TABLE 4.--ESTANZUELA AQUEDUCT.

+===========================================================+==========+

| Description. |Length, |

| |in meters |

+-----------------------------------------------------------+----------+

| | |

|Cast-iron pipes, 45.7 cm. (18 in.) in diameter, along | |

| the stream bed of the Estanzuela River | 110 |

| | |

|Concrete tubes, 55.9 cm. (22 in.) in diameter, | |

| to Mederos (including 281 m. of tunnel) | 4,473.81 |

| | |

|Cast-iron siphons, 45.7 cm. (18 in.) | |

| in diameter: Calabozos 239 m | |

| South Virgen 124 " | |

| North Virgen 177 " | |

| Mederos 426 " | |

| ----- | 966 |

| | |

|Concrete tubes, 63.5 cm. (25 in.) in diameter, | |

| Mederos to South Reservoir. |12,039.19 |

| | |

|Cast-iron siphons, 50.8 cm. (20 in.) in diameter: | |

| Necaxa 315 m.| |

| San Augustin 796 " | |

| ----- | 1,111 |

| | |

+-----------------------------------------------------------+----------+

| Total |18,700 |

+===========================================================+==========+

The gradient of the concrete pipes is 0.43% from Estanzuela to Mederos,

and 0.53% from Mederos to the South Reservoir. The calculated

discharging capacity of the conduit when running full is 364 liters (13

cu. ft.) per sec. for the upper, and 465 liters (16.4 cu. ft.) per sec.

for the lower section. For these pipes, the coefficient, _n_, in

Kutter's formula, was taken at 0.013. At present the line has been

limited by overflows to discharge three-quarters full.

The increase in the size of the pipes from Mederos is for the purpose of

receiving the waters of the Mederos River and other springs in the San

Pablo and Aqua Verde catchment areas, as shown on Plate II.

The invert of the concrete conduit where it leaves the Estanzuela River

is 684.25 m. above datum, and at the valve-house of the South Reservoir

it is 589.00 m.

The concrete pipes were manufactured and laid under contract with Mr.

Arthur S. Bent, of Los Angeles, Cal., the Company providing all

materials, labor, etc. The contractor was paid 10 cents per lin. ft. of

pipe manufactured and 10 cents per lin. ft. laid. He was also

responsible for the satisfactory completion of the work.

[Illustration: FIG. 9.--ESTANZUELA PIPE LINE STEEL FORMS FOR THE

MANUFACTURE OF CONCRETE PIPE.]

Fig. 9 shows the details of the joint recommended by Mr. Schuyler and

adopted for these pipes. The 63.5-cm. (25-in.) pipes were 61 cm. long

and 76 mm. (3 in.) thick. The 55.9-cm. (22-in.) pipes were of the same

length, but 70 mm. (2-3/4 in.) thick. For the purpose of strengthening

these pipes while hauling them over very rough roads they were

reinforced with four rings of No. 6 galvanized-iron wire.

_Manufacture of Pipes._--The pipes were manufactured under the

Supervision of Mr. H. Stanley Bent, at a pipe yard established below

the crushing plant, from which the crushed rock and sand were delivered

by gravity in bogies run on narrow-gauge rails. The area of the pipe

yard was approximately 1-1/4 hectares, and it was laid out with parallel

lines of 76-mm. (3-in.) galvanized-iron piping with hose couplings for

sprinkling purposes. After trials with aggregates of various sizes, the

concrete for the pipes was proportioned by volume as follows:

Crushed rock broken to pass through a 19-mm. screen 0.136 cu. m.

Manufactured sand (run of rolls) 0.119 " "

Portland cement 0.090 " "

------------

Total 0.345 cu. m.=

(12.2 cu. ft.)

[Illustration: PLATE III, FIG. 2.--STEEL FORMS FOR MOULDING CONCRETE

TUBES, ESTANZUELA AQUEDUCT.]

The above quantity manufactured two 63.5-cm. pipes; a 55.9-cm. pipe

required 0.1415 cu. m. (5 cu. ft.) of the material, in the same

proportions. Fig. 9 shows the forms for these pipes, and Fig. 2, Plate

III, illustrates the process of moulding. The forms consist of cast-iron

bottom rings, to the proper section of the joint, and inner and outer

steel forms of 3-mm. plate, provided with inner and outer locking

arrangements. The concrete was poured through a cast-iron hopper which

fitted to the top of the outer form.

The concrete, which was mixed very dry, in a 1/2-cu. yd. batch, "Smith"

mixer, was thoroughly tamped with a 22-lb. tamper, and worked until it

was of a stiff jelly-like consistency, the wire rings being added as the

concrete was placed. The best results were obtained with the minimum

quantity of water. The upper joint was moulded with a heavy cast-iron

ring. The jacket and core forms were loosened immediately, and placed

over other rings, a sufficient number of bottom rings being used for a

day's work. For the pipes required for curves, special forms were used

to give the necessary bevel to the joint. After 24 hours the finished

pipes were lifted from the bottom ring with a special lifter, and ranged

in position for coating internally with a Portland cement grout to which

a little freshly slaked lime was added. The pipes were all numbered, and

were kept moist for 10 days by constant sprinkling. They were not hauled

to the work until 28 days after they were moulded, although this rule

was sometimes broken, to the detriment of the pipes. More than 32,000

pipes were manufactured, but some were used for purposes other than the

Estanzuela Aqueduct.

_Cost of Pipes._--The contractor brought with him experienced concrete

pipe makers from California, and these were afterward assisted by

Mexican labor. In a day two tampers could manufacture from 45 to 50

pipes of the larger (63.5-cm,), and from 55 to 60 of the smaller

(55.9-cm.) size.

The cost varied from 2.75 to 3.25 pesos per pipe for the smaller, and

from 3.50 to 4.00 pesos for the larger size.

The approximate cost of manufacturing is as follows: Taking, as a fair

example, one week's work during March, 1908, the wages paid to the 74

men comprising the total pay-roll (though part of this labor was

intermittent) amounted to 981 pesos. This includes a general foreman at

10 pesos per day, four American tampers at 7.50 pesos, and Mexican labor

varying from 4 to 1 peso, and all labor necessary to handle and finish

the pipes, including coating the interiors. During this week there were

made 1,126 of the 63.5-cm. and 1,095 of the 55.9-cm. size. The pay-roll

includes 520 pesos for the larger pipes (46 cents each) and 461 pesos

for the smaller pipe (42 cents each). Table 5 shows the quantities and

cost of the materials used in the manufacture of these pipes.

ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911. · 第 18 / 48 题