THE splicing of a transmission rope is an important matter; the points

on which the success of the splice, and incidentally the drive, depend

being the length of the splice, which in turn depends upon the diameter

of the rope and which is given in the table (Fig. 97a); the diameter

of the splice, which should be the same as the diameter of the rope;

the securing of the ends of the strands of the splice, which must be

so fastened that they will not wear or whip out or cause the overlying

strands to wear unduly; and the workmanship of the splice, which should

be the best it is possible to secure. When splicing an old and a new

piece of rope, the new piece should be thoroughly stretched, for, at

best, it is an exceedingly difficult task on account of the stretch and

difference in diameter of the rope.

[Illustration: FIG. 97a. DATA RELATIVE TO MANILA TRANSMISSION ROPE AND

SHEAVES]

========+========+===========+=========+=========

| | | |

| | | |

| | | |

Diameter| Square |Approximate|Breaking | Maximum

of Rope| of |Weight per |Strength,|Allowable

in |Diameter| Foot, | Pounds |Tension,

Inches | | Pounds | | Pounds

--------+--------+-----------+---------+---------

1/2 | .25 | .12 | 1750 | 50

5/8 | .2906 | .16 | 2730 | 80

3/4 | .5625 | .20 | 3950 | 112

7/8 | .7656 | .26 | 5400 | 153

1 | 1. | .34 | 7000 | 200

1-1/8 | 1.2656 | .43 | 8900 | 253

1-1/4 | 1.5625 | .63 | 10,900 | 312

1-1/2 | 2.25 | .77 | 15,700 | 450

1-3/4 | 3.0625 | 1.04 | 21,400 | 612

2 | 4. | 1.36 | 28,000 | 800

2-1/4 | 5.0625 | 1.73 | 35,400 | 1012

2-1/2 | 6.25 | 2.13 | 43,700 | 1250

========+========+===========+=========+=========

+====================+========+==========

|LENGTH OF SPLICE | |

| IN FEET |Smallest| Maximum

+------+------+------+Diameter| Number

| 3- | 4- | 6- | of | of

|Strand|Strand|Strand|Sheaves |Revolutions

| | | | in |per Minute

| | | | Inches |

+------+------+------+--------+-----------

| 6 | | | 20 | 1060

| 6 | | | 24 | 970

| 6 | 8 | | 27 | 760

| 6 | 8 | | 32 | 650

| 7 | 10 | 14 | 36 | 570

| 7 | 10 | 16 | 40 | 510

| 7 | 10 | 16 | 45 | 460

| 8 | 12 | 18 | 54 | 380

| 8 | 12 | 18 | 63 | 330

| 9 | 14 | 20 | 72 | 290

| 9 | 14 | 20 | 81 | 255

| 10 | 16 | 22 | 90 | 230

+======+======+======+========+==========

The illustrations and instructions for making standard rope splices

are taken, by the courtesy of the American Manufacturing Company, from

their "Blue Book of Rope Transmission."

There are many different splices now in use, but the one that

experience has proved best is what is known as the English transmission

splice. In describing this we take for our example a four-strand rope,

1-3/4 inches in diameter, as spliced on sheaves in the multiple system.

The rope is first placed around sheaves, and, with a tackle, stretched

and hauled taut; the ends should pass each other from six to seven

feet, the passing point being marked with twine on each rope. The rope

is then slipped from the sheaves and allowed to rest on shafts, to give

sufficient slack for making the splice.

[Illustration: FIG. 98.]

Unlay the strands in pairs as far back as the twines _M_, _M′_, crotch

the four pairs of strands thus opened (Fig. 98), cores having been

drawn out together on the upper side. Then, having removed marking

twine _M_, unlay the two strands 6 and 8, still in pairs, back a

distance of two feet, to _A_; the strands 1 and 3, also in pairs,

being carefully laid in their place. Next unlay the strands 5 and 7 in

pairs, to _A′_, replacing them as before with 2 and 4. The rope is now

as shown in Fig. 99. The pair of strands 6 and 8 are now separated,

and 8 unlaid four feet back to _B_, a distance of six feet from

center, strand 6 being left at _A_. The pair of strands 1 and 3 having

been separated, 3 is left at _A_, as companion for 6, strand 1 being

carefully laid in place of strand 8 until they meet at point _B_. The

two pairs of strands 2-4 and 5-7 are now separated and laid in the same

manner, every care being taken, while thus putting the rope together,

that original twist and lay of strand is maintained. The protruding

cores are now cut off so that the ends, when pushed back in rope, butt

together.

