“The ‘_Gazetteer_’ for Monday, Dec. 28th, 1767, informs us that the

two Arches adjoining the South end of the Bridge were, at length, then

stopped up, and wheels preparing to be erected in each of them; and on

the 30th, most of the Locks at that part of the edifice were entirely

closed by the ice. It was not, however, until the year 1770, as we are

informed in Concannen’s ‘_History of Southwark_,’ page 233, that the

Borough Water-works were perfected by the erection of a Steam-Engine;

though a part of the machinery was originally erected on the

River-banks for the supply of Mr. Thrale’s Brewery, when it was worked

by horses. These works were then known by the name of their proprietor,

which was afterwards changed for that of the Company which bought them:

and an engine erected, wherein the pressure of the atmosphere acted

upon the Steam-piston.

“I proceed now, Mr. Barbican, to give you some account of the

Water-works erected at the North end of London Bridge, which were

considered to be far superior even to the celebrated hydraulics of

Marli, in France. You are already aware, that the wheels beneath

the Arches were turned by the common tide-water of the Thames; the

axle-trees being 19 feet in length, and 3 in diameter, having 4 sets

of arms, 8 in each place, on which were fixed 4 rings, or fellies, 20

feet in diameter, with 26 floats of 14 feet long, and 18 inches deep.

The gudgeons, or centre-pins, of these wheels, rested upon brasses,

fixed on 2 large levers 16 feet long, the tops of which were formed of

arched timber, the levers being made circular on their lower sides to

an arch, and kept in their places by 2 arching studs fixed in a stock,

through 2 mortices in the lever. To the lower part of the arch on the

lever, was fixed a strong triple chain, the links attached to circles

of 1 foot in diameter, having notches or teeth, to take hold of the

leaves of a cast-iron pinion, 10 inches in diameter, with 8 teeth in

it, moving on an axis. The other end of this chain had a large weight

hanging from it, to assist in counterpoising the wheel, and to preserve

the chain from sliding on the pinion. On the same axis with the pinion,

were 2 cog-wheels; one of 6 feet in diameter having 48 cogs, and

another of 51 cogs, each working in a trundle of 6 rounds: on this

axis there was also a winch, by which one man could raise or lower the

wheels as occasion might require. Near the end of the great axle-tree,

was another cog-wheel of 8 feet in diameter, and 44 cogs, working

into a trundle of 20 rounds, 4-1/2 feet in diameter; the axis of which

was fixed in brasses at each end of the lever before mentioned, and

communicated with iron cranks having 4 necks, each of which raised an

iron spear attached to levers 24 feet in length. To the other ends were

fastened iron rods and forcing-plugs, working in cast-iron cylinders

4-3/4 feet long, 7 inches in bore above, and 9 below, where the valves

were. These cylinders were placed over a hollow trunk of cast-iron,

with 4 valves in it, immediately beneath them; and as one end of the

trunk was furnished with a sucking-pipe and grate going into the water,

they were each filled alternately, and delivered their supplies through

curved pipes into a second trunk, furnished with an iron pipe, through

which the water was forced up to any height required. These were,

however, only half the works; the whole of the mechanism being double

to each wheel. The first wheel in the Arch next the City, worked 16

forcers; and in the third Arch were three wheels, one working 12, the

second 8, and another 16 forcers. Their utmost power of raising water

was estimated from four of the wheels, to be 2052 gallons per minute;

123,120 gallons--being equal to 1954 hogsheads--in an hour; or 46,896

hogsheads daily, to the height of 120 feet, including the waste, which

might be considered as a fifth part of the whole. Every revolution of

a wheel, made 2-1/2 strokes in every minute in all the forcers, the

wheels turning 6 times in a minute at high-water, and 4-1/2 times

at middle water; and it was stated before a Committee of the House

of Commons, that in the year 1820, these Works supplied 26,322,705

hogsheads of water. It is usual to give Dr. Desaguliers as the

authority for these particulars, but I have abstracted them from the

‘_Philosophical Transactions_,’ already referred to; and they are also

printed in Maitland’s ‘_History_,’ volume i., page 51, whence they have

been copied into almost every subsequent account of London. After the

grant of a fifth Arch to the Water-works, about July 1767, an improved

wheel was designed by Mr. Smeaton, to be erected at that part; of which

two engravings and several particulars, together with his remarks on

the Water-engine, are inserted in the Second volume of his ‘_Reports_’

already cited, Plates ii.-iii., pages 27-30.

