CHAPTER XVI.

RECONSTRUCTION AND WIDENING--CONCLUSION.

The need for the reconstruction of bridges, arising from various causes

which have been treated in the preceding chapters, original weakness or

faults in design, decay or defects, may also be caused by such

extraneous considerations as the growth of loads, widening of the

openings spanned, or improvement of the headway.

In any case, a precise survey or measuring up of the structure and its

immediate surroundings is required, in the execution of which the

greatest care is desirable, and with respect to which it may be well to

give a few hints.

The surveying chain, when used, should be tested, the measure of

accuracy required rendering this imperative in a degree peculiar to work

of this class. Linen tapes should also be compared with a reliable steel

tape, and used only where sufficiently accurate for the particular

purpose. A careful and observant man may do very good work with a linen

tape, making just that allowance in the sag of the tape which corrects

for the inevitable stretch; but there is still some uncertainty involved

in its use, and the author prefers to rely upon a steel tape,

notwithstanding the inconvenience commonly experienced from its

intractable nature and liability to damage.

Instruments used must also be in the best adjustment; as errors, which

in ordinary field work may not be of great importance, are inadmissible

in bridge work.

It is not necessary here to enter upon the methods of small survey

work, but it may be desirable to point out that abutment walls should be

plumbed for verticality; girders, which are liable to be leaning,

defined in position by reference to their bearings; and generally that

it should never be taken for granted that there is truth in old work, or

that this may be assumed as to line or level.

In cases where disputes with any local authority as to headway are

likely to arise, it is prudent to supplement the information as to level

of soffits by rods cut to length in strict agreement with the clear

height, before removing the old superstructure.

It is apparent that in cases where the superstructure is already

condemned, the detail measurements may be confined to that part of the

structure which is to remain, securing only such information as to the

work superseded which may be required in arranging for the new work.

In taking particulars of skew bridges, needless as the warning may seem,

it is yet necessary to remark that there may be right or left-hand skews

which will not reverse. The author has known a disregard of this to make

serious trouble in two instances.

Dealing first with reconstruction of the superstructure of railway

under-bridges, these, if small, may not give much trouble, though the

demand for greater strength will, perhaps, involve some difficulty in

working to the limiting construction depth--i.e., the distance from the

top of rail to soffit of bridge--particularly as many old bridges have a

very niggardly allowance in this respect. It may be, and quite commonly

is, necessary to raise the rails a small amount, or, if headway is not

restricted, to lower the soffit. Clearances between the running gauge

and girder-work may also be difficult to secure, more liberal allowances

being now required than formerly. Complications in the character of the

permanent way, so frequently found upon old bridges, should, of course,

be got rid of, if possible; but the endeavour may introduce further

difficulties. Regard must throughout be had to the methods to be adopted

in removing old work and in erecting the new. Perhaps the simplest case

to deal with is that where girders lie parallel to, and under the rails,

with a timber floor upon which the permanent way is carried, as sections

of the road involving pairs of girders may be readily removed, and

replaced by the new girder-work (see Fig. 93). If the deck be of trough

flooring or old rails, the matter may not be so simple, as regard must

then be had to the position of joints in the existing floor, and the new

work be schemed with respect to the number and office of girders which

may be got in at any one breaking of the road. A slight slewing of rails

may sometimes be resorted to on occasion, where this has the effect of

releasing some part of the work not otherwise to be dealt with.

[Illustration: FIGS. 93 and 94.]

Bridges having main girders, with timber or trough flooring resting upon

the bottom flanges, or suspended by bolts, will, if carrying many roads,

cause some little difficulty, as the dismantling of any one span

involves the disturbance of others; where, however, many lines are

concerned, it may be feasible to put one or more temporarily out of use,

preserving the continuity of traffic over those which remain, but

refraining from any diversion of the more important roads.

Somewhat similar troubles occur where main girders with cross-girders at

the lower flanges are found, particularly if the cross-girders are

arranged in line, the ends abutting on each side of the same main girder

webs. It is seldom, however, that this construction is used in bridges

of small span carrying many roads; but where it does occur, it may

necessitate the use of timbering below, to carry the ends of

cross-girders when freed from their supporting main girders. (See Fig.

