of opinion that the barrack was

gone. This was not credited by the workmen who had been employed at

it, but this morning we found it to be the case; the Rock was pretty

clearly seen, but no trace of the barrack. From the circumstance of

the yard of a large vessel, and also a piece of a boom, having come

ashore in the direction of the Rock, we think it is not improbable

that some wreck has happened, and that some part of it has been thrown

upon the barrack by the force of the sea. Should any opportunity

occur for going out to the Rock, we shall take advantage of it, in

order to give you farther information on the subject. I remain, &c.

(Signed) WM. S. HOGBEN.” A subsequent letter from Mr Hogben is of the

following tenor:--“_Skerryvore Lighthouse Works, Tyree, 10th November

1838._--Dear Sir,--This morning, Charles Barclay, with a boat and four

men, went out to the Rock to view the site of the barrack; and, the

weather being moderate, he got a good landing. The following is the

state in which he found everything:--The whole barrack timbers had been

carried away, excepting the long beam next the place where the crab

stood which drew up the beams, and about seven feet of the long beam

opposite the place where the other crab stood. The former of these

beams had fallen in the direction of the highest part of the Rock, and

had drawn one of the iron stancheons 16 inches. The latter was all

in splinters, with one of the iron stancheons broken, and the other

bent. The rest of the stancheons were broken at the point between the

round and the flat, and some of them were drawn about 9 inches. The

iron hoop which bound the top of the beams was lying at the distance

of about the length of the beams to the eastward of the centre of the

barrack, having one of its screws broken. Five large wooden knees were

remaining, a ladder partly broken, some moulds for taking the angle of

the beams, and most of the quarry and masons’ tools. The grindstone

was thrown from the top of the Rock into a deep hole on the side next

Tyree, a distance of about 12 yards, apparently whole. The smith’s

forge had disappeared, and the anvil had been thrown about 8 yards

to the N.E. of the place, where it was left; it was brought ashore,

along with the hoop which encircled the top of the barrack. The iron

posts which supported the bellows were standing. The crab on the S.W.

side was thrown from its place to the east side of the site of the

barrack, a distance of about 15 or 20 yards, and was dashed to pieces,

excepting the axle, handles, pinion, and the trunk of the barrel. The

other crab was thrown from its place to the N.E., over a part of the

rock 5 or 6 feet high, to a distance of about 6 yards, and was found

in a similar state to the former. A stone measuring three-fourths

of a ton was found near the seat of one of the beams; it had been

thrown up from the hole where it had been deposited while cutting the

seats for the barrack timbers. One of the ring-bolts near the top of

the Rock to which the chain binding the wood had been made fast, was

broken close by the surface of the Rock, and the wood was all gone. The

mooring buoy has also disappeared. The barrack was seen from the top

of Ben Keen-na-vara, by some men on Saturday, 3d November, so that the

succeeding night, which was truly awful, must have done the damage. I

may mention, that many of the islanders say that they have not seen

such a swell as on that evening for about sixteen years. I am happy to

say that no damage has been done to the works on shore here, as on that

evening the wind was about S.W., and we are pretty much sheltered from

the wind in that direction. The shore on the S.W. side of the island is

strewed with sea-weed, which has been carried up far beyond the usual

reach of the tide. Hoping that the above information will suffice, I

remain, &c.

(Signed) “WM. S. HOGBEN.”