“I have in my possession a large and curious old drawing, in colours,

representing two elevations, and a ground-plan of these Works and

the Water-Tower, executed before the grant of a fifth Arch, or the

erection of wheels at the South end of the edifice, which is chiefly

interesting, as shewing the courses of the main-pipes then attached to

every wheel for conveying water to the various parts of London; which

were connected and furnished in the following manner. Bishopsgate Main,

supplied from the Wheels under the 3rd Arch, and Western end of the

4th, called ‘the Upper, and Borough Wheels:’ Cheapside Main, from those

under the second and 3rd Arches, called the ‘Three-Ringed, and Low

Wheels:’ Aldgate Main, from those under the 2nd Arch, and the Eastern

end of the 4th, expressed by the same name: Fleet-street Main, from

a small Wheel in the 1st Arch, and another at the Western end of the

4th, called ‘the Two-Ringed, and Borough Wheels:’ Newgate-street Main,

from those in the 2nd Arch, and the Western end of the 4th, or ‘the

Upper, and Three-Ringed Wheels:’ Broad-street Main, principally from

‘the Low-Wheel,’ under the 2nd Arch; though it also derived some water

from that at the Western end of the 4th: Grace Church-street Main, from

those in the 1st and 2nd Arches, or ‘the Two-Ringed, and Three-Ringed

Wheels:’ Cannon-street Main, from ‘the Upper, and Borough Wheels,’ or

those beneath the 3rd and 4th Arches: Thames-street Main, from a ‘Low

Wheel’ at the Eastern end of the 4th Arch; and the Borough Main, from

the proper Wheel, which was situate at its Western extremity, forming

ten sets of main-pipes in all. At each end of the Bridge, round the

Western-sides of the Water-works, were wooden platforms or galleries,

occasionally decorated with plants and flowers; and immediately over

the Wheels at the City end, were the work-shops belonging to them.

Their history is now, however, fast drawing to a close: in March,

1817, the managers gave notice that they were about to rebuild their

largest Water-wheel; but on July 26th, 1822, the third Year of King

George IV., an Act was passed for their entire removal, with a view of

improving London Bridge, or erecting a new one. You will, of course,

find this document in ‘_The Statutes of the Realm_,’ by John Raithby,

Esq., volume viii., London, 1822, quarto, pages 1049-1054; it being

chapter cix. of the ‘_Local and Personal Acts declared public_:’ and I

shall now give you a slight idea of its contents. Having declared,

that about 260 years of the original grants to the Water-works are yet

unexpired, it is enacted that the Corporation of London shall raise

£15,000 out of the Bridge-House Estates, for carrying the Act into

effect; £10,000 of which should be paid to the Proprietors of the

Water-works, for rendering void all their licences, and transferring

all their machinery, buildings, &c. to the New-River Company, which

Company was entitled to commence receiving rents and defraying expenses

connected with the Water, from June 24th, 1822; and it was also

licensed to procure leave from the Corporation, to cut the River-banks,

&c. below low-water mark, not exceeding 100 feet from the East side

of the present Bridge, for laying down pipes, &c., saving the City’s

rights in the Thames; paying the sum of 20_s._ as a fine for so doing,

and 20_s._ annually afterwards. Full powers were likewise granted, that

the Company might lay down pipes in the streets, and over the Bridges

of London; and that it might resign the supply of a part of a district

to another party, and receive a recompence in return; adding that it

should neither be compelled to continue the supply, nor be considered

to have an exclusive right to it. Upon conclusion of the agreement,

the Company was to remove the whole machinery, &c. within the six

months following, which was otherwise to be taken up and sold by the

Corporation. The New-River Company was also charged with the payment

of certain annuities to the former Proprietors of the Water-works,

for the remainder of their lease, as well as with the pensions due to

their servants, &c. to be defrayed out of the rents received. Such,

then, was the end of the London Bridge Water-works; and the only other

remarkable event which I find recorded in the year 1767, connected

with our edifice is, that on Saturday, November 28th, about 5 o’clock

in the morning, the tide ebbed and flowed at this place, and at

Greenwich, twice within an hour and a half; as you will find recorded

both in the ‘_Continuation of Maitland’s History_,’ page 71, and in the

‘_Gazetteer_’ for Wednesday, December 22nd.

