ALASKA.

One of the first recommendations made by me in my report of seven years

ago was that the Government build a railroad from Seward to Fairbanks in

Alaska. Five years ago you intrusted to me the direction of this work.

The road is now more than two-thirds built, and Congress at this

session, after exhaustively examining into the work, has authorized an

additional appropriation sufficient for its completion. The showing made

before Congress was that the road had been built without graft: every

dollar has gone into actual work or material. It has been built without

giving profits to any large contractors, for it has been constructed

entirely by small contractors or by day's labor. It has been built

without touch of politics: every man on the road has been chosen

exclusively for ability and experience. It has been well and solidly

built as a permanent road, not an exploiting road. It has been built for

as little money as private parties could have built it, as all competent

independent engineers who have seen the road advise.

Edwin F. Wendt, of the Interstate Commerce Commission, in charge of

valuation of the railroads of the United States from Pittsburgh to

Boston, after an investigation into the manner in which the Alaskan

Railroad was constructed and its cost, reported to me as follows:

In concluding, it is not amiss to again state that after the full

study which was given to the property during our trip, we are

satisfied that the project is being executed rapidly and

efficiently by men of experience and ability. It is believed that

it is being handled as cheaply as private contractors could handle

it under the circumstances.

The road has not been built as soon as expected because each year we

have exhausted our appropriation before the work contemplated had been

done. We could not say in October of one year what the cost of anything

a year or more later would be, and we ran out of money earlier than

anticipated. It has not been built as cheaply as expected because it has

been built on a rising market for everything that went into its

construction--from labor, lumber, food supplies, machinery, and steel to

rail and ocean transportation. I believe, however, it can safely be said

that no other piece of Government construction or private construction

done during the war will show a less percentage of increase over a cost

that was estimated more than four years ago.

The men have been well housed and well fed. Their wages have been good

and promptly paid; there has been but one strike, and that was four

years ago and was settled by Department of Labor experts fixing the

scale of wages. The men have had the benefit of a system of compensation

for damages like that in the Reclamation Service and Panama Canal. They

have had excellent hospital service, and our camps and towns have been

free of typhoid fever and malaria. That the men like the work is

testified by the fact that hundreds who "came out" the past two years,

attracted by the high wages of war industries, are now anxious to return

to Alaska.

There has been but one setback in the construction, and that was the

washing out of 12 miles of tracks along the Nenana River. This is a

glacial stream which, when the snows melt, comes down at times with

irresistible force. In this instance it abandoned its long accustomed

way and cut into a new bed and through trees that had been standing for

several generations, tearing out part of the track which had been laid.

The work of locating and constructing the road has been left in the

hands of the engineers appointed by yourself. The only instruction

which they received from me was that they should build the road as if

they were working for a private concern, selecting the best men for the

work irrespective of politics or pressure of any kind. As a result, we

have a force that has been gathered from the construction camps of the

western railroads, made up of men of experience and proved capacity.

That they have done their work efficiently, honestly, and at reasonable

cost is my belief.

It is not possible during the construction of a railroad to tell what it

costs per mile because all the foundation work, the construction of

bases from which to work, the equipment for construction, and much of

the material is a charge which must be spread over the entire completed

line. The best estimate that can be made to-day as to the newly

constructed road is that it has cost between $70,000 and $80,000 per

main-line mile, or between $60,000 and $70,000 per mile of track.

This cost per mile includes the building of the most difficult and

expensive stretch of line along the entire route from Seward to

Fairbanks--that running along Turnagain Arm, which is sheer rock rising

precipitously from the sea for nearly 30 miles. There are miles of this

road which have cost $200,000 per mile. Even to blast a mule trail in

one portion of this route cost $25,000 a mile.

The only Government-built railroad--that across the Isthmus of

Panama--cost $221,052 per mile. The only two recently built railroads in

the United States are (1) the Virginian, built by H.H. Rogers, which

cost exclusive of equipment $151,000 per mile, with labor at from $1.35

to $1.75 per day and all machinery, fuel, rails, and supplies at its

door, and (2) the Milwaukee line to Puget Sound, which is estimated as

having cost $130,000 per mile exclusive of equipment.

The work has been conducted with its main base at Anchorage, which is at

the head of Cook Inlet. The point was chosen as the nearest point from

which to construct a railroad into the Matanuska coal fields. That was

the primary objective of the railroad, to get at the Matanuska coal.

From Anchorage it was also intended to drive farther north through the

Susitna Valley and across Broad Pass, and to the south along Turnagain

Arm toward the Alaska Northern track. To secure coal for Alaska was the

first need. So in addition to Anchorage as a base, one was also started

at Nenana, on the Tanana River, from which to reach the Nenana coal

fields lying to the south. If these two fields were open, one would

supply the coast of Alaska and one the interior. This program has been

acted upon, with the result that the Matanuska field is open to

tidewater with a downgrade road all the way. The Nenana road has been

pushed far enough south to touch a coal mine near the track, which may

obviate the immediate necessity for reaching into the Nenana field

proper.

There is an open stretch across Broad Pass to connect the Susitna

Valley with the road coming down from Nenana. This gap closed, there

will be through connection between Seward and Fairbanks.

Conservation Through Engineering Extract from the Annual Report of the Secretary of the Interior · 第 34 / 37 题