THE NEW BUILDING.

The first act of Congress providing for the construction of the

building was approved April 15, 1886. Its terms adopted the plan

submitted by Mr. John L. Smithmeyer; created a commission consisting

of the Secretary of the Interior, the Architect of the Capitol

Extension, and the Librarian of Congress, to have charge of and

carry forward the work; and selected the present site. The year 1886

was occupied in appraising and taking possession of the ground; the

next year in clearing the site, making the principal excavation for

the foundations, and laying the drainage system; and the year 1888

in laying one half of the concrete foundation footings on the plan

adopted by the act above mentioned. On October 2, 1888, a new act

of Congress was approved, repealing so much of the act of April

15, 1886, as provided for a commission and the construction of the

building according to the plan therein specified. This act placed the

work under the sole control and management of the Chief of Engineers

of the Army, Brigadier-General Thomas Lincoln Casey, requiring him to

report direct to Congress annually and to prepare general plans for

the entire construction of the building, subject to the approval of

the Secretary of War and the Secretary of the Interior, and within a

total cost of $4,000,000, exclusive of appropriations previously made.

The preparation of the new design was at once entered upon, using

the previous one of Mr. Smithmeyer as a basis by reducing its

dimensions and otherwise considerably modifying it to bring the

cost within the required limit. The new plans were completed and

submitted for approval to the Secretaries on November 23, 1888,

but no action was taken by them. At the same time this design,

together with another modification of the original, retaining the

full dimensions of the building, but modifying its ground-plan and

other architectural features, within and without, in many important

particulars, was placed before Congress. The cost of the building by

the latter design was estimated at $6,003,140, and the time for its

construction at eight years. Toward the close of the session Congress

again took up the subject of plans in connection with the sundry

civil appropriation bill and adopted the larger modified design

by the act approved March 2, 1889, directing that the building be

erected in accordance therewith, and at a total cost not to exceed

$5,500,000, exclusive of appropriations previously made. The amount

of the previous appropriations was $1,000,000, of which a balance

of $745,567.94 remained after the expenses of operations on the old

plan had all been defrayed. Thus the total limit of cost of the new

plan was fixed by law at $6,245,567.94. It may be added that none of

the plans, drawings, or designs made prior to General Casey’s taking

charge of the work were used, all having been new and different.

In the meantime many detailed plans of stonework for the exterior

walls, foundations, etc., had been prepared, and the working up of

the details of design and construction in general had been actively

going on in the drafting room, so that all was in readiness for the

prompt and vigorous commencement of operations, which took place on

the ground as soon as Congress had passed the act of March 2, 1889.

In the execution of the work General Casey had the entire responsible

charge under Congress from October 2, 1888, until his death, on March

25, 1896, and he also disbursed the funds during that period. He

held general supervision, gave general direction to all principal

proceedings, and maintained an intimate knowledge of the work

at all times, while performing the duties of his more absorbing

and important office of Chief of Engineers of the Army at the War

Department, to which he succeeded a few months before he was placed

in charge of the Library building by Congress. General Casey had been

connected with some of the most important pieces of construction ever

undertaken by the Government, including the erection of the State,

War and Navy Building and the completion of the Washington Monument.

The last was an especially difficult task, as it had been necessary

to strengthen the old foundations of the shaft before it was possible

to proceed with the work. In this delicate and hazardous undertaking,

as well as in the erection of the State, War and Navy Building, and

other works, General Casey had been assisted by Mr. Bernard R. Green,

C. E., whom he now appointed to be superintendent and engineer of

the construction of the new Library building, and put in full local

charge of the entire work.

To aid in designing the artistic features of the architecture--that

is, exclusive of arrangement, construction, utility, apparatus, and

the management of the business--Mr. Paul J. Pelz was employed under

the immediate direction of General Casey and Mr. Green. Mr. Pelz

had been in partnership with Mr. Smithmeyer in the production of

the original general plan and design. In this way the design of the

building, as it now appears in the main in the exterior and court

walls, the dome, the approaches to the west front, was evolved, Mr.

Pelz thereby fixing the plan and main proportions of the building.

In the spring of 1892 Mr. Pelz’s connection with the work ceased. At

that time the building had reached but little more than one-half its

height.

