presented a truly ruinous prospect; for nearly all the centre houses

being removed, there appeared a wide vacancy, with a broken chasm

in the middle, down to the water’s edge, where the new arch was

being constructed. There are three engravings of this edifice taken

immediately subsequent to the destruction, the rarest of which is

an extremely slight and rude etching, on a small folio half-sheet,

entitled ‘_The Melancholy Prospect of London Bridge South-East, April

12th, 1758. J. Jump Del. et Sculp. Published according to Act. To be

had at the Acorn in the Strand._’ In this most barbarous prospect the

buildings are represented in flames; and I have seen it marked so high

as 4_s._ I cannot imagine why Gough, in his ‘_British Topography_,’

volume i., page 735, calls the next of these engravings ‘a miserable

view,’ since it is certainly as good as the generality of the prints

of the period, and is very considerably better than the last. It

consists of a large half-sheet, entitled ‘_An Exact View of London

Bridge since the Conflagration of the Temporary Bridge_,’ which is a

copper-plate of 8 inches by 13-1/4; and beneath it, in letter-press,

is ‘_A Chronological and Historical Account from the first building

a Bridge across the River Thames from London to Southwark, till the

late Conflagration of the Temporary Bridge, the 11th of April, 1758.

Sold by William Herbert, under the Piazzas on the Remains of London

Bridge. Price One Shilling, Plain. Colour’d, Eighteen Pence._’ The only

additional information which we derive from this narrative, is, that

‘as the wind providentially blew the whole time at East,--tho’ all the

day before it had blown strong from the Southward,--it did no damage to

any of the houses at either end.’ But by far the best representation of

the effects of this fire, is a half-sheet copper-plate, entitled, in

French and English, ‘_A View of London Bridge, with the Ruins of y^e

Temporary Bridge, Drawn the day after the Dreadfull Fire, April the

11th, 1758, by A. Walker. Published according to Act of Parliament,

June 28, 1758. London: Printed for John Ryall, at Hogarth’s Head in

Fleet Street. A. Walker delin. et sculp._’ All these prospects were

taken on the West side of the Bridge, and represent the building

horizontally across the picture: Herbert’s extends from Fishmongers’

Hall to the Southwark Gate; but Anthony Walker’s takes in the whole

Bridge, and part of the buildings on the Surrey shore.

“Yet, if this fire were sudden, and its destruction extensive, the

exertions of the City Corporation were not less prompt and effectual in

repairing of the damage. The Common Council, like Bunyan’s Captains in

_Mansoul_, being always true lovers of London, like so many Samsons,

shook themselves and came together to consult upon and contrive a

remedy. The Court of Common Council met by one o’clock on the day

after the fire, and was attended by Mr. Dance, Mr. Taylor, and Mr.

Phillips, the builder of the Bridge, whom the Lord Mayor had previously

ordered to survey it; and their report was, that with a proper number

of workmen, who should be allowed to labour on days, they would

engage to make the old Bridge passable for carriages by the 1st of

May. A new Temporary Bridge was ordered to be immediately erected,

and upwards of 500 workmen were constantly employed upon it, by whose

means, as it is stated in the ‘_Gentleman’s Magazine_’ for 1758, page

193, the Bridge was re-opened for foot-passengers, on Wednesday, the

19th of April; and the whole of the new wooden edifice was ready for

carriages in less than a month after the fire. During the erection

of this building, there seemed to be discovered an additional proof

that the last conflagration was not accidental; for Daniel Capel, the

Inspector of the Bridge, having been informed that Mary Dennis, before

mentioned, and John Scott, one of the Bridge Watchmen, had seen lights

about the new works at an unseasonable hour in the night of the 23rd

of August, brought them to give their evidence before Mr. Alderman

Francis Cokayne. The Inspector was then ordered to search if there were

any appearance of fire, and make his report to the Lord Mayor; upon

which he stated, that having carefully surveyed the Bridge with proper

attendants, they found the appearance of an attempt in three places,

where the new wood work was scorched quite black; and one of the

Watchmen also produced the remains of a link found in the unfinished

works of the Bridge. To prevent another conflagration, therefore, says

Entick, in his ‘_Continuation of Maitland’s History_,’ page 21, it

was ordered that two men, well armed, should be placed every night,

from sun-set to sun-rise, in a gallery erected from end to end of the

Temporary Bridge, just beneath the centre of the works, with lamps

lighted, and a bell, to alarm the neighbourhood in case of an attack.

