CHAPTER IX

FIELD ENGINEERING

=1109.= The following, from the =Engineer Field Manual=, together with

the elements of field engineering covered in Chapter XI, on

=Obstacles=, will give the company officer a good, working knowledge

of those parts of field engineering for which he is most likely to

have need.

Bridges

=1111. Dimensions and guard rail.= A roadway 9 ft. wide in the clear

should be provided to pass infantry in fours, cavalry two abreast, and

military wagons in one direction; a width of 6 ft. will suffice for

infantry in column of twos, cavalry in single file, and field guns

passed over by hand.

The _clear width_ of roadway of an ordinary highway bridge should not

be less than 12 ft. for single track, or 20 ft. for double track.

The _clear head room_ in ordinary military bridges should not be less

than 9 ft. for wagons and cavalry; for highway bridges not less than

14 ft.

Ramps at the ends of a bridge, if intended for artillery, should not

be steeper than 1 on 7. For animals, slopes steeper than 1 on 10 are

inconvenient.

If the bridges are high, hand rails should be provided. A single rope

may suffice, or it may have brush placed upon it to form a screen.

A guard rail should be provided along each side of the roadway, near

the ends of the flooring planks. In hasty bridges it may be secured by

a lashing or lashings through the planking to the stringer underneath.

Otherwise it may be fastened with spikes or bolts.

=1112. Spar bridges.=--This name is applied to bridges built of round

timbers lashed together. Intermediate points of support are provided

by inclined frames acting as struts to transmit weight from the middle

of the bridge to the banks. The single-lock and double-lock bridges

with two and three spans of 15 ft., respectively, are the ones of most

utility.

The first step in constructing a spar bridge is to measure the gap to

be bridged and select the position of the footings on either bank.

Determine the distance from each footing to the middle point of the

roadway if a single-lock, or the two corresponding points of a

double-lock bridge. Next determine and mark on each spar except the

diagonals the places where other spars cross it. The marking may be

done with chalk, or with an ax. If possible a convenient notation

should be adopted. As, for example, in marking with chalk, a ring

around the spar where the edge of the crossing spar will come, and a

diagonal cross on the part which will be hidden by the crossing spar.

A simple way to determine the length of spars is the following: Take

two small lines somewhat longer than the width of the gap, double each

and lash the bights together. Stretch them tightly across the gap so

that the lashing comes at the middle as at _A_, Fig. 8. Release one

end of each and stretch it to the footing on the same side as

indicated by the dotted lines. Mark each line at the footing _C_ or

_C'_, and at the position chosen for the abutment sill, _B_ or _B'_.

Cut the lashing and take each piece of rope to its own side. The

distances _AB_ and _AB'_ are the lengths between the transoms, and

with 2 ft. added give the length of road bearers required. The

distances _AC_ and _AC'_ are the lengths of struts from butt to top of

transom, and with 3 ft added, give the total length of spars required.

For a double lock bridge, a piece of rope of a length equal to the

length of the middle bay replaces the lashing. If the banks are not

parallel, a measurement should be taken on each side of the bridge.

If desired, a section of the gap may be laid down on the ground in

full size and the lengths of spars determined by laying them in place.

This method, though given as standard by all authorities, requires

more time and more handling of material than the other and gives no

better results.

The construction of a frame is shown in Fig. 1, and the system of

marking in Fig. 2. The arrangement of frames to form a single lock

bridge is shown in Figs. 3 and 4, and a double lock bridge in Fig 6.

[Illustration: Fig. 1]

[Illustration: Fig. 2]

[Illustration: Fig. 3]

[Illustration: Fig. 4]

[Illustration: Fig. 5]

[Illustration: Fig. 6]

[Illustration: Fig. 7]

[Illustration: Fig. 8]

[Illustration: Fig. 9]

=1113. Construction of single-lock bridges=, Figs. 3, 4, and

5.--Suitable for spans of 30 ft. or less. The two frames lock together

at the center of the span; their slope must not be more than 4 on 7.

