CHAPTER IV.

WELL BORING.

The first method of well boring known in Europe is that called the

Chinese, in which a chisel suspended by a rope and surrounded by a tube

of a few feet in length is worked up and down by means of a spring-pole

or lever at the surface. The twisting and untwisting of the rope

prevents the chisel from always striking in the same place; and by its

continued blows the rock is pounded and broken. The chisel is withdrawn

occasionally, and a bucket or shell-pump is lowered, having a hinged

valve at the bottom opening upwards, so that a quantity of the _débris_

becomes enclosed in the bucket, and is then drawn up by it to the

surface; the lowering of the bucket is repeated until the hole is

cleared, and the chisel is then put to work again.

Fig. 49 is of an apparatus, on the Chinese system, which may be used

either for hemp-rope or wire-rope, and which was originally made for

hoop-iron. At A, Fig. 49, is represented a log of oak wood, which is set

perpendicularly so deep in the ground as to penetrate the loose gravel

and pass a little into the rock, and stand firm in its place; it is well

rammed with gravel and the ground levelled, so that the butt of the log

is flush with the surface of the ground, or a few feet below. Through

this log, which may be, according to the depth of loose ground, from 5

feet to 30 feet long, a vertical hole is bored by an auger of a diameter

equal to that of the intended boring in the rock. On the top of the

ground, on one side of the hole, is a windlass whose drum is 5 feet in

diameter, and the cogwheel which drives it 6 feet; the pinion on the

crank axle is 6 inches. This windlass serves for hoisting the spindle or

drill, and is of a large diameter, in order to prevent short bends in

the iron, which would soon make it brittle.

[Illustration: Chinese System.

Fig. 49.]

In all cases where iron, either hoop-iron or wire-rope, is used, the

diameter of the drum of the windlass used must be sufficiently large to

prevent a permanent bend in the iron. On the opposite side of the

windlass is a lever of unequal leverage, about one-third at the side of

the hole, and two-thirds at the opposite side, where it ends in a cross

or broad end where men do the work. The workmen, with one foot on a

bench or platform, rest their hands on a railing, and work with the

other foot the long end of the lever. In this way the whole weight of

the men is made use of. The lift of the bore-bit is from 10 to 12

inches, which causes the men to work the treadle from 20 to 24 inches

high. Below the treadle, T, is a spring-pole, S, fastened under the

platform on which the men stand, the end of this spring-pole is

connected by a link to the working end of the lever, or to the rope

directly, and pulls the treadle down. When the bore-spindle is raised by

means of the treadle, the spring-pole imparts to it a sudden return, and

increases by these means the velocity of the bit, and consequently that

of the stroke downwards.

This method has been generally disused, iron or wood rods substituted in

the place of the rope, and a variety of augers and chisels instead of

the simple chisel, with appliances for clearing the bore-hole of

_débris_. Figs. 50 to 56 show examples of an ordinary set of well boring

tools. Fig. 52 is a flat chisel; Fig. 53 a [V]-chisel; and Fig. 54 a

[T]-chisel. These chisels are made from wrought-iron, and when small are

usually 18 inches long, 2-1/2 inches extreme breadth, and weigh some

4-1/2 lb.; the cutting edge being faced with the best steel. They are

used for hard rocks, and whilst in operation need carefully watching

that they may be removed and fresh tools substituted when their sides

are sufficiently worn to diminish their breadth. If this circumstance is

not attended to the size of the hole decreases, so that when a new

chisel of the proper size is introduced it will not pass down to the

bottom of the hole, and much unnecessary delay is occasioned in

enlarging it. In working with the chisel, the borer keeps the tiller, or

handles, in both hands, one hand being placed upon each handle, and

moves slowly round the bore, in order to prevent the chisel from falling

twice, successively, in the same place, and thus preserve the bore

circular. Every time a fresh chisel is lowered to the bottom it should

be worked round in the hole, to test whether it is its proper size and

shape; if this is not the case the chisel must be raised at once and

worked gradually and carefully until the hole is as it should be. The

description of strata being cut by the chisel can be ascertained with

considerable accuracy by a skilful workman from the character of the

shock transmitted to the rods.

