=Trolley Wire.= The trolley wire is suspended from the span wires or

brackets in such a way as to permit of an uninterrupted passage of an

upward pressing trolley wheel underneath it. The trolley wire itself

may be either round, grooved, or figure 8 in section. Where a round

wire is used, No. 00 B. & S. gauge is the most common size. Figure

8 wire, so called from its section, which is shown in Fig. 64, is

designed to present a smooth under surface to the trolley wheel, which

will not be interrupted by the clamps or ears used to support it.

Clamps are fastened to the upper part of the figure 8. The grooved wire

is rolled with grooves into which the supporting clamps fasten. This

wire also presents a smooth under surface to the trolley wheel.

[Illustration: Fig. 65. Trolley Wire Clamp and Ear.]

=Trolley-Wire Clamps and Ears.= The trolley is supported either by

clamps or by soldered ears. One type of clamp grasps the wire by virtue

of screw pressure. A soldered ear is shown at E, Fig. 65. This ear has

small projections at each end, which are bent around the wire to assist

the solder in holding the wire to the ear. Another form of ear, used to

some extent, holds the wire by virtue of having the edges of the groove

offset or riveted around the wire.

The ear or clamp screws to a bolt which is insulated from the metal

ear through which passes the span wire. A cross-section through a

common type of trolley-wire hanger is shown in Fig. 66. Here there is

an outer shell of metal, which is adapted to hook to the span wire. In

this shell is an insulating bolt, that is, a bolt surrounded with some

form of insulating material which is very strong mechanically and not

likely to be cracked by the hammering action of the passing trolley

wheel. Most of the insulating compounds used in making trolley-wire

insulators are trade secrets. Another kind of insulator called the “cap

and cone” type is shown at C, Fig. 65. In these insulators, the metal

part B which fastens to the span wire does not completely surround

the insulation C. Wood has sometimes been used for the insulation of

trolley-wire hangers.

[Illustration: Fig. 66. Cross-Section Trolley Wire Hanger.]

=Span Wires.= In city streets, the trolley wire is commonly suspended

from span wires stretched between poles located on both sides of the

street. These span wires are of ¼-inch or ⅜-inch galvanized stranded

steel cable. In order to add to the insulation between the trolley

wire and the poles at the side of the street, what is called a _strain

insulator_ is placed in the span wire. This is an insulator adapted to

withstand the great tension put upon it by the span wire. One of these

is shown in Fig. 67. Means are usually provided for tightening the

span wires as they stretch and as the poles give under the strain. The

insulator in Fig. 67 has a screw eye for that purpose.

[Illustration: Fig. 67. Strain Insulator.]

[Illustration: Fig. 68. Overhead Construction.]

=Brackets.= In the bracket type of overhead construction, a trolley

wire is fastened to brackets placed on poles near the track. This

construction is used on suburban and interurban lines where the

presence of poles near the track is not objectionable. It has been

found that a rigid connection of the trolley wire to a bracket is

likely to result in the breaking of the trolley-wire insulators. For

this reason the brackets now commonly used provide for a flexible

suspension of the trolley-wire hanger from the bracket. A bracket

employing such flexible construction, made by the Ohio Brass Company,

is illustrated in Fig. 68.

An example of standard straight-line bracket construction is shown in

Fig. 69.

=Feeders.= Where additional conductivity is needed beyond that

furnished by the trolley wire itself, feeders are run on insulators

along the poles at the side of the track. Such feeders are connected to

the trolley wire at regular intervals. Where span-wire construction

is used, the feed wire may be substituted for the span wire at the

pole where the connection between feed wire and trolley wire is made.

In such a case, of course, a trolley-wire hanger is used which has

no insulator, so that the current feeds directly through the hanger.

Another method is to run the feed connection parallel with a span wire

and a short distance from it.

[Illustration: Fig. 69. Standard Straight Line Construction.]