94.)

[Illustration: FIG. 95.]

If it is proposed to use new main and cross-girders, it is desirable to

arrange these in the manner already recommended, the cross-girders not

in line; this has peculiar advantages in reconstruction work, as the

bolting up and riveting of the cross-girder ends is not hampered by

other cross-girder attachments, leaving each piece of floor complete in

itself. Twin main girders are occasionally used with the same object,

and present the advantage of simplicity in erection and independence of

one span from those adjoining (see Fig. 95); but the method is wasteful

of space, and involves a somewhat greater total weight in the main

girders.

The foregoing observations apply more generally to small single-span

bridges, the operations on which may be effected without any material

disturbance of traffic arrangements; though this can seldom be wholly

avoided, it should be confined, where practicable, to a few hours on a

Sunday.

The reconstruction of bridges over 70-feet span may have to be dealt

with under more elaborate arrangements, if carrying two lines only,

possibly with single-line working for a period more or less protracted;

or it may be necessary, having regard to the weight of main girders to

be removed, to carry the whole structure upon temporary staging,

supporting the road independently, cutting up and removing the old work,

and later putting the new work in place, either by detailed erection in

its ultimate position, or by erection at one side and drawing across.

The latter method is, however, commonly reserved for cases in which no

special staging is used under the old structure.

Bridges of a number of openings are usually dealt with by securing full

possession of one road at a time, which for double-line bridges

necessitates single-line working. It is commonly out of the question,

even with moderate spans, to deal with some of these only at a time, and

so avoid continuous possession of one road, for a lengthened period; and

it can only, as a rule, be managed where the ends of the new main

girders do not in any way interfere with those of the old, and where it

is not necessary to reset bed-stones, or make other alterations in the

bearings which necessitate the complete clearance of the pier-tops. In

exceptional cases it may be found possible to arrange for the complete

removal of a small number of moderate spans on a Sunday, and the putting

in place of the new work, as in the case of small single spans.

Spans erected to one side of the final position, to be later travelled

across, are commonly mounted upon gantry staging, and up to 50 tons

weight may rest directly upon rails well greased. The power adopted to

move the span is usually that of screw or hydraulic jacks, or

occasionally engine haulage, special tackle being in that case necessary

to apply the engine power in the right direction. If the time is

limited, or weight considerable, a more elaborate arrangement by which

the load is supported upon wheels, may be necessary, with a view to

reducing the resistance to a manageable amount. All work which it is

possible to do before shifting into place, including the permanent way,

where this is of a special character, should be executed in advance,

leaving only the rail connections to be made good when the span is in

position.

Where timber staging is used to carry the permanent way before

dismantling an old structure, it is convenient to begin by placing stout

balks of timber under the sleepers from end to end of the bridge, or

directly under the rails if space is limited; the staging is then

arranged to give support to the running timbers.

Metallic under-bridges of ample headway, perhaps over coal-workings

(since settled down), or for some less sufficient reason made of metal,

may be cheaply replaced by brick arches built below the old

superstructure, the springings of the arch being checked into the face

of the existing abutments. With stout walls, careful work and good

material will make this an efficient and durable job.

It being a primary condition of reconstruction work to interfere but

little with ordinary traffic arrangements, single-line working is

avoided wherever practicable; as this, always objectionable, may

necessitate the erection of special signals and signal apparatus,

besides the temporary remodelling of the roads, and in this country may

involve also a Board of Trade inspection--altogether a troublesome and

expensive business.