[Illustration: FIG. 99.]

The rope now appears as shown in Fig. 100, and after the eight strands

have been cut to convenient working lengths (about two feet), the

companion strands are ready to be fastened together and "tucked"; this

operation is described for strands 2 and 7, the method being identical

for the other three pairs. Unlay 2 and 7 for about twelve to fourteen

inches, divide each strand in half by removing its cover yarns (see

Fig. 101), whip with twine the ends of interior yarns 2′ and 7′; then,

leaving cover 2, relay 2′ until near 7 and 7′, here join with simple

knot 2′ and 7′, Fig. 102. Divide cover yarns 7, and pass 2′ through

them, continuing on through the rope _under_ the two adjacent strands,

avoiding the core, thus locking 2′, Fig. 103. _In no event pass 2′

over these or any other strands._ Half-strand 7′ must now be taken

care of; at the right of the knot made with 2′ and 7′, 2′ is slightly

raised with a marlin spike, and 7′ passed or tucked around it two or

three times, these two half-strands forming in this way a whole strand.

Half-strand 7′ is tucked until cover 2 is reached, whose yarns are

divided and 7′ passed through them and drawn under the two adjacent

strands, forming again the lock. The strand ends at both locks are

now cut off, leaving about two inches, so that the yarns may draw

slightly without unlocking. This completes the joining of one pair of

strands, Fig. 104. The three remaining pairs of strands are joined in

the same manner.

[Illustration: FIG. 100.]

[Illustration: FIG. 101.]

[Illustration: FIG. 102.]

[Illustration: FIG. 103.]

[Illustration: FIG. 104.]

After the rope has been in service a few days, the projecting ends

at locks wear away, and if tucks have been carefully made, and the

original twist of yarns preserved, the diameter of the rope will not be

increased, nor can the splice be located when the rope is in motion.

XVIII

WIRE ROPE TRANSMISSION[13]

WIRE ropes are extensively and successfully used in the horizontal

and inclined transmission of great power of unlimited amount, the

advantages over hemp rope belting being: driving at very long

distances, comparatively small loss through slipping and the

possibility of driving in the open air.

[13] Contributed to Power by C. Boysen, M. E.

Vertical transmission of power, on account of the weight of the rope,

is excluded.

Formerly the material used in the manufacture of the wires was best

charcoal iron, but now almost exclusively tough crucible-steel wires

are used, as steel wire ropes are stronger, do not stretch as much, and

last longer than iron ropes.

The wire ropes consist of six strands of from six to twenty wires each,

and the strands to form the rope are woven in the opposite direction

to the wires in the strand. In the center of each strand and in the

center of the rope a cotton core is placed. These cores are of the

greatest importance, for by reducing the friction of the wires against

each other, they serve to increase the lifetime of the rope, which,

according to the strain on the rope and the size of the smallest

pulley, is from one to three years.

To prevent rusting, the wire ropes receive a coat of boiled linseed

oil, or a hot mixture consisting of three parts of drip oil and one

part of resin is applied. This latter mixture at the same time improves

the adhesion between the rope and the lining placed in the bottom

of the pulleys, thus reducing the loss caused by slipping of the

rope. Wire ropes used for the transmission of power should never be

galvanized.

