CHAPTER III.

SCREW PILES.

Details.

"Now for some details.

"Solid piles are usually from 4 to 8 inches in diameter, and hollow

cast-iron from 10 to 30 inches, and generally 10 to 20 inches. Avoid

any cast-iron screw piles that are less than half an inch in thickness.

When they are from 1/12th to 1/18th of the diameter is perhaps the

best, according as their length is little or great; but of course they

have to be of a thickness that will stand the load, and what is the

best foundry practice should not be forgotten.

"Now as to the blade of the screw. If of wrought-iron, which seems to

me the wrong material for that purpose, it should not be less than half

an inch in thickness; if of cast-iron, as usually is the case, the

thickness of the blade of the screw at the pile shaft should be about

1.25 to 1.50 that of the column, and at the edge not less than half an

inch, and it should taper equally on both sides, and care be taken that

the metal is the very best and so cast as to ensure uniformity and

strength.

"All sizes of screws from twice to six times the diameter of the pile

when hollow I have screwed, but the best are from 2 to 1 to 3 to 1, and

when they are more than 4 to 1 it is to be feared they will break

before they can be made to penetrate far enough to say nothing about.

Solid piles with screws four to seven times the diameter of pile I have

also fixed, and 5 to 1 to 6 to 1 is quite large enough; but the kind of

ground and the depth to which they must be got down should govern the

size and the pitch. The greatest depth, apart from imagination for

measurement, to which I have ever screwed a pile is about 25 feet.

Without special tackle I have made a 2 feet in diameter screw penetrate

hard clay, dense sand, and other hard soil from 8 to as much as 17

feet; but then 10 to 15 feet is deep enough, for there is such a thing

as overscrewing. A 3 to 4 feet in diameter screw I have fixed all

depths from 10 to 20 feet in ordinary sand, clay, and sandy gravel. A 4

feet to as large as a 5 feet screw, which great size should only be

used for soft soils, from 15 to 25 feet, and the most usual depth is

about 15 feet, and hardly ever above 20 feet.

"A 9 feet 6 inches screw blade has been used on a 7 feet in diameter

cylinder, but that is the largest I have heard of, but then it only

projected 2 feet 6 inches beyond the column. Five feet is usually about

the largest, and is only used for very soft soils. When more than that

size they are unwieldy and very liable to be broken, and if the screws

are fixed to a shaft and have to be shipped they are awkward things,

and the freight becomes expensive. For hard soil, and that which will

not compress nicely, about 2 to 3 feet is large enough for the diameter

of the screw, and 3 to 5 feet for soft soils. The pitch of the screw is

generally from one-third to one-seventh of the outside diameter of the

blade. It varies according to the hardness and softness of the ground

and is steeper as it becomes harder. When the pitch is increased the

effect of the power applied to screw it is reduced, therefore the

steeper or greater the pitch the harder the screwing.

"Piles can be screwed with a small pitch when sufficient power cannot

be obtained to make a steep-pitched screw penetrate. Piles with a

single turn of the screw, it seems to me, are the best, although the

double-threaded screw may be right in soft marshy ground; but the

usefulness of a double thread is doubtful, for I believe it breaks up

the ground for no good, although some state that the screw threads work

in parallel lines, and that a double-threaded screw is steadier; for

they say a single-threaded pile is always likely to turn on the outside

edge of the blade, and that the double-threaded is not, as it has a lip

on both sides.

"Generally the screw has rather more than one entire turn round the

pile, and when it is below the ground each side of the blade steadies

the other, for the turns range from one to about two. Sometimes the

edge of the blade is notched like a saw; but it is a question whether

the saw-edge blade will screw into ground that an ordinary blade will

not, and until it is proved by experiment it can only be a matter of

opinion; but there is one thing to consider, a saw-cut edge blade may

to some extent wedge the soil between the teeth; still, I have used

them, and they penetrated thin limestone, chalk, and compact gravel

seams. Instead of double threads, double points are the thing, and all

screw piles should have a point of some kind. For soft ground, a single

gimlet, and a double for hard soils, and I have noticed what I call a

double gimlet point is best for keeping a pile in the required

position, as each point prevents the other departing from a correct

line. By points I mean the ends are spread out about 3 to 4 inches on

each side of the axis of pile like spiral cutters.