Any bridgework which is accompanied by breaking or blocking the road can

only be undertaken by arrangement with the traffic department, after

notice duly given and published in the periodical record of such

matters; it is generally fixed for a Sunday. Preparatory to this, it is

necessary to make all ready by getting as much done beforehand as is

possible. Wherever practicable and prudent, the whole work is released

from its surroundings, masonry cut away, rivets cut out and replaced by

good bolts, nuts removed from holding down bolts, or the bolts cut

through, etc. Particular care should be exercised to ascertain what

remains to be done immediately prior to removal. It is necessary further

to arrange for trucks to be in readiness to receive old material, and

others containing new girder work to be conveniently stationed, having

been loaded up to come right end foremost; engine power, cranes, empty

and loaded trucks, being all marshalled and so placed as to be available

in proper order, and as wanted. There must be no mistake as to what

roads will be fouled by swinging the crane with its load, or as to the

reach of the crane in effecting its work.

The whole operation to be conducted on any Sunday should be well within

the resources of the men and plant engaged in it, or so managed that it

is a matter of no serious importance if the whole cannot be completed as

originally desired.

Possession of the roads to be blocked having been secured between

certain hours, if some part only of the work to be carried out has been

completed as the time grows short, any attempt to execute the remainder

may result in checking trains until such time as the line may be

reported clear--a contingency to be avoided--though the temptation to

save another Sunday’s work by delay of a few minutes to some one train

may be considerable.

In scheming any reconstruction, it may be insisted that at least one

feasible method of carrying out the work must be secured, though it is

the author’s experience that frequently some other method than that

contemplated is in the end adopted, when, some months later, the final

arrangements for fixing are made. The tendency of a zealous erector is

commonly to take full advantage of any facilities offered, with a view

to a moderate amount of work being done at any one time, and to achieve

as much more as he can himself secure by scheming, or a liberal use of

labour; all Sunday work, with attendance of engines and cranes, being of

necessity expensive.

Railway over-bridges do not commonly present any particular

difficulties. The spans to be dealt with are usually small, and the

weights to be lifted moderate. The height above rails may, however, be

above the lift of any crane; and, for the purpose of raising main

girders, a derrick may become necessary, the rearing and guying of which

may block many roads during the time it is in use. The girders of larger

spans, too unmanageable to be lifted whole, may be erected upon staging;

to secure the requisite headway it may be necessary to build the girders

at a level above that at which they will finally be, lowering them into

position when self-supporting, and after the removal of the staging.

The widening of railway under-bridges is, as a rule, a matter of no

special difficulty, but some remarks may be of use. Widenings should be

planned with a regard to later reconstruction of the original bridge, if

that is at all likely to be necessary, and with the object that, when

complete, the whole should be a consistent piece of work.

It may, indeed, happen that widening of a bridge may involve the

remodelling or reconstruction of the old work, to enable the new roads

to be laid down as desired; this is more likely to be necessary where

there exist main girders not competent to take any additional load, and

to duplicate which would sacrifice space between the new and old roads;

or it may be unavoidable because of slewing of the old rails, as part of

a general rearrangement.

[Illustration: FIG. 96.]

Dealing with widenings simply, there is often some little trouble in

contriving a connection between the new and the old work, as this may

have to be made under, or close to, the sleeper ends of the existing

roads. It is desirable to arrange this part so that no drilling of old

work for rivets or bolts shall be necessary, there being, in fact, no

strict connection. By judicious scheming, this may be effected, whilst

securing freedom from leakage of water at the joint. (See Figs. 96 and

97.) If tying of the new and old structure is desired, this can usually

be done quite simply, well below the floor at some more accessible

level.

[Illustration: FIGS. 97 and 98.]

The strict jointing-up of trough flooring, new to old, at right angles

to the troughs, cannot be contemplated, but may be dealt with by

treating each part independently, the ends being near together,

separated by the space of an inch or so. Each trough end being closed up

by a diaphragm or oak block to prevent ballast dropping through, the top

of the space may be covered by a loose strip, secured to prevent it

shifting, the bottom provided with a gutter of liberal dimensions to

take away leakage, as it is practically impossible to make this

arrangement “drop dry” under the conditions common in executing work of

this kind (see Fig. 98).

[Illustration: FIGS. 99 and 100.]