The bridge can be erected by two or three noncommissioned officers

and 20 men, one-half on each side of the gap. Heavy spars require more

men.

The footings at _A_ and _B_ must be firm, horizontal if possible, and

at right angles to the axis of the bridge. In a masonry pier they may

be cut out. In firm soil a simple trench will suffice. In yielding

soil a plank or sill must be laid in the trench. The frames are made

of such length as to give a slight camber to the bridge, which may be

increased to allow for probable settlement of the footings. The inside

dimension of one frame is made slightly greater than the outside

dimension of the other, so that one frame may fall inside of the other

when hauled into position. For a 9 ft. roadway the standards of the

narrow (inside) frame should be 9 ft. 6 ins. apart at the transom and

10 ft. 6 ins. at the ledger, in the clear, and the other (outside)

frame 1 ft. 6 ins. wider throughout.

A frame is constructed on each bank. The standards are laid on the

ground in prolongation of the bridge, butts toward the bank. The

ledgers are lashed on _above_ and the transoms _beneath_ the standards

at the positions marked. The diagonal braces are lashed to the

standards, two butts and one tip above the latter, and to each other.

Before the braces are lashed the frame must be square by checking the

measurements of the diagonals.

If necessary, pickets for the foot and guy ropes are driven, the

former about 2 paces from the bank and 4 paces on each side of the

axis of the bridge; the latter about 20 paces from the bank and 10

paces on each side of the axis. The foot ropes, _CC_, Fig. 5, are

secured by timber hitches to the butts of the standards and the back

and fore guys, _DD_ and _EE_, to the tips the fore guys are passed

across to the opposite bank. The guys of the _narrow_ frame should be

_inside_ the guys and standards of the wide frame.

The frames are put into position one after the other, or

simultaneously if there are enough men. A man is told off to each foot

rope and one to each back guy to slack off as required, two turns

being taken with each of these ropes around their respective pickets.

The other men raise the frame and launch it forward, assisted by the

men at the fore guys, until the frame is balanced on the edge of the

bank. The frame is then tilted until the butts rest on the footing, by

slacking off the foot ropes and hauling on the fore guys, Fig. 5.

After the head of the frame has been hauled over beyond the

perpendicular, it is lowered nearly into its final position by

slacking off the back guys. When the two frames are in this position

opposite each other, the narrow frame is further lowered until its

standards rest upon the transom of the other. The wider (outer) frame

is then lowered until the two lock into each other, the standards of

each resting upon the transom of the other.

The center or fork transom, Figs. 3 and 4, is then passed from shore

and placed in the fork between the two frames. This forms the central

support to receive a floor system of two bays, built as already

described.

The estimated time for construction of such a bridge is about one hour

if the material is available and in position on both sides of the

stream. The construction of the roadway requires about twenty minutes;

forming footings in masonry about one hour.

=1114. Construction of double-lock bridge=, Fig. 6.--Suitable for

spans not exceeding 45 ft., and consisting of two inclined frames

which lock into a connecting horizontal frame of two or more distance

pieces, with cross transoms, dividing the gap to be bridged into three

equal bays of about 15 ft. The force required is two or three

noncommissioned officers and 25 to 50 men; the time for construction,

except roadway, about two and one-half hours; extra time to be allowed

for difficult footings.

The width of gap is measured, the position of footings determined, and

the length of standards from butt to transom determined and marked as

before.

The inclined frames in this case are built of equal widths, launched

as before, and held by guys just above their final position. Two

stringers are launched out from each bank to the main transom. The

distance pieces, Fig. 6, are put into position inside the standards,

using tackle if necessary, and the road transoms are placed and lashed

to the distance pieces at the places marked. Both frames are now

lowered until they jam.

