Sometimes the construction engineer of the railroad brings his new line

face to face with a mountain too steep to be easily mounted. Then he may

prepare to pierce it. Tunnels are not pleasant things through which to

ride. They are, moreover, expensive to construct, and when once

constructed are an unending care, necessitating expensive and constant

inspection. But--and that "but" in this case is a very large one--they

reduce grades and distances in a wholesale fashion; and when you reduce

grades you are pretty sure to be reducing operating expenses. A railroad

man will think twice in his opposition to a smoky bore of a tunnel that

will cost some three to five million dollars, when his expert advisers

tell him that that same smoky bore will save him a hundred thousand tons

of coal in the course of a year.

From almost its very beginnings the American railroad has been dependent

upon tunnels, and thus has closely followed European precedent. The

Alleghany Portage Railroad, to which reference has already been made,

passed through what is said to have been the first railroad tunnel in the

United States. It pierced a spur in the Alleghany Mountains, and it was

901 feet in length, 20 feet wide, and 19 feet high within the arch, 150

feet at each end being arched with cut stone. The old tunnel, built in

1832, which has not echoed with the panting of the locomotive for more

than half a century, is still to be found not far from Johnstown, Pa. It

simply serves the purpose to-day of calling attention to the durable

fashion in which the earliest of our railroad-builders worked.

Of the building of the Baltimore & Ohio, tunnel-construction formed an

early part, several paths being found across the steep profiles of the

Alleghanies. The Kingwood Tunnel, which B. H. Latrobe drove, was nearly a

mile long and the chief of these bores. But when the Hoosac Tunnel was

first proposed--piercing the rocky heart of one of the greatest of the

Berkshires--the country stood aghast. Four miles and a half of tunnel!

That seemed ridiculous away back in 1854, when the plan was first broached

and folk were not slow to say what they thought of such an absurd plan.

For twenty years it looked as though these scoffers were in the right--the

work of digging that monumental tunnel was a fearful drain on the treasury

of the commonwealth of Massachusetts, which was lending its aid to the

project. But the tunnel-diggers finally conquered--they almost always

do--and the Hoosac remains to-day the greatest of all mountain tunnels in

America. The system of continuous tunnels, by which the Pennsylvania

Railroad recently reached its terminal in New York, stretches from Bergen

Hill in New Jersey to Sunnyside, Long Island, a distance of some ten

miles. In fact the largest feature of recent tunnel-work in this country

has been in connection with terminal and rapid-transit development in the

larger cities. For a good many years New York and Baltimore, in

particular, have been pierced with these sub-surface railroads; it is a

construction feature that increases as our great cities themselves

increase. No river is to-day too formidable to be conquered by these

underground traffic routes. A river such as the Hudson or the Detroit may

sometimes halt the bridge-builders; it has but slight terror for the

tunnel engineers.

The tunnel-work is apt to be a separate part of the work of building a

railroad. It calls for its own talent, and that of an exceedingly expert

sort. If the tunnel is more than a half or three-quarters of a mile long

it will probably be dug from a shaft or shafts as well as from its

portals. In this way the work will not only be greatly hastened but the

shafts will continue in use after the work is completed as vents for the

discharge of engine smoke and gases from the tube. The work must be under

the constant and close supervision of resident engineers. The survey lines

must be corrected daily, for the tunnel must not go astray. It must drive

a true course from heading to heading. In the shafts plumb lines, with

heavy bobs, to lessen vibration, will be hung. Sometimes these bobs are

immersed in water or in molasses.

From the portals and from the bottoms of the shafts the headings are

driven. If the tunnel is to accommodate no more than a single track it

will be built from 15 to 16-1/2 feet wide, and from 21 to 22 feet high,

inside of its lining; so the general method is first to drive a top

heading of about 10 feet in height up under the roof of the bore. The rest

of the material is taken out in its own good season on two following

benches or levels.

Piercing a granite mountain is no rapid work. When the Pennsylvania

Railroad built its second Gallitzin Tunnel in 1903, 13 men, working 4

drills in the top heading, were able to drill 16 holes, each 10 feet deep,

in a single day. The engineers there figured that each blast removed

twenty-three cubic yards of the rock. At night, when the "hard-rock men"

were sleeping and their drills silent, a gang of fourteen "muckers"

removed the loosened material.

