|Course.

| |Granite Beds

| |and Joints

| |in superficial

| |feet.

| | |Sandstone

| | |Beds and

| | |Joints in

| | |sup. feet.

| | | |Granite

| | | |face-work

| | | |in superficial

| | | |feet.

| | | | |Sandstone

| | | | |face-work.

| | | | | |Sandstone

| | | | | |polish-work.

| | | | | | |Granite

| | | | | | |boring in

| | | | | | |lineal

| | | | | | |feet.

| | | | | | | |Sandstone

| | | | | | | |boring in

| | | | | | | |lineal

| | | | | | | |feet.

| | | | | | | | |Granite

| | | | | | | | |wedge

| | | | | | | | |grooves in

| | | | | | | | |lin. feet.

| | | | | | | | | |Sandstone

| | | | | | | | | |wedge

| | | | | | | | | |grooves in

| | | | | | | | | |lin. feet.

| | | | | | | | | | |Granite

| | | | | | | | | | |Lewis

| | | | | | | | | | |holes.

| | | | | | | | | | | |Sand-

stone

| | | | | | | | | | | |Lewis

| | | | | | | | | | | |holes.

+--+-----+-----+----+----+----+----+----+----+----+ --+----+

|1 | | 500 | | | | | | | | | 18 |

|2 |1165 |3354 |132 | | |156 |264 |208 |170 | 2 | 71 |

|3 |2472 |3141 |275 | | |208 |325 |260 |421 | 2 | 84 |

|4 |1832 |2980 |265 | | |208 |325 |300 |300 | 2 | 71 |

|5 |1735 |2406 |220 | | |208 |251 |300 |204 | 2 | 54 |

|6 |1120 |2788 |196 | | |104 |316 |156 |349 | 6 | 71 |

|7 | 679 |2100 |159 | | | 69 |267 |138 |185 | 6 | 58 |

|8 | 613 |1858 |110 | | | 78 |184 |104 |164 | 6 | 45 |

|9 | 750 |1359 |113 | | | 82 |166 |113 |125 | 6 | 45 |

|10| 626 |1887 |111 | | | 87 |173 |112 |145 | 6 | 45 |

|11| 898 |1216 |114 | | | 91 |181 |130 |156 | 6 | 45 |

|12| 519 |1394 | 90 | | | 51 |125 | 69 |120 | 6 | 37 |

|13| 522 |1157 | 87 | | | 51 |125 | 69 |120 | 6 | 37 |

|14| 443 |1148 | 86 | | | 51 |125 | 69 |120 | 6 | 37 |

|15| 539 | 997 | 84 | | | 51 |125 | 69 |120 | 6 | 37 |

|16| 448 |1123 | 82 | | | 51 |125 | 69 |120 | 6 | 37 |

|17| 484 |1093 | 80 | | | 51 |125 | 69 |120 | 6 | 37 |

|18| 430 |1036 | 79 | | | 51 |125 | 69 |120 | 6 | 37 |

|19| 467 |1023 | 84 | | | 56 |134 | 74 |129 | 6 | 37 |

|20| 484 | 952 | 89 | | | 56 |110 | 80 |114 | 6 | 29 |

|21| 513 | 872 | 87 | | | 56 |110 | 80 |114 | 6 | 29 |

|22| 319 | 981 | 82 | | | 53 |113 | 76 |118 | 6 | 29 |

|23| 464 | 829 | 78 | | | 53 |113 | 76 |118 | 6 | 29 |

|24| 361 | 926 | 88 | | | 59 |107 | 83 |111 | 6 | 29 |

|25| 388 | 802 | 77 | | | 56 |110 | 80 |114 | 6 | 29 |

|26| 370 | 818 | 76 | | | 56 |110 | 80 |114 | 6 | 39 |

|27| |1017 | | 70 | 36 | |130 | | 78 | | 38 |

|28| | 943 | | 62 | 31 | | 99 | | 58 | | 33 |

|29| | 956 | | 61 | 31 | | 81 | | 61 | | 26 |

|30| | 785 | | 61 | 30 | | 78 | | 54 | | 26 |

|31| | 754 | | 60 | 30 | | 75 | | 68 | | 25 |

|32| | 762 | | 70 | 35 | | 87 | | 80 | | 26 |

|33| | 868 | | 73 | 47 | | 98 | | 97 | | 28 |

|34| | 908 | | 68 | 23 | |100 | | 93 | | 30 |

|35| |1022 | | 68 | 23 | |106 | | 93 | | 32 |

|36| | 854 | | 64 | 21 | |106 | | 86 | | 32 |

|37| | 782 | | 71 | 25 | |112 | |100 | | 32 |

|38| | 502 | | 70 |111 | | 24 | | | | |

|39| | 421 | | 56 | 37 | | 16 | | | | |

|40| | 417 | | 56 | 37 | | 16 | | | | |

|41| | 391 | | 55 | 37 | | 14 | | | | |

|42| | 372 | | 60 | 44 | | 14 | | | | |

|43| | 383 | | 60 | 44 | | | | | | 16 |

|44| | 409 | | 59 | 40 | | | | | | 16 |

|45| | 395 | | 59 | 40 | | | | | | 16 |

|46| | 388 | | 58 | 40 | | | | | | 16 |

|47| | 685 | | 67 |231 | | | | 80 | | 18 |

|48| | 361 | | 54 | 38 | | | | | | 16 |

|49| | 352 | | 54 | 38 | | | | | | 16 |

|50| | 335 | | 54 | 52 | | | | | | 14 |

|51| | 322 | | 64 | 44 | | | | | | 14 |

|52| | 315 | | 64 | 44 | | | | | | 16 |

|53| | 335 | | 58 | 49 | | | | | | 16 |

|54| | 339 | | 58 | 41 | | | | | | 16 |

|55| | 318 | | 54 | 38 | | | | | | 16 |

|56| | 672 | | 65 |231 | | | | 80 | | 18 |

|57| | 320 | | 51 | 38 | | | | | | 16 |

|58| | 318 | | 51 | 38 | | | | | | 16 |

|59| | 301 | | 51 | 48 | | | | | | 14 |

|60| | 250 | | 60 | 41 | | | | | | 14 |

|61| | 273 | | 60 | 41 | | | | | | 16 |

|62| | 298 | | 55 | 49 | | | | | | 16 |

|63| | 294 | | 51 | 41 | | | | | | 16 |

|64| | 294 | | 51 | 41 | | | | | | 16 |

|65| | 645 | | 55 |231 | | | | 80 | | 18 |

|66| | 277 | | 49 | 38 | | | | | | 16 |

|67| | 274 | | 49 | 38 | | | | | | 16 |

|68| | 250 | | 53 | 57 | | | | | | 16 |

|69| | 192 | | 43 | 61 | | | | | | 12 |

|70| | 198 | | 43 | 61 | | | | | | 16 |

|71| | 282 | | 57 | 44 | | | | | | 16 |

|72| | 259 | | 49 | 38 | | | | | | 16 |

|73| | 254 | | 49 | 38 | | | | | | 16 |

|74| | 645 | | 51 |247 | | | | 80 | | 18 |

|75| | 209 | | 45 | 45 | | | | | | 16 |

|76| | 247 | | 53 | 41 | | | | | | 16 |

|77| | 226 | | 57 | 52 | | | | | | 16 |

|78| | 165 | | 54 | 61 | | | | | | 12 |

|79| | 221 | | 54 | 61 | | | | | | 12 |

|80| | 225 | | 52 | 49 | | | | | | 12 |

|81| | 368 | | | 49 | 38 | | | | | 16 |

|82| | 679 | | |115 | | | | | | 16 |

|83| | 846 | | |160 | | | | | | 16 |

|84| | 671 | | |148 | | | | | | 16 |

|85| | 165 | | |399 | | | | | | 16 |

|86| | 157 | | | 92 | | | | | | 8 |

|87| | 147 | | | 91 | | | | | | 8 |

|88| | 138 | | | 90 | | | | | | 8 |

|89| | 129 | | | 89 | | | | | | 8 |

|90| | 120 | | | 88 | | | | | | 8 |

+--+-----+-----+----+----+----+----+----+----+----+---+----+

|A |18641|66440|2944|3145|4377|2093|5306|2933|5179|594|2240|

+--+-----+-----+----+----+----+----+----+----+----+---+----+

No. VII.

ABSTRACT-ACCOUNT OF THE EXPENCE OF ERECTING THE BELL-ROCK

LIGHT-HOUSE, AND OF EXECUTING THE ULTERIOR WORKS CONNECTED WITH THAT

ESTABLISHMENT.

WAGES AND PREMIUMS.

Wages of artificers while off at the Bell Rock, and in

the work-yards at Arbroath and Edinburgh, where the

stones were cut and prepared in regular courses, L.11,980 15 8

Premiums to artificers for Sundays’ work and extra hours

upon the Rock, and in the Work-yard at Arbroath, 998 14 9

Premiums to seamen, including Sundays’ work at the Bell

Rock, 473 5 6

_Note._--Masons and smiths were paid at the rate of 3s.

4d.,--mill-wrights 3s. 6d.,--joiners 3s., and labourers

at from 2s. 2d. to 2s. 8d. per day; besides lodgings

ashore, and victuals while afloat.--The premiums paid to

artificers were at the rate of 6d. per hour for extra

time; eight hours constituting a day’s work at the

Rock.--The seamen were paid at the same rate on Sundays

as on week days.

_Amount for wages and premiums to artificers, and

including premiums to seamen,_ ---- L. 13,452 15 11

BUILDING MATERIALS.

35,952 cubic feet of Sandstone from Mylnefield quarry,

dressed to the quarry-moulds, and put on ship-board, L. 3,412 18 5

Extra dressing in reducing the courses to regular

thicknesses at Mylnfield, 667 2 8

1700 cubic feet of sandstone from Craigleith Quarry for

the cornice and parapet wall of the Light-room, 200 0 10

13,964 cubic feet of granite from Rubieslaw and other

quarries at Aberdeen, and from Cairngall near Peterhead, 1,979 1 4

Extra dressing in reducing the granite stones to the

quarry-moulds, and to regular thicknesses, to suit the

respective courses, including cartage and charges of

shipping, 1,291 7 2½

40 Tons of Pozzolano-earth in casks, 398 3 4

60 Tons of Aberthaw-limestone, including freight from

South Wales, 78 14 2

100 Bushels Parker’s or Roman cement, including casks and

shipping charges, 43 12 0

6 Tons of Tarras, including casks and shipping charges, 52 19 10

Casks for carrying lime and sand from the workyard to the

Bell Rock, 38 3 3

4824 oaken trenails, from 21 to 24 inches and 6195 oaken

wedges, from 12 to 18 inches in length, 216 1 6

_Note._--The quarry price of Sandstone varied from 1s. to

2s. 9d., and Granite from 1s. 3d. to 5s. per cubic foot.