"Unless it is certain the ground is easy and uniform, a pile with a

screw having one turn to two turns for bearing purposes, and two,

three, or four solid inclined screw-threads projecting about

three-quarters of an inch with two end spiral cutters as just named, is

my desire, or in addition to the bearing blade a single-turn thread of

about 3 to 4 inches projection and the same kind of point; then unless

it will screw, none will. They are less trouble when cast in one piece

with the pile; but not for transport or shipping, or foreign work

generally, because to be able to detach the screws is an advantage in

many ways, such as packing, defects, breakages, carriage, and I think

the castings are better when the blade is not cast on the pile. It may

also happen that a rocky bed is unexpectedly encountered, then the pile

is useless with the screw, but might be fixed firmly in Portland cement

without the blade in a hole made in the rock. At the top of the screw

blade seat in which a pile has to be fixed there should be a

wrought-iron ring about half to three-quarters of an inch in thickness,

and not less than 2 inches in width, to relieve any strain on the

casting. It may be put on hot, so as to cool sufficiently tight but not

strain the casting. A firm and even bearing for the pile on the socket

seat is important, and it should fit accurately.

"I have heard of screw piles in which the blade was made of two or more

separate segments so as to obtain, it was supposed, equal pressure all

round, and to ease screwing, but rather fancy they might be inclined to

jam the ground, as they would be not unlike a lot of very large round

saw teeth. They may be right, but it has to be proved they will screw

where a plain blade will not, provided the latter pile has double

cutter-points to steady it.

"Give me a screw blade not more than about 2 feet from the points, and

not one with a blade 10 feet or so above the points and say from 5 to 6

feet in the ground, for then, should the screw work at all crooked and

the pile be not exactly upright at the commencement of screwing, it is

no easy task to get it to stand vertically upon applying the power,

because such piles are generally long and slender, and shift about

until the blade is screwed. They want careful and constant guidance. Of

course, the idea of placing the screw a little way down is that when

the ground bears as well at that place as at the point, and there is no

scour, it is no use putting the bearing blade lower. That is right; but

then it always occurs to me to ask what is the use of anything below

the bearing level if the foundation be protected from scour, for a thin

pile by itself has little lateral strength.

"Of course, you are bound to make out a pile requires a lot of screwing

or you will be considered as making too much profit, but always take

care to watch how the first pile screws, and measure the distance every

few minutes. What the ground is can then be judged, and you will be

able to think out things for 'extra' profit. It causes me a lot of

consideration sometimes, but after a struggle I generally manage to

think rightly for my pocket, and work it all serene. What a beautiful

sharpener of one's brain 'extras' are!

"It is not always an experimental pile is screwed so as to judge of

the distance the permanent piles should penetrate, and therefore a

guess has to be made from the experience of screw piles under the

same conditions of screwing and in the same soil. There is a good

deal of chance about it, for although the soil may be of the same

general character it often varies in hardness; and that is where the

bother is, for it makes the 'extras' to be wrong way about for some

time. What I do then is to work the oracle, and try to make out the

screw blades will be broken or injured for certain if I am compelled

to screw them as ordered, and I work on the proverb that equal

support is not to be obtained at a uniform depth when the ground

varies, which is true; and I state that the resistance is different

and offer to screw on, but say am afraid the blade may be broken, and

in that how-kind-I-am-to-consider-your-interests sort of way

generally manage to obtain a bit 'extra,' or save something that

would have been loss, and get the pile measured at once for a

making-up length, and really without damaging any one, for if the

ground is harder at one place than at another there is no occasion to

go so deep, always provided scour is not to be feared. So I am

pleased, and it does not hurt them.

"Now for a hint or two on screwing piles. I shall not refer to the

columns above the ground, but to the bearing piles below, i.e., the

part that has to be screwed into the ground. However, I will just say

that upon the top of some of the columns the usual hinged shoes of

bearing-blocks should be placed to receive the ends of the girders, and

by that means the pressure on the columns will be on the centre of the

pile, and allowance be made for expansion and contraction, and that is

important.

"Fixed staging is far the best from which to screw piles, but the

chances must be considered of its being swept away by floods in a

river, or smashed by the sea, and on any exposed coast there may not be

time to construct it during the working season, so as to give a

sufficient number of days for screwing operations. When a fixed stage

cannot be erected, or the work be done from the end of a finished pier,

pontoons or rafts are then a makeshift, but care must be taken that

they do not break from the moorings. A couple of pontoons well braced

together will do with a space between them to screw the pile, but in a

steady or shallow river, perhaps making a timber stage upon the shore

and floating it out can be done if a centre pile is fixed on the bed of

the river to be certain it is in the right position when grounded. The

staging must be equally weighted to make it sink, and arrangements made

so that it can be floated away at any time if necessary.

