Reply: This lumber was sold for delivery at the buyer’s end of

the route, the purchase price was to be paid only after arrival

and examination. The carrier was an agent of the seller, and he

did not give the buyer an opportunity to make examination until

November 28. No valid delivery was made, or could have been

made, before November 28, inasmuch as an examination by the

buyer was to precede such delivery. When delivery was tendered

on November 28 the lumber was found to be such as the buyer was

at liberty to reject. He was, accordingly, authorized to go into

the market on that day and buy at the price then prevailing in

order to place himself in as good a position as he would have

been in if the seller had done his duty and had not been guilty

of a breach of contract. The buyer has a right to demand that

the seller shall place him in this position.

=Opinion No. 37.=

LIABILITY OF TRANSPORTATION COMPANY IN DELIVERING WITHOUT SURRENDER OF

BILL OF LADING.

Question—Can a transportation company be held responsible for delivering

a shipment of lumber to a consignee without surrender on the part of the

consignee of signed bill of lading, originally issued when shipment was

made?

Reply: Until lumber shipped has been completely delivered to the

person entitled to receive it, the bill of lading represents the

lumber, but no longer. The transfer of a bill of lading passes

the title of the transferor to the transferee. If, therefore, a

transportation company delivers the shipment to consignee

without a surrender of the bill of lading it is liable to a

person who has obtained a valid title to the shipment by

transfer of the bill of lading from the consignee.

=Opinion No. 29.=

IF NO SPECIFIC TIME OF SHIPMENT IS NAMED A REASONABLE TIME IS

UNDERSTOOD.

Question—On October 25th we bought of a manufacturer a carload of lumber

through their agent. On the 30th we received confirmation of the order.

Nothing was said about the time of shipment, except that in sending the

sizes on October 26th, we told them to “ship at once.” On November 1st

they wrote that they would ship it “the coming week.” No part of it has

been shipped yet. We could have disposed of the carload during this time

at a very good profit. During all this time we have been completely out

of this kind of lumber. Have we a just claim for damages?

Reply: It does not appear whether the confirmation received by

the buyers on October 30 was sent by the sellers before or after

their receipt of the instruction to “ship at once.” The only

importance of this point is this: If the sellers confirmed the

order after receiving the instruction to “ship at once,” they

were bound to ship at once. If they confirmed the order before

receiving this instruction, then the instruction formed no part

of the contract, and is not to be taken into account; in that

case the sellers were bound simply to ship the lumber within a

reasonable time—within the time within which these sizes

commonly are shipped. If they have not done so, they are guilty

of a breach of contract and the buyers may recover any damages

the breach has caused them. They are entitled to be placed by

the sellers in as good a position as they would be in if the

sellers had carried out their contract according to its terms.

The letter of the sellers of November 1, saying they would ship

the goods “the coming week,” forms no part of the contract. The

agreement was made before that letter was written, and it is

binding as originally made. The letter is of importance,

however, as showing an estimate of the sellers themselves as to

what was a reasonable date of shipment. The letter is not

binding upon the buyers, if they can prove that an earlier date

would have been reasonable; but it is binding upon the sellers,

who wrote it.

=Opinion No. 36.=

ONE WHO BUYS LUMBER IS LIABLE THOUGH HE TRANSFERS IT BEFORE DELIVERY.

Question—An individual buys a carload of lumber for future delivery and

before it is delivered he forms a partnership with two other persons and

turns the order over to the firm. Delivery of the lumber is made to this

firm. Please say whether the individual is liable, or only the

partnership. It is a limited partnership and the buyer has only a

certain definite amount at stake with it.

Reply: This is simply the case of an individual who has

purchased goods and then has sold or transferred them before

they have come into his actual possession. Such cases, that is,

of a second sale before delivery to the first purchaser, are

very common, and the original purchaser remains liable precisely

as if delivery has been made to him and he had afterward

disposed of the goods as he saw fit. In the case our

correspondent puts the seller may look to the first buyer unless

he has agreed to release him and look to the firm.