~Proceed to Skerryvore.~

~State in which the Rock was found.~

On the day on which I received this discouraging intelligence, I

requested a special meeting of the Committee, for the purpose of

deliberating as to the best course to be pursued, when I received

instructions to proceed to the Rock, and for that purpose to hire

a steamer at Glasgow. I accordingly started that very evening for

Skerryvore, with the intention at the same time of removing such of

the men from Tyree as were not to be employed during the winter. I

left Greenock in the steamer _Tobermory_, accompanied by Mr Macurich

of the Lighthouse tender, at midnight of the 14th November, after some

delay in repairing a leak in the boiler, which was discovered in time

before starting, and reached Hynish at 11 on the forenoon of the 16th,

having got a good passage round the Mull of Kintyre. The weather was,

however, in every other respect most unfavourable for the purpose; and

having merely touched, in passing Tyree, at the workyard at Hynish, to

inquire whether any thing farther had transpired, and to take on board

Mr Charles Barclay, who had visited the Rock after the loss of the

barrack, we at once proceeded and reached Skerryvore about 4 o’clock

in the afternoon. The sea ran very high, and there was not the most

remote chance of landing, but, having got into the boat, I approached

near enough to the Rock to enable me to survey the melancholy remains

of our labours, which seemed to be in the same state in which they were

described by Mr Hogben. The beam which lay back on the inclined ledge

still kept its place, having been firmly lashed by Mr Charles Barclay

to a ring which was near it when he landed on the 10th November; and

I could see the remains of some of the stancheons and of the crabs

which the sea had left. After waiting, in the hope of a change in the

state of the sea, until it was nearly dark, we again turned towards

Tyree, in all the gloom of a stormy night, and depressed by mingled

disappointment and sad forebodings, occasioned by the fate of our

intended asylum from the waves. Owing to the heavy sea, and a strong

gale against us, we hung for a long time off Hynish Point, and did not

reach the Bay till midnight. Next morning about 7, we came off Hynish,

in order to take in the men who were to go home for the winter. The

ground was deeply covered with snow, which made the embarkation of so

many persons and so much baggage a tedious and uncomfortable operation;

and when we sailed, we experienced all the inconveniences of a strong

gale and a heavy sea, with the concomitant of a deck covered with

passengers, all very sick and much dispirited. Many of the men, indeed,

seemed to be as deeply concerned for the loss we had sustained as I

myself was. To add to our difficulties, the vessel, under the care of

a native pilot, had touched slightly on a rock off Hynish Point, and

gave some indications of leaking. We, however, reached Oban in safety.

[Illustration: No. 10.]

~Cause of the destruction of the barrack.~

Various conjectures were made as to the cause of the destruction of the

barrack. Those who saw it erected were so confident of its stability,

that they could not avoid connecting its failure with some injury

received from the wreck-timber, which had come ashore on the island

of Tyree, two days after the supposed date of the accident. In this

opinion they were strengthened by the total destruction of the cranes

and other objects on the rock, forgetting that the timber of the

barrack itself, when once let loose, must of necessity have proved even

a more powerful agent of destruction than the driftwood of the wreck.

But whatever doubt may exist as to the first cause of the injury, there

seems good reason to suppose that the dismemberment of the parts of

the structure had commenced with the removal of the horizontal braces,

and that the beams, having thus more liberty for play and tremor,

had gradually shaken loose the fixtures at the top, which consisted

of straps _c_ _c_, passing right over the tops _a_ _a_, of the beams

and _b b_, the hexagonal quoin of hardwood already noticed at p. 88,

which were secured by means of a central bolt _d_, and finally girt

outside by a ring, _e_ _e_, as shewn in the annexed woodcut (No.

10.) The moment this dismemberment occurred, the beams would be free

to work their own destruction; and the enormous leverage which they

exerted, when dashed to and fro by the breakers, would soon snap the

iron stancheons at the base, and throw all loose to the waves. The only

remaining beam was that which was supported against a ledge of rock,

and which had received the sea from the opposite direction to that in

which it was found lying. That beam, however, although firmly lashed

to the rock by the men who first visited it after the accident, along

with Mr Charles Barclay, also disappeared in the course of the winter.

As a proof how severely these beams had been dashed by the waves, I

may state, that the only remaining part of a beam which I saw attached

to the iron stancheons, when I landed in the following spring, was so

thoroughly riven and _shaken_ as to be quite like a bundle of lathwood.

~Preparations for a new barrack.~

[Illustration: No. 11.]