Where trough flooring, new and old, has to be made good parallel to the

troughs, the difficulty of making a direct connection is less marked,

and it is not unusual to introduce a strip cover simply; but if

accessible, the work is still troublesome, as there is commonly a want

of strict alignment and truth as to level, between the new and the old

troughs. It is preferable to arrange for junctions of a more convenient

type, as in Figs. 99 and 100.

When widening masonry arch bridges by girder-work, it is desirable to

insure that any girders parallel to the masonry face shall be

sufficiently far removed from it to enable painting to be executed. The

space remaining between the girder and the arch may then be bridged by

floor-plates, or an extension of the timber floor if that is adopted.

In effecting a junction such as this, the author has used the

arrangement shown in Fig. 101, the advantage being that the piece of

connecting-floor is sufficiently wide, and also sufficiently flexible,

to allow the girder-work freedom to deflect without doing harm. The load

carried by the width of floor is, as to one part, delivered well on to

the old masonry, in preference to being imposed near to the face. If it

should for any reason be imperative to place the girder close to the

arch face, it is preferable to scheme the floor so that there shall be

no actual contact, the new floor in that case slightly overhanging the

masonry, as in Fig. 102, or dealt with as in Fig. 103, if depth is

restricted.

The widening of masonry arch bridges by masonry, calls for no other

remark than that the new work should be free from the old; though it may

be advisable, when the widening is narrow, to tie the new work to the

old in such a way as to permit independent settlement.

If the widening is exceptionally narrow, there may be no choice but to

bond the new and old work together, and in the best manner, with the

object of minimising the risk of separation.

[Illustration: FIGS. 101 and 102.]

[Illustration: FIG. 103.]

The above matters relative to widenings, though apparently trifling, may

by neglect cause much trouble and expense in maintenance. They

principally concern small bridges, the extension of larger structures

coming rather in the category of independent works.

CONCLUSION.

In bringing these chapters, dealing largely with questions affecting

maintenance, to a close, it may be well to draw attention to the fact

that economy in design (apart from improper reduction of sections) goes

hand-in-hand with economy of upkeep. Given good material, that which

favours low first cost, simplicity of detail, fewness of parts, absence

of smithing, the use of rolled sections, and good depth to girders,

favours also small expenditure in maintenance. The less complex the

design, the easier will it be to keep the structure in order; the less

the number of parts, the fewer will be the connections. Freedom from

smithing eliminates liability to failure at cranks, or other work which

has been subject to fire. It is apparent also that the free use of

rolled instead of built-up sections, reduces the liability to trouble

from bad riveting, or from good riveting overstressed. A liberal depth

to all girders, by reducing deflections, limits the inclination of the

ends and gives the connections a better chance of remaining intact.

Lastly, with work of this character, the labour of scraping and painting

is simplified and cheapened.

The author wishes to reiterate the statement made in the opening

paragraphs of this book, that all instances of decrepitude, failure, or

peculiar behaviour cited, have been under his direct observation. The

fact is insisted upon simply that the reader may appreciate that the

information is at first hand.

It has not been thought necessary, nor was it considered desirable, to

indicate the locality of each case referred to; but it may be said that

the matter of these chapters has been accumulating during many years,

and relates to structures under the control of many different bodies.

The study of old bridges is strongly recommended, particularly with

respect to stress and strain, which in structures new or old, occur

possibly as may be expected--certainly as they must. Consideration of

existing work may thus be a useful check upon the fanciful requirements

of some methods of design. There is a recent tendency, for instance, in

English practice to over-stiffen the webs of plate-girders, such that if

the theory upon which the results are based were true, many old bridges

carrying their loads with no sign of distress, should have failed long

ago. Excess in riveting is a common extravagance, to which the same

criticism may in a less degree apply. Considerable impact allowances for

girders of large span may also be referred to as an application of

empiric theory not justified by experience, which, as in all cases where

such considerations fight with facts, should be modified or rejected.