=Opinion No. 38.=

A LUMBER SALESMAN GENERALLY HAS NO POWER TO BIND HIS PRINCIPAL.

Question—One of our traveling salesmen has just sent in a larger order

than we feel safe in filling for that particular customer on the liberal

terms of credit allowed him in the same contract. Are we compelled to

fill the order, or may we reject it without incurring any legal

liability?

Reply: Ordinarily a traveling salesman is authorized merely to

take orders and submit them to his principal for acceptance or

rejection. He has no power to bind his employer irrevocably by a

contract of sale. Our correspondents are justified in refusing

to fill an order sent in by their salesman unless the latter was

expressly authorized to make a valid and binding sale upon his

employers’ behalf, or unless traveling salesmen are usually

clothed with this power. In the latter case each salesman will

be presumed to have the powers usually possessed by men of this

class, unless the buyer had notice of a limitation upon this

general and usual power in the case of the salesman with whom he

was dealing.

=Opinion No. 35.=

USING LUMBER WITHOUT CONSENT OF SHIPPER WHERE QUALITY IS DISPUTED.

Question—We shipped a carload of lumber to a party and they complained

of the quality and refused to settle in full. We insisted upon a

settlement in accordance with invoice, or re-inspection of the entire

carload by an inspector that would be satisfactory to both parties. We

sent a man to look at the lumber and found that it was put in a dry kiln

without our consent, and this, of course, prevented an inspection of the

lumber in its original condition. Are we correct now in insisting upon a

settlement in full as invoiced, and can we maintain our action in a

lawsuit?

Reply: If your lumber was received by the company and, without

authorization from you they put it in the dry kiln, so as to

prevent your examining it or taking it back, they would be

liable to you for the invoice price. They cannot accept the

lumber, use it and then refuse to pay. By their acceptance they

waive any defects in quality or quantity, which can be

ascertained upon an inspection of the lumber upon arrival. They

do not waive any defects that are what we call “latent,” that

is, that are not readily ascertainable upon an examination of

the lumber on arrival, but only show after the lumber may be put

in use. As we take it, such complaints as have been made relate

to alleged defects which they ascertained as soon as they

received the lumber. In that case they had no legal right to use

it, and if they used it, they are liable for the invoice price.

=Opinion No. 34.=

IN AN F. O. B. SALE, SHIPPING POINT, THE CARRIER IS THE BUYER’S AGENT.

Question—If I buy goods f. o. b. point of shipment and part of the goods

invoiced are lost in transit can the consignor enforce payment for the

goods not received?

Reply: When goods are bought f. o. b. place of shipment they are

delivered to the buyer at the place of shipment. Title to the

goods passes to the buyer as soon as delivery is made to the

carrier and the carrier is an agent of the buyer to bring his

goods to him. If the goods are lost on the way the buyer must

pay for them, just as if they had reached him; they have reached

his agent and have been delivered to him, and that is all the

buyer can ask. When goods are sold the presumption always is

that the buyer is to take charge of them in the place in which

they are at the time of the sale. There is no presumption that

the seller is to carry the goods to any place the buyer may

select and deliver them to the buyer there. The seller may do

this, of course, and he frequently does do it; but he is never

bound to do it unless he has expressly so agreed. If the buyer,

in any case, declared that the goods were to be brought to him

by the seller he must show some clause in the contract that has

this meaning; in the absence of such a clause the buyer, either

in person or through an agent, is to take possession of the

goods in the place they occupy at the time of the sale. The

words, “free on board,” are sufficient to prevent the seller

from making a good delivery while the goods are in his own

warehouse, as he otherwise might do. These words place upon him

the duty of taking the goods to the boat or cars and meeting the

expenses necessary actually to start them on their way; but when

this much is done the seller’s whole duty is done. The goods

then belong to the buyer and have been delivered to him; that is

all that is necessary to raise an obligation on his part to pay

for them.

=Opinion No. 33.=

BUYERS CAN INSIST THAT LUMBER, PURCHASED ON CREDIT, BE DELIVERED.

