ROAD CONSTRUCTION

The question of the kind of road for hauling logs with the motor truck

is a very important one. It is impossible to move a fifteen-ton load day

in and day out unless there are good roads, and no motor truck operation

of reasonably large proportions can be successfully maintained without a

road that is well constructed and which will not give way during any

kind of weather, under the loads that are carried. One cannot

successfully and continuously operate on dirt or even gravel roads as

they are good only when dry. Good roads are as important to the motor

truck operator as the railroad is to the transportation of logs by rail.

The big handicap in motor truck logging in the past has been poor roads.

The same man who will survey, grade, carefully lay and ballast the steel

for a logging railroad will many times put a truck and trailer on a poor

dirt road and expect the truck to haul economically and satisfactorily.

A motor truck will haul over some mighty poor apologies for roads but it

does not pay. A good road is an excellent investment. It makes larger

loads and more trips a day possible, will save on tires and repairs, and

will require less gasoline to the mile; the efficiency and output will

be increased and the time and operating costs will be decreased.

[Illustration: Sub-grade for motor truck logging road.]

There have been some very successful operators who have secured a small

body of timber at a low price on a public road who made the motor truck

pay without building a road. This method of logging in a small way will

continue to be carried on by small operators who will haul only during

three seasons of the year or even less. However, the big future for the

motor truck for logging is in the larger tracts of timber where it would

not pay to put in a railroad but where a good type of motor truck road

can be built cheaply and loads as large as the truck can handle be

carried with no road restrictions as to the weight.

In general four types of roads are used by loggers: (1) the cross-plank

road, (2) the fore and aft pole road, (3) the fore and aft plank road,

and (4) the cement road. The puncheon road is a modification of the fore

and aft plank road and will be taken up with the latter. The methods and

cost of construction, the advantages and the disadvantages of these

various types of roads follow in detail.

_Sub-Grade_: The sub-grade is put in the same way for each type of road.

The average width of the truck is seven feet and six inches, calling for

a road about eight and a half feet wide, so that the sub-grade should be

twelve feet in width. An illustration of the amount of grading necessary

is shown on page 25. Too much care cannot be taken in the matter of

ditches for draining. In a rainy climate, the water should be carried

away from the hill side of the grade every fifty feet.

_Cross-Plank Road_: The cross-plank road is constructed by laying cull

ties on hewn poles lengthwise of the road. Three rows, four feet apart

are used and second grade ten foot plank, six inches thick and of random

widths, are securely nailed to the ties. Great care must be taken to

have the ties laid fairly smooth if the road is to be even. Plank less

than six inches in thickness should not be used as the thinner ones very

soon crack and go to piece under the excessive jar and vibration.

This is a very expensive road to build as it wastes material. Six

thousand feet of lumber is necessary for every hundred foot station, at

a cost of $222 a station for the material alone, without considering the

cost of laying it. The maintenance cost also is very heavy because the

nails pull out as a result of the vibration caused by the truck. This

type of road is used only over short stretches, such as swampy ground

in connection with the dirt road, and on steep grades and sharp turns in

connection with the pole or plank road.

The Esary Logging Company at Camano Island, Washington, put in a

cross-plank road for a short distance on a sharp curve and a steep

grade, to see how it would affect the traction. It was found that cross

planking was not necessary on curves where the grade is ten per cent or

less when coming down with a load, providing trailer brakes are used. In

the future the company will not use this type of road unless grades

above this maximum are encountered. It is impossible to lay a

cross-plank road smoothly because the stringers settle and make the road

bumpy. The resulting jar on the equipment and the fact that these

stretches have to be taken at a much reduced speed, furnish ample reason

to condemn its use.

The only real use for a cross-plank road is to secure better traction on

grades exceeding ten or twelve per cent, and then it should be laid with

a space of about one inch between the planks. Even in such cases it

would be better to use some other method for securing traction, such as

sanding the track or winding the drive wheels with a light cable. The

waste of material and the excessive vibration limit the use of this type

of road.

_Fore and Aft Pole Road._ In the fore and aft pole road, poles from

twelve to fourteen inches in diameter are hewn on one or more faces and

laid longitudinally with the road, with one or more logs for each wheel

track. This type of road is commonly used by motor truck loggers and is

one that lends itself readily to their use. It is the most practical

road that can be built unless there is a small saw-mill handy to saw

planks for the fore and aft plank road. The smaller material growing

along the right of way is used at an expense of only what it costs to

fell it, hew it and put the poles in place. Hemlock poles may be used to

advantage.

