CHAPTER XIII.

TIMBER BRIDGES.

Timber bridges, though probably the most ancient in type, are yet the

least durable in any particular instance. The perishable nature of the

material when used for exposed construction renders it peculiarly liable

to develop defects which quickly put a limit to the life of the

structure. In addition to decay in the body of the main members--which

may perhaps be long delayed, so that a simple beam bridge may last for

many years--there is in more complex designs decay at connections and

joints, which proves very detrimental to the integrity of the whole.

Water running upon the surface of a member gravitates to its lower end,

and, if there be a joint or other connection, settles there, to be

productive of lasting mischief. From this cause, together with a very

common deficiency of bearing surface relative to the forces to be met,

the joints soon develop some movement; working of the structure

commences under passing loads, its final destruction being then a

question of time only. Each joint is, in fact, in timber bridge

construction a source of serious weakness to a degree which has no

parallel in well-designed metallic bridges.

Wrought-iron straps to confine the ends of raking members, or for other

uses, are liable to crush into the wood, and bolts are apt to enlarge

the hole through which they pass. Wood keys, where these are introduced

to prevent one timber from sliding upon another, are also prone to

develop cracks in the main members, and fibre crippling from excess of

stress. All these defects are, however, in timber-work more easily

defined than efficiently remedied, as it is barely practicable for any

but the harder woods to ensure, for heavy loads, a sufficiency of

bearing surfaces.

The most readily detected evidence of deterioration in timber bridges is

the sag of its bearing members, or trusses, for the simple reason that

if there is no local trouble at the joints, there will probably be no

appreciable drop at the centre of the span. The existence of such a

depression may, however, be caused in rare instances by the spread of

the supporting piers or abutments, particularly in the case of beams

trussed by end diagonal rakers and having no tie.

Bridges formed of deep trusses, with the road upon the top, are

sometimes found to be wanting in lateral bracing, the result of which is

that the main trusses go out of line, leaning considerably one way or

the other, being checked only by such rigidity as the joints and

floor-beam attachments may have, with possibly some assistance from the

end connections of the span.

The decay of piles where entering the ground or water is, of course, a

fruitful source of trouble, as also is the sinking of piles, where these

are insufficient in number, or have not been well driven in the first

place.

A vital difficulty with timber structures generally is the uncertainty

that will commonly exist as to how far decay extends in those cases

where it has started. Timber does not necessarily show upon its surface

the evidences of internal rotting. Memel timber may, indeed, be

sometimes found to have become thoroughly unreliable, yet showing no

sign of this upon its painted surface. By sounding the wood with a

hammer, or by probing, its condition may commonly be ascertained. In

cases of doubt, an auger-hole will make it clear as to whether the

interior be good or otherwise, as to the particular parts tested; but

only as to those parts, leaving it a matter of guesswork as to the

remainder.

[Illustration: FIG. 85.]

A railway bridge having many of the defects which have been indicated

may be quoted as an example. This structure crossed a canal, supported

upon piles, some of which were in water, others carrying land spans. The

canal span consisted of four trusses, one under each rail, or nearly so,

framed in the manner shown in Fig. 85, precise details not, however,

being now available. The trusses, apart from deflection under live load,

sagged considerably--in one instance, 4-1/2 inches; one inside truss was

also leaning towards the centre line of the bridge as much as 3 inches.

One raker, or diagonal strut, was rotted half through its thickness, and

many other timbers were badly decayed. The end connections and joints

were also in a bad condition. The vertical tie-bolts of the main trusses

were all slack. The piles generally, many of which were badly decayed,

had sunk and inclined towards one end of the bridge about 4 inches in 7

feet of height, the ground being soft and unreliable.

Movement under a passenger train crawling over the bridge was very

appreciable, but not startling. There had been introduced, from time to

time, additional timbers and iron ties, with the object of rendering the

spans more reliable, but leaving it somewhat difficult to determine the

function of the several members. The bridge was, of course,

reconstructed.

[Illustration: FIG. 86.]

[Illustration: FIG. 87.]

[Illustration: FIG. 88.]

An instance may here be cited showing how badly distorted a timber

structure may become without actually falling. The bridge referred to

consisted of three spans of 29 feet, each span having two trusses,

between which ran a colliery tramroad, 1-foot 6-inch gauge; the corves

running upon this, at 4 feet 6 inch centres, weighed, when full, about

10 cwt. each. The trusses were badly out of shape, the centre span

having sagged 5-1/2 inches, with one truss of the same span nearly 10

inches out of line at the centre. This little bridge, of which some

details are shown in Figs. 86, 87, and 88, had been in use about twenty

years.

