CHAPTER XIV.

"EXTRA" MEASUREMENTS. TOAD-STOOL CONTRACTORS, TESTIMONIALS.

"Have you managed to get a bit 'extra' out of measurements?"

"Yes, occasionally, but that game is about played out. In the good old

times they used to let us all kinds of work, for we did business in

company more then than we do now, and what one did not know the other

did, and so we could do pretty nearly everything except metal work, so

long as they supplied us with the materials.

"I have already named about the 'extra' depth of foundations in

bridges, and pipes that were not so large as thought. I have also got a

bit 'extra' from side ditching when they had taken no cross sections of

the ground by leaving a few buoys or mounds at the highest parts. I

have also had a trifle out of the cuttings by rounding off the slopes a

few inches when they were long but working right to the slope peg at

top and nicking in an inch or two at the foot of the slope; but the

game is hardly worth the candle, as they have almost given up soiling

the slopes. Then there was a chance both ways. You got more measurement

than the actual excavation, and also a bit 'extra' for soiling that was

not put in, but it does not run into enough money to make it pay

safely, and as the slopes and formation are so much on show the fun is

hardly worth the risk. There is more to be had, so far as earthworks

are concerned, in road approaches than railway cuttings, and in docks

than either."

"I think you are right there."

"You see the earthwork is not so much in patches in dockwork, but all

together, and there is often as much in an acre or so of dock as in a

whole railway four or five miles in length, and inches in dockwork are

worth remembering. Besides they are not noticed so much, and the

excavation is soon covered up; and if it is in clay, and found out, you

can always say to the bosses--'I never saw such clay to swell in

patches.' Be sure to say 'in patches' for then you have an excuse handy

if the clay 'swells' nowhere else except at the place you have not

excavated to the right depth. You can generally get the surface not

exactly level throughout, and you have a large space to work on then,

and every inch means sovereigns. Really I think it does no one any

harm, and does good to me if the bottom is a trifle elevated. It comes

rather easy to most of us to make ourselves think a thing is good and

nice when it would cost us something to think otherwise."

"Yes. Money and our wishes usually work on the same main line."

"I once got done out of a bit 'extra' measurement by an engineer really

lovely."

"Did you. How was that?"

"I don't mind telling you, but there will be squalls if you blab. It

happened like this. It was a line that had been commenced and most of

the easy work done. It was in the days when every jerry-builder and

parish sewer contractor, and big linen-draper too, thought he was a

railway and dock contractor. You know they borrowed a bit from a local

bank, and would take any contract from a bridge of balloons to the moon

to a tunnel through the earth to Australia. Channel Tunnels, Forth

Bridges, and Panama Canals would have been toys to them, and they could

have made them on their heads. They sprung up just like

toad-stools--can't call them mushrooms, it would be a libel on the

plants--and every one of them thought they were quite as good as

Brassey, and could have given him points. They had cheek, that was all,

just like quack doctors. Well, what with, so they told me, big local

loan-mongers to work the oracle and swim with them, and general

recommendations--which I never take much notice of unless I know what a

man has seen or done--saying they were full of the sublimest honesty

and wisdom as ever had been known, and were that clever as few indeed

could hope to be, the game was worked trumps for a time. Tests, not

general testimonials, is my motto. What you have done or seen done, not

what people are kind enough to say they think you can do, and which

they don't know you can do. The man that asks a chap that he is

friendly with to write a recommendation has his sentimental feelings

worked on, and then truth takes a back seat, and of course you are

bound to say your friend is the best man that could be made for the

place, just that and nothing else. It costs a chap nothing to write it,

and it is only very few that care to refuse, because it does not do to

tell a man whom you wish to be friendly with that you don't think much

of him, and that he is quite sufficiently a shirker and polite humbug

to suit a good many, or that your own private opinion is he is not far

off being twin-brother to a mouse-coloured beast of burden that brays.

It is not good form, so we all, from kindness I suppose, write pretty

of one another except when we are owed money and can't get it, then

adjectives are often necessary, and as strong as you can find, with a

few put in as are only known to chaps like you and me, and are not

taught in schools, although they learn a lot there as they should not.

