CONCRETE.[1]

[Footnote 1: Read July 5, 1887, before the Western Society of

Engineers.]

By JOHN LUNDIE.

The subject of cement and concrete has been so well treated of in

engineering literature, that to give an extended paper on the subject

would be but the collection and reiteration of platitudes familiar to

every engineer who has been engaged on foundation works of any

magnitude. It shall therefore be the object of this communication to

place before the society several notes, stated briefly and to the

point, rather as a basis for discussion than as an attempt at an

exhaustive treatment of the subject.

Concrete is simply a low grade of masonry. It is a comparatively

simple matter to trace the line of continuity from heavy squared

ashlar blocks down through coursed and random rubble, to grouted

indiscriminate rubble, and finally to concrete. Improvements in the

manufacture of hydraulic cements have given an impetus to the use of

concrete, but its use is by no means of recent date. It is no uncommon

thing in the taking down of heavy walls several centuries old to find

that the method of building was to carry up face and back with rubble

and stiff mortar, and to fill the interior with bowlders and gravel,

the interstices of which were filled by grouting--the whole mass

becoming virtually a monolith. Modern quick-setting cement

accomplishes this object within a time consistent with the

requirements of modern engineering works; the formation of a

monolithic mass within a reasonable time and with materials requiring

as little handling as possible being the desideratum.

The materials of concrete as used at present are cement, sand, gravel,

broken stone, and, of course, water. It is, perhaps, unnecessary to

say that one of the primary requirements in materials is that they

should be clean. Stone should be angular, gravel well washed, sand

coarse and sharp, cement fine and possessing a fair proportion of the

requirements laid down in the orthodox specification. The addition of

lime water, saccharated or otherwise, has been suggested as an

improvement over water pure and simple, but no satisfactory

experiments are on record justifying the addition of lime water.

Regarding the mixing of cement and lime with saccharated water, the

writer made some experiments several months ago by mixing neat cement

and lime with pure water and with saccharated water, with the result

that the sugar proved positively detrimental to the cement, while it

increased the tenacity of briquettes of lime.

Stone which will pass a 2 inch is usually specified for ordinary

concrete. It will be found that stone broken to this limit of size has

fifty per cent. of its bulk voids. This space must be filled by mortar

or preferably by gravel and mortar. If the mixing of concrete is

perfect, the proportion of stone, by bulk, to other materials should

be two to one. A percentage excess of other materials is, however,

usually allowed to compensate for imperfection in mixing. While an

excess of good mortar is not detrimental to concrete (as it will

harden in course of time to equal the stone), still on the score of

economy it is advisable to use gravel or a finer grade of stone in

addition to the 2 inch ring stone to fill the interstices--gravel is

cheaper than cement. The statement that excess in stone will give body

to concrete is a fallacy hardly worth contradicting. In short, the

proportion of material should be so graded that each particle of sand

should have its jacket of cement, necessitating the cement being finer

than the sand (this forms the mortar); then each pebble and stone

should have its jacket of mortar. The smaller the interstices between

the gravel and stones, the better. The quantity of water necessary to

make good concrete is a sorely debated question. The quantity

necessary depends on various considerations, and will probably be

different for what appears to be the same proportion of materials. It

is a well known fact that brick mortar is made very soft, and bricks

are often wet before being laid, while a very hard stone is usually

set with very stiff mortar. So in concrete the amount of water

necessarily depends, to a great extent, on the porosity or dryness of

the stone and other material used. But as to using a larger or smaller

quantity of water with given materials, as a matter of observation it

will be found that the water should only be limited by its effect in

washing away mortar from the stone. Where can better concrete be found

than that which has set under water? A certain definite amount of

water is necessary and sufficient to hydrate the cement; less than

that amount will be detrimental, while an excess can do no harm,

provided, as before mentioned, that it does not wash the mortar from

the stone. Again, dry concrete is apt to be very porous, which in

certain positions is a very grave objection to it--this, not only from

the fact of its porosity, but from the liability to disintegration

from water freezing in the crevices.

Concrete, when ready to be placed in position, should be of the

consistency of a pulpy mass which will settle into place by its own

weight, every crevice being naturally filled. Pounding dry concrete is

apt to break adjacent work, which will never again set properly. There

should be no other object in pounding concrete than to assist it to

settle into the place it is intended to fill. This is one of the evils

concomitant with imperfection of mixing. The greater perfection of

mixing attained, the nearer we get to the ideal monolith. The less

handling concrete has after being mixed, the better. Immediately after

the mass is mixed setting commences; therefore the sooner it is in

position, the more perfect will be the hardened mass; and, on the

other hand, the more it is handled, the more is the process

interrupted and in like degree is the finished mass deteriorated. A

low drop will be found the best method of placing a batch in position.

Too much of a drop scatters the material and undoes the work of

thorough mixing. Let the mass drop and then let it alone. If of proper

temper, it will find its own place with very little trimming. Care

should be taken to wet adjacent porous material, or the wooden form

into which concrete is being placed; otherwise the water may be

extracted from the concrete, to its detriment.

