The thwart is carefully fitted to the gunwale members and the ends are

pegged. Some builders wedged the ends of this thwart from outside the

gunwales, the wedge standing vertical in the thwart so that the gunwale

would not split; however, it is not certain that wedging was used in

prehistoric times, although it is seen in some existing old canoes. The

pegs used in this canoe are driven from above, into holes bored through

the gunwale and the tenon of the thwart to lock all firmly together.

Three holes are then bored in the broad shoulders of the thwart about

1½ inches inboard of gunwale for the root lashing that is also used.

The ends of the gunwale members are now brought together, and to avoid

an unfair curve appearing at the thwart in place, short pieces of

split plank or of sapling, notched to hold them in place, are inserted

between the gunwale members as temporary thwarts at points about 5 feet

on each side of the middle thwart. After the ends are brought together

and the final fitting is carried out, a peg is driven athwartships the

ends and a single-part root lashing is carefully wrapped around the

assembly.

Some canoe builders omitted the blunted half-arrowhead form at the

gunwale end. Instead, the inside faces were tapered to allow the two

parts to bear on one another for some distance. The gunwales were then

pinched together and lashed with one or more wrappings. Finally, a thin

wedge was sometimes driven from inboard between the two gunwale ends to

tighten the wrappings. The wedges were usually so carefully fitted as

to be difficult to identify. It is probable that this wedged gunwale

ending represents the prehistoric form, and the blunted half-arrowhead

ending is a result of the use of steel tools.

After the ends of the gunwales have been securely fastened together,

the first pair of permanent thwarts is fitted. These are located 36

inches, center to center, on each side of the middle thwart, a distance

that determines the centers of the mortises in each gunwale member.

Each thwart, made from a ¾-inch by 3-inch piece, tapers smoothly in

thickness from the ¾-inch center to the ⁵⁄₁₆-inch shoulder. The tenon

is of the same dimensions as that of the middle thwart, the width

takes the same form as that of the middle thwart, and the edges are

similarly beveled and rounded. The distance between the shoulders,

taken along the centerline, is 22½ inches, and the centerline length of

the thwart 25½ inches. However, the shoulders and ends of the tenons

must be bevelled to follow the curve of the gunwales hence the extreme

length of the thwart is actually very close to 26 inches. The worker

determines the bevel of the shoulders by fitting the thwart to the

run of the gunwales, the temporary thwarts being shifted so that the

distance between the gunwales equals that set by the measuring stick.

These two thwarts having been fitted, the tenons are pegged as before,

but in the shoulders only one lashing hole is bored instead of the

three employed in the middle thwart.

[Illustration: Figure 32

MALECITE CANOE BUILDING, 1910. (_Canadian Geological Survey photos._)

Weighting gunwales on bark cover on building bed.

Resetting stakes.

Shaping bark cover and securing it to stakes.]

[Illustration: Figure 33

FIRST STAGE OF CANOE CONSTRUCTION: assembled gunwale frame is used to

locate stakes temporarily on building bed. Instead of the gunwales, a

building frame was used in some areas. (_Sketch by Adney_.)]

The second pair of thwarts is placed 30 inches, center to center, from

the first pair, one at each end, and on the basis of this measurement

the tenons are cut as for the others. These two thwarts are made of

⅝-by 4-inch pieces tapering in thickness each way from the center to

the shoulder, where they are a scant ⁵⁄₁₆ inch thick, the tenons having

the same dimensions as in the other thwarts. In width the thwarts are

worked to an even 3 inches from shoulder to shoulder, but in the form

of a curve so that when each thwart is in place its center will be

bowed toward the ends of the canoe, viewed from above. As in the first

pair, the shoulders and ends are cut to a bevel to fit the gunwale;

at the centerline they each measure 12 inches shoulder-to-shoulder in

a straight line athwartships and 15 inches end-to-end. Allowing for

bevel, the maximum length is just over 15-⁵⁄₁₆ inches. These thwarts

are drilled for single gunwale lashings and the corner edges are well

rounded from shoulder to shoulder. The distance from the centerlines

of these last thwarts at the bow and stern to the extreme ends of the

joined gunwales is 33 inches, so the finished gunwale length is 16 feet.