Do you know when I read general testimonials I always think what a lot

of saints and Solomons there are wanting situations, and it must be

only the sinners and fools as are in harness. What you want to know

from a reliable source is, how did a chap get on upon any particular

bit of work he had to do, and have it specified what it was, and in

what position he was, and whether all was and is right. Therefore, if I

asked for a testimonial I want one specially written for the occasion

and with reference to the kind of work that is in hand, and not as if I

was going to let a man walk out with my daughter. I name this because,

between you and me, I've found when a man is praised up as a sort of

saint, and nothing said as to what he has done in work that he is near

to being either a humbug or an ass. That was just the case here, for it

was to one of these toad-stool contractors that the directors let the

first contract, and engineers who do not advise their directors to have

nothing to do with such public works contractors (!) I think deserve

all the trouble they get into. Surely it is better to have a contractor

who knows what work is and should be, even if he has but a small

capital, than one who knows next to nothing about construction, and is

financed by some loan-monger, or is at the mercy of some wire-puller?"

"I say, you are hot on the question."

"Well, I consider it about poisons some works that would otherwise have

been made all right, and would have paid well too at the original

capital. Besides it ought to be known a man must be specially educated

to properly execute large public works, and should be bred an engineer,

for one that can make shanties, dust-bins and privies, may blossom into

a jerry runner-up of two-story stucco villas that have the faces and

insides covered with lime and mud and half-penny paper, but it wants a

contractor that is just about an engineer to know how to properly carry

out railways, docks, bridges, canals, harbours, and all sea works and

similar undertakings, and not a bell-pull mender and drain maker,

because then he hardly knows anything himself of what has to be done

and he is at the mercy of others. He tenders at figures below what he

ought, and then the work cannot be properly executed, or the easy

portion is done somehow or other and then the man goes smash. It is

just the difference between our sterling building firms and the

jerry-shanty-raisers who ought not to be called builders. Well, this

one started with a rattle and scraped about, and then went to

splinters. That's why I have named it, and because on this railway

there was a road diversion. About a quarter of it was excavated and it

was in an awful mess. It was in gravelly sand, and taken out in dabs,

and in and out, all widths and depths.

"I thought I saw a chance of a bit 'extra' and said nothing. One day I

got rather fierce for 'extras,' and I sniffed out some small heaps at

intervals up the approach. They were about a yard in height and four or

five yards round. I felt sure they had not been put on the cross

sections, which I got to know had been taken in some places as close as

15 feet apart, so I thought, 'Before I get the wagon roads in and move

another heap, I will see the young guv'nor.'

"Well, I had to go to the office, and he knew of the heaps and said 'I

will allow you 30 yards for those. I had not forgotten them.' Now that

was what they were to a spadeful, so I thought it was good business as

I knew they were not shown on the sections. He said 'In case anything

should happen to you or me I will write what I mean and have it

attached to the agreement.' I thought that was kind of him. Now, we had

worked for about a week, and I was keen on plunder. He then dictated a

few lines to the timekeeper, saying that it was agreed 30 cubic yards

of earth were in the heaps and they were to be paid for as an allowance

in addition to the 9239 cubic yards, the total measurement of the

excavation I had to do under the contract. Of course it was worded

right, but I give you the meaning. This I signed, and it was witnessed

by the time-keeper and the young guv'nor. I made just about the same as

he did of the total measurement, but was so eager after the 30 cubic

yards in the heaps that I signed the paper off hand, but of course I

knew then what was written, but thought no more about it. I left the

office and had six of neat right off on the strength of those heaps. I

will cut it short now.

"Well, I finished the job quickly, and one day, just before I had done,

I thought to myself, 'There have not been any "extras" on this approach

road, for what with slope and fence pegs being set out there has

actually been no chance of a bit "extra."' After thinking I said to

myself, 'It is an awkward place to measure. I will make my measurements

so that they work out five hundred yards more, add a little all over, I

can but give way in the end, have a nice, warm, genteel wrangle that

will shake up the cockles of my heart, and I may get half or something

extra if I do the oily persuasive trick, and look wronged in my

countenance.' So up I went to the office and said, 'I shall about

finish to-morrow, sir, and I think you will say I have done the job

well and quickly, and deserve another. It has been a tight fit, and has

only just kept me going.'