These circumstances by no means shook my belief in the suitableness

of the plan adopted for obtaining a temporary dwelling on the rock;

but they induced me, as soon as I received authority from the

Commissioners, whose confident expectation of final success was not

damped by the unhappy issue of our season’s labours, to examine very

carefully the whole details of the ties and fastenings. In preparing a

similar structure for next season, I resolved to strengthen the ties

at the top, where I imagined the former failure to have occurred, by

adding six strong stancheons _a_, _a_ (Plate V.), one to each beam,

with heads passing through a centre-plate (H), which united them in one

as a cap and to which they were secured by strong screws and keys. The

nature of those fixtures will be more easily understood by a reference

to the figures (1) and (2) in Plate VI., which shew an elevation and

plan of the upper part of the beams. In the elevation only the beams A,

B, C, are shewn; but in the plan, all the six beams appear _mitering_

at their heads _n_, _n_, to the central beam or tie _o_, _o_ (see

also Plate V.), which was introduced to counteract the tendency of

the heavy seas that might burst inside the pyramid, and by exerting a

powerful force in the vertical direction, might separate the beams at

the top. In the Plate (VI.), _a_, _a_, are strong stancheons of iron

attached to the outside of the beams by bolts, and also by collars _r_,

_r_, attached to ears _g_, _g_. These stancheons being bent into the

vertical direction and rounded at the top, passed through the malleable

iron plate H, which was held down, and, as already stated, bound the

beams together by nuts _c_, _c_, and wedges _b_, _b_. Through a hole in

the centre of this plate, a large spike _p_ was driven, which produced

an expansion of the central beam, and thus wedged up or tightened all

the joints formed by the _mitering_ of the seven timbers. On each of

those stancheons, _snugs_ were formed at _e_, capable of receiving and

retaining in its place against any tendency to move upwards, a strong

metallic ring _g_, which was tightly keyed by wedges at _k_. Additional

ties of iron D, E, F, were also provided, which connected the six beams

together in pairs. Each end of those ties was attached to the timbers

by three spikes; one tie, D, is shewn a little fore-shortened; another,

E, is seen only on the end; while the third F, is shewn as cut off at

the middle. Lastly, an important change was made, by the substitution

of malleable iron for wooden braces (see Plate V.) _b_, _b_, _b_, _b_,

in the horizontal direction. Fixtures of this kind held the whole more

firmly together; and their construction was such that they might firmly

embrace each beam, without requiring any means of attachment beyond

wedging tightly up; and thus the entire strength of the timbers was

unimpaired by the driving of spikes or bolts. Those braces (No. 11),

_a_, _a_, had, at each end, double knobs, and were pushed up along the

beams, until they squeezed the timbers _x_, _x_, _x_ between them;

plates _p_, _p_ (having holes in them through which the double knobs of

the braces were made to pass), were then put on and keyed and screwed,

as shewn in the figure, so that each beam was quite enclosed by

fixtures, which were thus independent of spikes or bolts. Thin hardwood

wedges were afterwards driven in, wherever they could be inserted

between the iron and the timber; and those wedges were “_stitched_” to

the beams with common nails, merely to prevent their dropping downward,

after any temporary contraction of the timber from the state of the

atmosphere. In all this, I have anticipated what more properly belongs

to the works of the season 1839; but I consider it best, for the sake

of clearness, to connect this account of the new with the destruction

of the old Barrack.

* * * * *

~Works at Hynish.~

While the operations already described were in progress at the Rock,

various works were going forward at the workyard in Tyree. About 16

masons, 12 quarriers, and 4 carpenters, were employed in building

the barracks for the workmen and in erecting smiths’ and carpenters’

shops. A large room, paved with a stone floor, for drawing out at

full size the courses of the Tower and making the moulds for dressing

the stones, was also provided; and a platform of squared masonry was

set in the workyard, on which the courses were to be laid, before

being shipped for the Rock. During the season, the pier had also been

carried out 256 feet, to a point 15 feet within the low-water mark. It

was also necessary to provide depositories for the security of tools

and other implements, as well as a large coal-shed for the supply of

the Steamer which was then in the course of being built. It had, as

already noticed, been determined that the stores were to be served

out at the cost prices of the Greenock market, to be paid for once

a month, at the same time that the wages of the men were paid. That

arrangement had been carried into effect on a small scale, from the

very beginning of the works; but this season it became necessary, owing

to the increased number of men, to conduct it on a more extended and

systematic plan; and, for that purpose, a person was required to act

as storekeeper and clerk. In order also to preserve the provisions

from injury by damp and to secure them from the inroads of the needy

Celts and from innumerable rats which overrun that part of Tyree, it

was found necessary to set apart, as a storehouse, a large room on the

second storey of one of the workshops. The chief articles served out in

the store were meal, molasses, sugar, coffee, tea, tobacco and butter.