This watch was continued under the direction of Mr. Capel, until the

whole of the Temporary Bridge was taken down. Before this, however, as

we are informed by ‘_Owen’s Weekly Chronicle, or Universal Journal_,’

for August 26th to September 2nd, 1758, page 173, five watermen, armed

with blunderbusses and cutlasses, had watched for a fortnight, from ten

at night until five in the morning, in a boat under the great Arch.

The opening of the second wooden erection for carriages did not take

place until Wednesday, the 18th of October, 1758, as we learn from

‘_Owen’s Weekly Chronicle_,’ October 14th to 21st, No. 29, page 230:

on page 206 of a former number of which, the watch is particularly

mentioned; and we are also told that there was a convenient pathway

for foot-passengers, railed in and elevated above the carriage-road.

Pages 183 and 198 of the same authority, shew that the edifice was

strewed over with gravel above the planks; that on each side there

were uprights for covering it; and that a month intervened between the

gravelling and the opening of the Bridge. In consequence, too, of the

recent attempt to destroy the New Bridge, this paper likewise informs

us, page 238, that orders were issued by the Lord Mayor, that no

coaches nor foot-passengers should carry any lighted torches over the

Temporary Bridge.

“It was not, however, until the middle of the year 1759, that the new

Arch of London Bridge began to assume its intended form; though we

can trace its progress only by slight occasional notices contained

in the periodicals of the day. Thus we learn from a paragraph in the

‘_London Chronicle_,’ of Saturday, July the 28th, 1759, page 88, that

‘the grand Arch at London Bridge is now completed. It is finished

in the Gothick taste, and the ballustrades upon it are fixing. The

foot-paths will be rather wider than those at Westminster; and it is

proposed to fix posts along them with chains from one post to the

other, to secure foot-passengers from any damage which might otherwise

happen from cattle.’ The strength and complication of the timber used

for forming this Arch, are particularly pointed out in an engraving

and letter signed E. M., in ‘_The London Magazine_’ for that year,

volume xxviii., page 672; where it is stated, that about 17,000 feet of

wood were contained within the arch, which, at some little distance,

appeared to be entirely solid, the vacant spaces being exceedingly

small in proportion to the beams themselves. Its actual contents were

13,872 cubic feet of timber, forming the centre; and 3570 feet more

occupied in booms, guard-piles, struts, and trusses required for the

preservation of the old and new works, and for keeping off the River

craft, tide-water, and ice. This alteration was carried into effect

by Sir Robert Taylor, Architect to the Bank of England, and Mr. Dance,

Senior; and the Carpenter employed for the construction of this

CENTRING OF THE GREAT ARCH OF LONDON BRIDGE,

[Illustration]

received 2_s._ per foot for the use of his timber, including labour,

and took it back again at his own expense. It measured 70 feet span,

by 48 feet wide, and the rise was 23 feet; it was formed of 16 ribs

or frames, and was supported on three Sterlings; namely, the two side

ones of about 6 feet each, and that from which the Chapel pier had been

removed. The author of the letter which I have referred to, censuring

the extraordinary quantity of wood used in the centre, observes that it

employed nearly 10,500 feet more than were used at Westminster Bridge;

notwithstanding the Arch at London Bridge is 4-3/4 feet narrower and

12 feet lower, though the Bridge itself is 4-3/4 feet wider. The

author’s own plan, which is also annexed to the letter, more resembles

that adopted by the late Mr. Rennie, in his alteration of Rochester

Bridge, in the year 1821. It consisted of five radii, supporting as

many timbers placed pentagonally; occupied only 7000 feet of timber,

and would have amounted to £1000 less than the plan actually adopted.

“Many months had not elapsed, however, when it was discovered, that,

by the removal of the large centre pier, the excavations around

and underneath its Sterlings were so considerable, as to place the

adjoining piers, and even the new arch itself, in very imminent danger.