INDEX

Abutments, leaning, 82, 173

-- movements of, 158

-- settlement of, 78

Adjustment of centre girders, 128

-- of distributing girders, 120

Angular distortions, 88

Arches, equilibrium of, 162

-- repair of, 163

Arrangement of cross girders, 21, 175

Asphalt, 26

Ballast, 29

Bearing pressure on rivets, 47, 51, 57

Bearings, skew, 4

Bottom booms, end bays, 18

Bracing, additional, 117

-- effects of, 34

-- flat bars, 37

-- incomplete, 41

-- sea piers, 42

Bridge floors, 20

-- repairs, 107

-- surveys, 107

Bridges, life of, 165

Breaks in [T] bars, 16

Buckling of webs, 16

Camber, 24, 80

Cast-iron arches, 80, 145

-- -- bridges, 141

-- -- columns, 7,144

-- -- girders, 141

-- -- in sea water, 101

Centre girders, 122

Cinder ballast, 29

Cold-blast iron, 141

Cooling stresses in cast iron, 145

Construction depth, 173

Corrugated sheeting, 29

Cost of centre girders, 135

-- of maintenance, 168

Counterbracing, 19

Cracked bedstones, 3

-- columns, 7

-- web plates, 13, 14, 15, 50

Cross girder arrangement, 21

-- girders, fixed ends, 22, 118

-- -- rusted, 29, 97

-- -- weak, 30, 66

Decay and painting, 96

-- of floor plates, 109

-- of timber, 28, 150

Deflection, 85

-- due to booms and web, 86

-- exceptional cases, 88

-- in new and old work, 85

-- working formulæ, 87

Deformations, 73

Depth of girders, 23, 89, 184

Diagonal ties, 19, 42

Distortion due to temperature changes, 79, 84

Distributing girders, 120

Drainage holes, 25

“Drop” loads, 89

Dwarf walls under floors, 26

Early steel girders, 68

Economy, 184

Effect of earth slips, 157

-- of floor on deflection, 88

-- -- -- on stresses, 23, 30

-- of high stress, 86

-- of permanent way on stresses, 18

--of skew on bridge floors, 25

-- -- -- on centre girders, 131

-- of transverse bracings, 34

-- of vibration on masonry, 162

-- of wave action on sea piers, 42

End bays, bottom booms, 18

Equilibrium of masonry arches, 162

Examination of bridges, 107

Examples of cast-iron bridges overstressed, 141

-- of high stress, 70

-- of life of bridges, 167

-- of rivet stress, 56

-- of strengthening, 114

-- -- -- by centre girders, 131, 134

Excessive bearing pressure, 51

Faulty workmanship, 80

Fixed ends to cross girders, 22, 118

Flange stresses, 63, 66, 67

Flanges, side loaded, 9, 73

Flat bar bracing, 37

Flexing of girders, 9, 74, 76

Flexure curves, 138

Fractured bedstones, 3

-- rails, 30

-- webs, 13, 14, 15, 50

Fractures in cast iron, 7, 145

Girder bearings, 2

Girders on columns, 7

-- on masonry, 8

Girderwork in masonry, 101

Headway, 173

High stress, 61

-- in cast iron, 141

-- in rivets, 47, 52

Holes for drainage, 25

Impact, 20, 62

Inclination of girder ends, 23, 53

Incomplete bracing, 41

Initial set, 88

Interference with traffic, 177

Jack arches, 29, 101

Joints in rails, 29, 109

-- in trough floors, 28, 180

Junction between metallic and masonry bridges, 183

-- -- new and old masonry bridges, 182

-- -- new and old metallic bridges, 180

Lattice girder stresses, 47-66

Liberal depth to girders, 23, 89, 184

Life of bridges, 165

Limit of elasticity, 61

Linen tapes, 172

Longitudinal floor girders, 23

Loose rivets, 21, 25, 51, 53, 56, 109

Main girders, 9-17

Masonry bridges, 157

-- enduring character of, 161

Memel timber, 150

Methods of calculation, 46, 61

-- of observing deflection, 90

-- of setting out deflection curves, 138

Movements of abutments, 158

-- of cast-iron bridge, 82

-- of piers, 42, 83, 159

-- of rollers, 7