When working in sandstone there is no adherence of the rock to the

chisel when drawn to the surface, but with clays the contrary is the

case. Should the stratum be very hard, the chisel may be worn and blunt

before cutting three quarters of an inch, it must therefore be raised to

the surface and frequently examined; however, 7 or 8 inches may be bored

without examination, should the nature of the stratum allow of such

progress being made.

[Illustration: Well-boring Tools.

Figs. 50-56.]

Ground augers, Figs. 50, 51, and 56, are similar in action to those used

for boring wood, but differ in shape and construction. The common earth

auger, Fig. 50, is 3 feet in length, having the lower two-thirds

cylindrical. The bottom is partially closed by the lips, and there is an

opening a little up one side for the admission of soft or bruised

material. Augers are only used for penetrating soft rock, clay, and

sand; and their shape is varied to suit the nature of the strata

traversed, being open and cylindrical for clays having a certain degree

of cohesion, conical, and sometimes closed, in quicksands. Augers are

sometimes made as long as 10 feet, and are then very effective if the

strata is soft enough to permit of their use. The shell is made from 3

feet to 3-1/2 feet in length, of nearly the same shape as the common

auger, sometimes closed to the bottom, Fig. 56, or with an auger nose,

Fig. 51; in either case there is a clack or valve placed inside for the

purpose of retaining borings of a soft nature or preventing them from

being washed out in a wet hole. Fig. 59 shows a wad-hook for withdrawing

stones, and Fig. 58 a worm-auger.

The Crow's Foot, Fig. 55, is used when the boring rods have broken in

the bore-hole, for the purpose of extracting that portion remaining in

the hole; it is the same length, and at the foot the same breadth as the

chisels. When the rods have broken, the part above the fracture is drawn

out of the bore-hole and the crow's foot screwed on in place of the

broken piece; when this is lowered down upon the broken rod, by careful

twisting the toe is caused to grip the broken piece with sufficient

force to allow the portion below the fracture to be drawn out of the

bore-hole. A rough expedient is to fasten a metal ring to a rope and

lower it over the broken rod, when the rod cants the ring, and thus

gives it a considerable grip; this is often very successful. Fig. 57 is

a worm used for the same purpose. A bell-box, Fig. 60, is frequently

employed for drawing broken rods; it has two palls fixed at the top of

the box, which rise and permit the end of the rod to pass when the box

is lowered, but upon raising it the palls fall and grip the rod firmly.

A spiral angular worm, similar to Fig. 57, is also applied for

withdrawing tubes.

[Illustration: Withdrawing Tools.

Figs. 57-59.]

[Illustration: Bell-box.

Fig. 60.]

Of these withdrawing tools the crow is the safest and best, as it may be

used without that intelligent supervision and care absolutely necessary

with the worms and wad-hooks, or the bell-box.

The boring rods, Figs. 61, 62, are in 3, 6, 10, 15, or 20 feet lengths,

of wrought-iron, preferably Swedish, and are made of different degrees

of strength according to the depth of the hole for which they are

required; they are generally 1 inch square in section: at one end is a

male and at the other end a female screw for the purpose of connecting

them together. The screw should not have fewer than six threads. One of

the sides of the female screw frequently splits and allows the male

screw to be drawn out, thus leaving the rods in the hole. By constant

wear, also, the screw may have its thread so worn as to become liable to

slip. Common rods being most liable to accident should be carefully

examined every time they are drawn out of the bore-hole, as an

unobserved failure may occasion much inconvenience, and even the loss of

the bore-hole. In addition to the ordinary rods there are short pieces,

varying from 6 inches to 2 feet in length, which are fixed at the top,

as required, for adjusting the rods at a convenient height.

[Illustration: Boring Rods.

Fig. 61, 62.]

[Illustration: Hand-dog.

Fig. 63.]

[Illustration: Lifting Dog.

Fig. 64, 65.]

[Illustration: Tillers.

Fig. 66.]

Fig. 63 is a hand-dog; Figs. 64 and 65, a lifting dog; Fig. 66, the

tillers or handles by which the workmen impart a rotary motion to the

tools. The tillers are clamped to the topmost boring rod at a convenient

height for working. Fig. 61, a top rod with shackle. Fig. 67, a

spring-hook. When in use this should be frequently examined and kept in

repair.

[Illustration: Spring-hook.

Fig. 67.]

