17. Advanced Report Centre will be at G 25 D 93 ("The Peck and
Jackdaw").
18. A site for a forward dump will be chosen--preferably on the
BAYSWATER-BROADMEAD Road. "Q" will arrange.
19. Practice Raids will be carried out upon a model of the objective
which will be erected at the depot.
20. Parties detailed for Glass-cutting, Safe-opening, etc., etc., will
draw the necessary tools from the Main Dump at K 25 A on the 12th
inst. "Q" will arrange.