=Section Insulators.= Section insulators are usually placed in the

trolley wire at regular intervals. Such a section insulator is shown

in Fig. 70. Its purpose is to insulate one section of trolley wire

from the next, so that in case the trolley wire of one section breaks,

or is grounded in any other manner, that section can be disconnected

and the other sections on either side kept in operation. In large

city street-railway systems, each section of trolley wire usually has

its own feeder or feeders, independent of the other sections. This

feeder is supplied through an automatic circuit breaker at the power

house. In case a certain section of trolley wire is grounded the large

current that immediately flows will open the circuit breaker supplying

that section; but, unless the ground contact is of an extremely low

resistance, it will not affect the operation of the other feeders.

Should it be of sufficiently low resistance to cause all the generator

circuit breakers to open, it would, of course, interrupt the entire

service temporarily; but usually the circuit breaker on any individual

feeder will cut that feeder out before all the circuit breakers will

open.

[Illustration: Fig. 70. Section Insulator.]

=High-Tension Lines.= Where high-tension alternating-current wires are

run, as in the case where the road is of such length as to require the

establishment of several substations, these high-tension circuits are

usually carried some distance above the 500-volt direct-current trolley

and feeders. An example of interurban overhead construction is shown

in Fig. 69. Here the high-tension wires are carried on large porcelain

insulators of a size necessary for 26,000 volts. These insulators

are placed 35 inches apart. High-tension wires are kept so far apart

because of the danger that arcs will in some way be started between the

lines, as the high-tension current will maintain an extremely long arc.

The blowing of green twigs across the lines, or birds of sufficient

size flying into the lines, is likely to establish arcs which will

temporarily short-circuit the line. The greater the distance apart of

the wires, the less danger that such things will occur.

Both glass and porcelain insulators are successfully used on lines of

very high tension. Glass is the cheaper and porcelain has the greater

mechanical strength.

High-tension wires are usually of hard-drawn copper or of aluminum made

up in the form of a cable of several strands. Aluminum is lighter for

a given conductivity than copper; and, at the market price controlling

at the present time, is cheaper. It is, however, more subject to

unevenness of composition, which leaves weak spots at certain points

in the wire; and that is the reason why aluminum is now always used

in the form of a stranded cable rather than as a single conductor.

Aluminum, being considerably softer than copper and melting at a lower

temperature, is more likely to be worn through as a result of abrasions

or to be melted off by a temporary arc. These slight objections are

balanced against its smaller first cost as compared with the cost of

copper.

The calculation of the proper amount of feed wire for a given section

of road is somewhat similar to the calculation of electric light and

power wiring as already outlined. It is first necessary to estimate

approximately the amount of current required at different portions of

the line. The amount of drop to be allowed between the power house and

cars must be decided arbitrarily by the engineer. A drop of 10 per cent

is probably the one most commonly figured upon in designing feeding

systems. The resistance in ohms of the copper feeders required to

conduct a given current with a given loss in volts, can be calculated

by dividing the volts lost by the current, according to Ohm’s law. By

the aid of a table which gives the conductivity of various sizes of

wire according to the methods outlined in connection with “Electric

Wiring,” the proper number and size of the feeders can be determined.

The most difficult thing to determine is the load that will be placed

upon any section of the line. Of course, there will be times when cars

are bunched together owing to blockades. It is out of the question

to provide enough feeder copper to keep the loss in voltage within

reasonable limits at such times. The ordinary load upon any feeder is

used as the basis of calculation in most cases. The amount of current

required per car depends on the weight of the car and the character of

the service. This will be taken up later under the head of “Operation.”

THIRD RAIL.

[Illustration: Fig. 71. Third-Rail Insulator.]

=Location.= The third-rail system of conducting current to electric

cars, as most commonly employed in the United States, follows the

example set by the Metropolitan West Side Elevated Railway of Chicago.

All the elevated roads in the United States are now operated by means

of third rails located at one side of the track. The third rail is

an ordinary T-rail and is located with the center of its head 20

inches outside of the gauge line of the nearest track rail, and 6³⁄₁₆

inches above the top of the track rail. On a few interurban roads this

distance has been increased in order to accommodate certain steam

railroad rolling stock which must at times be operated over the line.