Lining tubes are employed to prevent the bore-hole falling in through

the lateral swelling of clay strata, or when passing through running

sand. The tubes are usually of iron, of good quality, soft, easily bent,

and capable of sustaining an indent without fracture. Inferior tubes

occasion grave and costly accidents which are frequently irreparable, as

a single bad tube may endanger the success of an entire boring.

Wrought-iron tubes with screwed flush joints, Fig. 68, are to be

recommended, but they are supplied brazed, Fig. 69, or riveted, Fig. 70,

and can be fitted with steel driving collars and shoes. Cast-iron tubes

are constantly applied; they should have turned ends with wrought-iron

collars and countersunk screws.

[Illustration: Tubes with Screwed Joints.

Fig. 68.]

[Illustration: Tubes with Brazed or Riveted Joints.

Figs. 69, 70.]

Cold-drawn wrought-iron tubes have been used, and are very effective as

well as easily applied, but their relatively high cost occasions their

application to be limited.

[Illustration: Stud Block.

Fig. 71.]

Fig. 71 shows a stud-block, which is used for suspending tubing either

for putting it down or for drawing it up. It consists of a block made to

fit inside the end of the tube, and attached to the rods in the usual

way. In the side of the block is fixed an iron stud for slipping into a

slot, similar to a bayonet-joint, cut in the end of the tube, so that it

may be thus suspended. Figs. 72 to 74 show various forms of

spring-darts, and Fig. 75 a pipe-dog, for the same purpose. Sometimes a

conical plug, with a screw cut around the outside for tightening itself

in the upper end of the tube, is used for raising and lowering tubing.

Figs. 76 and 77 are of tube clamps, and Fig. 78 tongs for screwing up

the tubes. Fig. 79 is of an ordinary form of sinker's bucket.

[Illustration: Spring-dart.

Fig. 72.]

[Illustration: Spring-Dart.

Fig. 73.]

[Illustration: Spring-dart.

Fig. 74.]

[Illustration: Pipe-dog.

Fig. 75.]

[Illustration: Tube Clamp.

Fig. 76.]

[Illustration: Tube Clamp.

Fig. 77.]

[Illustration: Tongs.

Fig. 78.]

[Illustration: Sinker's Bucket.

Fig. 79.]

Fig. 80 is a pipe-dolly, used for driving the lining tubes; the figure

shows it in position ready for driving.

When a projection in the bore-hole obstructs the downward course of the

lining tubes, the hole can be enlarged below the pipes by means of a

rimer, Fig. 81. It consists of an iron shank, to which is bolted two

thin strips, bowed out in to the form of a drawing pen. The rimer is

screwed on to the boring rods, and forced down through the pipes; when

below the last length of pipe the rimer expands, and can then be turned

round, which has the effect of scraping the sides and enlarging that

portion of the hole subject to its operation. Fig. 82 is of an improved

form of rimer, termed a riming spring. It will be seen that this

instrument is much stronger than the ordinary rimer, in consequence of

the shank being extended through its entire length, thus rendering the

scraping action of the bows very effective, whilst the slot at the foot

of the bows permits of its introduction into, and withdrawal from, the

tubing.

[Illustration: Pipe-dolly.

Fig. 80.]

[Illustration: Rimer.

Fig. 81.]

[Illustration: Riming Spring.

Fig. 82.]

In England, for small works, the entire boring apparatus is frequently

arranged as in Fig. 83, the tool being fixed at the end of the

wrought-iron rods instead of at the end of a rope, as in the Chinese

method. Referring to Fig. 83, A is the boring tool; B the rod to which

the tool is attached; D D the levers by which the men E E give a

circular or rotating motion to the tool; F, chain for attaching the

boring apparatus to the pole G, which is fixed at H, and by its means

the man at I transmits a vertical motion to the boring tool.

[Illustration: Boring Apparatus.

English, for Small Works.

Fig. 83.]