Pozzolano from L. 6 to L. 14 per ton. Tarras from L. 6,

10s. to L. 11 per ton. Limestone was 1s. per ton. Cement

varied from 5s. to 6s. 6d. per bushel; oaken trenails

from L. 1 to L. 5 per hundred, and wedges were L. 1: 6: 6

per hundred.

_Amount for Building Materials_, ---- 8,378 4 1½

IMPLEMENTS AND MACHINERY FOR THE WORKS, INCLUDING

BEACON-HOUSE, CAST-IRON RAILWAYS, &c. &c. (SEE PLATES

VIII., IX., X., XIV., XVII., AND XVIII.)

4662 cubic feet of Memel and Swedish timber, and 480

Petersburgh deals for the use of the Beacon-house,

cast-iron Railways and wharfs upon the Bell Rock, and for

making moulds for the stone-cutters, L. 1,436 19 7

69 tons 9 cwt. of cast-iron for Railways, 812 15 11

25,893 lb. malleable iron in stanchions, bats, knees,

stays, bracing-chains, screw and spear bolts, including

other apparatus for the use of the Beacon-house and

Railways, 1,244 3 7

19 Tons 13 cwt. 2 qrs. 3 lb. cast-iron, 14,002 lb.

malleable iron, and 505 lb. of brass for cranes,

winch-machines, and other apparatus, 1,191 14 7½

Cordage for cranes, &c. 409 1 0

Two large Sling or Woolwich-carts, for conveying large

blocks of stone, fitted up with wheel and pinion-work for

slinging or lifting the stones off the ground, 150 3 6

15,446 lb. quarry and stone-cutters’ tools; 11,934 lb.

malleable iron, and 771 lb. steel, used in the work-yard;

exclusively of tools, nails, and other furnishings

connected with joiners’ and smiths’ shops; but including

stone-jacks and common carts used in work-yard, &c. &c., 1,567 10 1½

_Note._--The price of fir-timber varied from 3s. to 5s.

6d. per cubic foot; cast-iron from L. 10, 10s. to L.

23:6:8 per ton; chains and axles, &c. 6½d. to 1s. per

lb.; quarry and stone-cutters tools from 6d. to 10d. per

lb.; Swedish and British bar-iron from L. 21 to L. 29 per

ton. Steel was 7d. per lb., and brass 1s. 10d. per lb.

_Amount for Machinery, &c._ ---- 6,812 8 4

SHIPPING.

Price of the hull of a Prussian fishing-dogger, L. 250 0 2

Carpenter-work, altering and fitting up the dogger as the

Pharos Floating-light, 1,397 12 8

Two sets of chains, with mushroom anchors, spare shackles

and swivels, &c., for mooring her off the Bell Rock, the

whole weighing about 13,083 lb. of malleable, and 3200

lb. of cast-iron, 462 9 4

Outfit in hempen cables, sails and rigging, including

11 tons cast-iron, ballast, ship-hearth, cabin-stoves,

alarm-bell, &c., 1,664 2 3

Three large copper lanterns, glazed with plate glass, (so

constructed, that the ship’s masts passed through them),

fitted with brass chandeliers for 60 agitable-lamps, each

having a small silvered-copper reflector, 397 1 2½

Freight of a vessel, and expence of laying down the

moorings for the Floating-light, 81 5 6

Wear and tear of the Floating-light riding off the Bell

Rock, from July 1807 till February 1811, 1,059 11 5½

Advertising the mooring and exhibition of the

Floating-light, generally, in the Newspapers of the

United Kingdom, 227 18 9

Victualling the crew of the Floating-light, including

occasional subsisting money and board-wages while ashore, 1,149 18 7

Pay of the master, mate, principal and assistant

light-keepers, and seven seamen, from 1807 to March 1811, 1,632 12 8

---- 8,322 12 5

First Cost and Outfit of the Sir Joseph Banks Tender of

84 tons register, the Sloop Smeaton of 42 tons, the Sloop

Patriot of 46 tons, and of four Stone Lighters of about

15 tons each, including wear and tear during the progress

of the works, L. 5,436 9 7½

Bedding for seamen and artificers during the progress of

the works, 349 7 2

Victualling seamen and artificers afloat, including

occasional subsisting money for seamen while ashore,

2,930 12 7½

Pay of the masters, mates, and seamen of the respective

vessels, 2,434 2 2

Freight of hired vessels bringing stone from Mylnefield,

Aberdeen, and Peterhead quarries, and timber and

cast-iron from Leith and other ports to Arbroath, 930 17 11

Port charges and sailing disbursements of the several

vessels, 358 8 4½

Insurance of Shipping, effected only for a limited

period, 647 12 6

14 Mushroom Anchors, weighing 13 tons 7 cwts. 0 qrs. 10

lb. of cast-iron, 235 15 8

28,456 lb. malleable iron, in mooring-chains, shanks of

mushroom-anchors, spare swivels and shackles, 891 11 2

16 Large mooring buoys of coopers’ work, and one of

carpenters’ work, 456 19 2

_Note._--Pay of the masters of the respective vessels in

the service was from L. 5 to L. 6, 6s., mates from L. 4

to L. 5, 5s., principal light-keeper L. 5, 5s., assistant

light-keeper L. 3, 15s., seamen from L. 2, 10s. to L. 3,

15s. per month. Officers’ occasional subsisting money

2s., and seamens’ 1s. 8d. per day.

The price of the hulls of the vessels were from L. 9,

15s. to L. 10 per ton, and cordage from L. 77 to L. 130

per ton; cordage subject to a discount of 7½ per

cent.; other articles generally to 5 per cent.

_Amount for shipping_, ---- 14,671 16 4½

LIGHT-ROOM, &c. (See Plates XVI. and XX.)

Lantern or Light-room with tinned copper roof, 8

cast-iron sashes, 8 feet in height, glazed with

48 squares of plate-glass, measuring 13½ by

26¾ inches. Malleable iron stays, copper rings,

flag-staff, and signal-ball, &c. L. 1,135 1 11

24 Reflectors raised to the parabolic-curve, made

from copper plated, in the proportion of 6 oz.

of silver to each lb. of copper; arranged upon

a malleable iron chandelier, furnished with

brass fountains, and argand burners, including

a train of Revolving-machinery, and two

alarm-bells, set upon tripods on the balcony, &c. 1,287 17 2

Balcony-railing of cast-iron, with brass supports

and top-rail; and a conductor or thunder-rod

extending, from the Light-room to the Rock, 216 0 3

_Amount of Light-room, &c._ ---- 2,638 19 4

ULTERIOR WORKS, &c. (See Plate XII.)

Finishing and Completing the interior of the

Light-house, with wainscot partitions,--doors,--

trap-ladders,--furniture of oaken-timber

for the several apartments,--kitchen range

with cast-iron chimney,--tinned-copper oil

cisterns--brass and copper bolts and hinges for

doors,--window-shutters,--brasslocks,--brass hand-rails

for inside stairs,--water-cisterns, and coal magazines,

&c. L. 1,489 16 6

Erecting permanent Railways upon the Bell Rock,

improving the wharfs or landing places, and removing the

Beacon-house, 1,338 16 6

Houses erected for the families of the light-keepers and

seamen of the Tender, signal-tower, store-houses, and

sea-wall, at Arbroath, 4,500 8 3

The price of about 1½ acre of ground for a garden,

trenching, and enclosing it for the use of the

light-keepers, and seamen, and their families, 1,158 18 10

The price of a pew of 14 sittings in the parish-church

of Arbroath, for the use of the Light-keepers and their

families, 52 10 0

_Note._--Wainscot 7s. 6d. per foot, brass 1s. 8d. to 2s.

per lb.

_Amount for Ulterior Works_, ---- 8,540 10 1

INCIDENTS.

Expence of Act of Parliament, L. 548 8 0

Travelling charges connected with the work, 312 14 7

Incidental charges for stamps and postages, including

letters for artificers afloat, salary for Engineer’s

clerk, &c. 882 5 1

Advertising the exhibition of the Light upon the Bell

Rock, and the discontinuance of the Floating-light, on

the 1st of February 1811, 219 10 3

The cost-price of the artificers barracks, platform of

aisler-masonry for fitting the courses before shipping

them to the Rock,--engineer’s office,--smith and joiner’s

shops,--store-house and stable, estimated at 1,255 5 6

Rent of the work-yard, and compensation to the landlord

for taking it off the hands of the Commissioners before

the expiry of the lease, 174 19 6

Price, hire, and keep of work-horses, 593 5 11½

481 tons coals, used in the artificers’ barracks,

smith’s-shop, lime-kiln in the work-yard, and at the

beacon-house, &c. 347 4 2

Shore-dues upon materials for the Light-house, and other

articles during the progress of the works, 270 9 6

57½ dozen of flambeaux, for night-work at the Bell

Rock, 32 9 6

Stationery and books for Engineer’s office, and shipping, 134 10 8½

One five feet Achromatic-telescope with brass-stand,

steadying-rods, two eye-tubes, a mahogany-stand with

night-glass for signal-room, 35 1 0

Pension, and Sick lists for wages of artificers and

seamen when off work, medical attendance, &c. 925 12 2

Superintendence of engineers, and plans, including L. 300

to Captain Brodie, 4,858 13 5

Interest upon L. 25,000 of Government loan, up to March

1810, 3,446 11 5

Treasury fees for Exchequer bonds, &c. 235 10 4

_Note._--Price of coal 13s. 4d. to 19s. per ton. Oats

from 20s. to 23s. per boll. Hay from 10½d. to 1s. 3d.

per stone of 22 lb.

_Amount for Incidents_ ---- 14,272 11 1

Amount of gross expenditure in erecting the Light-house,

including Ulterior Works, L. 77,089 17 8

[Sidenote: Gross Expenditure.]

[Sidenote: Deductions.]

DEDUCTIONS.

For workmens’ barracks, implements, machinery, shipping

and old materials, disposed of by public sale, or

transferred to the Northern Light-houses for the general

service of the Board, at the conclusion of the works.