=Insulators.= The third rail is supported every fifth tie on an

insulator. These insulators on first construction were made of wooden

blocks boiled in paraffine, but at the present time more substantial

forms of insulation are being used.

One form of third-rail insulator, known as the “Gonzenbach,” has a

base of cast iron resting on the tie. Over this is placed a cap of

insulating material similar to that used in strain and trolley-wire

insulators. Over this insulating material is another cast-iron cap upon

which the third rail rests. The weight of the third rail holds it in

position, and there is no clamping together of the various parts of the

insulator.

Another form of third-rail insulator is made of what is called

“reconstructed granite,” and another of vitrified clay. Fig. 71 shows

one of the latter.

=Switches.= Where the third rail is used, a contact shoe is placed on

each side of both trucks of the motor car. At switches it is necessary

to omit the third rail for a short distance on one side of the track,

and place a short section of third rail on the other side of the track

so that the current supply to the car will be uninterrupted.

=At Highway Crossings.= Where the third-rail system is employed on

interurban surface lines, it is necessary to omit a section of it at

every highway crossing. If the crossing is too wide to be bridged

across by a car, the car must have sufficient momentum to drift over

such crossings when it comes to them. To connect across the break in

the third rail at such points, an underground cable is generally used.

This cable must be thoroughly protected against leakage of moisture

into the insulation where it comes to the surface for connection to the

third rail.

Another form of third rail, laid several years ago on some of the lines

of the New York, New Haven & Hartford Railroad, was of an inverted

V-shape, and was laid midway between the track rails with its top 1

inch above them and its bottom only 1⅝ inches above the ties. It was

supported on wooden blocks. This location of the third rail has never

been popular, because of the poor insulation with the rail located so

close to the ties between the rails.

=Conductivity.= The conductivity of a steel rail varies considerably. A

rail of the ordinary composition used on steam railroads is too high in

carbon to give the best conductivity. Such a rail has about one-tenth

the conductivity of the same cross-section of copper. Steel can easily

be obtained, however, which will have one-seventh the conductivity of

copper, and the additional cost of obtaining such special steel is

quite low, so that the majority of roads installing the third-rail

system have seen fit to pay the extra cost and thereby secure a softer

rail than that usually employed in track rails.

=Cost.= The cost of the third-rail system is less than an overhead

trolley system, provided enough copper is placed in the trolley feeders

to make the conductivity of the trolley system equal to that of the

third-rail system. It is very seldom, however, that a trolley system is

so constructed on an interurban road; and hence the trolley system, as

usually constructed, is cheaper than the third-rail system, because it

is not of equal conductivity to a third-rail system.

=Advantages in Operation.= Where very heavy cars or trains are to

be operated, the third-rail system is decidedly an advantage, for

two reasons. In the first place, it affords the cheaper method of

conducting a given heavy volume of current; and in the second place,

the contact shoes that conduct the current from the third rail to the

moving car or train are built to carry a much larger volume of current

than the trolley wheel, which has only a small area of contact on

the trolley wire. Ordinarily there are two of these contact shoes in

multiple for every motor car.

Another advantage of the third rail over the trolley is that the

trolley may leave the wire at high speeds or in passing switches.

On well-constructed roads, where the trolley wire is kept in good

alignment and the track is smooth, there is little trouble from this

source; but it is undoubtedly a convenience to be able to operate cars

or trains without giving any attention to a trolley pole.

[Illustration: Fig. 72. Cross-Section of Conduit.]

CONDUIT SYSTEMS.

The underground conduit system, in which the conductors conveying the

current to the cars are located in a conduit under the tracks, is in

use in two cities of the United States—New York City and Washington,

D. C. The cost of this system, and the danger of interruption of the

service where the drainage is not excellent, have prevented its more

extensive adoption.

The New York type of conduit is a good example of this construction.

The conductors consist of T-bars (CC) of steel supported from porcelain

cup insulators located 15 feet apart in the conduit. A cross-section

of the conduit is shown in Fig. 72. At each insulator a handhole is

provided (Fig. 73), so that access may be had to the insulator from the

street surface. Manholes are provided at intervals of about 150 feet,

so that the dirt which collects in the conduit can be scraped into

these manholes and removed at intervals. The manholes also serve as

points of drainage to the sewer system.