“The year 1768 commenced with so violent and general a frost, that

its effects were felt equally upon the land and the water. ‘It is

said,’ observes the ‘_Gazetteer_’ of Friday, January 1st, ‘that London

Bridge is in great danger by this severe frost: the most essential of

the piles which form the Sterlings have been lately observed to be

quite loose, and playing in the water; and workmen have been ordered,

notwithstanding the imminent danger, to throw Kentish rag-stone

round the piers.’ In addition to this, there were also several fatal

accidents, arising from the River being frozen, which were likewise

greatly detrimental to this edifice. The night of Tuesday, January

5th, was said to have been the most fatal ever known for damage done

upon the Thames: one French vessel was thrown upon the Sterlings of

the Bridge, with the loss of her bow-sprit, where it was obliged to

be kept for several days secured by ropes; and two others were driven

through the Centre Arch, losing their main-masts, and carrying away

the lamps from the parapet. Some barges also got across the other

Arches, and after the breaking up of the frost, which was about the

middle of January, the ‘_Gazetteer_’ of Thursday, 21st, states, that

‘yesterday a great many tons of Kentish rag-stones were thrown under

the Great Arch of London Bridge, as a supposed temporary remedy

against the damage the foundation received during the late frost. An

expedient productive of infinite ruin to the navigation, as they are

soon scowered away again, and an accumulating expense to the City of

an alarming nature.’ It is also added in the same paper for Tuesday,

February 2nd, that ‘the damages done to London Bridge Water-works in

the late severe weather, are not yet repaired, though the workmen have

worked over hours, and on Sundays, ever since the weather broke. The

last damaged wheel will be at work this week.’ It had been frequently

remarked in the papers of this period, that the amount of rents

received from the Proprietors of the London Bridge Water-works, was

not, in any degree, proportionate to the expenses of their repairs,

which were calculated at £2500 yearly; and in the ‘_Gazetteer_’ for

Friday, April 22nd, 1768, it is stated that they returned only £3000

clear of all expenses. It is also rather curiously observed, that ‘’tis

computed that there are drowned at London Bridge, about 50 people

upon an average every year; which, as they are the prime of watermen,

bargemen, and seamen, amount, at £400 each, to £20,000 _per annum_.’

The ‘_Continuation of Maitland’s History_,’ page 73, states, that on

April 10th, in this year, the Thames was so remarkably low, that it

was with difficulty even a wherry could cross it, the sand-banks on

both sides of the Bridge being entirely dry. And now, as I have already

mentioned to you several particulars concerning the foundation of

Blackfriars’ Bridge, let me conclude this year with a summary notice

of its completion. The Architect, then, was Robert Mylne, Esq.; the

first pile of it was driven in the middle of the Thames on Saturday,

June 7th, 1760; and the first stone was laid by Sir Thomas Chitty, Lord

Mayor, on Friday, October 31st. On Wednesday, November 19th, 1768,

it was made passable as a bridle-way, exactly two years after its

reception of foot passengers; and it was finally and generally opened

on Sunday, November, 19th, 1769. The total expense of this building

amounted to £152,840. 3_s._ 10_d._; exclusive of £5830 for altering

and filling-up the Fleet-ditch, and £2167, the cost of the Temporary

Wooden Bridge. Until June 22nd, 1785, there was a toll of 1/2_d._

for every foot-passenger, and 1_d._ on Sundays; the yearly amount of

which, from its commencement in 1766, with the purposes to which it was

applied, may be seen in the ‘_Second Report of the Select Committee

for Improving the Port of London_,’ 1799, folio, _Appendix_ B 11, page

49. The Toll-house was burned down in the Riots of 1780, when all the

account-books were destroyed.

“And now to return again to our memorials of London Bridge, I do not

find, even after the most careful search, any particulars of this

edifice, connected with the great Frost of 1785, notwithstanding

its extent and severity for 115 days; and for that of 1789, though

there are many descriptions of its appearance both up and down the

River, there are but few notices of it at this identical spot. The

‘_Public Advertiser_’ of Friday, January 9th, 1789, states, that the

shipping below the Bridge was in considerable danger, from the tiers

at Deptford, Greenwich, &c. being enclosed with ice; and that the

Thames being frozen over on the day preceding, ‘several purl-booths

were erected, and many thousands of persons crossed upon the ice

from Tower-wharf to the opposite shore.’ The same paper for the day

following, states, that the frost had then continued for about six

weeks; whilst its severity down the River kept still increasing.