It has been found on removing boxing that the portion adjacent to the

wood was frequently friable and of poor quality, owing to the fact

just stated. It is usual to face or plaster concrete work after

removing the boxing. On breakwater work, where the writer was engaged,

the wall was faced with cement and flint grit, and this was found to

form a particularly hard and lasting protection to the face of the

work.

Batches of concrete should be placed in position as if they were

stones in block masonry, as the union of one day's work with a

previous is not by any means so perfect as where one batch is placed

in contact with another which has not yet set. A slope cannot be added

to with the same degree of perfection that one horizontal layer can be

placed on another; consequently, where work must necessarily be

interrupted, it should be stepped, and not sloped off.

Experience in concrete work has shown that its true place is in heavy

foundations, retaining walls, and such like, and then perfectly

independent of other material. Arches, thin walls, and such like are

very questionable structures in continuous concrete, and are on record

rather as failures than otherwise. This may to a certain degree be due

to the high coefficient of expansion Portland cement concrete has by

heat. This was found by Cunningham to be 0.000005 of its bulk for one

degree Fahrenheit. It is a matter which any intelligent observer may

remark, the invariable breakage of continuous concrete sidewalks,

while those made in small sections remain good. This may be traced to

expansion and contraction by heat, together with friction on the lower

side.

In foundations, according to the same authority above quoted, properly

made Portland cement concrete may be trusted with a safe load of 25

tons per square foot.

In large masses concrete should be worked continuously, while in small

masses it should be moulded in small sections, which should be

independent of each other and simply form artificial stones.

The facility with which concrete can be used in founding under water

renders it particularly suitable for subaqueous structures. The method

of dropping it from hopper barges in masses of 100 tons at a time,

inclosed in a bag of coarse stuff, has been successfully employed by

Dyce Cay and others. This can be carried on till the concrete appears

above water, when the ordinary method of boxing can be employed to

complete the work. This method was employed in the north pier

breakwater at Aberdeen, the breakwater being founded on the sand, with

a very broad base. The advantage of bags is apparent in the leveling

off of an uneven foundation. In breakwater works on the Tay, in

Scotland, where the writer was engaged, large blocks perforated

vertically were employed. These were constructed below high water

mark, and an air tight cover placed over them. They were lifted by

pontoons as the tide rose, and conveyed to and deposited in place, the

hollows being filled with air, serving to give buoyancy to the mass.

After placing in position the vertical hollows were filled with

concrete, so binding the whole together--they being placed vertically

over each other.

As mentioned before, continuous stretches of concrete in small

sections should be guarded against, owing to expansion by heat; but

the fact of a few cracks appearing in heavy masses of concrete should

not cause apprehension. These occur from unequal settlement and other

causes. They should continue to be carefully grouted and faced until

settlement is complete.

The use of concrete is becoming more and more general for foundation

works. The desideratum hitherto has been a perfect and at the same

time an economical mixer. Concrete can be mixed by hand and the

materials well incorporated, but this is an expensive and man-killing

method, as the handling of the wet mass by the shovel is extremely

hard work, besides which the slowness of the method allows part of a

large batch to set before the other is mixed, so that small batches,

with attendant extra handling, are necessary to make a good job.

Mixers with a multiplicity of knives to toss the material have been

used, but with little economical success. Of simple conveyers, such as

a worm screw, little need be said; they are not mixers, and it seems a

positive waste of time to pass material through a machine when it

comes out in little better shape than it is put in. A box of the shape

of a barrel has been used, it being trunnioned at the sides. The

objection to this is that the material is thrown from side to side as

a mass, there being a waste of energy in throwing about the material

in mass without accomplishing an equivalent amount of mixing. Then a

rectangular box has been used, trunnioned at opposite corners; but

here the grave objection is that the concrete collects in the corners,

and after a few turns it requires cleaning out, the material so

sticking in the corners that it gets clogged up and ceases to mix.

The writer has just protected by letters patent a machine, in devising

which the following objects were borne in mind:

1st. That every motion of the machine should do some useful work.

Hitherto box or barrel mixers have gone on the principle of

throwing the material about indiscriminately, expecting that

somehow or other it would get mixed.

2d. That the sticking of the material anywhere within the mixer

should be obviated.

3d. That an easy discharge should be obtained.

4th. That the water should be introduced while the mixer

revolves.

With these desiderata in view, a box was designed which in half a turn

gathers the material, then spreads it, and throws it from one side to

the other at the same time that water is being introduced through a

hollow trunnion.

It is also so constructed that all the sides slope steeply toward the

discharge, and there is not a rectangular or acute angle within the

box. A machine has now been worked steadily for several weeks, putting

in the concrete in the foundations of the new Jackson Street bridge in

this city, by General Fitz-Simons. The result exceeds expectations.

The concrete is perfectly mixed, the discharge is simple, complete and

effective, and at the same time the cost of labor in mixing and

placing in position is lessened by 50 per cent. as compared with any

known to have been put in under similar circumstances.--_Jour.

Association of Engineering Societies._

* * * * *

Scientific American Supplement, No. 643, April 28, 1888 · 第 15 / 57 题