After the endmost thwarts are pegged into place, the temporary stays

are removed. At each step of construction the alignment of the gunwales

is checked by measuring with the measuring sticks and by sighting,

since the shape of the assembled gunwales, in this case of the inner

gunwales, is very important in determining the sharpness of the

completed canoe and the fairness of its general form.

The assembled gunwales are now ready to be laid on the building bed

which, for the Malecite canoe, is 20 feet long, about 3½ feet wide and

is raised about 1½ inches at midlength so that the canoe bottom will be

straight when the craft is in the water. The gunwale frame having been

carefully centered on this bed, with the middle thwart exactly over the

highest point in the surface of the bed, some scrap split-planking is

laid across the gunwales and the whole weighted down with a few flat

stones. Next, 34 stakes from 30 to 50 inches long are prepared, each

made of a halved length of sapling. Around the outside of the gunwale

frame 26 of these are driven in pairs opposite one another across the

frame, about 24 inches apart and placed so that none is opposite a

thwart, except for the stakes at the extreme ends of the gunwale frame,

which are spaced about a foot from their nearest neighbors and are

face-to-face, about 1½ inches apart. All the stakes are driven with

the flat face about an inch from the gunwale frame and parallel to its

outside edge. Finally two more pairs of stakes are driven at each end,

the first pair about a foot beyond the end of the gunwale frame and

1½ inches apart, the second about 6 inches beyond these and similarly

spaced. The length between the outermost stakes, measured over the

gunwale frame, is about 18½ feet. Great care is taken to line up the

last pairs of stakes with the centerline of the gunwale frame.

[Illustration: Figure 34

SECOND STAGE OF CANOE CONSTRUCTION: stakes have been removed and laid

aside, and the gunwales shown in first stage have been removed from the

building bed. The bark cover is laid out on the building bed, and the

gunwales are in place upon it, weighted down with stones. (_Sketch by

Adney_.)]

If the canoe is to have a slight rocker near the ends and is to be

straight over the rest of the bottom, the ends of the gunwale frame

will be blocked above the building bed so that the frame is not hogged

on the bed.

After the builder is satisfied with the staking, each stake is

carefully pulled up and laid to one side, off the bed but near its

hole. The weights are then removed from the gunwale frame, which is

lifted from the bed and laid aside, and the bed, if disturbed is

repaired and re-leveled.

The roll of birch bark is now removed from storage, perhaps in a nearby

pool where it has been placed to keep it flexible, and unrolled white

side up on the building bed. As the bark dries, it will become more and

more stiff, so it will be necessary to moisten it frequently during

construction to maintain its flexibility.

The bark is usually long enough, but often it is not wide enough. If

the bark is too short, it may be pieced out at this time, or later. If

it is not wide enough it is centered on the bed; the piecing out will

be done later. The gunwale frame is now laid on the bark, care being

taken to place it as nearly as possible in its former position on the

bed.

The bark outside the frame is then slashed from the edge to a point

close to the end of each thwart, and also to points along the frame

halfway between the thwarts, so that the edges can be turned up. While

it is being slashed, the bark cover is bent slightly, so that it is

cut under tension. Later, when the required shape can be determined,

these slashes will be made into gores, the Malecite canoes having

flush seams, not overlaps, in the topsides and bottom. If a fault is

noted along the outer edge of the bark, a slash may be placed so as to

allow the fault to be cut out in the later goring; irregularity in the

position of the cuts does no great harm to the progress of building

these canoes. The slashes are usually carried to within an inch of the

gunwales on the bed. It is not customary to slash the bark close to the

end, there the bark can usually be brought up unbroken, depending upon

the form of the end.