By the price of the workmens’ barracks, storehouses and

offices in the work-yard at Arbroath, L. 700 0 0

By old gable-walls, lime-house, and sundries in workyard,

and engineer’s office, 52 8 2

By the price of three work horses and carts sold at

different times, 86 0 0

By fulzie of stable and work-yard, 21 17 0

By stone-shivers sold by public sale at different times,

including 232 cart loads for the use of the Roads in the

vicinity of Arbroath, 48 4 6

By artificers’ time three weeks at Mylnefield, deducted

from Quarry Account, 42 0 0

By two large Woolwich-carts, 55 0 0

By sundries, sold in the work-yard, by public sale, at

the conclusion of the work, 121 16 5

By the price of two cast-iron cranes, in use upon

the quays at Aberdeen and Arbroath, and a small

boring-machine used in the work-yard, 273 3 0

By broken cast-iron railways, 97 19 0

By the price of drift timber recovered, 6 10 0

By a stone-waggon and quarry-tools, sold at Aberdeen, 15 13 0

By old brass and bell-metal, 12 16 9

By scrap-iron from the smith’s shop, 6 10 8

By sale of old timber, and the soil taken off the site of

the light-keepers houses at Arbroath, 15 3 11

By the price of the Sir Joseph Banks Tender, 1,510 0 0

By the price of the Patriot, 400 0 0

By the price of an old boat and mast belonging to the

Patriot, 12 0 0

By cash, in name of damages, in consequence of sap-wood

in the Patriot’s hull, 80 0 0

By the amount of sales of sundry stores, 406 0 0

By the price of three praam-boats or stone-lighters, 193 0 0

By the price of the wreck of an old stone-lighter and

boat, 10 10 0

By retaining-money paid during the winter months, to one

of the seamen who left the service, 1 11 6

By interest upon the engineer’s deposit-account with the

Dundee Banking Company at Arbroath, from the commencement

till the conclusion of the works, 26 5 7

By return-freight of the sloop Smeaton, from Aberdeen to

Arbroath, 18 18 0

By shipping, boats, machinery, implements, stores, and

moorings, transferred to the general service of the

Northern Light-houses, 3,222 8 7

By the nett cost and maintenance of the Floating-light

deducted, as belonging to the general service of the

Northern Light-houses, L. 7,901 10 7

By the price of the vessel and her stores when sold, 421 1 10

---- 8,322 12 5

---- 15,758 8 6

Nett cost of the Bell Rock Light-house, and Ulterior

Works connected with that establishment, L. 61,331 9 2

===============

[Sidenote: Nett Cost.]

Extracted by

LACHLAN KENNEDY, Engineer’s Clerk.

* * * * *

[Sidenote: Average Price of Provisions.]

_Average Price of Provisions during the Period of the Bell Rock Works._

Beef 6d. per lb. of 17½ oz. avoirdupois.

Ship-biscuit L. 1, 9s. per cwt.

Quartern Loaf 13½d. per loaf, of 4 lb. 5½ oz.

Oat-meal L. 1, 11s. per boll, of 140 lb.

Barley 2½d. per lb. of 17½ oz.

Butter 1s. 8d. per lb. of 24 oz.

Salt 10s. per bushel, of 56 lb.

Whisky 11s. per gallon.

Small Beer 1s. 10d. per Scots gallon, of 8 Scots points.

DESCRIPTION OF PLATES.

DESCRIPTION of the PLATES, as they are mentioned in the Work.

PLATE I.

INCHKEITH LIGHT-HOUSE.

[Illustration:

_INCH KEITH LIGHT HOUSE._

_Drawn by W. Lorimer_

_PLATE I._]

The Light-house of Inchkeith, delineated on Plate I. was erected

while Mr THOMAS SMITH, the writer’s predecessor, held the situation

of Engineer for the Northern Light-houses. A plan of it is given, as

having been the first of these establishments erected upon the new

principle; the Reflectors being illuminated with Argand-burners; the

Light-room rendered completely fire-proof; and the Dwelling-house

fitted for the accommodation of two keepers. But as this establishment

is described in the introductory chapter, at page 24, and the names of

the several apartments are marked upon the Plate, it seems unnecessary

here to enter into detail.

PLATE II.

CARR ROCK BEACON.

[Illustration:

_CARR ROCK BEACON AS DESIGNED IN THE YEAR 1810._

_CARR ROCK BEACON AS EXECUTED IN THE YEAR 1821._

_Drawn by J. Slight_

_Eng^d. by E. Mitchell_

_PLATE II._]

[Sidenote: Pl. II.]

The Carr Rock Beacon is represented in Plate II. and referred to in the

introduction at page 53. The diagram marked Figure 1. is an outline

of the rock, shewing the position of the beacon, and plan of the

first course of the building, made to a radius of nine feet, cut in a

dove-tailed form, after the manner of the courses of the Edystone and

Bell Rock Light-houses.

Figure 2. is a section of the rock on the line A, B, Fig. 1. with

a perpendicular section also of a tower of masonry and apparatus,

for tolling an alarm-bell, which was originally intended for this

situation. In Fig. 2. letter _a_ represents an aperture measuring 3

inches in diameter, which was perforated with much labour and care

through a block of granite 7 feet in length, previously to its being

laid. This canal was intended to admit the tidal-waters into the

interior chamber of the building marked _b_, in which the flood-tide

was to act upon an air-tight copper-tank, marked _c_, and its rod of

connection formed into a rack with teeth, by which motion was to be

given to a train of machinery, represented at _d_ in the void of the

building. The machine was to act on the vertical shaft _e_, connected

with a series of hammers _f_, placed under the great bell _g_, which

was to have measured 5 feet in diameter, and become the cupola or

roof of the building. In this manner the bell was to be tolled to

forewarn the mariner of his approach to the dangers of the Carr, and

the other extensive ledges of sunken rocks in its neighbourhood. By

the rise of the flood-tide, and consequent admission of the waters

into the canal _a_, the tank _c_, with its connecting rod, not only

lifted the bell-hammers _f_, and, at the same time, also elevated the

weight marked _h_, which, in its descent during ebb-tide, was to have

continued the motion of the machinery; and thus, by the alternate

operation of the tides, the continual tolling of the Bell was to have

been preserved.

It will further be seen from the section of this building, that

the masonry of the solid is connected perpendicularly by means of

stone-joggles inserted half into the one course and half into the

other. But in the void or upper part, instead of the joggles, the

bed-joints of the stones were let or sunk about an inch in depth, into

each other, as at the Bell Rock, forming so many bands or girths to the

work. This will be observed by narrowly examining the section at letter

_i_, with its accompanying diagram Fig. 3., which represents a plan of

one of the courses of the void, shewing how the stones were connected

horizontally by a system of dove-tailing, as is further represented in

Fig. 4., being a plan of a course at the level _a_, _k_, in which the

perforation is delineated for the admission of the tidal-waters.

The ascent to this building was to have been by means of a ladder

of cast-iron or flight of steps, marked _a_, _i_, _l_, fixed on the

outward wall by means of screw-bolts fixed into brass-bats, sunk into

the masonry, and run up with lead. The entrance-door of this building

was formed in the cast-iron frame or pedestal on which the great bell

was to have been supported, the access to the interior being by the

balcony, round which a cast-iron rail was intended, not only for the

safety of the keepers or occasional attendants, but also, in some

measure, to defend the bell from the sprays of the sea.

Figure 5. represents the Pillar-formed Beacon, as finished at the

Carr Rock in the year 1821. The lower part of this diagram is a

perpendicular section of the rock on the line A B, Fig. 1. The masonry

is also shewn with two of the six great malleable iron-bats or

stancheons marked _a_ in Fig. 5., which passing through the several

courses, are sunk about 30 inches into the Rock. The upper part of

this diagram represents a frame of cast-iron work, of great strength,

fashioned somewhat after the manner of what seamen term a _spar_ or

_spur beacon_, from being made generally of timber, set up in the

form of struts or spur-beams. The connection of this frame will be

understood from the detached diagram Fig. 6., taken upon the line or

level marked _b_ in Fig. 5. From Figs. 5. and 6. it will be observed,

that the beacon consists of 6 pipes or hollow tubes, marked letter A,

which are inserted into the sockets _c_, in the sill-plate of Fig. 6,

into which these hollow tubes are strongly wedged and keyed with culter

or spear bolts, which pass through each of the sockets and base of the

hollow tubes at _c_. Besides the main hollow tubes marked A, other six

marked B, are set up as spurs or diagonals, which radiate from sockets

cast in the centre of the sill-plate marked _e_. These diagonals are

so situated, and connected by dove-tail or hook-joints, that they

butt against the main tubes, and support them at _f_. The main tubes

are further connected by means of horizontal bars of malleable iron,

marked _g_ in Fig. 5, laid into grooves formed in the arms of the

cast-iron collars F, _k_, which clasp around the main tubes at these

points, immediately above and below their connection with the diagonal

tubes. These collars are also keyed with the main tubes by means of

spear-bolts. At the point of junction _d d_, towards the top, the main

tubes form segments of a common circle, and rest upon the centre block

_h_, into which they are keyed and wedged. As a further security, a

strong cast-iron tubular formed case, marked _i i_, is made to clasp

around the whole upper parts of the main tubes at their point of

junction _d d_, so as to form a girth to them. This tubular case or cap

_i i_, is 8 feet in length, and terminates with a cast-iron ball marked

_m m_, which is 3½ feet in diameter, formed into ribs, connected

with the cap _i i_, by means of a socket, through which a spear-bolt

passes, and binds it to the top of the tubular-case at the point _l_.

Fig. 6. represents the Ballast-plate, which forms the sill or basement

of the superstructure. It contains about 8 tons of cast-iron, and is

so constructed as to become a cap or girth to the upper course of the

masonry which it is calculated to secure, by means of a flange of 6

inches in depth at the outward extremity, marked _b b_ in Fig. 5, where

it is let into the stone. This plate is cast in six pieces, connected

together at the points _m m m m m m_, by means of screw-bolts of one

and a half inch in diameter (with nuts), passing through flanges raised

at the joints of its several compartments. At the points _n n n n n n_,

there were six socket-holes, for the reception of the great stancheons

or bolts, marked _a a_, Fig. 5, which, passing through the masonry,

are sunk 30 inches into the Rock, where they are fixed at the lower

ends with iron-wedges, driven home by means of a long iron-driver.

The ballast-plate is connected with the upper ends of these great

stancheons, by means of a shackle and bolt, in such a manner that the

more exposed parts may be renewed. The whole is imbedded and run up

with pozzolano-mortar, so as to preserve the several parts as much as

possible from the effects of oxidation.

Fig. 7. represents a horizontal section of this beacon, on the line

F F, shewing the connection of the horizontal malleable iron-bars

or braces _g g g g_, which fit into the grooves of the arms of the

collars, embracing the hollow tubes or pillars A A A A, and connecting

them by means of spear-bolts at _k k k k_. The grooves in these arms

are so formed as to command the braces, and to contain a quantity of

Parker’s or Roman cement, by which the bolts are preserved from the

effects of oxidation. These collars and arms, with their connecting

malleable iron-bars, form a girth immediately above the diagonal

struts or braces B B B, Fig. 5. A similar chain of connection is in

like manner formed below the junction of these diagonal struts, with

the main tubes, which, like those described above, has the effect of

binding the whole fabric horizontally.