The presentiments of many, and the apprehensions of almost all, were

consequently so great, that but few persons would pass either over

or under it; the Surveyors themselves were not prepared with any

adequate remedy; and Mr. John Smeaton, the celebrated Engineer, was

instantly summoned express from Yorkshire to relieve the difficulty.

Having immediately proceeded to survey the Bridge, and to sound about

the dangerous Sterlings, he advised the Corporation to buy back again

the stones of the City Gates, and throw them into the water, to guard

the Sterlings; preserve the bottom from farther corrosion; raise the

floor under the Arch; and restore the head of the current required for

the Water-works, to its original power. These City Gates, you will

remember, had been previously sold and taken down, in 1760 and 61, as

appears by the ‘_Gentleman’s Magazine_’ for those years; volume xxx.,

pages 390, 440, 591, and volume xxxi., page 187: where we are informed,

that on Wednesday, July 30th, were sold to Mr. Blagden, a Carpenter in

Coleman Street, before the Commissioners of City Lands, the edifice of

Aldgate for £177: 10_s._; Cripplegate for £91; and Ludgate for £148.

Two months were allowed for the removal of each, the latter being

begun on Monday, August 4th, and Aldgate on Monday, September 1st.

Bishopsgate was sold on Wednesday, December 10th; and on Wednesday,

April 22, 1761, Moorgate was also sold for £166, and Aldersgate for

£91. It was probably the materials of the first of these, which lay

in Moorfields, when Mr. Smeaton advised their being thrown into the

Thames: and with so much promptitude was that advice followed, that

the stones were bought the same day; horses, carts, and barges were

instantly procured, and the work commenced immediately, although it

was Sunday morning. These particulars are related in the Life of this

Engineer, attached to his ‘_Reports made on various Occasions_,’ volume

i, London, 1812, quarto, page xix.

“Whilst we are speaking of this alteration of London Bridge, it seems

to be a proper place to say something of the massive features of our

ancient edifice, and the oldest contrivances used for the support of

Bridges in general. First, then, the Piers are said to be raised, so

far as their nature can at present be known, upon rough piles of oak

and elm, shod with iron, and driven very close, but apparently not

fastened. Upon the heads of these are frequently found pieces of plank,

chiefly oak, 4 to 6 inches in thickness; and the insides of the Piers

are filled up with rubble laid in mortar. This kind of building is

supposed to have been anciently used when the bed of the river could

not be laid dry; and the stilts or piles were then surrounded by a row

of other piles and planks, like a wall, called a Sterling or Jettee,

the vacant spaces of which were filled with loose stones, &c. to the

top. The inconveniences attending such a method are, however, so great,

that it is now entirely disused: as, on account of the very loose

composition of the Piers, they must be made both large and broad, to

prevent their entire destruction upon drawing the centre of the Arch.

This great breadth, also, very materially contracts the water-way, and

incommodes navigation; whilst the Sterling itself is in considerable

danger of bursting.”

“But, Mr. Postern,” said I, as the Antiquary arrived at this part of

his narrative, “although Maitland tells us, in his ‘_History_,’ volume

i., page 46, and volume ii., page 1349, that the use of Coffer-dams, or

_Caissons_, for building of the Piers of Bridges, was first introduced

into the Thames at the erection of Westminster Bridge, yet it has been

supposed that even this of London was constructed somewhat after the

same plan; and that those Sterlings are but the upper parts of the

machines themselves, left in the water to guard the Piers; though it

is certain, that in most of the Reports, illustrative of the great

repair of London Bridge, the Sterlings are mentioned as additions

to the original structure for the support of the Piers. I have been

obligingly furnished, however, with an interesting drawing, and

extract from the MS. Journal of Mr. William Knight, of Mr. Rennie’s

office, by which we are enabled to understand the construction of

these parts of the Bridge in a much clearer and more perfect manner.

Mr. Knight observes, that having received several different statements

as to the way in which the Piers of the old London Bridge had been

erected, he determined upon convincing himself by an actual survey.