When the bark has been cut as described, it can be turned up smoothly

all around the frame so that the stake holes can be seen and a few

of the stakes can be replaced. The frame and the bark are then

realigned so that all stakes may be replaced in their holes without

difficulty. When the frame and bark are aligned, the frame is weighted

as before and the bark is turned up all around it, the stakes being

firmly driven, as this is done, in their original holes. The longest

stakes are at the ends of the frame, as the depth of the hull is to be

greatest there. The tops of each pair of opposite stakes are now tied

together with a thong of basswood or cedar bark, to hold them rigid and

upright.

[Illustration: Figure 35

MALECITE CANOE BUILDERS NEAR FREDERICTON, N.B., using wooden plank

building bed with stakes set in holes in the platform. This was a late

method of construction, which probably originated in the early French

canoe factory at Trois Rivières, Que.]

After the bark is turned up around the frame, its lack of width becomes

fully apparent. At this stage, some builders fitted the additional

pieces to gain the necessary width; others did it later. The method of

piecing the bark cover and the sewing technique, however, is explained

here.

The bark is pieced out with regard to the danger of abrasion that would

occur when the canoe is moving through obstructions in the water, or

when it is rolled or hauled ashore and unloaded. If the bark is to be

lapped below the waterline, the thickness of the bark of both pieces

in the lap is scraped thin so a ridge will not be formed athwart the

bottom; here, however, most tribes used edge-to-edge joining. If

there are laps in the topsides, the exposed edge is toward the stern;

if in the midlength, upward toward the gunwale; and if it is in the

end the lap may be toward the bottom, because this makes it easier

to sew, and because in the ends of the canoe there is less danger of

serious abrasion. Many tribes used edge-to-edge joining everywhere

in the topsides so that the direction of lapping was not a matter of

consideration. The type of goring, whether by slash and lap or by

cutting out a ~V~-shaped gore, will, of course, have much to do with

the selection of the method of sewing to be used.

It is to be recalled that in canoe building no needle was used in

sewing the bark; the ends of the root strands were sharpened and used

to thread the strand through the awl holes. Much of the topside sewing

in a bark canoe was done with small strands made by splitting small

roots in half and then flattening the halves by scraping. Large root

strands quartered and prepared in the same manner, or the cores of

these, were sometimes used in heavy sewing or lashing at the gunwale or

in the ends of a canoe.

As noted previously, root thongs were used well water-soaked or quite

green, for they became very stiff and rather brittle as they dried

out. Once in place, however, the drying did not seem to destroy their

strength. Rawhide was also used for such sewing by some tribes.

The sewing was done by Indian women, if their help was available, and

the forms of stitching used in canoe building varied greatly. The root

sewing at the ends of the canoes ranged from a simple over-and-over

spiral form to elaborate and decorative styles. Long-and-short

stitching in a sequence that usually followed some formal pattern was

widely used. Among the patterns were such arrangements as one long,

four short, and one long; or two longs, two or three shorts, and two

longs; or one short, five of progressively increasing length, and then

one short; or six progressively longer followed by six progressively

shorter. Cross-stitching, employing the two ends of the sewing root as

in the lacing of a shoe was also common. Sometimes this was combined

with a straight-across double-strand pass to join the ends of the ~X~.

The harness stitch, in which both ends of the sewing root were passed

in opposite directions through the same holes, was often used, as was

the 2-thong in-and-out lacing from each side used in northwestern

canoes having plank stem-pieces.

If the root strand was too short to complete a seam, instead of being

spliced or knotted the end was tucked back under the last turns or

stitches, on the inside of the bark cover. In starting, the tail was

placed under the first turn of the stitch, so that it could not be

pulled through. To finish sewing with double-ended strands, as in the

harness stitch, both ends were tucked under the last turn or two.

Commonly two or more turns were taken through a single hole in the

bark; this might be done to clear some obstruction such as a frame head

at the gunwale, or to provide a stronger stitch, or turn, as in the

harness stitch and others, or to allow for greater spacing between awl

holes in the bark. (Since the awl blade was tapered, the size of the

hole it made in the bark could be regulated by the depth of penetration

of the blade as it was turned in the hole.)