A retailer says: “Lumber was sold to us by a special written contract on

a six months’ credit, the lumber to be ordered out as fast as we saw

fit. We have taken a little more than half and only about two of the six

months have expired. We order another small shipment to be made. The

seller replies that he will send this car, but that he can make no more

deliveries unless we are ready to discount part, at least, of our bill.

He says that he has already extended credit to us as far as he feels

justified in doing. He seems to pay no attention to the contract, under

which we were entitled to order out all of the lumber at once, or in

such shipments as suited us, and were to have a credit upon the whole

bill of six months. Will he be sustained in the stand he has taken? If

we have a remedy please say what it is?”

Reply: When lumber has been sold and part of it delivered, it is

too late for either the buyer or the seller to alter the

contract without the consent of the other. If the sale is upon

credit, as in this case, the terms of credit are such as have

been agreed upon in the beginning. Either the buyer or the

seller may ask, of course, to have the terms changed before all

of the deliveries have been made, but if the other does not

agree to the change the contract must be performed as it was

made. It would be as reasonable for the buyer to refuse to

accept the remainder of the lumber unless the terms of credit

were made more favorable to him, as for the seller to refuse to

continue his deliveries as agreed unless his new proposal as to

credits were accepted. If the seller, in the case our

correspondents put, refuses to go on with the contract in its

original form, the buyers will have the same remedy they would

have had if no deliveries at all had been made. They may go into

the open market, when the time for delivery arrives, buy lumber

enough to finish out the contract, and then hold the seller for

such amount as they are compelled to pay over and above that

named in the contract. Or, if they do not choose to do that,

they may establish the amount of the loss arising from the

seller’s breach of contract in any way in which it can be shown

to the satisfaction of a jury and collect the damages so

established. Or the buyers may cancel the remainder of the

contract if they prefer that course. There is only one exception

to this rule. Any one who has bought goods on credit is bound by

an implied agreement to keep his credit good, and if he fails to

do so he cannot require the seller to deliver the goods.

Accordingly, if a buyer, before all of the lumber is delivered,

shows an inability to pay any just claim in the ordinary course

of business, when it falls due, those who have sold him on

credit may lawfully refuse to go on with the deliveries and the

buyer will have no remedy.

=Opinion No. 39.=

ONE CUSTOMER CANNOT DEMAND THAT CREDIT BE EXTENDED TO ANOTHER.

Question—Lumber corporation No. 1 bought from lumber corporation No. 2

several carloads of lumber for future delivery. Corporation No. 1,

before the agreed time of delivery, commenced proceedings of

dissolution. Out of corporation No. 1, however, a new corporation, No.

3, was formed. Corporation No. 3 now demands of corporation No. 2 that

they deliver this lumber. No. 2 declines on the ground that the

personal, as well as the financial, standing of the new corporation is

entirely changed. Do you think that corporation No. 2 has a legal right

to do this? Where the word corporation is used we mean that one company

is incorporated under the laws of one State, while the other two

companies are existing under charters from different States.

Reply: If any person or corporation has been willing to extend

credit to corporation No. 1 that same person or corporation

cannot for this reason be compelled to extend credit to

corporation No. 3, or to any other person or corporation. If a

corporation has bought goods and paid for them it may assign its

right under that contract, which is simply a right to demand

delivery of the goods to another corporation; but if it has

bought goods on credit, and has then gone into dissolution, it

cannot demand that the credit of any other corporation be

substituted for its own.

=Opinion No. 40.=

GIVING A BAD CHECK DOES NOT PREVENT DISCHARGE IN BANKRUPTCY.

Giving a worthless check for goods and disposing of them immediately is

not a ground for refusing a discharge from bankruptcy. Judge Hough of

the United States District Court has recently granted a discharge to a

party who filed a petition in bankruptcy on October 24, 1906, with

liabilities of $11,577 and no assets. His discharge was opposed by a

creditor, who said that on June 6, 1892, the debtor bought $1,964 worth

of goods, giving a check in payment, which was deposited in bank and

came back marked “no funds.” The creditor went at once to debtor’s place

of business and found that he had sold out and left the city. When

debtor’s application for a discharge came up for a hearing he excepted

to the specifications of objections, and Judge Hough sustained the

exception on the ground that the objections are not within the statutory

list.

