CHAPTER XI

MAINTENANCE OF HIGHWAYS

Proper maintenance of highways is equally important with proper

construction. With nearly all types of road construction, the need for

maintenance arises soon after the surface is placed under traffic and

is continuous thereafter. The nature and amount of maintenance work

varies greatly among the several types of surface and the organization

suitable for a system of highways will depend to a considerable extent

upon the kinds of surfaces that are to be maintained.

The upkeep of a road may be conveniently considered as of two kinds,

viz., (1) that which has to do with the wearing surface and earth

shoulders or berms upon which there is some traffic and (2) that which

has to do with the side ditches and drainage structures and keeping

the roadside in presentable condition. Both kinds of work are usually

carried out by the same organization, but whereas the nature of the

work indicated under (1) will vary with the type of wearing surface

and with all variations in traffic, that which is indicated under (2)

will be nearly constant in any locality.

ORGANIZATION FOR MAINTENANCE

Maintenance of highways is preferably under the administration of the

same authority as construction and when an improvement is undertaken

under the jurisdiction of a State Highway Department, the completed

improvement is ordinarily maintained under the state authority. If

the improvement is made by county authorities, the maintenance is also

carried out under county authority.

The nature of the organization of maintenance forces is dependent upon

the kind of roads to be cared for and must of necessity be varied in

any instance as conditions demand. In general, either maintenance

gangs or patrolmen are employed and often both are used on the same

road system.

=Patrol Maintenance.=--Where this system is in operation, the highway

system is divided into patrol districts of from six to eighteen miles

of highway and a single patrolman is placed in charge of each

district. He is provided with all of the necessary tools and materials

required in his district and performs all of the work required in the

ordinary upkeep of the highway. He should work under the direction of

the county engineer or the district engineer for the state highway

department, because his work involves the use of materials and

processes requiring technical supervision.

=Gang Maintenance.=--The maintenance gang may be employed for some

types of road surface in lieu of the patrolman or with other types of

surface may be employed to supplement the work of the patrolman. The

maintenance gang consists of three to ten men and is furnished all of

the tools and materials required for the particular kind of work they

do. Ordinarily the gang goes over the roads assigned to it once each

season and performs those repair operations requiring more work than

the patrolman can find time for. The work of the maintenance gang like

that of the patrolman should be under engineering supervision.

=Maintenance of Earth, Sand-clay, Gravel and Macadam Roads.=--The

ordinary upkeep of earth, sand-clay, gravel and macadam surfaces is

most readily accomplished by the patrol method, since constant care is

required to keep the roads in a condition of maximum service ability.

The tools required for each patrolman may include the following:

1 shovel 1 spade

1 stone rake 1 pick

1 scythe 1 tamper

1 or more road drags 1 mowing machine for cutting weeds

1 wheelbarrow (sometimes)

1 light truck 1 small kit carpenter's tools

The work of the patrolman consists in keeping the surface of the road

smooth by dragging, repairing chuck holes by tamping in fresh material

of the appropriate kind, keeping the ditches and culverts free from

obstruction, cutting weeds and repairing bridge floors if they are of

plank construction. Removal of snow drifts is sometimes a part of the

patrolman's duty, but more often that is done by special gangs.

Usually the patrolman is authorized to hire teams for dragging and

cutting weeds.

When an earth road requires to be re-graded so as to restore the

cross-section and deepen the ditches, a gang is sent in to perform

that work, as it is obviously impossible for the patrolman to perform

work, of that kind.

If the gravel road is being maintained with a bituminous carpet coat,

the patrolman will be furnished the necessary tools to enable him to

patch the surface with bituminous material as necessity requires.

When the surface deteriorates to such an extent that a new carpet coat

is required, the gang system is employed for all work connected with

resurfacing, instead of attempting to have the work done by patrolmen.

The maintenance of the macadam road is carried out in much the same

manner as that of the gravel road. The binder of stone dust or clayey

sand is renewed as often as it is swept off by traffic. Depressions or

ruts are repaired by first loosening the surface with a pick and then

adding broken stone and screenings to restore the surface.

When the macadam reaches the stage where entire resurfacing is

needed, the work is performed by gangs organized and equipped for the

purpose; and likewise when the surface is being maintained with a

bituminous carpet, the renewal of the carpet coat is performed by

special gangs, but the ordinary upkeep of the surface by patching is

handled by a patrolman.

MAINTENANCE OF MIXED BITUMINOUS SURFACES

[Illustration: Fig. 22.--Scarafier used in Gravel Road Maintenance]

These types of surface can be kept in satisfactory condition if they

are carefully repaired once or twice each season. This work requires

considerable experience and some special equipment, not ordinarily

supplied to patrolmen. A gang is organized for the work and supplied

with the proper equipment. They go over the roads and patch all worn

places, generally first removing the wearing surface entirely in the

area affected.

The wearing surface mixture is then prepared and tamped or rolled into

place. If the area affected is small, tamping is satisfactory, and

when the area is considerable, rolling is employed. The upkeep of the

side roads may be accomplished by the same gang but is preferably

taken care of by patrolmen, who do not attempt any but minor repairs

to the wearing surface.

MAINTENANCE OF BRICK AND CONCRETE ROADS

On brick and concrete roads, the principal work on the wearing surface

consists in filling the cracks with a suitable bituminous material.

This work is done by patrolmen or by special gangs and generally will

be done once each year. The upkeep of the side roads is cared for by

patrolmen who drag the side roads and cut the weeds as occasion

requires.