The length of stitches varied with the need for strength and

watertightness. Long stitches were about I inch, short stitches from

about ⅜ to ½ inch in length. The run of the grain, of course, was a

consideration in the length of stitch used.

[Illustration: Figure 36

SEWING: two common styles of root stitching used in bark canoes.]

The piecing of the side panels was done with a great variety of sewing

styles, according to strength requirements. The strain put upon the

bark in molding it by rib pressure was greater in the midlength than

in the ends; and the sewing differed accordingly. The over-and-over

spiral, with a batten under the sewing, was used for sewing in the

midlength, as was back-stitching, a variety of basting stitch in which

a new pass is started about half way between stitches, thus forming

overlapped passes or turns. Back-stitching was usually done in a

direction slightly diagonal to the line of sewing, so as to cross

the grain of the bark at an angle with each pass. The double-thong

in-and-out stitch, in which each thong goes through the same hole from

opposite sides, was frequently used. The simple, spiral over-and-over

stitch was used in sewing panels in the ends of canoes, as was the

simple, in-and-out basting stitch using either a single or double

strand.

When the sides were pieced out edge-to-edge, the sewing was usually

done spirally, over and over a narrow, thin batten placed outside the

bark cover. This batten might be either a thin split sapling or, more

commonly, a split and thinned piece of root. If the pieced-out sides

were lapped, then the harness stitch was commonly used. The lap might

be some inches wide to decrease the danger of splitting while the bark

was being punched with the awl, afterward the surplus was cut away

leaving about a half inch of overlap. On rare occasions the strength

of a lapped-edge seam was increased by the use of a parallel row of

stitching.

[Illustration: Figure 37

COMPARISON OF CANOE ON THE BUILDING BED (above), with gunwales or

building frame weighted down by stones inside bark cover, and (below)

canoe when first removed from building bed during fifth stage of

construction. (_Sketches by Adney._)]

In making the canoe watertight, it is to be remembered that some forms

of stitch make the bark lie up tight all along its edges while others

bind only where the stitch crosses the seam. The in-and-out stitch,

which was used only above the waterline, cannot be pulled up hard

without causing the bark to pucker and split and cannot be made very

watertight with gum. The over-and-over stitch, in either a spiral

form or square across the seam on the outside and diagonally on the

inside, is very strong; when a batten is used under the stitches it

can be pulled up hard and allows a very watertight gumming. When this

style of sewing is used without a batten across the run of the grain,

as in the gore seams, it cannot be pulled up as hard, but will serve.

Back-stitching, which was much used in the topsides, can be pulled up

quite hard and makes a tight seam when gummed, as do the harness stitch

and cross-stitch. The ends, regardless of the style of sewing used,

were more readily made tight by gumming than the other seams in a bark

canoe.

Two basic methods, with some slight and unimportant variations, were

used to fasten the bark to the gunwales. One employed a continuous

over-and-over stitch, the other employed groups of lashings. On a canoe

with the lashing continuous along the gunwales, the turns were made

two or more times through the same hole on each side of each rib head

to allow space for them. This might also be done where the lashing was

in groups, as described above. Usually, a measuring stick was used to

space the groups between thwart ends so that each group came between

the rib heads. The groupings could be independent lashings, or the

strand could be carried from one group to another. If the latter, it

was passed along under the gunwale in a number of in-and-out stitches

or in a single lone stitch either inside or out, or else it was brought

around over the gunwale from the last full turn. Some tribes use both

ends of the lashing, passing them through the same hole in the bark

from opposite directions below the gunwales; the ends might be carried

in the same manner in a long stitch to the next group. In some elm and

other bark canoes employing basswood or cedar-bark lashings the bark

was tied with a single turn at wide intervals; when roots were used

in these, however, small groupings of stitches were customary. When

group lashings were used with birch bark, the intervals between groups

was usually relatively short, though in a few canoes the groups and

intervals were of nearly equal length.