=Opinion No. 41.=

WHAT IS CONVEYANCE ON F. O. B. SHIPMENT?

Question—What is the meaning of f. o. b. Philadelphia, Pa.? What is the

meaning of f. o. b. cars Philadelphia, Pa.? Is there any difference

between the two above? If so, what is it?

2.—In selling goods f. o. b. New Orleans, and same are delivered

alongside of steamer, does the shipper or consignee have to pay cost of

handling charges in transferring from cars to steamer; that is, on goods

shipped from New York to New Orleans.

Reply: (1) When goods are sold f. o. b. place of shipment the

meaning is that the seller, for the amount named in the

contract, will supply the goods and will bear the expense of

delivering them on board that conveyance which is to carry them

to their destination. The only difference between the two

phrases set down above is that the latter binds the seller to

deliver the goods on the cars at Philadelphia without any

expense to the buyer; while the former binds him to deliver them

at his own expense on some conveyance not yet specified, which

will carry them to the buyer.

(2) If goods are sold f. o. b. New Orleans, and they are to be

carried to the buyer at some other place in a steamer, all

expenses necessary to deliver them aboard the steamer are to be

borne by the seller. The conveyance on board which the goods are

to be delivered is that which is to take them to their

destination. If goods are to be carried to a buyer on a steamer

there is no reason why he should bind the seller to load them on

freight cars and make a tender of them there.

=Opinion No. 42.=

FAILURE TO DELIVER ONE INSTALLMENT CAUSE FOR CANCELLING ORDER.

Question—We purchased a quantity of lumber to be shipped in February,

March and April in equal monthly shipments. The first shipment has not

been made in February and we would like to know whether this entitles us

legally to cancel the entire contract or only the February lot. In other

words, does the breaking of a contract in one instance cancel the entire

contract?

Reply: When goods are to be delivered in instalments the courts

of this State hold that the seller’s failure to deliver one

instalment justified the buyer in refusing to accept that tender

and also in rescinding so much of the contract as is yet

unfulfilled. It is one contract, not several, and the seller

cannot insist on a right to deliver only such instalments as he

finds it convenient to deliver and to have them accepted. The

buyer has not agreed to pay anything at all for part of the

goods. His contract is that he will pay a certain amount for all

of them. If he is not to have all of them, it is quite

conceivable, and is often a fact that any part less than all is

of very much less than proportionate value to him; it may have

practically no value to him at all. In any event, the seller has

agreed to do a certain service and the buyer has agreed to pay a

certain sum of money. The court will not infer from that an

obligation to pay half the money for half the service or to

accept half the service on any condition, if the other half is

to be, or has been, withheld.

=Opinion No. 43.=

Question—A customer places an order with the mill for November,

December, January and February, proportionate shipments. The mills are

unavoidably delayed in executing the order, but are finally able to make

shipment of practically the whole order in February. The customer

refuses to pay invoices for all the goods shipped in February, but

claims dating on proportionate amounts in April, May and June. Is he

justly or legally entitled to the dating and could he hold the goods

subject to sellers’ order?

Reply: There seems to have been no clause in this contract

releasing the mill in case of such a delay as has occurred. In

the absence of such a clause the buyer was justified in refusing

to accept the goods when all of them were shipped in February.

He is entitled to hold the goods subject to the seller’s order,

or to return them. He cannot, however, force another contract

upon the seller than that which was actually made. The mill may

take back its goods or allow the buyer to accept them upon such

new terms as may be agreed upon. The buyer is justified in

receiving the original contract. This is upon the supposition

that the buyer has not during the past four months said or done

anything to lead the seller to suppose that he was satisfied

with the delay, that he would accept all of the goods as readily

in February as if shipment had been made in strict accordance

with the terms of sale. If he has done that he is estopped now

from making any objection to the tender.

=Opinion No. 44.=

AMOUNT OF CLAIM FOR DAMAGE AGAINST CARRIER.