=1115. Roadway of spar bridge.=--For infantry in fours crowded the

transoms should have a diam. of not less than 9 ins. for a span of 15

ft. Five stringers 2 ft. 3 ins. c. to c., and 6 ins. diam. at the tip

will suffice. If the sticks vary in size, the larger ones should be

notched down on the transom so as to bring the tops in the same plane.

The stringers should be long enough to overlap the transoms, and

should be lashed together at each tip. The floor is held down by side

rails over the outside stringers and lashed to them. If lumber can not

be obtained, a floor may be made, of small spars, the interstices

filled with brush, and the whole covered with loam or clay; Figs. 7

and 9.

Corduroy Roads

=1116. Corduroying= is done by laying logs crosswise of the road and

touching each other. The result will be better if the logs are nearly

of the same size. The butts and tips should alternate. If the logs are

large the spaces may be filled with smaller poles. The bottom tier of

logs should be evenly bedded and should have a firm bearing at the

ends and not ride on the middle. The filling poles, if used, should be

cut and trimmed to lie close, packing them about the ends if

necessary. If the soil is only moderately soft the logs need be no

longer than the width of the road. In soft marsh it may be necessary

to make them longer.

The logs may be utilized as the wearing surface. In fact this is

usually the case. They make a rough surface, uncomfortable for

passengers and hard on wagons and loads, but the resistance to

traction is much less than would be expected, and the roughness and

slightly yielding surface make excellent footing for animals. Surface

corduroy is perishable and can last but a short time. In marshes,

where the logs can be placed below the ground-water level, they are

preserved from decay, and if any suitable material can be found, to

put a thin embankment over them, a good permanent road may be made.

Any tough, fibrous material may be used to temporarily harden the

surface of a road. Hay or straw, tall weeds, corn and cane stalks

have been used to good advantage. Such materials should be laid with

the fibers crosswise of the road, and covered with a thin layer of

earth, thrown on from the sides; except in sand, when it is better to

dig a shallow trench across the road, fill it with the material and

then dig another trench just in front of and in contact with the first

and throw the sand from it back onto the material in the first trench,

etc.

Brush work

=1117. A fascine= is a cylindrical bundle of brush, closely bound. The

usual length is 18 ft. and the diam. 9 ins. when compressed. Lengths

of 9 and 6 ft., which are sometimes used, are most conveniently

obtained by sawing a standard fascine into 2 or 3 pieces. The weight

of a fascine of partially seasoned material will average 140 lbs.

Fascines are made in a =cradle= which consists of five trestles. A

=trestle= is made of two sticks about 6-1/2 ft. long and 3 ins. in

diam, driven into the ground and lashed at the intersection as shown

in Fig. 10. In making a cradle, plant the end trestles 16 ft. apart

and parallel. Stretch a line from one to the other over the

intersection, place the others 4 ft. apart and lash them so that each

intersection comes fairly to the line.

=To build a fascine=, straight pieces of brush, 1 or 2 ins. at the

butt, are laid on, the butts projecting at the end 1 ft. beyond the

trestle. Leaves should be stripped and unruly branches cut off, or

partially cut through, so that they will lie close. The larger

straighter brush should be laid on the outside, butts alternating in

direction, and smaller stuff in the center. The general object is to

so dispose the brush as to make the fascine of uniform size, strength,

and stiffness from end to end.

When the cradle is nearly filled, the fascine is compressed or

=choked= by the =fascine choker=, Fig. 11, which consists of 2 bars 4

ft. long, joined at 18 ins. from the ends by a chain 4 ft. long. The

chain is marked at 14 ins. each way from the middle by inserting a

ring or special link. To use, two men standing on opposite sides pass

the chain under the brush, place the short ends of the handles on top

and pass the bars, short end first, across to each other. They then

bear down on the long ends until the marks on the chain come together.

Chokers may be improvised from sticks and rope or wire.

=Binding= will be done with a double turn of wire or tarred rope. It

should be done in 12 places, 18 ins. apart, the end binders 3 ins.

outside the end trestles. To bind a fascine will require 66 ft. of

wire.