[Illustration: Fig. 73. Handhole.]

=Contact Plow.= Current is conducted to the car through a pair of

contact shoes commonly called a _plow_ (Fig. 74). This plow has the

two shoes insulated from each other, and from the frame of the plow.

They are provided with flat springs that hold the shoes against the

conducting bars in the conduit. The shank of the plow is thin enough

(⁹⁄₁₆ inch) to enter the slot of the conduit. The conductors pass up

through the middle. These plows can, of course, be removed only when

the car is over an open pit.

=Cost.= A conduit system of this kind is very expensive to build

because of the fact that a very deep excavation must be made in the

street to accommodate the conduit. The track rails, slot rails, and

sheet-steel conduit lining are held in alignment by cast-iron yokes

placed 5 feet apart. The entire space around and underneath these yokes

is filled with concrete in order to give rigidity and a permanent

track. Three expensive items, therefore, enter into the construction

of a conduit road—namely, the deep excavation, which may call for the

changing of other underground pipes or conduits in the street; the

large amount of iron and steel needed for the yokes and slot rails; and

the large amount of concrete needed.

On American conduit roads the slot and conduit are placed under the

middle of the track. Some of these roads are simply reconstructed

cable-conduit roads in which the old cable conduit has been used for

electrical conductors. In the conduit road at Buda-Pest, Hungary, the

slot is placed alongside one of the track rails.

=Current Leakage.= The leakage on an underground conduit road is

considerable, because the insulators are necessarily located in a damp,

dirty place, which causes leakage over the surface of the insulators.

This leakage, however, is not prohibitive so long as the conductor

rails are not under water. If on account of poor drainage the conductor

rails become submerged, the leakage becomes so great that it is

impossible to operate the road.

[Illustration: Fig. 74. Contact Plow.]

It will be noticed that the conduit system as illustrated here employs

two conductor rails—one for the positive side of the circuit and the

other for the negative. The track rails, therefore, are not used

as conductors, and one side of the circuit is not grounded as in

the ordinary trolley system, although the leakage to ground may be

considerable from one or both conductor rails.

TRACK CONSTRUCTION.

=Girder Rail.= A great variety of track rails are used in electric

railways. The most common at one time was the girder, a typical section

of which, with joint, is illustrated in Fig. 75. This is an outgrowth

of the old tram rail used on horse railways. It has a tram alongside

of the head, on which vehicles may be driven. Its chief advantage from

the standpoint of the railway company is that there is plenty of room

for dirt and snow to be pushed away by the flanges of the cars. If the

company maintains the paving, it may be to its advantage to have teams

use the steel track rather than the paving, although this advantage in

maintenance is probably more than compensated for by the delay of cars

through the regular use of the track by teams.

[Illustration: Fig. 75. Girder Rail.]

=Trilby Groove Rail.= A modification of the girder rail, known as the

_Trilby_, and sometimes as the _grooved girder_, is shown in Fig. 76.

A rail similar to this is used in several large cities of the United

States. It has a groove of such a shape that the flanges of the car

wheels will force snow and dirt out of it instead of packing it into

the bottom of the groove, as in the case of the regular European

narrow-grooved rail. A narrow-grooved rail in which the grooves

correspond closely to the shape of the car-wheel flanges is sure to

make trouble in localities where there is snow and ice, as the grooves

become packed and derail the cars.

[Illustration: Fig. 76. Grooved Rail.]

=Shanghai T-Rail.= In some systems a T-rail is used. Where the T-rail

is to be used with paving, the popular form is the Shanghai T, shown

in Fig. 77. This rail is high enough to permit the use of high paving

blocks around it.

[Illustration: Fig. 77. Shanghai T-Rail and Joint.]

=Common T-Rail.= The T-rail used by steam railroads is known as the A.

S. C. E. standard T-rail, because it follows the standard dimensions

recommended for T-rails by the American Society of Civil Engineers.