Passages across the ice, strewed with ashes, were formed at Gun-Dock,

Execution-Dock, &c.; and these parts seem to have constituted the

principal scenes of attraction. ‘No sooner,’ says the ‘_London

Chronicle_’ from Saturday, January 10th, to Tuesday, January 13th, page

48, ‘had the Thames acquired a sufficient consistency, than booths,

turn-abouts, &c. &c. were erected; the puppet-shows, wild-beasts, &c.

were transported from every adjacent village; whilst the watermen,

that they might draw their usual resources from the water, broke in

the ice close to the shore, and erected bridges, with toll-bars, to

make every passenger pay a halfpenny for getting to the ice. One of the

suttling booths has for its sign ‘Beer, Wine, and Spirituous Liquors

without a License.’ A man who sells hot gingerbread, has a board on

which is written ‘no shop-tax nor window-duty.’ All the adventurers

contend in these short sentences for the preference of the company,

and the Thames is in general crowded.’ Another specimen of the humour

exhibited at this place, was contained in the following inscription

on a temporary building on the Thames, and printed in the ‘_Public

Advertiser_’ of Thursday, January 15th: ‘This Booth to Let. The present

possessor of the Premises is Mr. Frost. His affairs, however, not

being on a permanent footing, a dissolution or bankruptcy may soon

be expected, and the final settlement of the whole entrusted to Mr.

Thaw.’ On Wednesday, January 7th, a large pig was roasted on one of the

principal roads; and on Monday the 12th, a young bear was hunted on the

ice, near Rotherhithe. As usual, too, a printing-press was erected near

the same spot, of which there is a curious memorial preserved in Mr.

Crowle’s ‘_Illustrated Pennant_,’ volume viii., page 262, consisting of

a bill, having a border of type flowers containing the following verses;

afterwards altered and adopted in the Frost of 1814.

‘The silver Thames was frozen o’er,

No diff’rence ’twixt the Stream and shore;

The like no Man hath seen before,

Except he liv’d in Days of Yore.

_On the Ice, at the Thames Printing-Office opposite St. Catherine’s

Stairs in the severe Frost, January, 1789. Printed by me, William

Bailey._’ The same collection also contains a small stippled engraving,

entitled ‘_A View of the Thames from Rotherhithe Stairs, during

the Frost in 1789. Painted by G. Samuel, and Engraved by W. Birch,

Enamel-painter._’ The severity of this frost, however, appears to

have been felt considerably beyond these scenes of amusement. The

East-India ships were hastily sent down to Gravesend, to which place,

and even below it, large shoals of ice had already floated, extending

almost through the whole Reach; the navigation of boats was entirely

stopped, and it was supposed that the River would soon be completely

impassable from London Bridge to Woolwich. Vast quantities of boiling

water were poured every morning upon the Bridge Water-works, before

the wheels could be set in motion, and 25 horses were daily employed

in removing the ice which surrounded them: whilst at Blackfriars the

masses of floating ice were said to be 18 feet in thickness, and were

continually increasing from the many cart-loads of snow constantly

thrown over the ballustrades. ‘The various parts of the River,’--says

the ‘_Public Advertiser_’ of Friday, January 9th,--‘present different

appearances; in some, the surface is smooth for a mile or two, and then

rough and mountainous, from the great quantities of snow driven by the

wind, and frozen in large bodies.’ Towards Putney Bridge and upwards,

the scene on the ice again became really entertaining. ‘Opposite to

Windsor-street,’ continues the same paper, ‘booths have been erected

since Friday last, and a fair is kept on the river. Multitudes

of people are continually passing and repassing; puppet-shows,

round-abouts, and all the various amusements of Bartholomew fair are

exhibited. In short, Putney and Fulham, from the morning dawn till the

dusk of returning evening, are a scene of festivity and gaiety.’

“At length, the expected thaw commenced with some rain, about two

o’clock on Tuesday, January 13th; and before night the streets were

almost overflowed. ‘Perhaps,’ says the ‘_London Chronicle_,’ from that

date to Thursday, January 15th, page 56, ‘the breaking up of the Fair

upon the Thames last Tuesday night below Bridge, exceeded every idea

that could be formed of it, as it was not until after the dusk of the

evening, that the busy crowd was persuaded of the approach of a thaw.