Question—We made a shipment via two connecting railroads. When it

reached a junction prior to delivery at destination, i. e., a point on

the second road, was badly or entirely damaged in a wreck, and our

customer asked that we immediately replace the shipment, which we did,

and made another shipment of the same kind of lumber four days later,

but in the interim between the time of the first shipment and the time

we received the replacing order from the customer, the price advanced,

and in our second invoice we naturally charged the customer for the

advance. The claim department of the railroad now offers to settle with

us at the original invoice price of the first shipment and declines to

entertain a settlement at the advanced price. We claim that our position

is entirely legal in the matter, and that we are entitled to the

advanced price for the shipment that was lost, the same representing the

value of the goods at the time the goods were destroyed.

Reply: Usually the measure of damages in a case of this kind is

based upon the value of the goods at the time and place and in

the condition in which they ought to have been delivered; the

freight is to be deducted from this, if it has not been prepaid,

and then interest is to be added from the day on which delivery

ought to have been made to the day of payment; there is to be

added also any expense to which the owner of the goods has been

put as a necessary and natural result of the loss. What the

carrier is bound to do is to put the owner of the goods as

nearly as possible in the same position he would have occupied

if the carrier had done his full duty in the first place. If the

carrier had done his duty the owner could have sold the goods at

the market price on the day of delivery at the place of

delivery, he would have had the interest on the money

thereafter, he would have escaped all incidental expenses

arising out of the loss, and he would have been called upon to

pay freight to the carrier, if it had not been paid in advance.

There is only one exception to the rule that is at all common.

If the goods have already been sold for delivery at destination,

at a price less than that which chances to prevail when the day

of delivery arrives, and if the carrier, at the time of

shipment, had actual or constructive knowledge of this fact,

then the owner can demand only the selling price with interest.

In that case, if the carrier had done his duty, the owner would

have obtained for his goods, not the market price, but only the

contract price. Whether the carrier had or had not notice of the

sale makes a difference in this respect; that a carrier is not

to be held for a larger loss than he had in contemplation when

the freight rate was fixed and the degree of care demanded of

him was settled. If he had no knowledge of the sale, actual or

constructive, he is bound for damages based upon the market

price, as in the other case. The fact that other goods at a

different price were sent to replace the lost shipment does not

enter into the matter.

=Opinion No. 46.=

RISK IN SENDING CHECK TO DRAWER’S BANK FOR CERTIFICATION.

Question—We received a check from one of our customers and sent it to

the customer’s bank for certification. The bank failed before the end of

the next day and our check was not paid. Can we not return it to the

maker and demand the face of it from him?

Reply: If the drawer of the check in this case had sufficient

money on deposit to meet it our correspondents have no other

recourse except against the assets of the insolvent bank; the

depositor is discharged. The usual rule is that when a check is

delivered that is drawn upon a bank in the same place in which

the payee resides the drawer guarantees the solvency of the bank

during the remainder of the day on which the check was delivered

and the whole of the next day. The holder has this much time in

which to present the check and draw the money; if the bank fails

meanwhile the loss is upon the drawer of the check and the

holder takes the risk of failure after the second day. But this

rule does not apply when the holder of the check takes it to the

bank and has it certified before the end of the next day after

he receives it. Certification binds the bank and releases the

drawer. So far as the drawer and holder are concerned, the

effect is precisely the same as if the holder had drawn the

money and had then deposited it to his own credit in the same

bank.

=Opinion No. 45.=

A CONTRACT MAY BE CANCELLED WHEN ONE PARTY IS GUILTY OF BREACH.

Question—Lumber has been sold for delivery in installments running

through a considerable period. Payments are to be made in installments

also. The buyer has been very lax in this regard, however; he has not

made a single payment strictly on time, and in some cases has delayed

until the seller has been compelled to threaten suit. Is the seller

bound to go on making deliveries to the end of the time named in the

contract, getting his money whenever and however the tardy buyer sees

fit to pay it?

Lumber Legal Opinions · 第 3 / 8 段