Fig. 8. is a horizontal section upon the line _d d_, delineated upon

a scale of double the size of the other parts of the beacon, shewing

the connection of the hollow tubes A A A A A A, at the top, where they

change their cylindrical form into segments of a circle at the point

of contact, so as to embrace the centre-block _h h_. The top of these

tubes thus formed into a compact figure, is cased or covered with the

cylindrical cap _i i_, through which the spear-bolts immediately above

and below the points _d d_, in Fig. 5, are made to pass and bind the

whole firmly together.

PLATE III.

GENERAL CHART, SHEWING THE RELATIVE POSITION OF THE BELL ROCK.

[Illustration:

_CHART

shewing the relative situation

of the

BELL ROCK LIGHT HOUSE._

_Drawn by J. Steedman_

_Eng^d. by W. H. Lizars_

_Plate III._]

[Sidenote: Pl. III.]

This Plate is reduced from a manuscript-map in the possession of

the writer, which is drawn upon a large scale, originally intended

for exhibiting the depths of the German Ocean or North Sea, and the

situations of the numerous Light-houses on the coasts of the United

Kingdom, and opposite Continent, but is here given with the view of

shewing the relative position of the Bell Rock.

The chief peculiarity of this map is the sectional lines, exhibiting at

one view the relative depths of the ocean, in connection with a theory

which the writer has advanced, regarding the wasting of the firm ground

by the effects of the sea, as alluded to in Appendix V. These sectional

lines, of a deeper shade, are drawn across the German Ocean, from shore

to shore. As, for example, between Shetland and Norway, the greatest

depth is ascertained to be about 140 fathoms, and so of other examples,

extending southward as far as the Straits of Dover. The soundings are

all marked in fathoms, and, in so far as regards the east coast of

Scotland, have been very generally made from on board of the vessels

belonging to the service of the Northern Lights. The forms given to

the principal sand-banks, and the soundings in the central and eastern

parts of this great basin, have been taken from the best maritime

surveys, and nautical authorities. The numerous Light-houses on the

respective coasts are coloured; those of Scotland being blue, England

red, Ireland green, and the foreign Lights yellow.

PLATE IV.

CHART, SHEWING THE PARTICULAR POSITION OF THE BELL ROCK.

[Illustration:

_CHART

Shewing the Position_

of the

_BELL ROCK LIGHTHOUSE_

relatively to the Coasts of

_FIFE and FORFAR SHIRES._

_Drawn by A. Stevenson_

_Eng^d. by W. H. Lizars_

_PLATE IV._]

[Sidenote: Pl. IV.]

This chart is intended to shew the position of the Rock in reference

to the opposite shores of Fife and Forfar, and to the entrances to the

Friths of Forth and Tay. The most contiguous point of land, being in

the immediate neighbourhood of Aberbrothwick, is distant about 11¾

miles. This chart also exhibits the depths of water, and the nature of

the bottom, in the vicinity of the Rock.

PLATE V.

CHART OF THE BELL ROCK, SHEWING ITS POSITION RELATIVELY TO THE SHIPPING

EMPLOYED AT THE WORK.

[Illustration:

_BELL ROCK

Shewing the relative position

of the

SHIPPING EMPLOYED_

at the

_WORKS_

_Drawn by J. Steedman_

_Eng^d. by W. H. Lizars_

_PLATE V._]

[Sidenote: Pl. V.]

This Plate represents the Rock at low-water of spring-tides, when that

part of it which extends about 1000 feet in a south-western direction

from the Light-house, may be traced by the appearance of some detached

portions of rock, but chiefly from the sea-weeds which float at the

surface of the water. Its greatest extent, in a north-eastern and

south-western direction, is about 1400 feet, and in a south-eastern and

a north-western direction about 240 feet.

KING GEORGE III.--This is an insulated rock which lies towards the

south-eastern extremity of the Main or House Rock, and has been named

in reference to the reign in which the Light-house was erected.

KING JAMES V.--is also a detached rock, forming the south-western

extremity of the reef, which extends from the House-rock, and is named

in reference to that Monarch’s memorable voyage round his dominions,

about the year 1540, as alluded to in the Introduction, at page 4.

On the north-western side of the Rock, as nearly as may be, the figures

of the respective vessels employed at the work are delineated, and the

positions of their moorings laid down; with the exception of those of

the Pharos Floating-light, whose bearing or direction is only to be

understood, as the full distance at which she was ultimately moored

would fall beyond the limits of the Plate. The house-part of the Rock

is left bare at low-water of ordinary spring-tides, and at high-water

of these tides it is from 10 to 12 feet under water; but during the

storms of winter, the sea generally breaks over the whole surface of

the rock, so as to render walking upon it impracticable, even in the

lowest ebbs; while at high water, the sprays fly over the building, or

rise to a height of upwards of 100 feet. The reef, which extends in a

south-western direction from the House-rock, contains many Travellers

or large boulder-stones; affording a proof that the Bell Rock has at

one time been of greater dimensions than at present, and these detached

stones may be regarded as part of the debris, which have been separated

in the lapse of ages from the main Rock.

PLATE VI.

PLAN OF THE NORTH EASTERN PARTS OF THE BELL ROCK, SHEWING THE POSITION

OF THE LIGHT-HOUSE, RAILWAYS, AND WHARFS, &c.

[Illustration:

_NORTH EASTERN PARTS OF THE BELL ROCK SHEWING THE POSITION OF THE LIGHT

HOUSE, RAILWAYS, WHARFS, &C._

_Drawn by G. C. Scott_

_Eng^d. by E. Mitchell_

_PLATE VI._]

[Sidenote: Pl. VI.]

The description of this Plate, representing the higher parts of

the Rock as seen at low-water of spring-tides, affords the writer

an opportunity of mentioning many distinguished names connected

either officially, or in a friendly manner, with the erection of the

Light-house. In corresponding about the state of the Rock, he has often

found the advantage of this particular nomenclature of its different

parts, as affording a reference to all its localities.

SITE OF THE LIGHT-HOUSE, AND RAILWAY-TRACKS.--The site of the

Light-house, which will be seen from the Plate, was fixed by the writer

in a central position of what may be termed the House-Rock. From this,

as a centre, the Railways ramify in various directions. Upon these the

materials for the erection of the house were conveyed, and they are

still partly preserved, as convenient foot-paths and wharfs, in landing

stores for the Light-house. The portions of the Railway-tracks marked

with light dotted lines, were only used during the continuation of the

works; while those of a deeper shade represent the permanent railways.

SITE OF CAPTAIN BRODIE’S BEACON.--The late Captain Joseph Brodie,

of the Royal Navy, was perhaps not less known to the public as the

fortunate bearer of Lord Duncan’s dispatches announcing the victory

obtained by the British fleet off Camperdown, than for his unwearied

exertions in keeping up the interest of the public, relative to the

important results to navigation which would attend the erection of a

Light-house upon the Bell Rock, of which notice is taken at page 88.

SITE OF MR STEVENSON’S BEACON.--The position of the Beacon or temporary

erection delineated in Plate VIII., was fixed upon the southern side

of the site of the Light-house, with the ultimate view of obtaining

shelter from the breach of the north-east seas. It was farther

important, for the conveniency it afforded of a communication during

the progress of the works, by means of a wooden bridge, which will be

understood by examining Plate XVIII.

HALDANE’S LEDGE--is situate on the south-eastern side of the Rock,

where the writer made his first landing with his friend Mr James

Haldane, architect, as noticed at page 91.

GRAY’S ROCK.--Toward the eastern side of the Rock, there is a small

outlier, or reef, important as a low-water-mark, which is named Gray’s

Rock, in compliment to the late Mr John Gray, Writer to the Signet,

and the first Secretary to the Light-house Board, as noticed in the

Introduction, page 5.

SMITH’S ROCK,--situate on the eastern side of the Light-house,

derives its name from the late Mr Thomas Smith, who introduced

Reflecting-Lights upon the coast of Scotland; and was the first

Engineer to the Board, as noticed at page 7.

CUNINGHAM’S LEDGE.--This ledge of rock has its name from Mr Charles

Cuningham, Writer to the Signet, and successor to Mr Gray, as Secretary

and Cashier to the Light-house Board.

PORT HAMILTON.--This creek is situate at the south-eastern extremity

of the House-rock, and derives its name from Mr Robert Hamilton,

Sheriff of Lanarkshire, and _ex officio_ one of the Commissioners of

the Northern Light-houses; who first landed here in the year 1805,

accompanied by Mr Rennie and the writer, with a view further to

ascertain the practicability of erecting the proposed Light-house, as

noticed at page 95. Mr Hamilton has been a zealous member of the Bell

Rock Committee since the period of its institution in the year 1807,

and, from his literary habits, he has taken much interest in the pages

of this work.

PORT RENNIE--is situate in the north-eastern part of the House-rock,

and derives its name from the late Mr John Rennie, the celebrity and

extent of whose works as a Civil Engineer are well known to the public.

Mr Rennie was consulted by the Light-house Board relative to this work.

His reports will be found in Appendix, No. IV.; and his plan in Plate

VII.

PORT STEVENSON--enters from the north-eastern side of the Rock, and

forms the principal landing-place in that direction; it was named for

the writer by Mr Hamilton, at the landing above alluded to, in the year

1805.

THE ABBOT’S LEDGE--forms the north-western extremity of the House-rock,

and derives its name from a tradition (for we can find no authentic

record) of one of the Abbots of Aberbrothwick having erected an

Alarm-bell, to forewarn mariners of their danger in approaching the

Bell Rock.

SIR RALPH THE ROVER’S LEDGE--forms the south-western extremity of

the House-rock, and takes the name of Sir Ralph the Rover from a

noted pirate who is said to have landed upon it, and carried away the

Alarm-bell. This traditionary story is beautifully alluded to in a

ballad by Mr Southey in his Minor Poems, which, with his permission, is

included in Appendix, No. II. page 438.

DUNNICHEN LEDGE,--on the north-western side of the Rock, is named

in compliment to Mr Dempster of Dunnichen, who is mentioned in the

Introduction, page 5.

DUNSKEY LEDGE,--which is contiguous to the former, is named in

compliment to Sir James Hunter Blair of Dunskey, first Preses of the

Commissioners of the Northern Light-houses, as mentioned at page 6.

ARNISTON LEDGE.--Named in compliment to the late Lord Chief-Baron

Dundas of Arniston, who, while Solicitor-General and Lord Advocate of

Scotland, took an active part in Light-house affairs; and visited the

Bell Rock in the year 1812, as noticed at page 413.

RATTRAY LEDGE.--In compliment to Mr Baron Clerk Rattray, who, while

Sheriff of the Shire of Edinburgh, as noticed at page 98, was _ex

officio_ one of the Commissioners of the Northern Light-houses, and, as

one of the Bell Rock Committee, took much interest in the work.

HOPE’S WHARF--forms the termination of the permanent railway toward

the west. It was named for the Right Honourable Charles Hope, Lord

President of the Court of Session, who landed here in the year 1815.