The ends of the rope are spliced together, from 10 to 20 feet being

necessary for a good splice; great care should be taken that the splice

is made by experienced men, and that the rope is made long enough. A

rope stretches constantly from the time when placed on the pulleys,

the more so when placed on the pulleys tightly. Therefore it has to

be made long enough to transmit power without undue tension, and

for this reason the distance between the two pulleys has to be long

enough and the working strain per square inch of section low enough to

allow sufficient deflection in the rope. As a guidance to the amount

of deflection necessary, be it said that even in a short drive the

deflection of the rope, when not running, should not be less than

2 feet; and for a distance of 400 feet between pulley centers, the

deflection of the rope when running should be 5 feet in the driving

rope and 10 feet in the driven rope.

Either the top or the bottom rope may be the driving one, the former

being preferable; but the ropes should never be crossed.

Power can be transmitted to a distance of 6000 feet and more without

great loss; but as two pulleys should on no account be more than 500

feet apart, intermediate stations are placed along the road.

Precautions should be taken against the possibility of the rope

swaying. This may be caused either by the influence of the wind, by

a bad splice, by the rope wearing too much, by the pulleys not being

balanced well or by the pulleys not being in the same plane. It is of

importance that the pulleys be exactly in line, and careful attention

should be given to the construction and placing of the bearings.

Although the bearings are not strained excessively, the steps are

usually made long and movable. The connection between the shaft and the

pulley is best made by means of tangential keys.

Some engineers, when two ropes are found necessary for the transmission

of the power in question, use pulleys containing two grooves each,

and make the same kind of pulleys for the intermediate stations of

long-distance driving; whereas others advise a separate pulley for each

rope, both being connected with each other by a clutch.

The diameter of the smallest pulley has to be large enough in

comparison with the diameter of the rope or the thickness of the single

wires used to easily overcome the stiffness in the rope. The larger the

pulleys, the longer the rope will last.

The rim of the pulley is V-shaped, and the bottom of the groove is

dovetailed to receive a lining of wood, rubber or leather, on which

the rope rests. The lining increases the friction and reduces the loss

caused by slipping of the rope. Leather is the best lining and lasts

about three years. Either old belt leather, well saturated with oil,

or new leather, boiled in fish oil, can be taken. It is cut in pieces

of the same size as the dovetailed part of the groove, and then placed

on and pressed together in the latter. The pressing is done by means

of a piece of wood. The last remaining small space in the groove is

filled with soft rubber. If the lining has to consist of rubber, this

is softened and hammered into the groove. For wood lining, thin blocks

of the required size are placed into the groove through a hole provided

in the bottom of the rim. This slot is closed by a plate and fastened

to the bottom of the rim by means of screws after all blocks have been

inserted. The lining has to be turned absolutely true, for which reason

the filling is done while the pulley is still in the lathe.

Pulleys up to 3 feet in diameter are built with cast-iron arms; whereas

larger pulleys have wrought-iron arms made of round iron, cast in the

rim and boss. Pulleys under 8 feet 6 inches in diameter are made in one

piece, if for other reasons it is not necessary to have them in halves.

Guide pulleys are used for long ropes, especially if there is not

sufficient hight above the ground. The guide pulleys are of the same

construction as the main pulleys, and for the driving rope they are

also made of the same diameter. The diameter of the guide pulleys for

the driven rope can be made from 20 to 25 per cent. smaller.

The breaking strength of unannealed wires per square inch of section

and according to thickness and quality is: For iron wires from 70,000

to 110,000 pounds, and for steel wires from 110,000 to 130,000 pounds.

For thinner wires a higher value is taken than for thick ones.

The diameter of the wires used for making ropes for transmitting power

is from 0.02 to 0.1 inch, and on account of the stiffness, no wires

above the latter size should be used. A rope consisting of a greater

number of thin wires, besides being stronger is more pliable and lasts

longer than a rope of the same area consisting of a less number of

thicker wires.