This, however, with the cracking of some ice about 8 o’clock, made the

whole a scene of the most perfect confusion; as men, beasts, booths,

turn-abouts, puppet-shows, &c. &c. were all in motion, and pouring

towards the shore on each side. The confluence here was so sudden and

impetuous, that the watermen who had formed the toll-bars over the

sides of the river, where they had broken the ice for that purpose, not

being able to maintain their standard from the crowd, &c. pulled up

the boards, by which a number of persons who could not leap, or were

borne down by the press, were soused up to the middle. The difficulty

of landing at the Tower stairs was extreme, until near 10 o’clock,

occasioned by the crowding of people from the shore, who were attracted

by the confusion on the water. The inconvenience to the shipping is now

increased more than since the setting in of the Frost, as no persons

will venture upon the ice to fetch or carry any thing for them, and it

is not yet sufficiently disunited for a boat to live.’ The succeeding

number of this paper, page 60, mentions that on Thursday, January 15th,

the ice was so powerful as to cut the cables of two vessels lying at

the Old Rose Chain, and drive them through the Great Arch of London

Bridge; when their masts becoming entangled with the ballustrades, both

were broken, and many persons hurt. The Thames, however, continued to

be considerably frozen for some time after this. I shall terminate

the year 1789, by informing you, that it is stated in the ‘_Public

Advertiser_’ of Friday, January 16th, that the shares of the London

Bridge Proprietors, which some years before had been worth £3000 per

annum in Life Annuities, had then fallen below £2000.

“In the years 1793 and 1794, the Great Centre Arch again became a

subject of consideration; for, in order to confine the rubble which

had been deposited there to raise and preserve the form of its bed,

nine strong beams of timber were sunk in it horizontally between the

Sterlings, having upright pieces at each end fitting into grooves cut

in the sides of the Sterlings, which forced them down and held them

in their places. This contrivance, however, was only of temporary

benefit, for, at the excellent survey of London Bridge, made by Mr.

George Dance, in 1799, he supposed that only two of these timbers

were remaining, the rest having been carried away by the ice. If we

remember, indeed, the accidents that were continually happening to

the Bridge, by vessels driving through it at this very part, there

can be no great reason to wonder at these defences being speedily

destroyed. So early as January 19th, 1795, we find by ‘_Dodsley’s

Annual Register_’ for that year, volume xxxvii., page 3 of the

‘_Chronicle_’ part, that, about 12 o’clock, two vessels broke from

their moorings a little below the Bridge, when the tide drove them

violently against it. One of them being a large West-Indiaman, making

the Centre Arch, had all its masts carried away close by the board,

when it drove through with a violent crash, and continued up the river

to Somerset House. In 1798, also, the same authority, volume xl., page

40 of the ‘_Chronicle_’ part, mentions, that on May 23rd, a sprit-sail

vessel, laden with hay, drove against the Bridge with great velocity,

and the mast not being lowered in time, it struck the ballustrades

over the Centre Arch and broke them away to the space of nearly ten

feet; the two persons on board being killed by the stones. But if I

were to record all the accidents of this nature, which are contained

in the registers of every year, my narrative would be much longer,

and more melancholy, than either of us would desire; and I shall

add only, therefore, that even the timbers, sunk as an improvement

to the passage of the Centre Arch, were found, in some degree, to

injure the navigation of the Bridge. For in the examination of Mr.

M. P.--now Alderman--Lucas, on June 26th, 1799, he stated, that the

chalk, &c. thrown into the water to support the foundation of that

part of the Bridge, had produced shoals both above and below it; and,

that the timbers recently laid there having prevented the rubble

being scattered, it was stopped up in the wake of the Great Arch,

where it formed a bar. On this account, the last three hours of the

ebb-tide, which were always attended with danger, became additionally

hazardous; empty craft under 3 or 4 tons burthen, could not go through

with safety, and loaded craft could not pass at all at that time. The

stream being then sunk below the level of the Sterlings, the passage

was reduced nearly one half; the fall commenced and increased until the

ebb was over; a barge of 30 or 40 tons would consequently pass with her

bows under water, of which it frequently shipped four or five tons;

whilst it was impossible for any one to stand upon the deck, without

holding on to some part of the vessel. Let me add, that you will find

all these particulars, together with a ‘_Plan and description of the

Timbers sunk in the Great Arch of London Bridge, in the years 1793 and

1794_,’ in plate vii. of ‘_The several Plans and Drawings referred to

in the Second Report from the Select Committee upon the Improvement of

the Port of London_,’ 1799, folio; and in the Appendix A 5, B 6, and

pages 19 and 35 of the Report itself.

Chronicles of London Bridge · 第 34 / 42 段