[Illustration: FIG. 89.]

A third case which may be named is that of a road bridge, about 12 feet

wide, crossing by thirteen spans a shallow river liable to floods. The

construction was of a simple character, as indicated in Fig. 89, and

consisted of piles supporting trussed beams, which had sagged in some

instances over 2-1/2 inches. The bridge had, some years previous to the

author’s inspection, been heavily repaired, many new strut and

stretching pieces having been introduced, the piles also being

reinforced or renewed. Five years before, a traction engine, said to

weigh 5 tons, had passed across the bridge in safety; but the author

noticed that a coal wagon, which, with the horse, weighed about 50 cwt.,

when walked slowly over set up much movement. This bridge had been in

use nearly thirty years, and was very much out of line from end to end.

Though timber bridges cannot at the best be considered durable, yet, by

attention to certain points in design and construction, their length of

life may be materially enhanced. Every cut across the grain may be

considered an element of weakness by exposing the material to quicker

decay, for which reason the number of ends, or of joints, should be

reduced to a minimum. An additional reason for reducing the number of

joints or other connections is the liability of these to develop

movement, as already stated, the yield of any one joint, being the cause

of movement in others, which might, but for this, have remained close.

These considerations lead to the conclusion that fewness of parts is, in

timber construction, as in structural work generally, an excellent

principle to observe. Mortising, elaborate scarf joints, recessing, or

any cutting into the timber which is not essential, should be avoided,

the simplest forms of connection being preferable, if at all suitable.

If a step or butt surface is wanted for any member, it is commonly

better to provide this by a cleat or other added piece, rather than by

cutting into the timber butted against.

A complicated joint formed in the body of main timbers can only be

renewed by renewal of the timber itself, whereas by the method indicated

the joint is readily tightened, or re-made, without involving the main

member. Bearing surfaces should be ample, straps of liberal dimensions,

and bolts large (with good washers), both for the sake of bearing

surface in the holes, and reduction of any liability to bend under

cross-stress. In trusses of the form shown in Figs. 85 and 86, it is

desirable to introduce diagonal members in the middle bay, even though

it may appear that the stiffness of the main beams is sufficient to

render this unnecessary as a matter of strength, as without these there

is apt to be, under rolling load, a slight distortion, leading to

working of the joints and free entry of moisture. Lateral bracings

should also, for much the same reasons, be introduced, even though they

may not appear necessary in the new structure, with joints all close and

effective.

Projecting ends of timbers should be carried out well beyond the

requirement of strength or bearing, in order to ensure a liberal margin

for that decay in the end fibres which commonly develops. Timbers

resting upon abutments, or running into confined spaces, should be

arranged for free ventilation and ready drying. Occasionally joints at

the lower ends of timbers are protected by lead or zinc flashings to

prevent water running into them, a method which should have some

protective value. Whatever measures may be adopted, whether in the

design or execution of timber bridge-work, will, however, be but little

effective, if the timber itself is not good of its kind, and well

seasoned.

Creosoting to be useful should be thorough and something more than skin

deep. The timber itself should be well dried before treatment.

The repair of timber bridges very largely consists in the renewal of

decaying timbers, where this is practicable, or in adding supplementary

pieces where the old cannot conveniently be displaced. Joints may be

tightened up by hard-wood wedges, properly secured to prevent slacking

back, all bolts being also screwed up tight, perhaps some additional

being introduced.

Piles standing in water, which have decayed, may be strengthened by

driving other piles between the old, or on either side, but not of

necessity opposite to them, and by means of waling timbers bolted to the

old piles, put in a position to take load, either by the walings resting

upon their tops, or being bolted to them. Piles decayed where entering

solid ground may generally be strengthened by bolting on supplementary

timbers to reach well above and below the decayed part, or by cutting

out the bad length, introducing a new piece, and fishing the butt-joints

in a proper manner. But all remedial measures have generally to be

considered with reference to cost, as compared with the probable

increase of life of the structure. With a bridge in an advanced state of

decrepitude, such repairs may prove anything but economical, and at the

best defer reconstruction but a very moderate length of time.