"Piles can also be fixed in a medium depth of water by ordinary

gantries, but if they are in the sea the road on the staging should be

kept from 12 to 15 feet above high water on an open sea coast or the

inclined struts and ties and rail tops as well are very likely to be

destroyed, and it is also advisable to construct the flooring of the

stage so that it can be easily taken away in case of storms. The stage

piles also require to be well stiffened by struts, transoms, diagonals,

and capping sills. I have screwed piles from a floor that has been

suspended from staging by chains and ropes to the height wanted, and

when lowered it was fixed temporarily and as many guides as possible

were made for the piles. Perhaps as good a way as any is to fix, say

four guide piles having a space between them a shade larger than the

outside dimensions of the screw blade and braced to the rest of the

stage, and after the screw is in position and ready for screwing in the

ground, place, say a couple of frames, one at top and one as low as

possible between the guide piles, about an eighth of an inch more than

the outside dimension of the pile shaft, for then the pile is kept in

its right position as it is screwed. The guide frames should be at

about every 10 or 15 feet of the height above the ground, and at some

point between the capstan level and the ground. Should it be a tidal

river, fix guide booms if a properly made iron frame cannot be placed,

and remember the more a pile is guided the easier it is to screw, and

especially so at the start.

"The size and strength of the staging must be regulated according to

the power available for screwing the piles, but the length of the lever

arms and the capstan bars require a space in which to revolve, from,

say, 35 to 60 feet square. No timber stage is immovable, for the wood

yields. It is well to have two floors in a stage if it does not cost

too much, and there is plenty of tackle and a lot of screwing to do;

say, one fixed above high-water level and the other about half tide in

order to obtain double power, and sufficient power to screw the piles

cannot sometimes be otherwise secured. A word about floating stages.

With them it is not easy to make a pile screw vertically unless the

ground is uniform, and should a pile meet a boulder it will most

probably be forced out of position. According to the power

required--which really means the nature of the ground, as the harder

the soil the harder the screwing--the form of the pile and the depth to

which it has to be screwed, so must be the size and strength of the

raft, pontoon, or lighter, and the moorings must hold it tightly. In

some places a screw cannot be fixed from a floating stage, for the

water may nearly always be too disturbed, and the pontoons may sway too

much, for in all cases men, horses, or bullocks must have a steady

footing, and screwing machinery also requires a firm base. Unless the

moorings are very secure the platform will be unsteady. Its level

should be as little above the water as practicable for work, so as to

keep the point of resistance and that at which the screwing power is

applied as near together as possible, and the lower the pontoon the

less it rolls. It does not matter much what craft is used so long as it

is broad and steady and not high, as a platform or deck must be made

upon it in any case. To do any good with floating stages the power

required should be little, and the ground soft and uniform, for

sufficient force to screw may not be obtainable from a floating body,

and in hard soil it may only be possible to screw piles a little way

down and not to a sufficient depth for the load they will have to bear.

"Of course, vertical pile screwing is the easiest, and to try to screw

them at a greater angle than 63 deg., or about 1/2 to 1, is unadvisable,

and may not succeed, and even if they do it is too steep to be nice. 1

in 10 to 1 in 20 for raking piles is enough; for if they have to carry

girder ends, the more the batter the greater the strain on the pile,

and the same during screwing.

"Sometimes in loose soil it is difficult to start screwing, and then a

good plan is to cast some clay or solid earth round the pitch; it

steadies the pile and will probably make it bite properly, or a heavy

weight placed on the pile may make it catch hold of the ground; if not,

a few blows from a ram may do it. As a hollow pile penetrates, the core

requires to be removed, so as to help it to descend. If it is not large

enough for boys to get inside, scoops and tackle can be used. Water

forced down makes sand boil round the screw blade, and when the pile is

empty the unbalanced head of water outside relieves the pile and the

screw blade from some of the surface friction. If water pressure cannot

be used, the water inside the pile should be removed either by pumps or

buckets so as to help to loosen the ground.

