It would do no good to admit more steam to the first stage, for at the

rated capacity that stage is taking all the steam for which the blade

area will afford a passage. The port connecting the upper side of the

piston N with the exhaust may be permanently closed by means of the hand

valve Q, to be found on the side of the secondary pilot valve chest,

thus cutting the secondary valve entirely out of action. No dashpot is

necessary on this valve, the compression of the steam in the chamber W

by the fall of the piston being sufficient to avoid shock.

The timing of the secondary valve is adjusted by raising or lowering the

pilot valve by means of the adjustment provided. It should open soon

enough so that there will not be an appreciable drop in speed before the

valve comes into play. The economy of the machine will be impaired if

the valve is allowed to open too soon.

Safety Stop Governor

This device is mounted on the governor end of the turbine shaft, as

shown in Figs. 52 and 53. When the speed reaches a predetermined limit,

the plunger A, having its center of gravity slightly displaced from the

center of rotation of the shaft, is thrown radially outward and strikes

the lever B. It will easily be understood that when the plunger starts

outward, the resistance of spring C is rapidly overcome, since the

centrifugal force increases as the square of the radius, or in this case

the eccentricity of the center of gravity relative to the center of

rotation. Hence, the lever is struck a sharp blow. This releases the

trip E on the outside of the governor casing, and so opens the steam

valve F, which releases steam from beneath the actuating piston of a

quick-closing throttle valve, located in the steam line. Thus, within a

period of usually less than one second, the steam is entirely shut off

from the turbine when the speed has exceeded 7 or 8 per cent of the

normal.

[Illustration: FIG. 52]

[Illustration: FIG. 53]

The Oiling System

Mounted on the end of the bedplate is the oil pump, operated from the

main shaft of the turbine as previously stated. This may be of the

plunger type shown in Fig. 54, or upon the latest turbine, the rotary

type shown in Fig. 55. Around the bedplate are located the oil-cooling

coils, the oil strainer, the oil reservoir and the oil pipings to the

bearing.

[Illustration: FIG. 54]

The oil reservoir, cooler, and piping are all outside the machine and

easily accessible for cleaning. Usually a corrugated-steel floor plate

covers all this apparatus, so that it will not be unsightly and

accumulate dirt, particularly when the turbine is installed, so that all

this apparatus is below the floor level; i.e., when the top of the

bedplate comes flush with the floor line. In cases where the turbine is

set higher, a casing is usually built around this material so that it

can be easily removed, and forms a platform alongside the machine.

[Illustration: FIG. 55]

The oil cooler, shown in Fig. 56, is of the counter-current type, the

water entering at A and leaving at B, oil entering at C (opening not

shown) and leaving at D. The coils are of seamless drawn copper, and

attached to the cover by coupling the nut. The water manifold F is

divided into compartments by transverse ribs, each compartment

connecting the inlet of each coil with the outlet of the preceding coil,

thus placing all coils in series. These coils are removable in one piece

with the coverplate without disturbing the rest of the oil piping.

[Illustration: FIG. 56]

Blading

[Illustration: FIG. 57]

The blades are drawn from a rod consisting of a steel core coated with

copper so intimately connected with the other metal that when the bar is

drawn to the section required for the blading, the exterior coating

drawn with the rest of the bar forms a covering of uniform thickness as

shown in Fig. 57. The bar after being drawn through the correct section

is cut into suitable lengths punched as at A (Fig. 58), near the top of

the blade, and has a groove shown at B (Fig. 59), near the root, stamped

in its concave face, while the blade is being cut to length and punched.

The blades are then set into grooves cut into the rotor drum or the

concave surface of the casing, and spacing or packing pieces C (Fig. 59)

placed between them. These spacing pieces are of soft iron and of the

form which is desired that the passage between the blades shall take.

The groove made upon the inner face of the blade is sufficiently near to

the root to be covered by this spacing piece. When the groove has been

filled the soft-iron pieces are calked or spread so as to hold the

blades firmly in place. A wire of comma section, as shown at A (Fig.

59), is then strung through the punches near the outer ends of the

blades and upset or turned over as shown at the right in Fig. 58. This

upsetting is done by a tool which shears the tail of the comma at the

proper width between the blades. The bent-down portion on either side

of the blade holds it rigidly in position and the portion retained

within the width of the blade would retain the blade in its radial

position should it become loosened or broken off at the root. This comma

lashing, as it is called, takes up a small proportion only of the blade

length or projection and makes a job which is surprisingly stiff and

rigid, and yet which yields in case of serious disturbance rather than

to maintain a contact which would result in its own fusing or the

destruction of some more important member.