Improvised binders may be made from rods of live brush, hickory or

hazel is the best. Place the butt under the foot and twist the rod to

partially separate the fibers and make it flexible. A rod so prepared

is called a =withe=. To use a withe, make a half turn and twist at the

smaller end, Fig. 12; pass the withe around the brush and the large

end through the eye. Draw taut and double the large end back, taking 2

half-hitches over its own standing part, Fig. 13.

When the fascine is choked and bound, saw the ends off square, 9 ins.

outside the end binders. After a cradle is made, 4 men can make 1

fascine per hour, with wire binding. Withes require 1 man more.

=A fascine revetment= is made by placing the fascines as shown in Fig.

14. The use of headers and anchors is absolutely necessary in loose

soils only, but they greatly strengthen the revetment in any case. A

fascine revetment =must always be crowned= with sods or bags.

[Illustration: Fig. 10]

[Illustration: Fig. 11]

[Illustration: Fig. 12]

[Illustration: Fig. 13]

[Illustration: Fig. 14]

[Illustration: Fig. 15]

=1118.= In all brush weaving the following terms have been adopted and

are convenient to use:

=Randing.=--Weaving a single rod in and out between pickets.

=Slewing.=--Weaving two or more rods together in the same way.

=Pairing.=--Carrying two rods together, crossing each other in and out

at each picket.

=Wattling.=--A general term applied to the woven part of brush

construction.

=1119. A hurdle= is a basket work made of brushwood. If made in

pieces, the usual size is 2 ft. 9 ins. by 6 ft., though the width may

be varied so that it will cover the desired height of slope.

A hurdle is made by describing on the ground an arc of a circle of 8

ft. radius and on the arc driving 10 pickets, 8 ins. apart, covering 6

ft. out to out, Fig. 15. Brush is then woven in and out and well

compacted. The concave side of a hurdle should be placed next the

earth. It wraps less than if made flat.

=In weaving the hurdle=, begin randing at the middle space at the

bottom. Reaching the end, twist the rod as described for a withe, but

at one point only, bend it around the end picket and work back. Start

a second rod before the first one is quite out, slewing the two for a

short distance. Hammer the wattling down snug on the pickets with a

block of wood and continue until the top is reached. It improves the

hurdle to finish the edges with two selected rods paired, Fig. 16. A

pairing may be introduced in the middle, if desired, to give the

hurdle extra endurance if it is to be used as a pavement or floor. If

the hurdle is not to be used at once, or if it is to be transported,

it must be sewed. The sewing is done with wire, twine, or withes at

each end and in the middle, with stitches about 6 ins. long, as shown

in Fig. 16. About 40 ft. of wire is required to sew one hurdle. No. 14

is about the right size, and a coil of 100 lbs. will sew 40 hurdles.

Three men should make a hurdle in 2 hours, 2 wattling and the third

preparing the rods.

=1120. Continuous hurdle.=--If conditions permit the revetment to be

built in place, the hurdle is made continuous for considerable

lengths. The pickets may be larger; they are driven farther apart, 12

or 18 ins., and the brush may be heavier. The construction is more

rapid. The pickets are driven with a little more slant than is

intended and must be anchored to the parapet. A line of poles with

wire attached at intervals of 2 or 3 pickets will answer. The wires

should be made fast to the pickets after the wattling is done. They

will interfere with the wearing if fastened sooner. Two men should

make 4 yds. of continuous hurdle of ordinary height in one hour.

=1121. Brush revetment.=--Pickets may be set as above described and

the brush laid inside of them without weaving, being held in place by

bringing the earth up with it. In this case the anchors must be

fastened before the brush laying begins. The wires are not much in the

way in this operation.

=1122. Gabion making.--A gabion= is a cylindrical basket with open

ends, made of brush woven on pickets or stakes as described for

hurdles. The usual size is 2 ft. outside diam. and 2 ft. 9 ins. height

of wattling. On account of the sharp curvature somewhat better brush

is required for gabions than will do for hurdles.

