CHAPTER IX. THE ROVING FRAME

The process of doubling ends with the last drawing frame, but there

still remains a process by means of which the drafting of the

slivers and the parallelization of the fibres are continued. And, in

addition to these important functions, two other equally important

operations are conducted simultaneously, viz., that of imparting to

the drawn out sliver a slight twist to form what is known as a

"rove" or roving, and that of winding the rove on to a large rove

bobbin ready for the actual spinning frame.

The machine in which this multiple process is performed is termed a

"roving frame." Such machines are made in various sizes, and with

different types of faller mechanism, but each machine is provided

for the manipulation of two rows of bobbins, and, of course, with

two rows of spindles and flyers. These two rows of spindles, flyers,

and rove bobbin supports are shown clearly in Fig. 18, which

represents a spiral roving frame made by Messrs. Douglas Fraser &

Sons, Ltd., Arbroath.

Each circular bobbin support is provided with pins rising from the

upper face of the disc, and these pins serve to enter holes in the

flange of the bobbin and thus to drive the bobbin. The discs or

bobbin supports are situated in holes in the "lifter rail" or

"builder rail" or simply the "builder"; the vertical spindles pass

through the centre of the discs, each spindle being provided with a

"flyer," and finally a number of plates rest upon the tops of the

spindles.

[Illustration: FIG. 18 ROVING FRAME _By Permission of Messrs.

Douglas Fraser & Sons, Ltd_.]

A roving machine at work is shown in Fig. 19, and it will be seen

that the twisted sliver or rove on emerging from the drawing rollers

passes obliquely to the top of the spindle, through a guide eye,

then between the channel-shaped bend at the upper part of the flyer,

round the flyer arm, through an eye at the extreme end of either of

the flyer arms, and finally on to the bobbin. Each bobbin has its

own sliver can (occasionally two), and the sliver passes from this

can between the sides of the sliver guide, between the retaining

rollers, then amongst the gill pins of the fallers and between the

drawing (also the delivery) rollers. Here the sliver terminates

because the rotary action of the flyer imparts a little twist and

causes the material to assume a somewhat circular sectional form.

From this point, the path followed to the bobbin is that described

above.

As in all the preceding machines, the delivery speed of the sliver

is constant and is represented by the surface speed of the periphery

of the delivery rollers, this speed approximates to about 20 yards

per minute. The spindles and their flyers are also driven at a

constant speed, because in all cases we have--

spindle speed = delivery x twist.

There is thus a constant length of yarn to be wound on the rove

bobbin per minute, and the speed of the bobbin, which is driven

independently of the spindle and flyer, is constant for any one

series of rove coils on the bobbin. The speed of the bobbin differs,

however, for each complete layer of rove, simply because the

effective diameter of the material on the bobbin changes with the

beginning of each new layer.

The eyes of the flyers always rotate in the same horizontal plane,

and hence the rove always passes to the bobbins at the same height

from any fixed point. The bobbins, however, are raised gradually by

the builder during the formation of each layer from the top of the

bobbin to the bottom, and lowered gradually by the builder during

the formation of each layer from bottom to top. In other words, the

travel of the builder is represented by the distance between the

inner faces of the flanges of the rove bobbin.

[Illustration: FIG. 19 ROVING FRAME FAIRBAIRN'S ROVING FRAME IN WORK]

Since every complete layer of rove is wound on the bobbin in virtue

of the joint action of the spindle and flyer, the rotating bobbin,

and the builder, each complete traverse of the latter increases the

combined diameter of the rove and bobbin shaft by two diameters of

the rove. It is therefore necessary to impart an intermittent and

variable speed to the bobbin. The mechanism by means of which this

desirable and necessary speed is given to the bobbin constitutes one

of the most elegant groups of mechanical parts which obtains in

textile machinery. Some idea of the intricacy of the mechanism, as

well as its value and importance to the industry, may be gathered

from the fact that a considerable number of textile and mechanical

experts struggled with the problem for years; indeed 50 years

elapsed before an efficient and suitable group of mechanical parts

was evolved for performing the function.

The above group of mechanical parts is known as "the differential

motion," and the difficulties in constructing its suitable gearing

arose from the fact that the speed of the rove passing on to the

various diameters must be maintained throughout, and must coincide

with the delivery of yarn from the rollers, so that the attenuated

but slightly twisted sliver can be wound on to the bobbin without

strain or stretch. The varying motion is regulated and obtained by a

drive, either from friction plates or from cones, and the whole gear

is interesting, instructive--and sometimes bewildering--two distinct

motions, a constant one and a variable one, are conveyed to the

bobbins from the driving shaft of the machine.

The machine illustrated in Fig. 18 is of special design, and the

whole train of gear, with the exception of a small train of wheels

to the retaining roller, is placed at the pulley end--that nearest

the observer. The gear wheels are, as shown, efficiently guarded,

and provision is made to start or stop the machine from any position

on both sides. The machine is adapted for building 10 in. X 5 in.

bobbins, i.e. 10 in. between the flanges and 5 in. outside diameter,

and provided with either 56 or 64 spindles, the illustration showing

part of a machine and approximately 48 spindles.

The machines for rove (roving frames) are designated by the size of

the bobbin upon which the rove is wound, e.g. 10 in. x 5 in. frame,

and so on; this means that the flanges of the bobbin are 10 in.

apart and 5 in. in diameter, and hence the traverse of the builder

would be 10 in. The 10 in. x 5 in. bobbin is the standard size for

the ordinary run of yarns, but 9 in. x 4-1/2 in. bobbins are

used for the roves from which finer yarns are spun. When the

finished yarn appears in the form of rove (often termed spinning

direct), as is the case for heavier sizes or thick yarns, 8 in. x 4

in. bobbins are largely used.

Provision is made on each roving frame for changing the size of rove

so as to accommodate it for the subsequent process of spinning and

according to the count of the required yarn; the parts involved in

these changes are those which affect the draft gearing, the twist

gearing, and the builder gearing in conjunction with the automatic

index wheel which acts on the whole of the regulating motion.

The jute industry · 第 9 / 15 章