INDEX

A

American Mfg. Co., 136

B

Bauer, Chas. A., 54

Beams to carry stringers, finding, 42

Bearings, locating, 3

Belt, building, 94

Belt creep, 106

dressing, 91, 100

comparative test, 102

running off, 101

shifter device upon column, 9

sizes, 132

Belt, leather, selection, 89

marking spliced part, 12

new, putting on, 19, 20

slack, 100

splicing on the pulleys, 81

throwing on, 12

tight, 100

wire-lacing, 12

Belt-clamps, use, 19

Belting and pulley chart, 129

Belting, cleaning, 97

horse-power transmitted, 132, 133

use and abuse, 99

width, 132

Belts, cleaning, 88

keeping clean, 94

leather, care and management, 89

splicing, 72

main line, 5

taking-up, 11

Bird, Prof. Wm. W., 106, 107

Blue Book of Rope Transmission, 136

Board for use in lining countershaft, 35, 36

Boiled linseed oil in wire rope, 144

Bolt and nut for moving pulleys, 62

for hanger, size, 40

Bolt, preventing turning, 11, 21

Boysen, C., M. E., 143

Brands, effect on leather, 90

Breaking strain on shaft, 28

strength of unannealed wires, 146

Bunsen burner, use in moving pulley, 62

Bushing, split, 2

C

Center drive for heavily loaded shaft, 7

stock, 90

Chart, belting and pulley, 129

Cleaning belting, 97

Clutch, rim-friction, arrangement, 5

Clutches, coupling, 31

tightening while shafting is in motion, 7

Collars, split wood, 3

Compass saw, use in locating beams, 45

Contact, extra, securing, 17

Continuous-wrap system of rope drive, 112

-wrap system with direct-acting tightener, 113

Core, cotton, of wire rope, 143

rope, 124

Countershaft, lining, 32, 33, 35, 36, 37

Couplings, flanged bolt, 3

Cresson Co., Geo. V., catalog, 132

D

Deflection of rope, 144

Diameter of splice, 136

rope, 124, 135

of wires for transmission rope, 147

Diameters, pulley, 131

Differential action on ropes, 109, 112, 116

Disks for plumb-bob, 49

Distance of power transmission by wire rope, 144

Dixon, Walter E., M. E. 72,, 89

Dressing, waterproof, for belts, 91

Driving an overhead floor, 6

E

Elbow bolts, 46

Emery cloth for packing, 23, 24

End drive compared with center drive, 7

English transmission splice, 136

Evans, William, 102

F

Farmer, T., Jr., 102

Fastening strands of splice, 136

Fiber, rope, 124

Filled belts, 91

Flanged bolt couplings, 3

G

Gasoline blow torch, use in getting oil out of belt, 88

Gluing a joint, 85

Greene, F. S., 122

Guide pulleys, 146

H

Hanger adjustment, securing, 40, 41

bearing, repairing worn end, 14

positions, marks, 3

Hanger, removing to take off pulley, 63

sliding out of wall box, 1

Hangers, crosswise of shaft, 42

Hangers not allowing vertical adjustment, 3

Heads of hemp, 127

Hemp, 125, 127

Herrman, Chas., 1, 21, 32

Holman, A. G., M. E., 129

Hook bolts, 46

Horse-power transmitted by belting, 132, 133

Hoyt, R., 108

J

Joints in leather belt, 95

Journaled end of shaft, proper length, 1

K

Kavanagh, Wm., 61

Kent's Handbook, 132

Kinks, practical, 61

L

Lag screws, boring for, 46

Laps of leather belt, length, 90

of leather belt, thickness, 94

Leather belts, care and management, 89

selection, 89

Leather-cutting tool, 75

Leather, length for belt, 90, 95

Length of splice, 135

Leveling shafting, 54, 58

Line, leveling, 52

setting, 51

Lining a countershaft, 32, 33, 35, 36, 37

of pulley, wire rope transmission, 145

shafting, 30, 54

Loosening pulley that has seized, 26

Lubrication of rope, 123

M

McBarnes, Wm. H., 99

Main shaft belted to engine and to countershaft, 8

Marks on ends of shafts, 2

to show hanger positions, 3

Mounting dynamos and motors, 18

Mule belt, 13

Multiple-rope system, 108

N

Neatsfoot oil as belt dressing, 103

O

Oil, boiled linseed, on wire rope, 144

effect on belt, 92

getting out of belt, 87

P