Some operators use the single large pole placed on cross-ties eight or

ten feet apart and use lighter eight-inch poles placed on the outside

for a guard rail to keep the truck from leaving the track. The main pole

is laid in a ditch about eight inches deep, leaving it half buried. This

helps to keep the poles from spreading and increases their firmness and

strength. The pole is notched into the cross-ties, which are made of

logs not less than eight inches in diameter, and is securely nailed or

bolted to prevent it from rolling. The outside guard rail is laid on

the surface of the ground close to the main track and is securely braced

from the outside by means of posts sunk into the ground or it may be

spiked to the main pole or to the ties. When running with the trailer on

this narrow type of road, the guard rail is very necessary.

After the poles have been laid, the sub-grade should be ditched in the

center deep enough to carry away the water that falls in the middle of

the road. The success of the road depends to a large extent upon good

drainage.

The Meicklejohn and Brown Logging Company near Monroe, Washington,

operate over a pole road with three poles for each wheel. The poles are

from ten to twelve inches in diameter at the small end and are hewn to a

six inch face, giving an eighteen inch bearing surface for each wheel.

(See illustration on page 29.) The minimum sized pole that should be

used for roads of this character is one eight inches in diameter at the

small end. The road is constructed the same way as the single pole road

and the poles are laid on cross ties twelve inches in diameter placed

from eight to ten feet apart. Where the road is off the ground as when

crossing over a small depression, these sleepers must not be over five

feet apart. The guard rails at this operation are held in place by means

of a wooden brace nailed from each end of the rail to a near-by stump.

The ends of the poles used for the track are adzed so that they match

evenly. By breaking the joints and hewing them the road presents a level

surface with no bumps.

In planning the curves, it is necessary to make the tracks somewhat

wider than on straight stretches in order to keep the trailer from

running off. The track should be three feet wide on sharp curves and

provided with a stout guard rail if there is any danger of the truck

leaving the track. The curves are banked on the opposite side from that

used on railroad curves. That is, the inner rail is raised about three

inches. This is to throw the load to the outside away from the inner

guard rail, making it easier to make the turn without the rear wheels

binding. In this way a 35 degree curve may be negotiated with forty or

fifty foot logs. As the curves have to be passed at a much reduced

speed, there is little danger of the logs rolling off due to the raised

inner rail.

The grading for a road of this construction is usually light. The grades

should, if possible, be kept below five per cent. A truck will operate

better on a ten per cent grade in dry weather than on a five per cent

one in wet weather. On a road of this type, grades up to ten per cent

can be operated over unless there is snow. When the grades are above

this and the weather is wet, traction still may be secured by sanding

the road or by tacking an old half inch steel cable to the road in the

form of a figure "s". If this is sanded in addition, the truck may

safely be taken up a steeper grade than it would be safe to bring it

down without sanding.

The pole road could be greatly improved by hewing the faces of the poles

where they come together side by side so that an even fit is made. The

details of this improved form of construction are shown in figure 1,

page 30.

[Illustration: The most common type of motor truck logging road--a

fore-and-aft pole road.]

[Illustration: Figure 1. Cross section of pole road. Scale--1 inch

equals 2 feet.]

At the present time this is not done and there are one or more ruts in

the surface of the road due to the rounding off of the poles where they

are placed side by side. The front wheels of the truck are constantly

dropping into these ruts, tending to spread the track apart and making

it harder for the driver to steer. The tires also suffer from uneven

wear. With this deep groove in the track, a certain amount of the

traction of the rear wheels is also lost. Hence a much better road would

be one with the inner faces of the poles hewn so that a tight fit is

secured.

This road can be built of two large poles or three smaller ones to give

a flat track two and a half feet wide for each wheel. Laid nearly flush

with the ground the guard rail can be eliminated with this width of

track, except on sharp curves and other locations where there would be

danger if the truck left the track. On such a road the traction will

also be increased, better time can be made, the truck will be easier to

steer and hence safer to operate, and there will be less wear on the

tires. Such a road can be very easily and cheaply built by bringing in a

portable sawmill and slabbing the material on two sides to the desired

face.

The life of a good pole road is from three to four years if kept in good

repair. The maintenance cost is very light if the road is properly

constructed in the first place, consisting chiefly in removing a pole

here and there that shows signs of too much wear, and in bracing guard

rails where they weaken. The use of two or three hewn poles laid

lengthwise for each wheel without cross-ties does not pay as the poles

soon get out of place even when trenched, and the loss of traction due

to the irregularities and of time and money in the upkeep of such a road

more than justifies putting in a good road in the first place.

The cost of a fore and aft pole road varies with the accessibility of

the material and the cost of the labor. In the past they have been built

for as low as $2000 a mile, but with the present prices costs will range

from $5000 to $7000 a mile. One company within the year contracted the

grading and construction of the road for $70 a hundred foot station, not

including the cost of clearing and chunking out the right of way. The

total cost was about $125 a station or $6600 a mile.