"Piles do not generally screw to the full pitch, but when a pile

descends _more_ than the pitch at the last turn, it can be considered

the weight of the pile is too great for the ground. The slip usually

increases according to the yielding or plastic nature of the soil, and

the depth to which the pile is screwed. When water reaches such soils

the slip is increased, but not perceptibly in sand and loose grained

soils. Suppose the full pitch is 9 inches. The slip may be anything

from about 1 inch to as much as 4 inches. By watching the way in which

the screw penetrates, and whether it descends about the same distance

_each_ turn, or regularly decreases, it can be judged whether the bite

of the screw is right. Some slip will generally take place, therefore

note at first how much it is, and consider whether it will not churn up

the ground, for if the screw blade turns on nearly the same lines, the

bite will be gradually destroyed, and then it may be very difficult to

obtain a fresh hold of the ground, and the pile will most probably not

screw vertically, and the screw blade is liable to be injured and may

become worn away considerably.

"Piles can be screwed by means of men, horses, oxen, and machines.

Man-power can be used anywhere, machines in most places, but horses and

oxen only on land when the piles are screwed on a foreshore or between

tides; of course all live power works at the end of the capstan bars.

Once I had the option of screwing by horses or oxen, and chose oxen.

Another man had horses. I made more profit than he did, and the piles

screwed easier than his. I did not let him come near me when screwing;

but if you have the choice, use oxen in preference to horses. Of

course, I am speaking of those countries where they are used to the

yoke."

"Why?"

"Because they do not stop at any time or back like horses, not even

when the resistance of the pile becomes too great without more power,

but continue to pull, and therefore backward motion of the pile is

prevented. The oxen were yoked to two cross-arms attached to the end of

the lever.

"There are several machines for screwing piles worked by steam or other

power, and when the ground is not easy to penetrate, and a large number

of piles have to be screwed, their cost will be saved in the

regularity, quickness, and ease in screwing, and in stiff soil by

machine power I have known them screwed at the rate of 4 to 6 inches

per minute. Of course, it is a special machine, and not easily sold

when not further wanted except at a much less price than has been paid

for it, and that has to be considered. There are several different

methods of screwing piles from a fixed stage; for instance, suppose a

pile of sufficient length and with the screw attached is brought to the

site by barge or otherwise, the capstan head is then fixed, and the

pile swung vertically over the pitch by sling-chains fastened to

temporary eye-bolts passing through the bolt-holes in the flanges or

otherwise, and is moved either by a jib crane, a derrick upon a raft,

or some such hoisting apparatus; it is lowered into its place between

the guide-piles or steadied by sling-chains or other means, then the

capstan bars are put into the sockets of the capstan head, which should

be at equal distances apart, and the pile is ready for screwing after

it is known that it is vertical.

"Where circumstances did not allow of room for capstan bars of

sufficient length for men to walk round, I have screwed piles by ropes,

but it will only do when the soil is easy to penetrate. The way we

worked was something like this, we had two endless ropes passing round

the ends of short capstan bars and round two double purchase crabs

placed upon opposite sides of the pile, about six or eight men worked

at each crab, four or five winding, and two or three hauling in the

slack, one rope being passed through a sufficiently deep upper slot in

the capstan bar end so that it did not slip, also one in the lower slot

same end. Both the taut and the slack ends of the lower and upper ropes

were attached each to its own crab. A man must be stationed at the end

of the capstan bars to put the slack ends of the taut and slack ropes

into the slots. One rope gives the capstan half a turn when it is taut,

and then it falls out of its slot and is slack, and so with the other

rope, but it is not easy to keep the two ends of the rope equally

tight, and the power obtained is not great and may not be sufficient.

It is a kind of makeshift."

"How do you fix the capstan head to the pile shaft?"

"In many different ways. Sometimes it is keyed on or clamped tightly to

the top of the pile length by steel wedges, also placed upon the pile

length and fixed by temporary bolts passing through the top flanges of

the pile length, and also by fixing a temporary ribbed pile into the

capstan head, and by connecting it with the permanent pile by bolts or

slots, and so wedging is not wanted and it can be raised and lowered.

Another way is, two of the internal sides of the pile at top are cast

flat for a foot or so down into which the capstan head fits, and the

inside diameter is lessened for an inch or two to prevent the capstan

head slipping down, but it generally can't do that, even without the

narrowing of the pile for that object.

