H = H_t - [h]_p

is the available head for working the turbine, and on this the

calculations for the turbine should be based. In some cases it is

necessary to place the turbine above the tail-water level, and there

is then a fall [h] from the centre of the outlet surface of

the turbine to the tail-water level which is wasted, but which is

properly one of the losses belonging to the turbine itself. In that

case the velocities of the water in the turbine should be calculated

for a head H - [h], but the efficiency of the turbine for the

head H.

§ 186. _Gross Efficiency and Hydraulic Efficiency of a Turbine._--Let

T_d be the useful work done by the turbine, in foot-pounds per second,

T_t the work expended in friction of the turbine shaft, gearing, &c.,

a quantity which varies with the local conditions in which the turbine

is placed. Then the effective work done by the water in the turbine is

T = T_d + T_t.

The gross efficiency of the whole arrangement of turbine, races, and

transmissive machinery is

[eta]_t = T_d/CQH_t. (6)

Encyclopaedia Britannica, 11th Edition, "Husband" to "Hydrolysis" Volume 14, Slice 1 · 第 176 / 207 题