Some of the advantages of the pole road are that it is tough and strong

and does not crack, split or break easily so that if it is properly put

in it lasts and requires but little maintenance. The material for its

construction is found along the right of way and being small in diameter

is less expensive than other road materials.

_Fore and Aft Plank Roads._ This type of road is constructed by placing

cross-ties from eight to ten feet apart, center to center, upon which

are placed lengthwise for each wheel, two or three sawed timbers not

less than six inches in thickness and from twelve to fifteen inches in

width. A good road of this type will deliver 150 million feet of logs at

a conservative estimate.

The grading is usually light and in many places entirely unnecessary.

Second-grade six by eight ties with the eight inch face placed down, or

hewn poles are laid about eight feet apart. Where the road bed is soft,

the ties are placed closer and in some places as near as two and a half

feet apart. Over very swampy ground, the road known as the fore and aft

puncheon road is used. It consists simply of cedar puncheon placed

crosswise of the road with the usual planking nailed securely to it. The

plank used should never be less than six inches in thickness in the main

road as it has been proved that four inch plank very soon give way under

the heavy loads. On the spur lines it is practicable to use four inch

plank because the road is used only a short time.

The total width of the road is eight feet and the plank are laid on top

of the ground, but if they are sunk nearly to the level of the ground

the road is made considerably more firm and enduring, and of course is

safer. The ends are adzed smooth to present an even surface,

drift-bolted to the ties, and all joints broken.

The plank in the track are kept together by means of a three by four

inch timber driven tightly between the tracks on top of the cross-ties

at each joint, and a block nailed to the outside of the tie at each

joint with a wedge-shaped piece of wood driven between it and the plank.

(See illustration on page 33.) This wedge is driven in from time to time

as occasion may demand. If, in addition to this construction, dirt or

gravel is filled in the center to the level of the track, the road is

made very solid.

[Illustration: Fore-and-aft plank road with wedges on cross ties to

facilitate the re-aligning of the planks.]

With a good road of this type and a bearing surface of thirty inches,

the trouble and expense of a guard rail may be eliminated. When a light

truck is used for a small body of timber such a wide and heavily

constructed road is not practical. In this case, a four inch plank with

a fifteen inch surface and an eight inch pole for a guard rail would be

used. Here again the track must be made wider on the sharp curves, often

as wide as three and a half feet. Usually, the inner rail is made wider

than the outer one. On very sharp curves the track may have to be

planked solid to keep the trailer from running off. By sawing out chips

from one-half to one inch wide two-thirds of the way through the plank,

and about six feet apart on the inner side, a long plank may be bent

around quite a sharp curve. The ties, of course, should be placed so as

to allow the cut sections of the plank to rest squarely on them. This

does away with the short pieces and so strengthens the track.

The company logging at Camano Island, Washington, operates over a road

of this type, an illustration of which is shown on page 38. The

difficulties encountered in the construction of this particular road

were very considerable as a cut through very hard shale, in some places

as much as seven feet, was necessary. The maintenance on this road is

heavier than is usual. Two men are employed to work on it continually.

The work consists of blocking up the loose ties and plank, making any

necessary repairs and keeping sand and gravel on the steep grades. The

cost of this work is good insurance as it keeps the road in the best of

condition at all times and saves on other operating expenses.

[Illustration: Detailed view of fore-and-aft plank road, showing method

of wedging.]

_Cost._ The first cost of a road of this type is high but it more than

pays in the long run if a large body of timber is to be hauled over it.

The timber used in its construction amounts to about 160 thousand feet

per mile. Second grade material can be used at a cost of approximately

$5,500 a mile for the plank. The total cost per mile varies from $6,000

to $8,000. The plank road at Camano Island cost $20,000 for two and

three-quarter miles, which includes the cost of the plank, the grading

and labor of putting the plank in place. This is at the rate of about

$7,275 a mile, or approximately $138 a hundred foot station. The

overhead charge for the road at this operation is $.75 a thousand feet

of timber hauled over it. Plank roads of lighter construction have been

built for $4,000 a mile. The length of life is about the same as that of

a pole road, three to four years.

The fore and aft plank road is one of the best roads that can be put in

where the timber is of sufficient quantity to justify the expense. The

big advantage is the speed that can be made and the saving in the

equipment. Such a road is very free from bumps and the jar and vibration

on the truck is no greater than on a city pavement. The depreciation on

a truck depends to a great extent upon the road operated over. With the

above type, depreciation on the truck will not be less than five years.