While Lord Advocate of Scotland, he took a warm interest in the affairs

of the Northern Light-houses, and in 1803 brought the first bill into

Parliament for the erection of the Bell Rock Light-house, as noticed at

page 93.

PULTENEY LEDGE.--So named in compliment to Sir William Pulteney, who,

as a Member of Parliament, took a lively interest in the bill brought

forward for the Bell Rock Light-house in the year 1803, as alluded to

at page 92.

BANKS LEDGE.--Named in compliment to Sir Joseph Banks, who was

Vice-President of the Board of Trade in the year 1806, when the Bill

for the Light-house was in Parliament, and who took much interest in

it, as noticed at page 101.

COCHRANE’S LEDGE--is named in compliment to Admiral Sir Alexander

Cochrane, who first called the attention of the Light-house Board to an

erection upon the Bell Rock, as mentioned at page 85.

PORT ERSKINE--forms the principal landing-place on the western side

of the Rock, and derives its name from the Honourable Henry Erskine,

who, when Lord Advocate of Scotland, and _ex officio_ one of the

Commissioners of the Northern Light-houses, brought the second Bill for

the Bell Rock Light-house into Parliament, which passed in the year

1806, as stated at page 100.

ULBSTER LEDGE.--Named in compliment to the Right Honourable Sir John

Sinclair, Baronet, of Ulbster, Chairman of the Committee of the House

of Commons, and who brought up its report relative to the Bell Rock

bill, as stated at page 103.

KELLIE LEDGE.--Named in compliment to the Earl of Kellie, who visited

the works at the Bell Rock in the year 1810, as noticed at page 378.

PITMILLY WHARF--formed the western extremity of the landing-wharf in

use during the Light-house operations, and was named in compliment to

Mr Monypenny, now Lord Pitmilly, who, while in the commission both as

Sheriff of Fife and Solicitor-General of Scotland, was a member of the

Bell Rock Committee, and visited the works in the year 1810, as stated

at page 378.

KINEDDER LEDGE--is named in compliment to the late Mr William

Erskine, Sheriff of Orkney and Shetland, and a member of the Bell

Rock Committee. From Mr Erskine’s literary pursuits, he took a lively

interest in this work, before he left the Light-house Board, and also

after he was raised to the Bench, where he took his seat as Lord

Kinedder.

THE ABBOTSFORD.--This spot, where the waters of the two principal and

opposite landing-places meet, is named in compliment to Sir Walter

Scott, Baronet, of Abbotsford, who landed here in the year 1814, as

noticed at page 419, when he wrote the beautiful and expressive lines

inserted in a _fac-simile_ of his handwriting in the 2d Title-page.

RAE’S WHARF--forms the extremity of the southern reach of the permanent

railway, and derives its name from Sir William Rae, Baronet, who,

in the several capacities of Sheriff-Depute and Lord Advocate of

Scotland, has long been a member of the Light-house Board and Bell Rock

Committee. His Lordship visited the Rock in 1810, as noticed at page

387.

DUFF’S WHARF--derives its name from Mr Adam Duff, Sheriff of the shire

of Edinburgh, and a member of the Bell Rock Committee, who repeatedly

visited the works at the Bell Rock while in progress, particularly in

the year 1810, as noticed at page 387.

PORT BOYLE--takes its name from the Right Honourable David Boyle, Lord

Justice-Clerk, who, while Solicitor-General of Scotland, was a member

of the Bell Rock Committee, and visited the Light-house in the year

1811, as noticed at page 411.

THE CROWN LAWYERS.--This name is given to two detached rocks, which

lie on the south-eastern side of the House-rock, in allusion to the

Lord Advocate and Solicitor-General of Scotland, who are _ex officio_

Commissioners of the Northern Light-houses, as noticed at page 6.

THE MARITIME SHERIFFS.--This name comprehends a range of rocks, also on

the south-eastern side of the main Rock, in reference to the Sheriffs

of maritime counties, who are _ex officio_ Commissioners of the

Northern Light-houses, as noticed at page 6.

THE ROYAL BURGHS,--A group of rocks lying on the south-western side

of the House-rock, so named from certain of the Chief Magistrates of

the Royal Burghs of Scotland who are _ex officio_ Commissioners of the

Northern Light-houses, as noticed at page 6.

TELFORD’S LEDGE--is named in compliment to Mr Thomas Telford, Civil

Engineer, who was requested by Sir William Pulteney to visit the Bell

Rock professionally in the year 1803, as noticed at page 92.

DOWNIE’S LEDGE--derives its name from the late Mr Murdoch Downie, a

Marine Surveyor of considerable eminence, who suggested a plan for

erecting a Light-house on the Bell Rock, as noticed at page 93.

NEILL’S POOL--derives its name from Mr Patrick Neill, a particular

friend of the writer’s, who first visited the Bell Rock in 1808, as

noticed at page 235. The surface of this pool measures about three

fathoms across, and a fathom and a half in depth, when the tide

leaves the Rock. The bottom is generally covered with boulder-stones,

which are whirled about with much force when the sea is in a state of

agitation.

STUART’S TRACK--is on the south-western side of the Rock, derives its

name from the late Captain Harry Stuart of the Royal Navy, who visited

the Bell Rock in the year 1810, as alluded to at page 387. Captain

Stuart took an early interest in the plans for the Light-house, both by

Captain Brodie and the writer.

BRUCE’S LEDGE--was named in compliment to the memory of the late Mr

James Bruce of the Naval Yard, Leith, who frequently visited the Bell

Rock, and to whose ingenuity the Light-house service is indebted for

the improved construction of a boat, delineated in Plate XI. and

noticed at page 412.

RUSSELL’S LEDGE--is named in compliment to Mr Claud Russell, Accountant

to the Light-house Board, who visited the Rock in the year 1812, as

mentioned in page 414.

SCORESBY’S POINT,--the most northern part of the Rock, named in

compliment to the writer’s friend Captain Scoresby _junior_, who has so

much extended our information regarding the Polar Regions.

TRINITY ROCK.--This rock is named in compliment to a Committee of the

Trinity House of Leith, consisting of Messrs Thomas Grindlay, John Hay,

and Thomas Ritchie, who gave their advice and assistance in the fitting

out and mooring the Floating-light in the year 1807, as alluded to at

page 110.

BALFOUR’S LEDGE--is named in compliment to the late Provost Balfour of

Arbroath, who felt the most lively interest in the Light-house affairs.

In his hospitable mansion the writer occasionally resided while the

works were in progress.

LEITCH’S LEDGE--is named in compliment to the writer’s friend Mr

Quintin Leitch, who visited the Rock in the year 1818. Mr Leitch is

further noticed at page 43.

PILLANS’S LEDGE--is named in compliment to the writer’s friend Mr

James Pillans of Leith, who took an early interest in the erection of

the Light-house, and who signs the Report of the Merchants of Leith

regarding it, as noticed at page 96.

THE LAST HOPE.--This name was given by the writer to the highest

part of the rock, in allusion to the narrow escape which he and the

artificers made in the year 1807, by the timeous arrival of James

Spink, the Bell Rock pilot at Arbroath, as noticed at page 149.

Spink is a remarkably strong man, whose _tout ensemble_ is highly

characteristic of a North-country fisherman. He usually dresses in a

_pé-jacket_, cut after a particular fashion, and wears a large flat

blue bonnet. A striking likeness of Spink, in his pilot-dress, with

the badge or insignia on his left arm, which is characteristic of the

boatmen in the service of the Northern Lights has been taken by Howe,

and is in the writer’s possession.

FORREST’S PASSAGE.--This gully or opening on the eastern side of the

Rock, is sometimes taken as a track by boats in certain states of

the sea and tide. It derives its name from the late Mr John Forrest,

Superintendant of Lightkeepers’ duty in the service of the Northern

Lights, who is particularly noticed at page 406.

LOGANS’ REACH.--This reach or compartment of the Railway, on the

eastern side of the Light-house, is named in compliment to the late Mr

Peter Logan, foreman-builder at the Bell Rock, and his son Mr David

Logan, clerk-of-works, whose active and faithful services, in their

respective departments, have been too often noticed in this work to

admit of reference to particular pages.

WATT’S REACH--has its name in compliment to Mr Francis Watt,

foreman-mill-wright, whose services have also already been often

particularised in the course of this work, and whose exertions in

erecting the beacon and temporary-railways did much credit to his zeal

and intrepidity. The writer also often profited by his ingenuity, in

reference to the various pieces of machinery employed at the works.

KENNEDY’S REACH--derives its name from Mr Lachlan Kennedy, who, as

Accountant and Cashier in the Engineer’s Office, discharged the various

duties of his situation in a manner equally creditable to himself and

satisfactory to his employers. An Abstract-Account of the expence of

the work, as drawn up by him, appears in the Appendix, No. VII. page

475.

SLIGHTS’ REACH,--named in compliment to Mr James Slight, and his

brother Alexander, who were chiefly employed in drawing the courses

of the building at large, and in making the various and nicely formed

moulds for fashioning the stones. They also fitted up the interior of

the house, and the permanent railways on the rock; and made a complete

model of the Light-house.

THE SMITHS’ FORGE AND LEDGE--named in compliment to Mr James Dove,

foreman-smith, and his assistants, who have been frequently alluded

to in these pages. It was here that the forge was erected at the

commencement of the works on the Rock; and on the connecting ledge the

first or experimental cargo of stones was landed.

REID’S LEDGE--is named in compliment to Mr John Reid, the first

principal Lightkeeper at the Bell Rock, who retired from the service in

the year 1821, as noticed at page 422.

SELKIRKS’ LEDGE,--named for Mr Robert Selkirk, principal builder, and

his brother Thomas, who was the principal stone-cutter at the work.

WISHART’S LEDGE--is named for Mr Michael Wishart, some time principal

builder at the Rock, as noticed at page 291.

GLEN’S LEDGE.--This ledge has its name from Mr James Glen, millwright

and joiner, particularly noticed at page 279.

JOHN WATT.--A detached rock on the western side of the main rock, named

for John Watt, principal mortar-maker at the Bell Rock.

PETER FORTUNE.--A detached reef on the western side of the Rock, named

for a well known character in the Light-house service, as noticed at

page 299.

GLOAG’S TRACK--leads into Port Hamilton, and is named for Mr Robert

Gloag, who commanded the Light-house Yacht in the year 1807, and who

has otherwise had a good deal of connection with the Light-house

service.

MACURICH’S TRACK--on the western side of the Rock, is named in

compliment to Mr Thomas Macurich, mate of the sloop Smeaton, and

afterwards commander of the Bell Rock Tender, who had a very narrow

escape in a boat off the Rock, as noticed at page 253.