-- of wrought-iron bridges, 4, 21, 38, 73

New members to old work, 116

Oiling steelwork, 99

Old drawings unreliable, 108

-- rivets, 21, 51, 54, 55

Open webs, 17

Overhead bracing, 39

-- girders, 118

Painting, 98

Parapets, 79

Permissible stress in old work, 110

Piers, movements of, 42, 83, 159

-- out of plumb, 159

Piles, decay of, 102, 150

Pitch pine, 28

Plasticity, 61

Plate webs, 9

Plated floors, 23, 25, 30

Pointing masonry, 164

Proposed rivet stresses, 58

Quickly applied loads, 89

Rail joints, 29, 109

Rails, breaks in, 30

Reaction of cross girder with centre support, 127

Red-lead, 98, 100

Relative merits of bridges, 169

Relief by centre girders, 122

Repainting, 100

Repair of bridges, 107, 147, 155, 163

-- of timber piles, 156

Replacing flange plates, 110

-- rivets, 111

Resistance of cast iron to rust, 101

Riveted connections, 45, 86

Rivets in cramped positions, 20

-- in cross girder ends, 21, 49, 53, 54

-- in road bridges, 60

-- in webs of main girders, 46

-- spacing of, 60, 80

-- stresses in, 56

Rocking of piers, 8, 83, 159

Roller bearings, 7

Rubble masonry, 161-164

Running load and deflection, 95

Rusting, instances of, 29, 96

-- of steelwork, 99

-- over sea-water, 98

Sag in timber bridges, 150

-- of tapes, 172

Scour under piers, 161

Sea piers, 42, 102

Setting bedstones, 3, 129, 176

Settlements, 76, 157

Skew bearings, 4

-- bridges, right and left, 173

-- -- floors, 25

Skirting plate, 26

Slope of girder ends, 92

Softening of cast-iron in sea-water, 101

Spacing of rivets, 60, 79

Spread of abutments, 157

Spring joints, 23

Steel trough girders, 68

-- troughing, 70

Stiffening girders from floor, 12, 40

-- to webs, 16, 38, 185

Stop piers, 158

Strength of light top booms, 40

Strengthening of bridges, 107, 122

-- bridge floors, 118

-- cross girders, 123

Stress in plated floors, 31

Study of old bridges, 185

Tall piers, 42, 159

Timber bridges, 149

-- floors, 27

-- staging, 177

Top booms, 18

Traffic during reconstruction, 177

Transverse bracing, 34, 117

Trough floors, 27, 180

-- girders, 50, 74

[T] stiffeners, breaks in, 16

Twin girders, 15, 75

Twisting of girders, 11, 68, 73

-- -- -- corrected, 12

Types of reconstruction, 174

[U]-shaped booms, 18

Uncomplicated stress, 62

Uniform pressure on bearings, 6

Value of E in deflection formulæ, 87

Vibration, 162

Wasted webs, 14, 29, 96

Water, scour of, 161

Web buckling, 16

-- plates, cracked, 13, 14, 15, 50

-- rivets, 46, 50

-- stiffening, 16, 38, 185

Widening masonry bridges, 182

-- metallic bridges, 179

Wide spaced rivets, 79

Wind pressure, 41, 43

Yielding of piers, 8, 83, 159

LONDON: PRINTED BY WILLIAM CLOWES AND SONS, LIMITED,

GREAT WINDMILL STREET, W., AND DUKE STREET, STAMFORD STREET, S.E.

Transcriber's Notes:

The text of the original work (including inconsistent spelling,

hyphenation, formatting etc.) has been retained, except as mentioned

below.

The slight differences between the Table of Contents and the text have

not been changed.

Changes made to the text:

Some punctuation errors and obvious typographical errors have been

corrected silently.

Several illustrations have been moved to where they are described in the

text.

Page 123, formula (2): the original shows an unclear superscript after

the first L. As described in the following line of the text, this has

been changed to L{_l_}.

End of Project Gutenberg's The Anatomy of Bridgework, by William Henry Thorpe

The Anatomy of Bridgework · 第 16 / 16 章