In the fall of that year Mr. Edward Pearce Casey, of New York

City, was employed as architect and also as adviser and supervisor

in matters of art. His designs principally include all of the

most important interior architecture and enrichment in relief and

color. Mr. Casey continued as architect until the completion of the

building. On the death of General Casey, in March, 1896, he was

immediately succeeded by Mr. Green, under whose charge the building

was completed, in February, 1897, within the limit of time set by

Congress in 1888, and about $140,000 below the limit of cost--or, in

round numbers, for $6,360,000.

=General Decoration: Mr. Garnsey and Mr. Weinert.=--In addition to

those whose work has been described in the preceding paragraphs,

two other men remain to be mentioned in giving any general account

of the construction of the new building: Mr. Elmer E. Garnsey, who

was in charge, under the general supervision of the architect,

of the conventional color decoration of the interior, and Mr.

Albert Weinert, who, in the same way, was in charge of the stucco

ornamentation. Mr. Weinert was put at the head of a staff of

modellers, who executed on the spot the great variety of relief

arabesque and minor sculpture required in the comprehensive scheme

of stucco ornament adopted by Mr. Casey as a chief factor in the

decoration of the main halls and galleries throughout the building.

For the general color decoration of the building--which extends

into every room in the building, and includes the many elaborate

and beautiful arabesques which decorate the vaulting of the main

halls--Mr. Elmer E. Garnsey, who had been concerned in similar work

at the World’s Fair, the Boston Public Library, and the Carnegie

Library in Pittsburgh, was engaged. A large studio was fitted up

in the building and a staff of designers and fresco-painters was

organized. Mr. Edward J. Holslag was appointed foreman; Mr. William

A. Mackay and Mr. Frederick C. Martin were employed to carry out

on the walls the finer portions of the designs; and Mr. W. Mills

Thompson and Mr. Charles Caffin to make the finished cartoons from

the original sketches for the use of the fresco-painters. The latter

numbered about twenty-five, and the larger portion of them were kept

constantly busy for nearly a year and a half.

=The General Character of the Building.=--Of the splendid and

monumental building itself, it may be stated, before entering upon

a detailed description--and stated, too, with hardly any fear

of contradiction--that it is the most perfectly adapted for the

convenient use and storage of books of any large library in the

world. It is the largest, the costliest, and the safest. It is

absolutely fire-proof, not through any ingenious arrangement or

contrivance, but by the very quality of the materials of which it

is built--granite, brick, marble, iron, steel, and terra-cotta.

Wood floors are used in many of the rooms, but they are merely a

carpet of boards laid upon terra-cotta or brick vaults. It would be

impossible for the Library to burn down; a fire would nowhere have an

opportunity to spread. The great size of the building is perhaps best

appreciated from a statement of the amount of some of the materials

used in it: 409,000 cubic feet of granite, 500,000 enamelled brick,

22,000,000 red brick, 3,800 tons of steel and iron, and 73,000

barrels of cement. The draughting office turned out, during the

eight years that the Library was under construction, 1,600 plans and

drawings. Exclusive of the cellar, the total floor-space is 326,195

square feet, or nearly eight acres; and the whole number of windows

is about 2,165.

As a matter of “library economy,” the arrangement of the building is

of great interest. The problems to be solved were mostly new ones. In

a paper on the Library, read before the American Library Association,

Mr. Green said: “Its design was preceded by few or no good examples

of library architecture, and was therefore the outcome of theory and

deduction rather than the application of established principles.”

This task was not undertaken in any dogmatic way, however; “the

effort was,” as Mr. Green went on to say, “to plan on general rather

than particular principles, and afford the largest latitude for

expansion and re-arrangement in the use of the spaces.”

So far, however, as general interest is concerned, it is the

magnificent series of mural and sculptural decorations with which

the architecture is enriched that has contributed most to give

the Library its notable position among American public buildings.

Although a similarly comprehensive scheme of decoration was carried

out at the World’s Fair in Chicago, and afterwards in the new Public

Library in Boston, the Government itself had never before called

upon a representative number of American painters and sculptors

to help decorate, broadly and thoroughly, one of its great public

monuments. Commissions were here given to nearly fifty sculptors and

painters--all Americans--and their work, as shown throughout the

building, forms the most interesting record possible of the scope and

capabilities of American art.

It may be noted here, also, that, both inside and out, the Library

is, in the main, in the style of the Italian Renaissance--derived,

that is to say, from the architecture of the buildings erected in

Italy during the period (roughly speaking, the fifteenth century

or earlier) when the elements of classic art were revived and

re-combined in a _Renascence_, or _New Birth_, of the long-neglected

models of Greece and Rome.

Handbook of the new Library of Congress · 第 25 / 74 题