INDEX

Administration county; 15

federal; 17

highway; 13

state; 16

township; 13

Aesthetics; 62

Aggregate, fine; 101

Aggregate, coarse; 100

Air resistance; 51

Alignment; 46

Applying bituminous binder; 122

Asphaltic concrete; 128

Asphalt, natural; 117

liquid; 118

petroleum; 117

Assessments, special; 19

zone method; 20

Bedding course, green mortar; 111

sand mortar; 111

sand bedding mortar; 111

Binder for gravel; 75

Bitulithic or warrenite; 128

Bitumen; 118

Bituminous coatings on concrete; 105

Bituminous fillers; 112

Bituminous road materials and their use; 116

Bituminous surfaces; 96, 120

Blade grader; 69

Bonding; 87

Bonds, annuity; 26

serial; 27

sinking fund; 25

Box culverts; 39

Brick roads; 113

Brick, repressed; 107

tests of 108;

vertical fiber; 107

vitrified; 106

wire-cut-lug; 108

Broken stone road surfaces; 89

Cement, asphaltic; 118

Cement concrete roads; 98

Cement grout filler; 112

Characteristics, asphaltic concrete; 129

bituminous macadam; 125

broken stone; 97

concrete; 105

mixed macadam; 128

sand clay; 78

Classes of bituminous materials; 116

Classification according to consistency; 117

Clay and cement concrete pipe; 39

Coal tar; 116

Concrete, asphaltic; 128

Concrete materials; 100

Concrete pipe; 39

Control of erosion; 61

Costs; 70

County administration; 15

Cross sections; 60, 65

Culverts; 56

Curing concrete; 103

Design, broken stone roads; 89

concrete roads; 99

earth roads; 42

Desirability of road bonds; 27

Development of traffic; 2

Drainage, necessity of; 29

Drainage of roads; 29

Earth roads, in arid regions; 72

humid regions; 65

value of; 73

Earth works; 92

Education, rural; 6

Effect of grades; 54

Elevating grader; 66

Elevating grader work; 68

End walls for culverts; 39

Energy loss on account of grades; 57

Entrances, farm; 37, 61

Expansion joints; 104

Farm entrance culverts; 37

Federal administration; 17

Fillers; 118

Finance, highway; 19

Fine aggregate; 101

Finishing surface of concrete; 122

Foundation, asphaltic concrete; 129

brick; 109

macadam; 93

mixed macadam; 126

penetration macadam; 123

Telford; 94

Gang maintenance; 131

Grader, Maney; 67

use of; 69

Gravel, ideal; 81

natural; 83

roads; 74

General taxation; 24

Good roads and commerce; 7

Green concrete bedding course; 111

Highway administration; 13

Highway finance; 19

maintenance; 130

Importance of design; 30

Ideal road gravel; 81

Inter-city traffic; 5

Inter-county and inter-state traffic; 5

Internal resistance; 50

Intersections; 46

Laying tile; 35

Length of culvert; 37

Liquid asphalt; 118

Local farm to market traffic; 4

Macadam; 89

Maintenance, concrete; 105

earth roads; 70

general; 131

gravel roads; 88

macadam; 96

of highways; 130

patrol; 131

Maney grader; 67

Marginal curb; 113

Measuring materials; 101

Metal pipe; 38

Mixing wearing surface; 127

Mixtures; 117

Natural asphalt; 117

gravel; 79

Necessity for planning; 42

drainage; 29

Patching; 122, 125

Patrol maintenance; 131

Pebbles, size of; 80

Petroleum asphalt; 117

Placing asphaltic concrete; 129

Placing broken stone; 94

Placing concrete; 102, 103

mixed macadam; 127

Plans for roads; 43

Preliminary investigation; 44

Preparation of earth foundation; 102

of road; 85

Private entrances; 61

Properties of stone; 90

Proportions for concrete roads; 101

Purpose of highways; 1

Reinforced concrete box culverts; 39

Reinforcing; 104

Repressed brick; 107

Road oils; 117

Road plans; 43

Rocks, kind of, for macadam; 91

Rolling, macadam; 95

Rolling resistance; 50

Run-off; 31

Rural education; 6

Rural social life; 7

Safety consideration; 58

Sand bedding course; 111

Sand clay and gravel road; 74

Sand mortar bedding course; 111

Seal coat; 127

Serial bonds; 27

Sinking fund bond; 25

Slip scraper; 67

Special assessments; 19

Specifications; 119

Spreading screenings; 95

State administration; 16

Stone, use of; 92

Surface drainage; 30

Surfaces, bituminous; 120

Surface method; 87

Superelevation; 47

Tests, brick; 108

Tile drains; 35

Topeka asphaltic concrete; 128

Tractive resistance; 52

Trench method; 85

Truck operation costs; 9

Types of culverts; 38

Underground water; 34

Undulating roads; 58

Use of blade grader; 69

Utilizing natural gravels; 83

Value of earth roads; 73

Variation in rainfall; 64

Variation in soils; 63

Vehicle taxes; 24

Vertical fiber brick; 107

Vitrified brick roads; 106

Vitrified brick; 106

Water gas tar; 117

Width of roadway; 59

Wire-cut-lug brick; 108

Zone method of assessing; 20

* * * * *

[Transcriber's Notes:

The transcriber made these changes to the text to correct obvious

errors:

1. p. 5, accomodate --> accommodate

2. p. 39, guage --> gauge

3. p. 46, enbankment --> embankment

4. p. 63, tought --> tough

5. p. 68, absorbant --> absorbent

6. p. 73, persistant --> persistent

7. p. 77, indispensible --> indispensable

8. p. 119, aspealt --> asphalt

9. p. 127, repaid --> rapid

10. p. 130, Vetrified brick; 105 --> Vitrified brick; 106

11. p. 130, Virtical --> Vertical

End of Transcriber's Notes]

American Rural Highways · 第 11 / 11 章