WEBB’S ROCK--is named in compliment to Mr Joseph Webb, one of the

King’s pilots at Yarmouth, who superintended the fitting out and

mooring of the Floating-light, as noticed at page 108.

SINCLAIR’S TRACK--is named in compliment to Mr George Sinclair, who, in

1807, commanded the Floating-light, and acted as landing-master.

WILSON’S TRACK--named for Mr James Wilson, landing-master, whose active

and enterprising conduct is often noticed in the course of this work.

In the year 1815, Mr Wilson left the Light-house service, when he was

appointed one of the Harbour-masters of Leith. The speaking-trumpet

which he used at the Bell Rock was presented to him, with the sanction

of the Light-house Board, when a suitable inscription was engraved on a

plate of silver attached to it.

TAYLOR’S TRACK--leads into Port Erskine, and derives its name from Mr

David Taylor, who commanded the Sir Joseph Banks Tender during the

progress of the works, and afterwards became Light-house Storekeeper at

Leith.

CALDER’S TRACK--situate on the north-western side of the Rock, derives

its name from Mr Thomas Calder, who commanded the Light-house Yacht,

and other craft, connected with the works, as noticed at page 260.

SOUTAR’S TRACK--derives its name from Mr Peter Soutar, who was one

of the Praam-masters while the works were in progress. In 1815 he

succeeded Mr James Wilson in the command of the Light-house Yacht.

POOL’S TRACK--is named for Mr Robert Pool, commander of the Smeaton

stone-lighter, a very active and persevering seaman.

THE ENGINEERS’ LEDGE,--situate on the eastern side of the Rock, is

named in compliment to certain of the Engineer’s assistants, who,

though belonging more especially to his general or private business,

have nevertheless been occasionally employed in the department of the

Bell Rock, particularly Mr John Steedman, Mr John Thin, Mr William

Lorimer, Mr G. C. Scott, and Mr Robert Shortreed, some of whose names

are attached to several of the Plates.

THE ARTIFICERS.--A name given to a parcel of detached rocks, lying on

the north-western side of the main Rock, in allusion to the numerous

artificers employed at the works, many of whom are now moving in

spheres of more extended usefulness, and, did our limits admit, would

be deserving of particular notice, as may be learned from page 379.

THE MARINERS.--This is also a group of detached rocks on the

north-eastern side of the Rock, which in like manner is named in

compliment to the exertions of the Seamen, who, as _men-of-all-works_,

gave a helping hand to every operation; and many of whom deserve the

warmest acknowledgments of the writer.

STRACHAN’S LEDGE,--situate on the north-eastern side of the Rock,

was named for Mr Robert Strachan of Leith, who fitted out the

Floating-light, and narrowly escaped being lost upon the Rock, when

approaching it in a boat which was upset in the year 1808, as noticed

at page 244.

CRAW’S HORSE.--Another detached rock, deriving its name from a narrow

escape which the sloop Smeaton made in foggy weather, as noticed at

page 364, while James Craw, who had charge of the stable, and was

principal carter at the work-yard of Arbroath, was on board, with his

favourite horse, on his way to Leith, to convey the upper part of the

Light-house, from Edinburgh, to be shipped for the Bell Rock. The horse

alluded to was a remarkably strong and powerful animal, measuring about

16 hands in height, and having, in the language of jockies, a great

deal of bone. It is not a little remarkable, that while the work was

in progress, this animal must actually have drawn the materials of the

Light-house, extending to upwards of 2000 tons in its finished state,

perhaps three or four times, in removing the blocks of stone from the

ship to the work-yard, again to the platform, and from the work-yard,

when they were to be shipped for the Rock, besides occasional movements

to and from the hands of the stone-cutters. A sketch of this animal,

and of his master James Craw, will be found at Fig. 21. Plate X. The

horse having failed from age, towards the close of the work he was

removed to the Island of Inchkeith, to go at large, where he died in

the year 1813. The fame of this animal’s labours, together with his

strength and excellent proportion as a draught-horse, having attracted

the notice of Dr John Barclay, that eminent anatomist procured the

bones, and set them up in his Museum. This valuable collection, it

is understood, is to be bequeathed to the College of Surgeons of

Edinburgh; so that the bones of the Bell Rock-horse, to use the

Doctor’s own language, “will be seen and admired as a useful skeleton,

and a source of instruction, when those of his employers lie mingled

with the dust.”

PLATE VII.

ORIGINAL DESIGNS FOR THE BELL ROCK LIGHT-HOUSE.

[Illustration:

_DESIGNS FOR THE BELL ROCK LIGHT HOUSE BY M^R. STEVENSON._

_DESIGN FOR THE BELL ROCK LIGHT HOUSE BY M^R. RENNIE._

_Drawn by J. Slight_

_Engraved by R. Scott_

_PLATE VII._]

[Sidenote: Pl. VII.]

Fig. 1. shews the sites of the principal and diagonal supports of

cast-iron of the Pillar-formed Light-house, modelled by the writer

prior to his landing on the Rock in the year 1800, as alluded to in his

report, included in the Appendix, No. IV. at page 440. This Figure is a

Plan in which letters _a a a a a a a a_ point out the feet of the eight

principal columns; _e_ the central shoe or socket, intended to receive

the feet of the diagonal supports or braces, which correspond in number

with those of the main columns. This fabric, at the base, was to form a

common diameter of about 35 feet, diminishing to 12 feet at the top, or

immediately under the Light-room.

Fig. 2. The great columns in this design, which are sunk into the

Rock, and the diagonal braces _d d d d_, which butt against, or step

into the shoe _c_, are also strongly connected by the braces _b b b b

b b b b_, and cross ties marked _c c c c c c_. The habitable part of

this building is formed by two concentric rings of copper, marked _a

f_, _a f_, the one upon the outside, and the other upon the inside, of

the main columns. The space between these rings was to be filled with

plaster-of-Paris, or some light substance, to render the apartments

air-tight. Letter _g_ is the position of the entrance-door, and the

space below the first floor, marked _h_, is a coal magazine. The better

to throw off the sprays of the sea, the lower part, as will be seen

from the diagram, is of a conical form inverted.

Fig. 3. Shews the mode of fixing the principal columns, to the Rock,

and of building or connecting them together, being an enlarged section

of the foot of one of the main columns. The hollow cylindrical tube

marked _b b_, is sunk 24 inches, and acts as a steady pin or joggle to

the column which is wedged into the Rock, as shewn at _c c c c_, by

driving oaken and iron wedges alternately, instead of running them up

with melted lead. The next length of the column, marked _a a a a_, is

slipped over this tube, and has a seat cut in the rock at right angles

to the oblique direction of the column, to which it is connected by the

cutter or spear-bolts marked _d d d_, whose directions respectively

cross each other, as shewn in the section.

Fig. 4. represents one of the joints of the main columns, which occur

at every 7 feet of their length, from the rock to the habitable part

of the Light-house. This description of joint is what is technically

termed _spigot_ and _faucet_; _a a_ is the upper half, _b b b_ the

lower, _c c_ the joint, _d d d d_ the collar-piece clasping the joint,

and connecting it with the horizontal arms or braces _e e_, which, in

Fig. 2, are marked _b_, and in connection with the cross ties _c_, and

diagonal-supports _d_, bind the whole firmly together.

Fig. 5. represents the lower floor of the five apartments, in which _a

a a a a a a a_, as in the foregoing Figs. 1, 2, and 3. shew the main

columns passing between the outer covering and inner lining of copper.

Letter _c_ marks the entrance door, shewn at _g_, in Fig. 2., in which

d is the plat at the top of the ladder, formed on one of the columns,

which may also be conceived as passing up through the habitable part of

the building; the floors of which are formed with plates of cast-iron.

Fig. 6. represents a Light-house of masonry, modelled by the writer

immediately after his first landing upon the Rock. The better to

illustrate this design, the solid or lower part is given in elevation,

and the upper or habitable part in section. Compared with the Edystone

Light-house, upon the principles of which it was designed, the chief

differences consist in the exterior spiral-formed stair, intended to

afford permanent access to the Light-house, and also to serve as a

landing quay or wharf at high-water. The steps of this stair were to

be 3 feet in length, forming a kind of scarsement upon the outer-wall,

there being nothing to obstruct the force of the sea under the stair;

as it formed part of the main-wall, it may be conceived calculated to

have become a kind of spiral buttress to the building. In the upper

or habitable part, the interior walls diminish gradually, instead of

forming abrupt scarsements, and the floors were laid horizontally,

instead of being arched.

Fig. 7. Shews one of the floors, each stone of which forms part of

the outward walls, extending inwards to a centre stone, independently

of which they were to be connected, by means of copper-batts, with

a view to preserve their square form at the extremity, instead of

dove-tailing. These stones were also modelled with joggles sidewise,

upon the principles of the common-floor, termed Feathering in

carpentry; and also with dove-tailed joggles across the joints, where

they formed part of the outward wall, as shewn in this figure.

Fig. 8. is a plan of one of the courses of the void or habitable part

of this design, shewing both the joggles of the end joint and the

girth, raised upon the upper beds of the courses, and sunk into the

groove cut in the lower beds of the respective covering courses.

Figs. 9. and 10. exhibit different modes of connecting the stones

and courses of the solid of the building, both perpendicularly and

horizontally, by means of dove-tailing. But as a certain degree of

weakness is unavoidably incident to every system of dove-tailing, and,

as the method of forming the bed-joints of the void above alluded to is

equally effective, in its application to the solid or lower part of the

building, as represented in Plate XXIII., this is considered preferable

to the dove-tailing system.

Fig. 11. is part of a course, shewing a simple mode of connecting the

stones in water-buildings, so as to avoid dove-tailing, and preserve,

as much as possible, the entire figure of the stones. This is effected

by inserting square joggles into the joints, and allowing these

joggles to project 6 inches into the course immediately above, thereby

forming a connection horizontally between the stones of a course, and

vertically with the several courses.

Fig. 12. is also a course of masonry, in which the square or entire

form of the materials is preserved, while the stones are bound both

horizontally and vertically, by means of metallic-batts and plates, as

represented in the enlarged diagram described in the following Figure.

Fig. 13., _a_ is the dove-tailed cross-head or plate; _b_ is a section

both of the batt and plate, in their places, shewing their connection

with two courses of the building marked A B; _c_ shews the mode in which

the batt is fixed into the lower course, by means of wedges; _d_ the

upper end of the batt and plate, which is also wedged, and appears,

when in its place, as in Fig. 11., marked also _a a a_. But these

several modes of connecting the materials of masonry are considered

more or less objectionable, when compared with the girths delineated in

the design represented in Plate XXIII.

Figs. 14. and 15. are a reduced plan and elevation of the Bell Rock

Light-house by Mr Rennie, in the year 1807. They will be found so

obvious upon inspection, as not to require explanation, and are here

preserved as the only plans or drawings furnished for this work by that

eminent engineer.