The sheer-legs, made of sound Norway spars not less than 8 inches

diameter at the bottom, are placed over the bore-hole for the purpose of

supporting the tackle K K for drawing the rods out of or lowering them

into the hole, when it is advisable to clean out the hole or renew the

chisel. It is obvious that the more frequently it is necessary to break

the joints in drawing and lowering the rods, the more time will be

occupied in changing the chisels, or in each cleaning of the hole, and

as the depth of the hole increases the more tedious will the operation

be. It therefore becomes of much importance that the rods should be

drawn and lowered as quickly as possible, and to attain this end as long

lengths as practicable should be drawn at each lift. The length of the

lift or off-take, as it is termed, depending altogether upon the height

of the lifting tackle above the top of the bore-hole, the length of the

sheer-legs for a hole of any considerable depth should not be less than

30 to 40 feet; and they usually stand over a small pit or surface-well,

which may be sunk, where the clay or gravel is dry, to a depth of 20 or

30 feet. From the bottom of this pit the bore-hole may be commenced, and

here will be stationed the man who has charge of the bore-hole while

working the rods.

[Illustration: Boring Platform.

For Deep or Difficult Wells.

Fig. 84.]

The arrangement, Fig. 84, is intended for either deep or difficult

boring. A regular scaffolding is erected upon which a platform is built.

The boring chisel A is, as in the last instance, coupled by means of

screw-couplings to the boring rods B. At each stroke two men stationed

at E E turn the rod slightly by means of the tiller D D. A rope F, which

is attached to the boring tool, is passed a few times round the drum of

a windlass G, the end of the rope being held by a man at I. When the

handles are turned by the men at L L the man at I pulls at the rope end,

the friction between the rope and the drum of the windlass is then

sufficient to raise the rods and boring tool, but as soon as the tool

has been raised to its intended height the man at I slackens his hold

upon the rope, and as there is insufficient friction on the drum to

sustain the weight of the boring tools, they fall. By a repetition of

this operation the well is bored, and after it has been continued a

sufficient length of time the tiller is unscrewed, and a lifting dog,

attached to the rope from the windlass, is passed over the top of the

rods, and then a short top rod with a shackle is screwed on. The two men

at the windlass draw up the rods as far as the height of the

scaffolding or sheer-legs will allow, when a man at E, Fig. 84, by

passing a hand-dog or a key upon the top of the rod under the lowest

joint drawn above the top of the hole, takes the weight of the rods at

this joint, the men at L having lowered the rods for this purpose; with

another key the rods are unscrewed at this joint, the rope is lowered

again, the lifting dog put over the rod, another top rod screwed on, the

rods lifted, and the process continued until the chisel is drawn from

the hole and replaced by another, or, if necessary, replaced by some

other tool.

When a deep boring is undertaken, direct from the surface, the operation

had best be conducted with the aid of a boring sheer-frame such as is

shown in the frontispiece. This consists of a framework of timber balks,

upon which are erected four standards, 27 feet in height, and 9 inches ×

1 foot thick, 3 feet 8 inches apart at bottom, and 1 foot 2 inches at

top, as seen in the front and rear elevations. The standards are tied by

means of cross pieces, upon which shoulders are cut which fit into

mortise holes, and are fastened by means of wooden keys, the standards

being surmounted by two head pieces 5 feet long, mortised and fitted.

Upon the head pieces two independent cast-iron guide pulleys are

arranged in bearings; over these pulleys are led the ends of two ropes

coiling in opposite directions upon the barrel of a windlass moved by

spur gearing, and having a ratchet stop attached to a pair of diagonal

timbers, connected with the left-hand legs or standards of the sheers,

near the ground. These ropes are used for raising or lowering the

lengths of the boring rod.

Eight feet below the bearings of the top pulleys, a pair of horizontal

traverses is fixed across the frame, supporting smaller pulleys mounted

on a cast-iron frame, which is capable of motion between horizontal

wooden slides. Over these pulleys is led a rope from a plain windlass

fixed to the right-hand legs of the frame, to be used for raising or

lowering the shell to extract the _débris_ or rubbish from the hole.

The lever, 15 feet long, and 9 inches × 6 inches in section, is

supported by an independent timber frame. It has a cast-iron cap,

fastened by means of two iron straps, cast with lugs through which bolts

are passed, these being tightened with nuts in the ordinary manner. The

bearing-pins at a are 1-1/2 inch in diameter, and also form part of the

lower strap. Upon the cap is an iron hook, to this a chain is attached

carrying the spring-hook which bears the top shackle of the rods. The

top of the bore-hole is surrounded by a wooden tube 1 foot in diameter,

and surrounded by a hinged valve, whose action is similar to that of a

clack-valve; this has a hole in the centre for the rods to pass up and

down freely. The valve permits of the introduction and withdrawal of the

tools, and at the same time prevents anything from above falling into

the bore-hole.