A standard 65-pound T-rail of this kind is shown in Fig. 78. Other

weights of this rail have the same relative proportions. Such a rail

is used for interurban roads, and for suburban lines in streets where

there is no block paving. The high rails are used to facilitate paving

with high paving blocks.

[Illustration: Fig. 78. Standard A. S. C. E. Rail and One Joint Plate.]

=Track Support.= The greater portion of track is laid on wooden ties.

These ties, in the most substantial wooden tie construction, are 6

inches by 8 inches in section, and 8 feet long. They are spaced two

feet between centers. Sometimes smaller ties, spaced farther apart,

are used in cheaper forms of construction; but the foregoing figures

are those of the best construction known in American railway practice.

In paved streets, ties are usually employed, although sometimes what

is known as “concrete stringer” construction is used instead of ties

to support the rails. A strip of concrete about 12 inches deep is

laid under each rail, and the rails are held to gauge by ties or tie

rods placed at frequent intervals. Sometimes the concrete is made

a continuous bed under the entire track. In most large cities the

concrete foundation is used under all paving; and consequently, when

concrete is used instead of ties to support the rails, this concrete is

simply a continuation of the paving foundation. Where ties are used,

they are laid sometimes in gravel, crushed stone, or sand, although

frequently, in the largest cities, they are embedded in concrete.

Sometimes this concrete is extended under the ties, and sometimes it is

simply put around the ties.

=Ballast.= A ballast of gravel, broken stone, cinders, or other

material which is self draining and which will pack to form a solid bed

under the ties, should be used to get the best results under all forms

of tie construction, whether in paved streets or on a private right

of way, as on an interurban road. Of course, if concrete is placed

under the ties, the gravel or rock ballast is not necessary. If ties

are placed directly in soft earth, which forms mud when wet, they will

work up and down under the weight of passing trains, and an insecure

foundation for the track will be the result.

=Joints.= The matter of securing a proper joint for fastening together

the ends of rails so as to make a smooth riding track without

appreciable jar or jolt when the wheels pass a joint, has been given

much study by electric railway engineers. A section through an ordinary

bolted angle-bar joint is shown in Fig. 75. This joint is formed by

bolting a couple of bars, one on each side of the rails. The edges of

these bars are made accurately to such an angle that they will wedge

in between the head and base of the rail as the bolts are tightened;

hence the name _angle bars_. This is the form of joint generally used

on steam railroads and on electric roads in exposed track, or in track

where the joints are easily accessible, as in dirt streets. In paved

streets, the undesirability of tearing up the pavement frequently to

tighten the bolts on such joints, has led to the invention of several

other types, which will be described later. Nevertheless very good

results have been obtained in recent years with bolted joints laid in

paved streets where care has been given to details in laying the track,

and where the joints have been tightened several times before the

paving is finally laid around them.

=Welded Joints.= Several forms of welded joints are in use. All these

welded joints fasten the ends of the rails together so that the rail

is practically continuous—just as if there were no joints—so far as

the running surface of the rail is concerned. It was thought at one

time that a continuous rail would be an impossibility because of the

contraction and expansion of the rail under heat and cold, which, it

was thought, would tend to pull the rails apart in cold weather and to

cause them to bend and buckle out of line in hot weather. Experience

has conclusively shown, however, that contraction and expansion are not

to be feared when the track is laid in a street where it is covered

with paving material or dirt. The paving tends to hold the track in

line, and to protect it from extremes of heat and cold. The reason

that contraction and expansion do not work havoc on track with welded

joints, is probably that the rails have enough elasticity to provide

for the contraction and expansion without breaking.

It is found that the best results are secured by welding rail joints

during cool weather, so that the effect of contraction in the coldest

weather will be minimum. In this case, of course, there will be

considerable expansion of the track in the hottest weather, but this

does not cause serious bending of the rails; whereas occasionally, if

the track is welded in very hot weather, the contraction in winter will

cause the joint to break.

[Illustration: PORTABLE CUPOLA FOR CAST-WELDING JOINTS OF STREET CAR

RAILS.]

Electric railways · 第 5 / 11 段