"As the capstan is subject to great wear and tear and sudden strain, it

should be strong, for if it breaks the work is stopped. Wrought-iron

capstan heads are used, but cast-iron are perhaps better. Sometimes the

capstan sockets are made to fit the ends of rails, if rails instead of

timber are used for the capstan bars, but rail bars are rather heavy

and are not nice to handle. The capstan socket is generally made to

receive from eight to ten or more radial lever arms, and the lengths of

the bars are anything from 5 to 40 feet, but the latter is rather too

long as it is very difficult to control the strain and the bar usually

bends and springs. The best working lengths are from about 8 to 20

feet, if the staging is so large. The best height for the capstan bars

above the floor stage is from 3 feet 6 inches to 4 feet 6 inches. The

capstan bars have to be lifted and again fixed as the pile penetrates,

or a temporary pile of different length has to be fixed in it, unless

the capstan head can be slipped up and down on a ribbed pile, hence you

may want a platform you can raise or lower easily when required. If you

use double-headed rails of the same section top and bottom for the

bars, you can have them bent up a little near the capstan head, and

when you start, the bent end is lowest, and then the bars can be

reversed and so the work proceeds.

"Put the men, horses, or oxen in the most natural position for exerting

their full strength or a loss of power will result, and therefore it

will cost more to screw the piles.

"Should there be gantry staging on the site, the piles can be pitched

from a traverser, or by means of an ordinary crab winch. They can also

be screwed from the permanent structure by means of a projecting stage

temporarily fixed to it, and of a length sufficient to reach the next

span. The pile is run forward upon rollers and placed in the right

position. Then it is screwed on the endless rope system previously

described, or by passing the rope round a deep groove in the capstan

bar ends, and the rope is held tightly by being placed round a smaller

grooved pulley fixed about a hundred feet or so back towards the shore.

The men haul the endless rope and so the screwing is done. The worst of

screwing by endless ropes this way is that the pile very probably may

be pulled over towards the source of power as it comes from _one_

direction, therefore, support is required on the side of the pile to

prevent this tendency. The circumference of the ropes used varied from

4-1/2 to 6 inches, but I have used a 10 inch rope. Small ropes are

generally relatively stronger than large ones. Stretch a rope well

before using, as it yields, especially hemp ropes. The distance between

the point at which the power is applied, and the ground should be as

little as possible. In firm sand, when the power has been more than

about 20 to 25 feet above the ground, it is often very difficult to

screw piles by ordinary means to more than a small depth, as two places

in the pile are wanted from which to apply the screwing force, and both

as low down as convenient; but in screwing from a second stage care

should be taken that the pile shaft is not bent, for it may then be

strained like a girder and not merely as a column, also when much power

to screw is required it is not easy to avoid pulling them out of the

vertical. Always screw them steadily and prevent jerking. Any

obstruction, such as a boulder, tends to displace a pile, and loosens

the ground around it. In soft soils it may be possible to pull piles

upright by pushing aside an obstruction if the pile is given a turn or

two after meeting it and before pulling; but it must be carefully done,

or the pile may be smashed, and it is only safe to pull it over in easy

soils and when much force is not required."

"How much power is generally wanted for screwing?"

"That is not so easily answered as asked. It varies very much, and, of

course, depends upon the kind of soil and the size and pitch of the

screw. Ten men may be sufficient and a single stage, but two stages may

be necessary should the pile be 50 or 60 feet in length, and then not

far from one hundred men. An engineer told me the force generally

required for piles of usual sizes under ordinary screwing circumstances

varies from about 8 to 10 tons to as much as 50 tons, and usually from

about 10 to 25 tons, and, of course, the number of men to screw in

proportion.

"Ordinary piles and screws have gone down 21 feet in sand in eight

hours, and by steam machinery in clay at the rate of 6 inches per

minute, and also, to my loss only about 1 foot in a day--and then it is

time to stop altogether, should many piles hold like that. To compare

what has been done with what has to be done is misleading unless the

conditions are alike, for if they are otherwise the power required,

cost, and rate of screwing will all be different. I have screwed a

6-inch pile with a 2-feet one-turn screw into 20 feet of ordinary sand

with an applied power of 30 tons as calculated by an engineer from

measurements and the force of men applied at the capstan bars. There is

the surface friction on the screw blade and the pile shaft in the

ground, the cutting of the earth by the edge of the blade and the

points, and the loss of power from torsion and that applied compared

with the effective force, slip, friction, &c., to consider; and the

relative surface of the blades, width, and thickness of the cutting

edge and the pitch--for a steep pitch means harder screwing. By using

capstan bars and men at them, instead of ropes at the ends of the arms

worked by crabs, you will find about one-fifth more power is gained, or

rather is not lost. Of course, place the men as near to the end of the

capstan bar as convenient for work. My lecture is finished, and I am

parched."