[Illustration: Diminishing Tube Diameter Arrangement.

Fig. 85.]

The lever is applied by pressure upon its outer end, and as the relation

of the long to the short arm is as 4 to 1, a depression of 2 feet in the

one case produces an elevation of 6 inches in the other, the minimum

range of action, the maximum being 26 inches.

With the sheer-frame the boring tools are worked in the same manner as

in the preceding arrangements, Figs. 83, 84; but its portability,

compactness, and adaptation of means to the required end, render its use

desirable wherever it is possible to obtain it.

[Illustration: Driving Ring for wrought-iron Tubes.

Fig. 86.]

When in the progress of the work it is found that the auger does not go

down to the depth from which it was withdrawn, after trial, tubing will

generally be necessary. The hole should be enlarged from the surface,

or, if not very deep, commenced afresh from the surface with a larger

auger, and run down to nearly the same depth; the first length of tube

is then driven into the hole, and when this is effected another tube,

having similar dimensions to the first, is screwed into its upper end,

and the driving repeated, and so on until a sufficient number of pipes

have been used to reach to the bottom of the hole. If the ordinary auger

is now introduced through these tubes it will have free access to the

clay or sand, and after a few feet deeper have been bored another pipe

may be screwed on, and the whole driven farther down. In this way from

10 to 20 feet of soft stratum may be bored through. If the thickness of

the surface clay or sand is considerable the method here mentioned will

not be effective, as the friction of the pipes caused by the pressure

of the strata will be so great that perhaps not more than 80 or 100 feet

can be driven without the pipes being injured. It will then be necessary

to put down the first part of the bore-hole with a large auger, and

drive in pipes of larger diameter; the hole is continued of smaller

diameter, and lined with smaller tubes projecting beyond the large

tubes, as in Fig. 85, until the necessity for their use ceases. It will

be evident that to ensure success the tubing, whatever it is made of,

should be as truly cylindrical as possible, straight, and flush surface,

both outside and in. It will also be evident that in thus joining pieces

of tubing together, the thickness ought to have a due proportion to the

work required, and the force likely to be used in screwing or driving

them down. Wrought-iron tubes, when driven, must be worked carefully, by

means of a ring made of wrought-iron, from 1-1/2 to 2 inches in height

and 3/4 inch thick, and of the form shown in Fig. 86; or driven with a

pipe-dolly such as that in Fig. 80. The ring, or the dolly, is screwed

into the lowermost boring rod and worked at the same rate and in a

similar manner to the chisel, due regard being had to the depth at which

the driving is being done, as the weight of the boring rods will

materially affect the strength of the blow delivered. Cast-iron tubing

may be driven hard with a monkey. To withdraw broken or defective

tubing quickly, two hooks attached to ropes are lowered down from

opposite sides of the bore-hole, caught on the rim of the lowermost

tube, and power applied to haul the tubing up bodily.

Figs. 87 to 91 show good methods of forming tube or pipe joints both in

cast and wrought-iron, when not screwed.

[Illustration: Fig. 87.]

[Illustration: Fig. 88.]

[Illustration: Fig. 89.]

[Illustration: Fig. 90.]

[Illustration: Fig. 91.]

P. S. Reed, an English mining engineer, gives the following instance of

replacing defective tubing in a boring which had been pursued to the

depth of 582-1/2 feet, but which, owing to circumstances which were

difficult to determine, had become very expensive, and made slow

progress.

The 582-1/2 feet had been bored entirely by manual labour; but Reid

recommended the erection of a horse-gin, in which the power was applied

to a 40-inch drum placed upon a vertical axle, the arms of which

admitted of applying two horses, and men at pleasure, the power gained

being in the proportion of one to ten at the starting-point for the

horses.

Upon the upright drum a double-ended chain was attached, which worked

over sheer-legs erected immediately over the hole, so as to attain an

off-take for the rods of 60 feet, and so as that, in the act of raising

or lowering, there might always be one end of the chain in the bottom,

ready to be attached, and expedite the work as much as possible.