=The gabion form=, Fig. 17, is of wood, 21 ins. diam., with

equidistant notches around the circumference, equal in number to the

number of pickets to be used, usually 8 to 14, less if the brush is

large and stiff, more if it is small and pliable. The notches should

be of such depth that the pickets will project to 1 in. outside the

circle. The pickets should be 1-1/4 to 1-3/4 ins. diam., 3 ft. 6 ins.

long and sharpened, half at the small and half at the large end.

=To make a gabion=, the form is placed on the ground, level or nearly

so, and the pickets are driven vertically in the notches, large and

small ends down, alternately. The form is then raised a foot and held

by placing a lashing around outside the pickets, tightened with a rack

stick, Fig. 18. The wattling is randed or slewed from the form up. The

form is then dropped down, the gabion inverted and the wattling

completed. If the brush is small, uniform, and pliable, pairing will

make a better wattling than randing. If not for immediate use, the

gabion must be sewed as described for hurdles, the same quantity of

wire being required.

[Illustration: Fig. 16]

[Illustration: Fig. 17]

[Illustration: Fig. 18]

[Illustration: Fig. 19]

[Illustration: Fig. 20]

[Illustration: Fig. 21]

The gabion, when wattled and sewed, is completed by cutting off the

tops of the pickets 1 in. from the web, the bottom 3 ins., the latter

sharpened after cutting, and driving a carrying picket through the

middle of its length and a little on side of the axis. See that the

middle of this picket is smooth. Three men should make a gabion in an

hour.

Gabions may be made without the forms, but the work is slower and not

so good. The circle is struck on the ground and the pickets driven at

the proper points. The weaving is done from the ground up and the

entire time of one man is required to keep the pickets in proper

position.

=If brush is scarce=, gabions may be made with 6 ins. of wattling at

each end, the middle left open. In filling, the open part may be lined

with straw, grass, brush cuttings, or grain sacks, to keep the earth

from running out.

=1123. Gabion revetment.=--The use of gabions in revetments is

illustrated in Fig. 20. If more than two tiers are used, the

separating fascines should be anchored back. Gabion revetments should

be crowned with sods or bags.

The advantages of the gabion revetment are very great. It can be put

in place without extra labor and faster and with less exposure than

any other. It is self-supporting and gives cover from view and partial

cover from fire quicker than any other form.

Several forms of gabions of other material than brush have been used.

Sheet iron and iron and paper hoops are some of them. The iron

splinters badly, is heavy, and has not given satisfaction. If any

special materials are supplied the method of using them will, in view

of the foregoing explanation, be obvious.

=1124. Timber or pole revetment.=--Poles too large for use in any

other way may be cut to length and stood on end to form a revetment.

The lower ends should be in a small trench and have a waling piece in

front of them. There must also be a waling piece or cap at or near the

top, anchored back. Fig. 21 shows this form.

=1125. Miscellaneous revetments.=--Any receptacles for earth which

will make a stable, compact pile, as =boxes=, =baskets=, =oil or other

cans=, may be used for a revetment. =Barrels= may be used for gabions.

=Canvas= stretched behind pickets is well thought of in a foreign

service. If the soil will make =adobe=, or sun-dried bricks, an

excellent revetment may be made of them, but it will not stand wet

weather.

Knots

=1126.= =Square= or =reef knot=, Fig. 22, commonly used for joining

two ropes of the same size. The standing and running parts of each

rope must pass through the loop of the other in the same direction, i.

e., from above down ward or vice versa; otherwise a _granny_, is made,

which is a useless knot that will not hold. The reef knot can be upset

by taking one end of the rope and its standing part and pulling them

in opposite directions. With dry rope a reef knot is as strong as the

rope; with wet rope it slips before the rope breaks, while a double

sheet bend is found to hold.