The establishment of the store entailed a great deal of trouble, and

led to some expense for carriage and packages, as well as to occasional

trifling losses in serving out the allowances or from injury sustained

in the transport of the goods; but the inhospitable nature of the

country, and the remoteness of Tyree from the ordinary steam-boat

traffic, made the adoption of some such plan unavoidable. Amongst other

inconveniences which attended the store, not the least may be reckoned

the frequent importunities, on the part of the native labourers whom we

employed, to be permitted to purchase provisions at the workyard; but

that was never acceded to, except in cases where dearths (which are of

frequent occurrence in the island) rendered the call irresistible. Had

their entreaties easily prevailed, we should soon have had the whole

population of Tyree as our regular customers at the Store.

~Hynish Quarries.~

The quarries at Hynish, as already stated, were by no means productive.

The great proportion of the materials which had been quarried, was

found to be applicable only to the building of the pier and the

inclosing walls, and to the various erections in the workyard; and not

more than _one-tenth_ of the whole could be dressed as blocks for the

Tower.

During the numerous occasions on which I had been driven by stress of

weather to the neighbouring coasts, I had visited the quarries around

Oban and in various parts of Morven and Mull. When so forced to leave

what I might more especially call my _post_, I had an opportunity of

seeing the quarries at Ardentallen near Oban, which contain the old red

sandstone strongly impregnated with clay. That stone is by no means

suitable for the _face-work_ of a marine building, in such a situation

as the Skerryvore; while the comparatively small quantity of _hearting_

which could be admitted into such a work, made it inexpedient to seek

such materials at so great a distance. In this way, the Ardentallen

quarry seemed completely excluded from the field. At another time, in

passing through Inverary, I devoted a day to the examination of the

quarries which had lately been opened at that place and in which a

beautiful porphyry is wrought; but I saw no appearance of very large

blocks, or, at all events, nothing that could favour the expectation

of a considerable supply. But after carefully weighing the matter,

the great masses of granite at the Ross of Mull finally determined my

choice in favour of that locality; and the Duke of Argyll having, with

the greatest liberality, ratified his predecessor’s grant of liberty

to the Lighthouse Board to quarry stones from any part of the Argyll

estates, it was resolved to take measures early in the spring of 1839

for opening quarries at North Bay, in Mull, where an excellent station

for shipping had been discovered, close to the place where we saw

the most promising appearance of rock. This measure seemed the more

indispensable, as the last part of the quarry _terred_[18] or laid bare

at Hynish, had greatly disappointed our expectations. The unworkable

nature of gneiss rock also and its extreme uncertainty with regard to

quality, farther concurred to make a change most desirable. Granite,

indeed, is a material in many respects superior to sandstone, gneiss,

or porphyry. The first it greatly excels in durability and weight; and,

as a stone for the workyard, it is superior to the other two, from

its property of being _fissile_, or easily split in any direction. In

this respect it resembles certain parts of some sandstone strata which

are commonly called _liver rock_, of which Craigleith quarry, near

Edinburgh, furnishes an excellent example. Porphyry, and, I think,

all other igneous rocks (excepting granite), gneiss also, and most of

the other primary rocks, have not this property, being _fissile_ only

in one plane, so that quarries of those rocks generally turn out very

uncouth or irregular stones, which, though they may in some favourable

cases possess good natural _beds_, will always be found to have ragged

and irregular _joints_, which, for the most part, are incapable of

being properly dressed.

[18] This term in Scotland denotes the removal of the soil and

unsolid material, in order to lay bare the rock previous to working

the quarry, and seems obviously to be derived from the Latin “terra,”

perhaps through the medium of some old charter. The quantity of

terring very much affects the profitable working of a quarry.