[Illustration: Figure 38

THIRD STAGE OF CANOE CONSTRUCTION: the bark cover is shaped on the

building bed. The gores have been cut; part of the cover is shaped and

secured by stakes and battens. "A" shows battens secured by sticks

lashed to stakes. (_Sketch by Adney_.)]

In an independent group, the ends of the strand were treated as in

whipping, the tail being under the first turns made and the end tucked

back under the last--usually on the inside of the gunwales. Where there

were inner and outer gunwales the lashing was always around both,

and the tail might be jammed between them. If a cap was used on the

gunwales, the lashings were always under it. The use of a knotted turn

to start a lashing occurred only in the old Têtes de Boule canoes.

On the Malecite canoe, the sides are pieced out in one to three panels

rather than in one long, narrow panel on each side. The panel for the

midlength requires the greatest strength and is usually lapped inside

the bottom bark. The latter is first trimmed straight along its edge,

and the panel inserted behind it with a couple of inches of lap. Then

the two pieces of bark are sewn together over a halved-root batten with

an over-and-over stitch. (Other tribes used some form of the harness

stitch, or a similar style, allowing great strength.) The middle panel

does not extend much beyond the ends of the first pair of thwarts on

each side of the middle. The next panels toward the ends are lapped

outside the bottom bark and are sewn with the back-stitch. Then,

if still another panel is required at each end, this too is lapped

outside and is sewn in the lap with an in-and-out stitch. The ends of

the panels are usually sewn with an over-and-over stitch that runs

square with the seam outside and diagonally to it inside the bark. (The

harness stitch was used here by some tribes, as were many forms of the

cross-stitch.) The ends of the canoe and the gores have already been

sewn during an earlier stage of the building process.

Once the sides are pieced out, the bark is ready to be turned up and

around the gunwale frame and clamped perpendicularly. To effect this,

small stakes are made by halving saplings, so that each half is about a

half inch thick. The butt of each half is cut chisel-shaped, with the

bevel on the flat side; the rounded face is smoothed off, and it may

be tapered toward the head of the stake. Between two of the slashes

a length of bark is now brought up against the outer stakes; against

the bark the small, inside stake is placed with the round face of the

chisel-pointed butt wedged against the outer face of the gunwale. The

top is then levered against the outside stake, so that the flat face of

each clamps the bark in place. The top of the inner stake is then bound

to the outer.

[Illustration: Figure 39

CROSS SECTION of canoe on building bed during third stage of

construction (above) and fourth stage. (_Sketch by Adney._)]

In setting the inside stakes, care is taken that their points do not

pierce the bark. No inside stakes are required at the ends, as here the

outside stakes are so close together in opposing pairs as to hold the

bark in a sharp fold along the centerline of the cover. This of course

is also true of the stakes beyond the ends of the gunwales.

After a few lengths of bark have been thus secured, they are faired

between the stakes by inserting thin strips of split sapling, or

battens of wood or root, along each side of the bark, under the inside

and outside stakes. These battens are placed about halfway up the

upturned bark. Some builders used long wooden battens, as this gave a

very fair side when enough lengths were secured upright; others got

the same results with short battens, the ends of which were overlapped

between a pair of stakes on each side.

[Illustration: Figure 40

MULTIPLE CROSS SECTION through one side of a canoe on the building

bed: at the headboard, middle, first, and second thwarts. Gunwale is

raised and supported on sheering posts set under thwarts. Crown of

the building bed is shown by varying heights of bottoms of the four

sections.]

When the bark has been turned up and clamped, the gores may be trimmed

to allow it to be sewn with edge-to-edge seams at each slash. This

is usually done after the sides are faired, by moving the battens up

and down as the cuts are made, then replacing them in their original

position. The gores or slashes, if overlapped, are not usually sewn at

this stage of construction.

The Bark Canoes and Skin Boats of North America · 第 6 / 28 段