[Illustration: Fig. 22

_Square or Reef_]

=1127. Two half hitches=, Fig. 23, especially useful for belaying, or

making fast the end of a rope round its own standing part. The end may

be lashed down or seized to the standing part with a piece of spun

yarn; this adds to its security and prevents slipping.

This knot should never be used for hoisting a spar.

[Illustration: Fig. 23

_Two half hitches_]

=1128. Clove hitch=, Fig. 24, generally used for fastening a rope at

right angles to a spar or at the commencement of a lashing. If the end

of the spar is free, the hitch is made by first forming two loops, as

in Fig. 26, placing the right-hand loop over the other one and

slipping the double loop (Fig. 27) over the end of the spar. If this

can not be done, pass the end of the rope round the spar, bring it up

to the right of the standing part, cross over the latter, make

another turn round the spar, and bring up the end between the spar,

the last turn, and the standing part, Fig. 25. When used for securing

guys to sheer legs, etc., the knot should be made with a long end,

which is formed into two half hitches round the standing part and

secured to it with spun yarn.

[Illustration: Fig. 24

_Clove hitch_]

[Illustration: Fig. 25]

[Illustration: Fig. 26]

[Illustration: Fig. 27]

=1129. Timber hitch=, Fig. 28, used for hauling and lifting spars. It

can easily be loosed when the strain is taken off, but will not slip

under a pull. When used for hauling spars, a half hitch is added near

the end of the spar, Fig. 29.

[Illustration: Fig. 28

_Timber hitch_]

[Illustration: Fig. 29

_Timber hitch and half hitch_]

=1130. Bowline=, Fig. 30, forms a loop that will not slip. Make loop

with the standing part of the rope underneath, pass the end from below

through the loop, over the part round the standing part of the rope,

and then down through the loop _c_. The length of bight depends upon

the purpose for which the knot is required.

[Illustration: Fig. 30

_Bowline_]

=1131. Bowline on a bight=, Fig. 31. The first part is made like the

above, with the double part of a rope; then the bight _a_ is pulled

through sufficiently to allow it to be bent past _d_ and come up in

the position shown. It makes a more comfortable sling for a man than a

single bight.

[Illustration: Fig. 31

_Bowline on a Bight_]

=1132. Sheep shank=, Fig. 32, used for shortening a rope or to pass by

a weak spot; a half hitch is taken with the standing parts around the

bights.

[Illustration: Fig. 32

_Sheep shank_]

=1133. Short splice.= To make a _short splice_, Figs. 33, 34, 35,

unlay the strands of each rope for a convenient length. Bring the rope

ends together so that each strand of one rope lies between the two

consecutive strands of the other rope. Draw the strands of the first

rope along the second and grasp with one hand. Then work a free strand

of the second rope over the nearest strand of the first rope and under

the second strand, working in a direction opposite to the twist of the

rope. The same operation applied to all the strands will give the

result shown by Fig. 34. The splicing may be continued in the same

manner to any extent (Fig. 35) and the free ends of the strands may be

cut off when desired. The splice may be neatly tapered by cutting out

a few fibers from each strand each time it is passed through the rope.

Rolling under a board or the foot will make the splice compact.

[Illustration: Fig. 33

_Short splice_]

[Illustration: Fig. 34]

[Illustration: Fig. 35]

=1134. Long splice= (Figs. 36, 37).--Unlay the strands of each rope

for a convenient length and bring together as for a short splice.

Unlay to any desired length a strand, _d_, of one rope, laying in its

place the nearest strand, _a_, of the other rope. Repeat the operation

in the opposite direction with two other strands, _c_ and _f_. Fig. 37

shows strands _c_ and _f_ secured by tying together. Strands b and e

are shown secured by unlaying half of each for a suitable length and

laying half of the other in place of the unlayed portions, the loose

ends being passed through the rope. This splice is used when the rope

is to run through a block. The diameter of the rope is not enlarged at

the splice. The ends of the strands should not be trimmed off close

until the splice has been thoroughly stretched by work.

