TABLE 7.--COMPARISON OF MATERIALS IN SOUTH AND OBISPADO RESERVOIRS.

==========================+===============================+============

| SOUTH RESERVOIR. | _OBISPADO RESERVOIR._

+--------+-------------+--------+------------

| | Quantities, | | Quantities,

| No. | in cubic | No. | in cubic

| | meters. | | meters.

--------------------------+--------+-------------+--------+------------

_Earthwork:_ | | | |

Total excavation | ... | 34,000 | ... | 56,479

Placed in embankment | ... | 31,500 | ... | 7,255

Placed in spoil banks | ... | 2,500 | ... | 49,224

+--------+-------------+--------+------------

_Concrete:_ | | | |

Columns (including | | | |

foundations) | 135 | 1,240 | 356 | 543

Primary beams | 135 | 440 | 374 | 462

Secondary beams | 670 | 515 | 1,252 | 576

Side-walls | ... | 1,255 | ... | 710

| | | |

| Square | | Square |

| meters.| | meters.|

Roof slab | 5,140 | 520 | 10,206 | 1,020

Floor | 4,070 | 780 | 9,200 | 2,120

Parapet walls | ... | 90 | ... | 165

+--------+-------------+--------+------------

Total concrete | ... | 4,840 | ... | 5,596

+--------+-------------+--------+------------

| | Pounds. | | Pounds.

Reinforcing steel bars | ... | 387,000 | ... | 380,000

| | | |

| | Square | | Square

| | meters. | | meters.

Expanded metal in roofs, | | | |

slabs, etc. | ... | 5,691 | ... | 10,490

==========================+========+=============+========+============

The total cost of these reservoirs, including valve-houses, by-passes,

and the length of supply pipe where the by-pass joins, and including all

engineering expenses, etc., but exclusive of the cost of lands,

planting, fencing, and special work in connection with the formation of

parks, was as follows:

South Reservoir: 394,000 pesos, or 10,368 pesos per million liters.

Obispado Reservoir: 375,000 pesos, or 9,375 pesos[7] per million liters.

[7] Mexican currency.

These rates may be regarded as reasonable when taking into consideration

the special difficulties of construction in Mexico, and the high cost of

all imported material, on which heavy duties are levied.

The value of the materials alone in these reservoirs amounted to more

than 70% of their total cost.