Packing to secure good clamping fit, 23, 24

Plank to use in sliding hanger out of wall box, 1

Plumb-bob, 49, 58

-bob method of lining countershaft, 38

Point slipping, 92

Power transmission by wire ropes, distance, 144

Practical kinks, 61

Pulley and belting chart, 129

diameters, 131, 145

lining, wire rope transmission, 145

shafts holding arrangement and adjusting contrivance, 13

speed, 129

Pulley, cast-iron, moving, 62

driving, location, 5

loose, 61

seized, loosening, 25, 26

Pulleys for wire rope transmission, 145, 147

Pulleys, guide, 146

loosening, 65, 67, 70

moving, 62

removing, 65, 67, 70

solid, 4

split, 5

R

Rope, core, 124

diameter, 124, 135

differential action, 109, 112, 116

drives, 108

fibers, 124

lubrication, 123

splicing, 135

strands, 124

transmission, 135

new scheme, 115

ordering, 122

Ropes, slack, 111

tight, 111

Rusting of wire rope, preventing, 144

S

Scrapers for removing glue, 74, 75

Scrapers, turning edge, 76, 77

Seizing of pulley, 25

Separate-rope system, 108

Set-screws, use, 23

Shaft, breaking strain, 28

causes of breaking, 16

preventing turning, 15, 16

repairing break, 17

journaled off to act as collar, 2

length of journaled part of end, 1

Shaft line, space between end and wall, 3

Shafting, apparatus for leveling and lining, 54

hints, 1, 21, 32

leveling, 58

line, turning up, 49

lining, 30

testing alinement and level, 29

Shafts of light-working counters, marring, 10

Sheaves, 135

Sheet iron for packing, 24

Sizes of belts, 132

of rope, effect, 110

Slack ropes, 111

Slip of belt, legitimate, 107

Space between end of shaft line and wall, 3

Speed, pulley, 129

Splice, diameter, 136

English transmission, 136

fastening strands, 136

length, 135

Splice opener for heavy belts, 72

Splice, wire rope, 144

workmanship, 136

Spliced part of belt, marking, 12

Splicing belt on the pulleys, 81

board, 78, 79

leather belts, 72

rope, 135

Split bushing, 2

Split-pulley, tightening, 23

Split wood collars, 3

Steel for sharpening scraper, 76

Stillson wrench, use, 22

Strands of rope, 124

Stretchers, position, 49

Stringers, locating beams to carry, 42

Stringers of drop hangers, thickness, 38

Superior 2ds hemp, 127

Swaying of rope, preventing, 145

T

Take-up for rope drive, 112

-up sheave for rope drive, 116

Testing alinement and level of shafting, 29

Tight ropes, 111

Tightener, automatic, for rope drive, 113

Tightener for 31-rope drive, 117

system, dangerous, 6

Tightening ropes, 112

Timbers of boarded-over ceiling, locating, 42, 45

Tin for packing, 24

Tool for leveling shafting, 58

Tools for splicing leather belts, 72

Transmission rope, 135

rope, ordering, 122

Transmission, wire rope, 143

rope, deflection of rope, 144

Traveling take-up for rope drive, 112

Tucking strands, 139

Turning edge of scrapers, 76, 77

up line shafting, 49

V

V-shaped rails, for mounting dynamos and motors, 18

Vertical adjustment for hangers, 3

W

Water, effect on belt, 92

Width of belting, 132, 133

Willis, Geo. F., 115

Wire diameter, for transmission rope, 147

Wire-lacing a belt, 12

Wire rope, splice, 144

transmission, 143

Wrench, proper way to use, 22

Z

Zebu manila hemp, 125, 127

Transcriber's Notes:

Obvious typos were silently corrected.

Archaic and variable spelling has been preserved.

Variations in hyphenation and compound words have been preserved.

Italics are shown thus: _sloping_.

Bold type is shown thus: =shout=.

Small capitals have been capitalised.

Punctuation has been preserved as it appears in the

original publication.

Due to space constraints the table on p135 has been split.

Subscript shown by underscore _, superscript by ^.

Shafting, Pulleys, Belting and Rope Transmission · 第 6 / 6 段