Slow work that. The Northern Pacific finding its way through the crest of

the Cascade Mountains by means of the great Stampede Tunnel, nearly two

miles in length, demanded that the contractor work under pressure and make

13-1/2 feet of tunnel a day. The contractor, working under the bonus plan,

did better. With his army of 350 "hard-rock men," "muckers," and their

helpers, and his tireless battery of 36 drills he sometimes made as high

as eighteen feet a day from the two headings. On a three-year job he beat

his contract time by seven days. The Northern Pacific paid the price, $118

for each lineal foot of tunnel. That was a high price, occasioned largely

by the fact that the work was carried forward in what was then an almost

unbroken wilderness. The Wabash finding its way through the great and

forbidding hills of Western Pennsylvania to Pittsburgh a dozen years later

was able to dig its succession of tunnels at an average cost of $4,509 for

100 feet. Of that amount $2,527 went for labor; and $260 was the price of

a ton of dynamite.

When the tunnel engineer finds that his bore is not to pierce hard-rock,

of whose solidity he is more than reasonably assured, he prepares to use

cutting-shields. These shields, proceeding simultaneously from the portals

and from the footings of the shafts, are steel rings of a circumference

only slightly greater than that of the finished tunnel. With pick and with

drill and dynamite, they constantly clear a path for it, whereupon it is

pressed forward in that path. Dummy tracks follow the cutting-shield; and

dummy locomotives--more likely electric than steam in these days--are used

in removing the material. Electricity has been a boon to latter-day

tunnel-workers. Its use for light and power keeps the tunnel quite clear

of all gases during the work of boring.

In rare cases, the rock through which the shield has been forced is strong

enough to support itself; in most works the engineers prefer to line the

bore, with brick and concrete, as a rule. This lining is set in the path

of the cutting-shield before its protection is entirely withdrawn; and so

the heavy roof-timbering which was formerly a trade-mark of the successful

tunnel engineer is no longer used.

Tunnel-boring becomes doubly difficult when the railroad is to be carried

under a river or some broad arm of the sea. Men work in an unnatural

environment when they work below the surface of great waters, and the

record of such work is a record of many tragedies. At any instant firm

rock may cease, silt or sand or an underground stream may make its

appearance and the helpless workmen find a ready grave. In work where

there is even the slightest expectation of such a contingency the

air-lock, with its artificial pressure to hold back the soft earth and

moisture is brought into use. In another chapter we shall see how the

caisson is operated. Suffice it to say now that the necessity of "working

under the air," brings no comfort to any one. It vastly hinders and

complicates the work of construction, and adds greatly to the expense.

Moreover, it has its own record of tragedies. Still it remains, to the

infinite credit of a national persistence, that there is no record in the

annals of American engineering where the workers have finally given up a

tunnel job. Lives have been sacrificed, good-sized fortunes swept away,

but in the end the resistless railroad has always found its underground

path.

The tunnel-workers can tell you of the accident when the subway was being

driven under the East River from Manhattan to Brooklyn, three years ago.

The cutting-shield, which was advancing from the Brooklyn side, suddenly

slipped out from the rock into the unprotected soft mud of the river

bottom. The heavily compressed air shot a geyser straight up to the

surface of the river some fifty feet above. A workman shot through the

geyser, pirouetted gayly for a fraction of a second above the river, then

dropped, to be picked up by the crew of a passing ferryboat. In a week he

was back at work again inside the cutting-shield. His fortune was the

opposite of that which generally awaits a man caught in a tunnel accident.

"It ain't as bad as it used to be," one of them informs you. "When I first

got into this profession, they didn't have the electricity for lights or

moving the cars or nothing. We used to try and get along with safety

lamps an' near choke to death. It was more like hell then than it is now."

[Illustration: "SOMETIMES THE CONSTRUCTION ENGINEER ... BRINGS HIS LINE

FACE TO FACE WITH A MOUNTAIN"]

[Illustration: FINISHING THE LINING OF A TUNNEL]

[Illustration: THE BUSIEST TUNNEL POINT IN THE WORLD--AT THE WEST PORTALS

OF THE BERGEN TUNNELS, SIX ERIE TRACKS BELOW, FOUR LACKAWANNA ABOVE]

[Illustration: THE HACKENSACK PORTALS OF THE PENNSYLVANIA'S GREAT TUNNELS

UNDER NEW YORK CITY]

But your interest in the man who was blown from the tunnel to the surface

of the river and escaped with his life is not entirely satiated, and you

ask more questions. What do they do when they strike soft mud like that?