[Illustration: Fig. 36

_Long splice_]

[Illustration: Fig. 37]

=1135. Eye splice= (Figs. 38, 39, 40, 41).--Unlay a convenient length

of rope. Pass one loose strand, _a_, under one strand of the rope, as

shown in fig. 38, forming an eye of the proper size. Pass a second

loose strand, _b_, under the strand of the rope next to the strand

which secures _a_, Fig. 39. Pass the third strand, _c_, under the

strand next to that which secures _b_, fig. 40. Draw all taut and

continue and complete as for a short splice.

[Illustration: Fig. 38

_Eye splice_]

[Illustration: Fig. 39]

[Illustration: Fig. 40]

[Illustration: Fig. 41]

Lashings

=1136. To lash a transom to an upright spar=, Fig. 42, transom in

front of upright.--A clove hitch is made round the upright a few

inches below the transom. The lashing is brought under the transom, up

in front of it, horizontally behind the upright, down in front of the

transom, and back behind the upright at the level of the bottom of the

transom and above the clove hitch. The following turns are kept

outside the previous ones on one spar and inside on the other, not

riding over the turns already made. Four turns or more are required. A

couple of frapping turns are then taken between the spars, around the

lashing, and the lashing is finished off either round one of the spars

or any part of the lashing through which the rope can be passed. The

final clove hitch should never be made around the spar on the side

toward which the stress is to come, as it may jam and be difficult to

remove. The lashing must be well beaten with handspike or pick handle

to tighten it up. This is called a square shears are laid alongside of

each other with their butts on the ground, lashing.

[Illustration: Fig. 42]

=1137. Lashing for a pair of shears=, Fig. 43.--The two spars for the

points below where the lashing is to be resting on a skid. A clove

hitch is made round one spar and the lashing taken loosely eight or

nine times about the two spars above it without riding. A couple of

frapping turns are then taken between the spars and the lashing is

finished off with a clove hitch above the turns on one of the spars.

The butts of the spars are then opened out and a sling passed over the

fork, to which the block is hooked or lashed, and fore and back guys

are made fast with clove hitches to the bottom and top spars,

respectively, just above the each spar the distance from the butt to

the center of the lashing. Lay two of the spars parallel to each other

with an interval a little greater fork, Fig. 44.

[Illustration: Fig. 43]

[Illustration: Fig. 44]

=1138. To lash three spars together as for a gin or tripod.=--Mark on

than the diameter. Rest their tips on a skid and lay the third spar

between them with its butt in the opposite direction so that the marks

on the three spars will be in line. Make a clove hitch on one of the

outer spars below the lashing and take eight or nine loose turns

around the three, as shown in Fig. 45. Take a couple of frapping turns

between each pair of spars in succession and finish with a clove hitch

on the central spar above the lashing. Pass a sling over the lashing

and the tripod is ready for raising.

[Illustration: Fig. 45]

=1139. Holdfasts.=--To prepare a fastening in the ground for the

attachment of guys or purchases, stout pickets are driven into the

ground one behind the other, in the line of pull. The head of each

picket except the last is secured by a lashing to the foot of the

picket next behind, Fig. 46. The lashings are tightened by rack

sticks, the points of which are driven into the ground to hold them in

position. The distance between the stakes should be several times the

height of the stake above the ground.

[Illustration: Fig. 46]

Another form requiring more labor but having much greater strength is

called a "_deadman_," and consists of a log laid in a transverse

trench with an inclined trench intersecting it at its middle point.

The cable is passed down the inclined trench, takes several round

turns on the log, and is fastened to it by half hitches and marlin

stopping, Figs. 47, 48, 49. If the cable is to lead horizontally or

inclined downward, it should pass over a log at the outlet of the

inclined trench, Fig. 48. If the cable is to lead upward, this log is

not necessary, but the anchor log must be buried deeper.

[Illustration: Fig. 47]

[Illustration: Fig. 48]

[Illustration: Fig. 49]