These arrangements being made, it was soon found that there was a defect

in the tubing which was inserted to the depth of 109 feet, and the

defect was so serious, in permitting the sand to descend and be again

brought up with the boring tools, as to render it very difficult to tell

in what strata they really were; this increased to such a degree as to

cause the silting up of the hole in a single night to the extent of 180

feet, and it occupied nearly a fortnight in clearing the hole out again.

On carefully examining into this defect, it appeared that the water rose

in the hole to the depth of 74 feet from the surface; and that at this

point it was about level with the high-water mark on the Tees, about two

miles distant, with which it was no doubt connected by means of

permeable beds, extending from the arenaceous strata at a depth of 100

feet.

On commencing to bore, the motion of the rods in the hole caused the

vibration of the water between a range of 40 feet at the bottom of the

tubing, and so disturbed the quiescent sand as to cause it to run down

through the faults in the lower end of the tubing.

This tubing was made of galvanized iron plates, riveted together and

soldered; at the top of the hole it was in three concentric circles,

which had been screwed and forced down successively until an obstacle

was met with at three different places. So soon as the outer circle

reached the first depth, all hope appears to have vanished, from those

who bored the earlier part of the work, of getting the tube farther; a

second tube was, therefore, inserted, which seems to have advanced as

far as the second obstacle, where it, in its turn, was abandoned; and a

third one advanced until it rested in the strata at the lower part of

the lias freestone of a blue nature, as found on the rocks at Seaton

Carew, and in the bed of the Leven, near Hutton Rudby. The diameter of

the first tubing was 3-7/8 inches external and 3-1/2 inches internal;

the second tube was 3-1/4 inches external, and 3 inches internal

diameter; and the third tube was 2-3/4 inches external and 2-1/2 inches

internal diameter.

Such being the account gathered from the workmen who superintended the

earlier part of the boring, it became necessary to decide upon the best

cause to remedy the evil. At first sight it would have appeared easy

enough to have caught the lower end of the tubes by means of a fish-head

properly contrived, and thus to have lifted them out of the hole, and

replaced them with a perfect tube, such as a gas-tube, with faucet

screw-joints; but, on attempting this, it soon became evident that

however good the tubing which might have been adopted, it would be a

work of the greatest difficulty to extract when once it was regularly

fixed and jammed into its place by the tenacious clayey strata

surrounding it; and the difficulty of extracting it, in the present

case, was even enhanced by the inferior quality and make of the tubing;

in short, that, unless by crumpling it up in such a manner as to destroy

the hole, it was impossible to extract this tubing by main force.

There was, therefore, no other choice left but to attempt cutting it

out, inch by inch; though before doing so, force was applied to the

bottom of the tubing, to the extent of upwards of 30 tons, the only

result being the loss of several pieces of steel down the hole, which

had to be brought up with a powerful magnet.

After much mature consideration and contrivance, it was determined to

order such tubing as would at the same time present as little obstacle

as possible to the clay to be passed through on the outside, as well as

surround the largest of the three tubes then in the hole, and present no

obstacle to their being withdrawn through its interior.

These tubes were made 12 feet in length, flush outside and in, the lower

portion being steeled for 6 inches from the bottom end, so as to cut its

way and follow down the space, and cover that exposed by the old tubes

when cut and drawn, as shown in Fig. 92.

In order to commence operations, and avoid too much clay going down to

the bottom of the hole, a straw-plug was firmly fixed in the lias

portion of the hole. The lower portion of the new tubes was then screwed

around the old ones by means of powerful clamps, attached to the

exterior in such a manner as to avoid injuring the surface; and when

they could be screwed no farther, the knife or cutter, Figs. 92 to 94,

was introduced inside the old tubing. Some force was needed to get this

knife down into the tubing, but the spring a giving so as to

accommodate itself to the hole, permitted its descent to the distance

required; this being effected, it was turned round so that the steel

cutter, shown at _b_, being forced against the sides of the tube, cut it

through in the course of ten minutes or a quarter of an hour's turning.

See section at _b_, _c_, Fig. 93.

[Illustration: The Action of the Knife or Spring-cutter.

Prepared for Cutting.

Fig. 92.]

[Illustration: The Action of the Knife or Cutter.

Ready for Removal after Cutting.

Fig. 93.]

[Illustration: Back View of Knife or Cutter.

Fig. 94.]