This he effected on August 14th, 1821, when an excavation was made for

ascertaining whether the original structure would support new Arches

of a larger span; and he then found it to be built in the following

manner. ‘The foundation of the Piers on the North side,--between the

Great Lock and what is called the Long Entry Lock,--and in the Sterling

round it, appeared to be about 3 feet above low-water mark. The bottom

of the masonry originally laid of the pier, is about 2 feet 3 inches

above low-water mark; and the first course is laid upon a sill of oak,

16 inches wide, by 9 in thickness, and perfectly sound. Immediately

beneath this is a mass of Kentish rubble, mixed with flint, chalk,

&c., thrown in irregularly, but not mixed with any cement. The masonry

above the sill seems well bonded together, with good mortar joints,

but there are _no piles under the oak sill_. The external parts of the

pier seem to have been new-fronted at some period,--probably at the

time when the centre Arch was formed in 1759,--as the base of this new

fronting projects about 1 foot before the original Pier. There are _no

piles under the original part of the Pier_; but to the _new part there

are some small ones driven into the rubble_,--which can be of little

service,--with some planks laid upon their edges. The new masonry is

well bonded into the old work.’ Mr. Knight concludes, by observing

that, in all the accounts which he has hitherto met with, the old Piers

of this Bridge are described to _stand upon piles_; but that, as he

found this to be erroneous in the present instance, he considers it to

be a fair conclusion that all the other Piers were constructed upon the

same principle. His drawing represents a SECTION OF THE NORTH PIER OF

THE GREAT ARCH OF LONDON BRIDGE,

[Illustration]

shewing the original manner of constructing it, and the Sterling,

or ancient Coffer-dam, standing around it; which, it thus appears

unquestionably evident that, not having the art to pump dry, was filled

up with loose stones. The Arch on the right hand is denominated the

Long Entry Lock, and that on the left is a part of the Great Arch in

the centre. I should remark also, that Mr. Knight has examined several

other parts of this edifice with no less care and industry, in order

to ascertain the plans adopted at the famous alteration of London

Bridge, of which we are now speaking; of all of which observations he

has made interesting sketches and memoranda. He states that he has

felt with his measuring rods the timber, &c., placed in the river to

strengthen the piers of the Great Arch, and that his sounding leads

have been broken by catching in it. In April, 1826, the opening of the

roadway of London Bridge for throwing of two more Arches into one, to

increase the water-way during the building of the New Bridge, also made

a curious discovery of many of the more ancient parts of the original

building. The crowns of the old Arches, observes Mr. Knight, were

about 8 feet 6 inches from the present surface of the ground, which

appeared to have been raised at different periods; and five several

strata were evidently to be traced over the centre of the original

Bridge, which was 20 feet in width. Immediately over the crowns of

the Arches was a layer of fine gravel, about 20 inches in depth,

perhaps the ancient roadway, as its upper surface had the appearance

of being trodden down and dirty, when contrasted with that beneath

it. The next stratum consisted of mixed chalk and gravel; the third of

made ground of various materials; the fourth, a thick layer of burnt

wood, ruins, and black earth; and the last another bed of different

substances, over which was the granite paving. The filling-in between

the Arches was composed of chalk and mortar, of so hard a nature that

it was taken out with great difficulty. With respect to the building

itself, he observes, that the stone of which the Arches were formed

consists of two courses: that of the soffits or flying ribs, being

Merstham Fire-stone, and the course above very similar to the stone

of Caen, or Normandy. In the additions, or casings, on each side of

the original structure, Portland stone has been used, as well for the

facing, as for the Arches; whilst the backing and filling-in, between

the spandrils of the Arches, was composed of chalk and mortar; which

latter was evidently of a very bad quality and carelessly applied.

Indeed, the ashler facing had been so little attended to in the

bonding of the work together, that it is surprising, with the great

weight behind, the careless manner of throwing in the backing, and the

slight nature of the facing itself, that the whole work has not been

thrown outwards some time since. Having thus, Mr. Barnaby, added these

curious observations to your narrative, I must once more entreat you to

proceed.”