In addition, tire mileage will be double that obtained over a pole road,

and the gasoline and repair expense will be very materially cut. Owing

to the very small vibration, a load of logs can be brought to the

landing as fast as it is safe to let the truck glide on a down grade.

Speeds as high as 20 miles an hour can easily be taken without excessive

vibration. The traction is greater on this type of road than it is on

the pole road, due to the greater bearing surface. Traction on grades up

to 12% is easily secured by sanding the plank.

_Concrete Roads._ Concrete has been suggested as an ideal road material.

However, up to the present time, loggers have not been very enthusiastic

about this type of road on account of the cost of construction, which is

somewhat more expensive than the other types of roads, and on account of

the permanence of the finished road which is beyond that needed. To the

writer's knowledge, there is no company operating in the Northwest over

a concrete road of their own building. In the future such roads may be

used to a limited extent on the main haul by companies which have

operations extending over at least a five year period. The spur roads

will probably always be of some other material.

In building such roads two tracks of concrete, one for each wheel are

provided. The sub-grade should be well ditched in the center with cross

ditches every fifty feet, as is done with the pole road. It has been

suggested that the ditches holding the track be six inches deep and

twenty-six inches wide. They are filled to the top with concrete and

built with a lip four inches high and four inches wide along the outside

on top of the main surface to serve as a guard rail. No forms are

necessary except for the guard lip.

A word of caution here may not be amiss. Concrete roads of this nature

must be regarded as only experimental, for no specific data are

available for determining the proper section of concrete to be used for

carrying heavy loads on so narrow a bearing surface. It is evident that

the carrying capacity of such strips of concrete would be greatly

affected by the character of the sub-base. It will therefore be

impossible to specify a standard that can be used under all conditions.

The use of the concrete guard rail is one of the disadvantages of this

road. The edges of the rail cannot be made rounding except by special

forms and the rubbing of the tires against this rough surface would

greatly reduce the tire mileage. In addition, the rail is so exposed to

weather and hard wear that it cannot be relied upon to serve effectively

for any great length of time. The placing of forms is also a

considerable item of expense in building such a road. A method which

would eliminate such an expense and at the same time provide a more

practical rail would be an advantage.

[Illustration: Figure 2. Cross section of concrete road. Scale--1 inch

equals 2 feet.]

It has already been said that guard rails are unnecessary with a thirty

inch track except on sharp curves and otherwise dangerous places.

However, where rails are necessary the wooden rail fastened by bolts

embedded in the concrete as illustrated above, is quite effective and

readily installed. This consists of a four by six inch plank placed on

edge and drift-bolted to the concrete every three to five feet by a

three-quarter inch bolt. These bolts are placed in the concrete when it

is poured and should be embedded six inches. This will provide a rail

less expensive to build than a concrete rail and one which will last

longer and save on tires. Replacements are easily made by removing the

nuts and placing a new plank in place of the old. With a guard rail of

this type, there is left a twenty-six inch track for the wheels to run

in.

Experiments by W. D. Pence (Journ. West. Soc. Eng. Vol. VI, 1901, Page

549) on 1:2:4 concrete give an average value of 0.0000055 inches per

degree Fahrenheit for the coefficient of expansion. The richer the

concrete, the greater the change in dimension. Due to the expansion, in

laying the concrete the track must be broken every twenty-five or thirty

feet by placing a half-inch board in the ditch when the concrete is

being filled in. Later this board is removed and the joint filled with

asphalt so that the concrete may expand without danger of cracking the

road.

_Cost._ The best mix to use in building this road is what is known as

the 1:21/2:5. For one cubic yard of concrete, the following amounts of

materials will be used for the above mix: 1.21 barrels of cement, 0.46

cubic yards of sand, and 0.92 cubic yards of stone. At the present

prices, the cost for the materials for this road is about twenty cents a

cubic foot or about $4,400 a mile. The total cost of the road including

the necessary grading, ditching and labor, will be from $7,000 to $9,000

per mile.

One of the big advantages of the concrete road is the large gain in

traction secured when operating on steep grades. A motor truck will haul

up a twelve per cent and down a fifteen per cent grade in wet weather on

concrete due to the roughened surface on which the tires do not easily

slip. This, of course, would be dangerous to attempt on the other types

of roads. Another advantage is the small item of upkeep necessary. A

road well laid in the first place should need no repair except to

replace worn guard rails as they show signs of weakening. The concrete

road, however, will not be generally used except on the mainline by the

larger concerns, or for short distances on steep grades where greater

traction is desired.

Motor Truck Logging Methods Engineering Experiment Station Series, Bulletin No. 12 · 第 43 / 52 题