PREPARATIONS FOR LAUNCHING AND TOWING.

[Illustration: (Z)]

The torpedoes, port and starboard, loaded and ballasted, having been

hoisted out of the torpedo-room, are placed on the deck on their own

sides, with their heads forward under the leading block, and the number

of buoys required for each, placed abaft them, strung together as

directed (p. 17); the necessary number of exploding bolts having also

been taken from the bolt magazine, are now entered into the torpedoes,

and forced down until their safety keys rest on the brasswork, taking

care that each safety key points in the direction of the eye through

which its lanyard has to pass; the brass guard is now taken off, and

after top lever placed in the crutch of the exploding bolt; the fore top

lever is now placed on the shoulder of the after one, and the two levers

secured by their lanyards, as directed in pages 12 and 13. The eye at

the end of the buoy-rope is now rove through the large or small ring

in the stern end of the torpedo (see p. 17). The tow-rope having been

previously rove through the leading block on the deck and on the yard, is

rove through the thimble of the slings from forward aft, and bent, with a

single or double sheet bend, to the eye of the buoy-rope. The safety-key

line having been previously rove through the leading block on the

ensign-staff, and the lanyard on the safety key having been led through

the eye of the handle, making a fair lead with the slit in the bolt, are

bent together with a double-sheet bend, and stopped to the eye by a split

yarn of suitable strength, the yarn having been secured outside the bend.

It can also be stopped with another split yarn to the slings near the

thimble of the slings. The torpedo is now ready for launching.

Instructions for the Management of Harvey's Sea Torpedo · 第 12 / 38 题