The old tubes being three-ply, three of these knives or cutters were

required to cut out the three tubes, the inner one being detached first,

and then the two exterior ones; and so soon as these latter were cut out

as far as they had been forced into the clay, the work became simplified

into following down the interior tubing by the new tubes, as shown by

the dotted lines. From _d_ at the lower end, it was found that the old

inner tube had been so damaged or torn, either by the putting in or

hammering it down, as to leave a vent or fissure for the sand to

descend, and thus spoil the whole of the work for all future success in

the boring, to say nothing of the very great cost of lifting the sand

out, and subsequent most arduous labour to put the hole right.

Boring was recommenced after about a month's labour in taking out the

old tubings, leaving the new ones firmly bedded into the lias

formation, 112 feet from the surface, and the hole was subsequently

bored to a depth of 710 feet in the new red sandstone formation,

proceeding at the rate of about 3 feet in the twelve hours, and leaving

the hole so as, if requisite, it might be widened out to 4 inches

diameter. Fig. 92 shows the action of the knife and spring-cutter when

forced down into the tubing, ready to commence cutting. It also shows

the lower end of the new tubing, enclosing the others at the

commencement of the work. The joints of the new tubes were made by means

of a half-lap screw. Fig. 94 is a back view of the knife or cutter _b_.

Fig. 93 shows the action of the spring and cutter when the requisite

length is cut through and ready for lifting; the position of the tube

being maintained perpendicular, or nearly so, by the ball or thickening

on the rods at K, and the lower end of the tube being supported by the

projecting steel cutter at _b_, the dotted lines from _d_ showing the

position of the new steel-ended tube when screwed down ready for another

operation. In boring deeper after the tubes were removed, three wooden

blocks were used round the rods in the new tube to keep them plumb.

In some cases it is necessary to widen out holes below the sharp edge of

tubing, so as to permit its descent. This is effected with a rimer,

Figs. 81 and 82, and is an operation requiring great care and attention.

To reduce the stoppages for the withdrawal of _débris_ the system of

Fauvelle was introduced, but it is now very little practised on the

Continent, and not at all in Great Britain. The principles upon which it

was founded were: first, that the motion given to the tool in rotation

was simply derived from the resistance that a rope would oppose to an

effort of torsion; and therefore that the limits of application of the

system were only such as would provide that the tool should be safely

acted upon; and, secondly, that the injection of a current of water,

descending through a central tube, should wash out the _débris_ created

by the cutting tool at the bottom. The difficulties attending the

removal of the _débris_ were great; and though the system of Fauvelle

answered tolerably well when applied to shallow borings, it was found

to be attended with such disadvantages when applied on a large scale,

that it has been generally abandoned. The quantity of water required to

keep the boring tool clear is a great objection to the introduction of

this system, especially as in the majority of cases Artesian wells are

sunk in such places as are deprived of the advantage of a large supply.

In the ordinary system of well boring, innumerable breakages and delays

occur when a boring is required to be carried to any depth exceeding 200

or 300 feet, owing to the buckling of the rods, the crystallization of

the iron by the constant jarring at each blow, and particularly the

increased weight of the rods as the hole gets deeper. It follows from

this, that where the excavation is very deep, there is considerable

difficulty in transmitting the blow of the tool, in consequence of the

vibration produced in the long rod, or in consequence of the torsion;

and, for the same reason, there is a danger of the blows not being

equally delivered at the bottom. It has been attempted to obviate this

difficulty, but without much success, by the use of hollow rods,

presenting greater sectional area than was absolutely necessary for the

particular case, in order to increase their lateral resistance to the

blows tending to produce vibration.

Boring is usually executed by contract. The approximate average cost in

England may be taken at 1_s._ 3_d._ a foot for the first 30 feet; 2_s._

6_d._ a foot for the second 30 feet; and continue in arithmetical

progression, advancing 1_s._ 3_d._ a foot for every additional 30 feet

in depth. This does not include the cost of tubing, conveyance of plant

and tools, professional superintendence, or working in rock of unusual

hardness, such as hard limestone and whinstone. A clause is usually

inserted in the contract, to the effect that, if any unforeseen

difficulty is met with in the course of the work, it is then paid for by

the day, at a rate previously determined upon, until the difficulty has

been overcome.

Water Supply: the Present Practice of Sinking and Boring Wells With Geological Considerations and Examples of Wells Executed · 第 4 / 8 章