"Usual patter followed that is required on such occasions, and is kept

in stock for them. I was beginning to feel real happy, and thinking I

had got twenty pounds at least, and no mistake for talking pretty. So I

said, 'As I am here, sir, do you mind telling me what you make the

measurement?'"

"'Certainly. 9239 cubic yards, and 30 yards allowed for heaps. Total,

9269 cubic yards.'

"That did not suit me, so I started on the injured innocence lay, and

said meekly and persuasive like, 'You have left out something, I think,

sir.'

"'No; I have not.'

"'Well, sir, I make 500 yards more than you; and if I don't get it it

will be very bad for me, for I shall not be able to pay my men.' That

did not seem to flurry him. He opened the safe, and read from the paper

I had signed some months ago. Blessed if it ever occurred to me to

think that I had signed for the total quantities, but I had, for I was

then so taken up with the 30 yards. Like you, I am old enough to know

that no contract is indisputable, and that many things in law have to

be tried before they are law when a question arises, and that there is

not much finality about the show; but here I was caught, and had made

my own net, and no mistake; so, after putting in all I knew and saying

to him, 'I did not take that bit of paper to mean the same as he did,'

I considered it best to shake down easy as I saw I was grassed, so I

took his measurement; but I wished blue ruin to the heaps, and may

where they were tipped be well worried by worms and vermin. Look out! I

shall break something."

"Don't slap the table with your clenched fist like that, or we shall

have to pay for damages, and have nothing left for drinks."

"Right you are; but it does make me wild to think of it."

"You were had at your own game there!"

"Yes; but after all said and done, except the ground is level

throughout, I heard two engineers say earthwork measurements are

generally a matter of fair averaging; and if tables are used, some like

this table and others that, so all are happy; but they agreed

cross-sections are the best, and unless a plaster cast is made of the

surface of some ground, no one could say what the measurement really

was to a few yards, and that it does not much matter as the price per

cubic yard is so little compared with most prices of work, such as

masonry, brickwork, concrete, &c."

"You have finished, I fancy?"

"Yes."

"Now I'll tell you how I once got a bit 'extra' from measurements in

rather an odd way. The work was done without a contractor, it was

principally let in pieces to sub-contractors, and the rest day-work;

but I heard they did not gain much, if anything, by it. Came to nearly

the same thing, and all the bother and risk themselves, and about the

same good work.

"Well, the funny way I made some extra profit, of course, as usual,

very much against my will, was this. I happened to be in the engineer's

office, and heard the resident say to his assistant, 'Mr. ----, please

make a list of timber required for the quay sheds, and take out the

quantities.' Now it is only fair to say the assistant knew his book and

was up to snuff, but we are all caught tripping sometimes, and whether

it was his anxiety to ascertain the exact quantities, I don't know, but

he got mixed, and blessed if the timber was not ordered net lengths,

and nothing allowed for mortises and making joints. Just as we were

going to start on the sheds they took us away, and before the

foundations were excavated for the walls. It was fortunate they did, as

it happened, for it afterwards occurred to the assistant that he had

forgotten to allow for mortises and joints. So the sheds had to be made

about a foot less width than they should have been, and we got paid for

the foot or so at each end that was left out; and the inspector got the

tip, I suppose, for nothing was said, and it was not noticed, for they

were wide store sheds, with a line of rails through the centre, and it

really did not matter at all. So you see I was forced to take a bit

'extra,' but that is the only time in the whole of my life. Of course

it worried me much."

"No doubt it caused another wrinkle to set on your forehead."

"Very likely; but an old partner of mine told me he once was paid for

the corners of a lot of level-crossing lodges twice over by taking the

outside wall measurements all round instead of two outside and two

inside, but only once, when things had to be done at a great rush; it

was a case of hurry up all round, for all the final measurements of the

whole line had to be done in a fortnight."