PLATE VIII.

BEACON-HOUSE.

[Illustration:

_BELL ROCK BEACON_

_Drawn by W. Lorimer_

_Eng^d. by W. H. Lizars_

_PLATE VIII._]

[Sidenote: Pl. VIII.]

Fig. 1. represents the Beacon-house, which was used as a barrack for

the artificers during the working seasons of 1809 and 1810. Letter A A

A is the surface of the Rock. The principal legs or beams, with their

diagonal supports, radiating from the centre of the plan, are marked

_a a a a a a_, and the bracing chains _b b b_, as completed in the

year 1807. In 1808 the bracing-chains were removed, and the malleable

iron-bars marked _c c c_ were substituted. The dotted lines _d d d d

d_, are intended to show the form of the upper or habitable part of the

Beacon as it was ultimately finished, with its lantern, for ventilating

the barrack-room. One of the figures characterised as sailors, and

used for illustrating this elevation, is represented as standing upon

the Rock, and laying hold of one of the bracing-chains. The next figure

is ascending the trap-ladder, formed with cleats of timber nailed upon

one of the principal beams; he is on a level with the mortar-gallery,

marked letter _e e e_. The third figure is standing upon the cross

or collar-beams, nearly on a level with the floor of the cook-room,

marked _f f_. The fourth, or highest figure, is standing upon one of

the principal beams, with his feet on a level with the top of the

windows in the floor of the cabins of the engineer and his assistants

marked _g g_; the head of this figure being within the artificers’

barrack, marked _h h_. With one hand he is supposed to be touching the

provision-chest, marked _i_, and with the other he is laying hold of

the rope for hoisting the copper signal-ball _k_ upon the flag-staff.

Fig. 2. represents the gallery where the mortar-makers and smiths

latterly worked. _a a a a a a_ represent the principal beams of

the Beacon cut across; _b b b_ the position of the mortar tubs and

lime-casks; _c_ the smith’s anvil; _d_ his bellows; _e_ the hearth or

fire-place.

Fig. 3. represents the floor of the cook-room, in which _a a a a a a_

shew the principal beams cut across; _b_ the platt or landing at the

entrance-door; _c c_ the coboose or cooking-hearth; _d_ the chimney or

smoke funnel; _e e e e_ the provision casks; _f_ the trap stair leading

to the floor above; _g g_ the small life-boat, suspended by davits

from the principal beams of the beacon; _i i i i i i_ the six angular

upright posts cut across, marked _d_ in Fig. 1., which form the framing

of the hexagonal apartments or floors marked III. and IV. Letter _k_

represents the position of the privy, and stair leading to it.

Fig. 4. is the floor of the cabins of the engineer and his assistants.

Letters _a a a a a a_ mark the position of the six principal beams

of the beacon, now approaching closely together from their diagonal

direction: _b b b b b b_ the angular upright posts, which, together

with those marked _i i i i i i_, as referable to Fig. 3., form

the upper apartments into twelve sides; _c_ is the trap-ladder,

corresponding with letter _f_ in Fig. 3., which communicates with

the cook-room floor below; _d_ is another ladder, leading to the

artificers’ barrack above.

Fig. 5. represents the upper floor, or that of the artificers’

barrack-room, on a level with the top of the principal beams, marked

a in Figs. 1, 2, and 3. In this diagram _a a a a a_ represent the

ground-tier of beds, which were ranged in five heights, excepting

at the space over the man-hole, leading up to this apartment, where

there was only three heights of beds; _c_ represents the trap ladder

answerable to letter _d_ of Fig. 4.

Fig. 6. represents what may be termed a bird’s-eye view of the Beacon,

as completed in 1807, and before it was converted into a barrack. In

reference to Fig. 1., letter _a_ represents the six principal beams,

forming a common base measuring about 35 feet across, including the

bracing-chains, which are marked _b b b b b b_. These beams meet in a

point at the top, where they rest upon a block of beechwood, to which

the upper ends of the beams were fitted, the whole being girded with

strong malleable iron rings or hoops, keyed with spear-bolts. Here the

provision-chest _i_, and signal-ball _k_, are represented as resting

upon the top of the principal beams.

Fig. 7. is an enlarged view of two of the bracing-chains, marked _a a_,

with their tightening shakle marked _b b_, meeting in the ring _c c_.

Letter _d_ represents one of the batts, which were sunk into the rock A

A about 20 inches, and wedged with timber and iron, as shewn at _e e_.

Fig. 8. represents a side view of one of the beams of the beacon,

marked _a a a a_, cut across immediately above the great stancheons _b

b b b_, with its bolts, which were fitted upon each side of the beam;

_c c_ represent the clasp-plates, which embraced each foot of the

beacon, with its two stancheons. These clasp-plates were fixed with

spear-bolts, as shewn at _d d_. Letters _e e_ represent the wedging

with timber and iron, referred to in Fig. 7.

Fig. 9. represents a front view of a like portion of one of the

principal beams, as in Fig. 8.; _a a a a_ shew the stancheons on each

side of the beam, and _b b_ the lower extremity of the stancheons

sunk into the Rock A; _c c_ one of the clasp-plates; _d d d d_ the

spear-bolts.

Fig. 10. is one of the principal beams, _a_ cut across at the

clasp-plate _c c c c_. Letters _b b_ are the great iron-stancheons; and

_d d d_ shew the spear-bolts.

PLATE IX.

SHEWING THE PROGRESS OF THE WORKS DURING THE SECOND, THIRD, AND FOURTH

YEARS’ OPERATIONS.

[Illustration:

PROGRESS OF THE BELL ROCK WORKS.

_Drawn by J. Slight._

_Eng^d. by W. Miller._

_PLATE IX._]

[Sidenote: Pl. IX.]

Fig. 1. shews the state of the works about the close of the second

season, or year 1808, with two of the moveable beam-cranes, with their

guy tackles and working gear, which will be more particularly described

under Plate XIV. These are placed upon the top or fourth course of the

building. In the fore-ground, part of the unfinished railways are seen,

with waggons and artificers at work; and on the right the beacon is

partly traced in faint lines.

Fig. 2. represents the state of the works in the month of August 1809,

at the close of the third season’s work, when only one of the cranes

was set upon the building; the other, as the work increased in height,

and became less in diameter, was placed upon a temporary stool or prop

of masonry, marked _a a a a_. This prop was found extremely useful,

as, by elevating one of the cranes upon the top of it, the lift of

the materials was divided, and brought more conveniently within reach

of the higher crane, which at this period was about 30 feet above the

Rock. In the fore-ground of this diagram, part of the circular track

of railway round the building is seen. On the right, a part of the

Beacon-house appears with the rope-ladder of communication, extending

from the top of the solid of the Light-house to the mortar-gallery.

On the rope-ladder a figure is represented walking from the Beacon

to the Light-house, and a tackle, with its travelling pulley, is also

stretched, for conveying the mortar-bucket, to the builders.

Fig. 3. represents a section of the void or habitable part of the

Light-house as it appeared in the month of August 1810, when the

masonry was nearly completed. On the right is an elevation of part of

the Beacon-house, but instead of the rope-ladder of communication, a

bridge of timber is constructed. Letters _a a_ represent the top of the

solid, or level of the entrance-door of the building, from which the

stair-case ascends to the several apartments. Resting on the sill of

the door at _b_, is seen one of the beams for supporting the road-way

of the bridge, and below this, at the point _c_, is the step of one of

the diagonal braces of the bridge, where it is inserted about 6 inches

into one of the courses of the solid masonry. Regarding the frame-work

of the bridge, it may only further be noticed, that the road-way was

chiefly suspended from the king-posts _d d_.

Letter _e_ represents a block of stone, in the act of being raised

from the rail-way on the Rock, to the level of the bridge, by means of

the crab or winch-machine marked _f_, with wheel and pinion apparatus;

the pully of the working chain is suspended from the cross beam _g_,

which rests or is supported upon the top of the king-posts. One of the

figures on the bridge at _h_, is in the act of pushing forward a truck

cart or waggon _i_, to receive the stone _e_; when raised through the

aperture in the road-way, it is then lowered upon this waggon, and

removed towards the building within the sphere of the several purchases

or machines, by which it is transported to the hands of the builders.

Letter _k_ refers to a life-buoy, and a coil of rope, kept in readiness

upon the bridge, in case of accident by the fall of any of the people

from the building or beacon while the Rock was covered by the tide.

_l l_ represent two of the fire-buckets, which were hung round the

beacon, under the projection immediately above the cook-room. The

stone marked _e_, in the second stage of its progress towards the

top of the building, is now seen immediately above the lintel of the

entrance-door, the purchase chain, by which it is suspended, passes

over a pulley at _m_, attached to the beam _n n_, which is projected

from one of the windows of the Light-room store, where it is supported

upon a block of timber, so as to admit of the chain passing under

it. The further end of this beam, being within the Light-house, was

bolted to an upright post marked _o o_, and the whole apparatus was

worked by means of the crab or winch-machine at _p_, similar to that

upon the bridge marked _f f_. The stone _e_ is next supposed to

have gained the height of the floor of the bed-room, where another

apparatus, similar to those at _f_ and _p_, is placed. Here a figure

is represented at _q_, with a rod in his hand, in the act of hooking

the chain of the balance-crane into the Lewis-batt, fixed in the

stone _e_, still in its progress to the top of the building. _r r r_

represent the strong oaken beams placed on the floor of the library, on

which the foot of the cast-iron balance-crane is supported. _s s_ two

of the four diagonal braces of oak timber, bolted into a collar-piece

of cast-iron, clasping the upright shaft of the crane at _t t_, and

butting against the upright stretchers at _u u_; intended as a security

to the walls, in case the balance-crane should at any time get out of

equilibrium. The two figures marked _v v_, are represented as working

the balance-crane, and are supposed to be standing upon a moveable

platform _x x_, suspended from the body of the crane by rods of iron _y

y_. This platform or stage, with the artificers upon it, being moveable

with the body of the crane, gave great facility and conveniency to

those who wrought it. _z_ is the balance-weight, moveable by the

machinery along the balance-beam of the crane, to keep the whole in

a state of equilibrium, according to the varied load suspended from

the working or opposite beam; accented _á_ represents the moveable

block or cross-head of malleable iron, with two eyes, into which the

chains of the crane were hooked, when the _body_ (comprehending the

machinery and beams) was to be elevated upon the shaft in the progress

of building. But the cross-head, together with the other apparatus

of this machine, will be better understood by examining Plate XVII.,

with its letter-press description. _b´ b´ b´_ represent the form and

position of the Light-room in dotted lines; _c´_ the mortar-bucket made

to traverse upon the guide-rope _d´ d´_, stretched between the building

and the mortar-gallery of the Beacon; the end of the rope attached to

the building being fixed to the stanchion _é_, inserted into one of the

Lewis batt-holes, on the balcony of the Light-room.

