BOSTON ELEVATED RAILWAY RAPID TRANSIT SYSTEM

The transportation system of the city of Boston comprises a combination

of both rapid transit and surface lines operated under a single fare

arrangement with transfer privileges permitting a continuous ride in one

general direction from one end to the other of the system. The elevated

lines and the Tremont St. Subway were originally built by the railway

company in 1901. Today the total transportation system includes more

than 500 miles of line of which 37 miles are subway and elevated tracks.

The population served in the district of more than 92 square miles is

considerably over a million people and the number of revenue passengers

carried, approximates 350,000,000 per year. Statistics are not available

as to the passengers carried on the Rapid Transit lines.

[Illustration: EXTERIOR OF MAIN POWER STATION AT SOUTH BOSTON]

The original elevated structure operated between Sullivan Sq.,

Charlestown, and Dudley Street, with two branches through the city, one

by subway under Tremont St. and the other by the way of Atlantic Ave.

and South Station. In 1908-9 the elevated structure was extended to the

present terminal at Forest Hills and the Washington St. Subway was

completed through the business part of the city. The Cambridge Subway

was placed in operation in 1912. Recent extensions include an elevated

line from Sullivan Square to Everett and reconstruction of the tunnel to

East Boston.

Since July 1, 1919, the system has been operated by the Board of

Trustees of the Commonwealth. Under the direction of this board are

included not only the details of operation and management, but also the

decisions as to fares to be charged independent of the State Department

of Public Utilities.

Under the direction of the present management a continuous program of

improvements has been inaugurated which has necessitated the re-routing

of trains to handle the traffic to the best advantage.

Briefly there are four main routes as follows:

Forest Hills-Everett (via tunnel) 8.59 miles

Forest Hills-Everett (via elev.) 9.35 miles

Harvard-Andrew 5.56 miles

No. Station West-Kenmore 2.87 miles

Bowdoin-Maverick Sq. 1.67 miles

The Forest Hills-Everett route is called the main line, and the

Harvard-Andrew route the Cambridge Subway. The Bowdoin-Maverick Square

line up to the present has been operating three-car trains with overhead

trolley, but new equipment consisting of steel cars is now on order and

the third rail is now being installed in the tunnel. The Lechmere

Sq.-Broadway line over East Cambridge Viaduct and Tremont St. Subway is

also considered a rapid transit route, although surface type cars are

used with overhead trolley. These cars are equipped for multiple unit

control and are operated in three-car trains.

[Illustration: 35,000-KW. TURBO-GENERATOR IN SOUTH BOSTON POWER STATION]

The rush hour trains on the main line include as high as eight cars,

which is the limit set by the length of the station platforms. The

signal system is entirely automatic and during rush hours the headway

varies from 2 to 3½ minutes on the main line. The maximum grades

encountered are 2 to 3 percent with a high percentage of heavy

curvature. By taking advantage of the transfer arrangements at

terminals, rides of 14 miles can be obtained for a single fare.

_Power Station Equipment_

The power system as originally installed included several engine-driven

direct-current plants suitably located for distributing 600 volts direct

to the trolley. With the extension of the system, however, an

alternating-current station was installed at South Boston, generating

25-cycle three-phase current for distribution at 13,200 volts to

synchronous converter substations. Alternating-current generating

equipment has also been installed at the Lincoln Station. The total

installed capacity of turbine stations is now 115,000 kw. while the

direct-current generating stations have practically all been

discontinued.

[Illustration: RAPID TRANSIT LINES—BOSTON ELEVATED RAILWAY]

[Illustration: EXTERIOR OF EGLESTON SQUARE SUBSTATION]

_Substations_

There are in operation for supplying power to both elevated and surface

lines a total of 12 synchronous converter substations having a total

rated capacity of 58,000 kw. The power consumption of the Rapid Transit

lines is somewhat less than half the total energy used.

_Distribution_

Direct current is distributed from the several substations at 600 volts

and is collected on the rapid transit systems from an 85-lb.

over-running third rail.

_Rolling Stock_

Altogether there are 420 cars in the rapid transit service, the older

cars weighing about 34 tons with seating capacity of 48 and the newer

type as used in the Cambridge Subway 43 tons each, arranged to seat 72

passengers. On account of the limiting clearances in the old subway the

Cambridge cars cannot be used on the main line. All cars are motor cars

and no attempt is made to use trailers. Each car is equipped with two

motors and multiple unit control.

[Illustration: LATEST TYPE OF STEEL MOTOR CAR USED IN CAMBRIDGE SUBWAY]

[Illustration: MAIN LINE TRAIN—BOSTON ELEVATED RAILWAY]

[Illustration: INTERIOR OF SUBSTATION EQUIPPED WITH 2000-KW. SYNCHRONOUS

CONVERTERS]

------------------------------------------------------------------------

Metropolitan Subway and Elevated Systems Bulletin 49 · 第 6 / 16 题