CHICAGO ELEVATED RAILROADS

The present Chicago Elevated Railroads are an amalgamation of the four

systems which up to 1911 were operated as independent lines. Under the

unified system of operation a single fare takes the passenger from one

end of the system to the other, except that north of Howard Street on

the Evanston line an additional fare is collected. The longest

continuous ride without change is from Wilmette to Jackson Park, a

distance of 24 miles.

The first elevated road, afterward known as the South Side Elevated,

started operation in June, 1892, with steam engines. After the

successful demonstration on the Intramural Railway this line was

electrified; all steam equipment being withdrawn in 1898.

What is now the Chicago and Oak Park Elevated Railroad began operation

in 1893 also with steam locomotives. Electrical operation began in

September, 1896.

[Illustration: 30,000-KW. CURTIS TURBINE IN NORTHWEST STATION OF

COMMONWEALTH EDISON COMPANY]

The Metropolitan West Side was originally planned for steam locomotive

operation, but developments in electric traction during the construction

period were so rapid that orders for steam equipment were cancelled and

operation began in May, 1895, with electric equipment.

The Northwestern Elevated began operation in May, 1900, and was planned

as an electric rad from the start. In 1897 the “Union Loop” was built to

facilitate interchange of passengers from the different lines, but a

separate fare was required on each road up to 1913.

The population served by the Chicago Elevated Lines is estimated at more

than 1,000,000 people; the total number of passengers handled annually

is about 190,000,000. Trains of from six to eight cars are operated

during rush hour service on a two-minute headway with a maximum of 72

trains per hour on a track of the loop. Plans are being made to extend

some of the station platforms to permit the use of more than 6- and

8-car trains.

An extensive program of improvements to the present rapid transit system

has been proposed, but no definite steps have yet been taken toward

authorizing the work. These plans include a subway section under the

present loop district with several additional elevated lines.