"We get down and pray," he of the experience in this weird form of

construction engineering tells you. "We try to get the boys safely back

through the air-lock, and then we quit boring till we can fix things up

from outside. If it's a real bad case we've got to make land to bore

through. It's generally done by dumping rock and bags of sand from floats

just over where she blows out. It's a pretty rough way of doctoring her

up, but it has to go, and generally it does. All we want is to get it to

hold until we can set the rings of the tunnel.

"That ain't always the worst. I've been driving a bore under water this

way, when we struck stiff rock overhead and soft mud underneath the edge.

That's something that makes the engineers hump. You can't rest a cast-iron

tunnel like this on mud and you get a wondering if you've got to quit

after all this work under the durned old river, and let the boss lose his

money.

"The last time we struck a snag of that sort, the boss didn't give up. He

wasn't that kind. He had a chief engineer that was brass tacks from

beginning to end. What do you suppose that fellow did? He bored holes in

the bottom of the lining and drove steel legs right down to the next ledge

of solid rock below. There's that tunnel to-day, carrying 32,000 people

between five and six o'clock every night perched down there seventy feet

underground like a big caterpillar sprawled under the wickedest ledge o'

rock you ever see."

It takes a real genius of an engineer for this sort of work. He who drives

his bore into the unknown must be on guard for the unexpected. Emergencies

arise upon the minute, and the tunnel engineer must be ready with his

wits and ingenuity to meet them. Finally the day does come when the bores

from either shore are hard upon one another. If there has been blasting

under the bed of the river it is reduced to a minimum. The drills work at

half-speed, the fever of expectancy hangs over the men. Those who are

close at the heading catch faint sounds of the workmen on the other side

of the thin barrier--the last barrier of the river that was supposed to

acknowledge no conqueror.

The first tiny aperture between the two bores is greeted with wild cheers.

On the surface far above, the whistles of the shaft-houses carry forth the

news to the outer world; it is echoed and reëchoed by the noisy river

craft. The aperture grows larger. It is large enough to permit the passage

of a man's body; and a man, enjoying fame for this one moment in his life,

crawls through it. The men knock off work and have a rough spread in the

tunnel. At night the engineers and contractors banquet in a hotel. "Not so

bad," the chief engineer says quietly. "We were 3/8 of an inch out, in

8,000 feet." It was not so bad. It spoke wonders for his profession. To

carry forth two giant bores from the opposite sides of a broad river, and

have them meet within 3/8 of an inch of perfect alignment, was an

achievement well worth attention.

After that, the last traces of the rough rock and silt are removed, the

iron rings of the tunnel made fast together, the air pressure released,

the cutting-shields, that formed so essential a feature of the

construction, removed. Then there remains only the work of installing

conduits and wiring and laying the tracks before the tunnel is ready for

the traffic of the railroad.

* * * * *

The Michigan Central has recently finished a tunnel under the busy Detroit

River, at Detroit, which eliminates the use of a car-ferry at that point.

The tunnel was built in a manner entirely new to engineers. The river at

Detroit is about three-quarters of a mile wide, and its bed is of soft

blue clay, making it difficult to bore a tunnel safely and economically.

To meet this obstacle a new fashion of tunnel-building was created.

The tunnel itself consists of two tubes, each made from steel 3/8 of an

inch in thickness and reinforced every twelve feet by outer "fins." The

channel was dredged and a foundation bed of concrete laid. The sections of

the tunnel, each 250 feet long, were then put in position one at a time.

The section-ends were closed at a shore plant with water-tight wooden

bulkheads. They were then lashed to four floating cylinders of compressed

air and towed out to position. After that it was merely a matter of detail

to drop the sections into place, pour in more concrete and make the new

section fast. The wooden bulkheads next the completed tube were then

removed and the structure was ready for the track-layers. The sub-aqueous

portion of the new Detroit Tunnel is 2,600 feet long; it joins on the

Detroit side with a land tunnel 2,100 feet long, and on the Canadian side

with a land tunnel of 3,192 feet.

It takes more than a river, carrying through its narrow throat the vast

and growing traffic of the Great Lakes--a traffic that is comparable with

that of the Atlantic itself--to halt the progress of the railroad.