PLATE X.

VARIOUS IMPLEMENTS AND APPARATUS CONNECTED WITH THE WORKS.

[Illustration:

_CERTAIN IMPLEMENTS CONNECTED WITH THE BELL ROCK WORKS_

_Drawn by G. C. Scott_

_Eng^d. by E. Mitchell_

_PLATE X._]

[Sidenote: Pl. X.]

Fig. 1.--is an elevation of one of the three large copper Lanterns

carried by the Pharos Floating-Light, which was moored off the Bell

Rock while the Light-house was erecting. In order to relieve this

vessel of the cumbrous yards with which Floating-lights were in use to

be fitted, these lanterns were so constructed as to clasp round the

masts, and traverse upon them. This was effected by constructing them

with a tube of copper in the centre, capable of receiving the mast, and

through which it passed. The lanterns were first completely formed,

and fitted with brass flanges; they were then cut longitudinally

asunder, which conveniently admitted of their being screwed together

on the masts, after the vessel was fully equipped and moored in her

station. Letters _a a a a_ shew part of one of the masts, _b_ one of

the tackle-hooks for raising and lowering the lanterns at pleasure, _c

c c c c c c c c c_ the brass flanges, with their screw-bolts, by which

the body or case of the lantern was ultimately put together; _d d d_

shew the position of certain holes in the bottom for the admission of

air, _f f f f_ the holes at the top, connected with the ventilation,

to which the collar-pieces _e e_ and _g g_ form guards against the

immediate effects of the weather. The detached diagram, upon an

enlarged scale, shows the air-hole, which is marked _m_. The letters _h

h h h_ shew the part of the lantern which was glazed with plate-glass;

_i_ is one of the glass shutters, by which the lamps were trimmed; the

lower half being raised, slides into a groove made for its reception;

_k k_ shew the range of ten agitable burners or lamps, out of which the

oil cannot be spilt by the rolling motion of the ship. Each lamp having

a silvered-copper speculum or reflector _l l_ placed behind the flame,

was found greatly to increase the brilliancy of the light.

Fig. 2.--is a cross section of the bottom of the lantern, shewing the

mast _a_ cut across, _b b_ is the sole or bottom of the lantern, _c

c_ the flanges at the junction of the body, in reference to the same

letter in Fig. 1.; _d d d d_ the small holes for the admission of air,

_e e e_ the brass zone or chandelier, with its ten arms and sockets

marked _f f_, &c. in which the stalks of the burners are inserted.

The chandelier is made to traverse horizontally into a corresponding

groove fixed upon the interior cylinder or case, through which the mast

passes, and upon which the whole moves up and down. When, therefore,

the lamps require to be trimmed or taken out of the lantern, the

chandelier is turned until they are respectively brought opposite to

the shutter marked _i_.

Fig. 3. is an enlarged view of one of the agitable burners _a_, with

its reflector _b_, which last measures four inches over the lips, and

is raised to the parabolic curve of three inches focus; _c_ the socket,

_d_ the section of the moveable chandelier in its groove, answerable

to letters _k_ and _l_, Fig. 1., and _f_ and _e_ Fig. 2. In reference

to Fig. 3., _e e_ is a section of part of the central cylinder of the

lantern and mast of the ship.

Fig. 4. represents one of the Mushroom-Anchors, constructed wholly of

cast-iron, used for mooring the Floating-Light and other craft off the

Bell Rock, to which part of the mooring-chain is attached. This diagram

seems so obvious as to require no particular description. Towards the

head _a a_ the shank is strengthened by means of four feathers or

brackets raised upon it, somewhat resembling the connecting gills of

the vegetable mushroom. These anchors weighed from 14 to 21 cwt.

Figs. 5. to 9.--QUARRY TOOLS.--Fig. 5. is a common stone-pick, weighing

from 8 to 10 lb., shown with and without the handle, which measured

about 2 feet in length, but is here shortened. Fig. 6. is the Aberdeen

or granite pick, weighing from 6 to 16 lb. Fig. 7. is a quarry hammer,

weighing from 6 to 8 lb. used for jumping or boring batt-holes in the

Rock, and the trenail-holes in the courses of the building. Fig. 8.

represents the boring-irons for the trenail-holes, measuring 1¾

inches in breadth at the cutting end, and varying in length according

to the depth of the respective holes. Fig. 9. is the scraper used for

cleaning the holes; the perforated end being applied with a piece of

rag for drying up the moisture.

Fig. 10. represents one of the oaken trenails used for keeping the

stones in their places while the building was within the ordinary range

of the sea. The positions of these trenails may be traced in the small

circular holes of the courses, in Plate XIII. Their lower ends were cut

with a saw-draught as at letter _a_, into which a small wedge marked

_b_ was inserted, and the trenail having been driven home, the small

wedge had the effect of tightening or fixing it. The upper end _c_ was

then cut off flush with the upper bed of the stone, when it was split,

and another small wedge, marked _d_, driven into the chisel-mark,

which completed the operation of fixing the trenails into their places.

Fig. 11. represents a pair of the oaken wedges inserted into

corresponding grooves cut into the perpendicular joints of the stones

in each course of the solid or lower part of the Light-house, as may be

traced in the small oblong holes, marked in the joints of the courses

in Plate XIII. These wedges were chiefly intended for bringing the

dove-tailed parts of the stones to a general bearing. The thick end of

the wedge marked _a_ being dropped into its groove, the smaller end of

the corresponding wedge _b_ was then inserted, and driven home till

some degree of tension or firmness was obtained. This operation of

trenailing and wedging was followed from Mr Smeaton’s practice at the

Edystone Light-house.

Fig. 12. is a section of one of the cast-iron mortar-tubs, with its

pestle, shod or loaded with a piece of malleable iron.

Figs. 13. to 15.--CAST-IRON PLATE-RAILWAY.--Fig. 13. is a longitudinal

view of one length of the cast-iron railways erected upon the Rock; _a

a a a_ represent the stools or upright supports, _b b_ are the tracks

of the roadway, _c c_ one of the side stays or braces. Fig. 14. is a

cross section on the line A B of Fig. 15, in which _a a_ is the support

with its cross-brace _f_, bolted at _g g g g_; _b b_ are the railway

tracks, _c c c c_ the stays, with their connecting bolts on each side,

_d d_ the sleeper or horizontal brace connecting the top of the stools,

and forming a chair or seat for the rails and grated roadway; _e e e e_

represent the batts and spear-bolts, with which the whole was connected

to the Rock, by the process of wedging with timber and iron. Fig.

15. is a plan of the finished railway; _a a a a_ are the feet of the

stools, _b b_ the side rails or waggon-tracks, _c c_ the stays or side

braces, _d d_ the sleepers, and _h h_ the grated footpath. The weight

of a yard in length of the railways complete, of the height of four

feet, as represented in these diagrams, may be estimated about 5 cwt.

Fig. 16. represents a plan of one of the railway waggons; _a_ is the

iron handle made to hook upon either end of the waggon, so as to

prevent the necessity of turning it; _b b_ is the body of the waggon,

consisting of two pieces of oak timber, bolted upon the upper part of

the double frame intended for accommodating the wheels to the circular

track of the railway round the building. The upper and under frames are

connected with the bolt _c c_, so as to admit of the movement above

alluded to. For the same reason, a joint was formed in the perch or

middle of the frame at _d_. The trucks or wheels _e e e e_ were of

cast-iron, measuring 15 inches in diameter. These waggons were always

left upon the Rock, being simply turned upside down, or off their

wheels, in a particular part, and were seldom moved by the sea, as they

weighed about 2 cwt. each.

Fig. 17. The ten diagrams, marked _a_, _b_, _c_, _d_, _e_, _f_, _g_,

_h_, _i_, and _k_, are a set of moulds for one course of the solid

part of the building, by which the stones were cut and prepared in the

work-yard previous to their being shipped for the Rock. The application

and connection of these diagrams will be better understood by examining

the courses of the building in Plate XIII.

Fig. 18. a Trainer or Rule, framed of timber, applied by the builders,

for ascertaining the exact position of the stones of the respective

courses. _a_ is the eye or socket on which it was fitted to a

steady-pin placed exactly in the centre. This rule was used chiefly for

ascertaining the radiating direction of the stones, from the centre

towards the circumference, being laid agreeably to corresponding

notches and lines marked upon their upper-beds, so as to preserve

band throughout the work, and prevent difficulty with the closing or

finishing stones.

Fig. 19. is a perpendicular section of the carpenter’s jack, used with

much advantage for shifting and turning the stones in the work-yard.

The case of this machine was made of elm, and strongly bound at the

ends with iron. It measured 4 feet in height, its greatest breadth 12

inches, and its thickness 6 inches. _a a_ is the stock or case, _b

b_ the rack, fashioned at the lower end somewhat like the claws of a

carpenter’s hammer. The upper end is of a forked form, both ends being

conveniently applicable to the varied positions of the stones; _c_

and _d_ are the wheel and pinion work; _e_ the handle by which the

machinery is worked, affording a purchase or mechanical advantage in

the ratio of about 64 to 1.

Fig. 20. is a plan of the useful machine called The Woolwich

Sling-Cart, applicable to transporting large blocks of stone suspended

between the wheels by means of a Lewis-batt. When a stone was of

considerable length, it became necessary to employ a chain to steady

it at the farther end, the application of which will be seen in this

and the following figure. _a a a a_ represent the shafts and body of

the cart, _b b b b_ the wheels, _c c_ the handles passing between the

spokes of the wheels, by which the machinery is worked for lifting the

stone. The dotted line _d d d d_ represents a plan of a stone in its

state of suspension, _e e e_ the wheel and pinion work, _f_ the barrel

or cylinder on which the chain turns as the stone is raised; _g g_ is

the tail-beam with its chain _h h_, and steady-pin _i_.

Fig. 21. represents the sling-cart in its working state, with letters

corresponding to Fig. 20. Here the Bell Rock carter, and his horse, are

shown, already noticed in the description of Plate VI., page 498.

PLATE XI.

THE SHEER-CRANE, LEWIS-BATT, PRAAM-BOAT WITH CARGO, SLOOP SMEATON

DISCHARGING, AND BRUCE’s _TWO-HALF_ ATTENDING-BOAT.

[Illustration:

APPARATUS CONNECTED WITH THE BELL ROCK WORKS.

_Drawn by G. C. Scott_

_Eng^d. by W. Miller._

_PLATE XI._]

[Sidenote: Pl. XI.]

An Account of the Bell Rock Light-House Including the Details of the Erection and Peculiar Structure of That Edifice; to Which Is Prefixed a Historical View of the Institution and Progress of the Northern Light-Houses · 第 13 / 14 章