“After making you my acknowledgments,” recommenced the Antiquary, “for

the very curious illustration you have now furnished; and before

quitting the Great Arch of London Bridge, let me observe, that it

contains the Trinity Standard of High Water, which is placed there for

the benefit of persons erecting buildings on the banks of the Thames,

and originally inscribed upon a metal plate, affixed under the Great

Arch upon the North East side, as it may be seen beneath the centre

Arch of Blackfriars Bridge. It is at present engraven in the centre of

each Pier of the Great Arch, in black Roman letters, about 7-1/2 feet

above the springing line of the Arch, or 8-1/2 feet over the sterling;

and consists of the inscription,--

+--------------+

| |

| TRINITY. |

| |

| H. W. |

| |

| 1800. |

| |

| ------ |

| |

| Λ [Greek: L] |

| |

+--------------+

the character beneath being the average point of the ordinary rise of

a Spring Tide at High Water, which, above Bridge, is 14-1/2 feet or 15

feet, being 5 feet 3 inches above the Neap Tides. At high Spring Tides,

however, it has risen 16 feet and upwards; and in that remarkable one

combined with a land-flood on December 28th, 1821, it rose 2 feet, 10

inches, and five parts, above the mark below Bridge. From the official

tidal observations of the Trinity Company, it has been ascertained,

that, from Blackwall to London Bridge, the High Water ascends to the

same level; and that from the upper side of London Bridge to that of

Westminster the River is likewise generally level, excepting under the

influence of winds or land-floods. During that of 1821, to which I have

just referred, the banks of the River, and the marshes and gardens

above Westminster, were overflowed and damaged to a very considerable

extent; which has been attributed to the obstruction offered by the

present London Bridge to the passage of the water towards the sea, as

we learn from the ‘_Report of Ralph Walker, delivered into the House

of Commons, 11th of April, 1823_,’ octavo, page 9; where he states,

that the tides below this edifice during the flood, rose only to the

ordinary height, whilst at Low water the fall was increased by several

feet. This celebrated fall is, of course, most evident at Low water,

when it is about 4 feet 6 inches, or 6 feet in the Winter season; and

the most hazardous time for passing through any of the Bridge Locks, is

probably half an hour previous to, or, for barges, the last two hours

before, Low water below Bridge. The safest time of the tide is at High

water, or slack Low water: but boats may pass with safety for 2-1/2

hours after flood, and the last half hour of the drain of the tide at

ebb, above Bridge; the tide having then flowed nearly 4 feet below.

Deeply laden barges also take the drain through at Low water. The

Great Arch is doubtless one of the safest to pass under, and is always

used by craft and barges; but before the erection of the New Bridge

works, most of the other Locks were employed at the flood tide, when

the fall is extremely trifling. When the tide is on the ebb, the Arches

which are chiefly used for boats are, the Draw-Lock,--the 4th from the

Great Arch,--on the South; and St. Mary’s Lock,--adjoining the Great

Arch,--on the North, which is always taken on the first part of the

ebb. The Long-Narrow, once a favourite Lock, is now nearly abandoned;

but the Draw-Lock is perhaps considered the safest, and is the most

generally used since the erection of the New Bridge Coffer-dams. The

approach, however, is dangerous, and requires a skilful waterman, who

is obliged to pull his boat into the draft or eddy of the dam before he

can make the Lock. Though the works of the New Bridge have at present

closed several of the Arches of the ancient edifice, yet the 4th and

5th Locks from the Southwark end have been thrown into one, with a

strong wooden vaulting, parapet, and roadway above, to increase the

water-way beneath. Since the commencement of these works, the fall of

the river has also become less dangerous for barges, from the returning

tide sooner meeting with resistance; and instead of a direct fall of

6 feet in 50, it is now only about 6-1/2 feet in 250. The draft of

the tide, however, round the Coffer-dams, makes it very difficult

for lightermen to enter the Locks fairly; and some of the outer rows

of piles are driven inwards from their barges being carried against

them. In 1820 and 1822, the average fall at High water was only from

8 to 13 inches; and in 1823, after the removal of the London Bridge

Water-works, it decreased to between 3 and 4.

“Mr. Barnaby! Mr. Barnaby!” exclaimed I, fretted by this long

digression in the Antiquary’s narrative, “I protest you really put me

out of all patience: there’s no keeping you to one subject; for the

last of your annals referred to that most wearisome alteration and

repair of London Bridge which began in 1757, and now you are bewildered

in a discourse on the navigation and tides of the Thames! Truly, it’s

intolerable!”