[Illustration: FIG. 58]

[Illustration: FIG. 59]

Starting Up the Turbine

When starting up the turbine for the first time, or after any extended

period of idleness, special care must be taken to see that everything is

in good condition and that all parts of the machine are clean and free

from injury. The oil piping should be thoroughly inspected and cleaned

out if there is any accumulation of dirt. The oil reservoirs must be

very carefully wiped out and minutely examined for the presence of any

grit. (Avoid using cotton waste for this, as a considerable quantity of

lint is almost sure to be left behind and this will clog up the oil

passages in the bearings and strainer.)

The pilot valves should be removed from the barrel and wiped off, and

the barrels themselves cleaned out by pushing a soft cloth through them

with a piece of wood. In no case should any metal be used.

If the turbine has been in a place where there was dirt or where there

has been much dust blowing around, the bearings should be removed from

the spindle and taken apart and thoroughly cleaned. With care this can

be done without removing the spindle from the cylinder, by taking off

the bearing covers and very carefully lifting the weight of the spindle

off the bearings, then sliding back the bearings. It is best to lift the

spindle by means of jacks and a rope sling, as, if a crane is used,

there is great danger of lifting the spindle too high and thereby

straining it or injuring the blades. After all the parts have been

carefully gone over and cleaned, the oil for the bearing lubrication

should be put into the reservoirs by pouring it into the governor gear

case G (Fig. 34). Enough oil should be put in so that when the governor,

gear case, and all the bearing-supply pipes are full, the supply to the

oil pump is well covered.

Special care should be taken so that no grit gets into the oil when

pouring it into the machine. Considerable trouble may be saved in this

respect by pouring the oil through cloth.

A very careful inspection of the steam piping is necessary before the

turbine is run. If possible it should be blown out by steam from the

boilers before it is finally connected to the turbine. Considerable

annoyance may result by neglecting this precaution, from particles of

scale, red lead, gasket, etc., out of the steam pipe, closing up the

passages of the guide blades.

When starting up, always begin to revolve the spindle without vacuum

being on the turbine. After the spindle is turning slowly, bring the

vacuum up. The reason for this is, that when the turbine is standing

still, the glands do not pack and air in considerable quantity will rush

through the glands and down through the exhaust pipe. This sometimes has

the effect of unequal cooling. In case the turbine is used in

conjunction with its own separate condenser, the circulating pump may be

started up, then the turbine revolved, and afterward the air pump put in

operation; then, last, put the turbine up to speed. In cases, however,

where the turbine exhausts into the same condenser with other machinery

and the condenser is therefore already in operation, the valve between

the turbine and the condenser system should be kept closed until after

the turbine is revolved, the turbine in the meantime exhausting through

the relief valve to atmosphere.

Care must always be taken to see that the turbine is properly warmed up

before being caused to revolve, but in cases where high superheat is

employed always revolve the turbine just as soon as it is moderately

hot, and before it has time to become exposed to superheat.

In the case of highly superheated steam, it is not undesirable to

provide a connection in the steam line by means of which the turbine may

be started up with saturated steam and the superheat gradually applied

after the shaft has been permitted to revolve.

For warming up, it is usual practice to set the governor on the trigger

(see Fig. 50) and open the throttle valve to allow the entrance of a

small amount of steam.

It is always well to let the turbine operate at a reduced speed for a

time, until there is assurance that the condenser and auxiliaries are in

proper working order, that the oil pump is working properly, and that

there is no sticking in the governor or the valve gear.

After the turbine is up to speed and on the governor, it is well to

count the speed by counting the strokes of the pump rod, as it is

possible that the adjustment of the governor may have become changed

while the machine has been idle. It is well at this time, while there is

no load on the turbine, to be sure that the governor controls the

machine with the throttle wide open. It might be that the main poppet

valve has sustained some injury not evident on inspection, or was

leaking badly. Should there be some such defect, steps should be taken

to regrind the valve to its seat at the first opportunity.

On the larger machines an auxiliary oil pump is always furnished. This

should be used before starting up, so as to establish the oil

circulation before the turbine is revolved. After the turbine has

reached speed, and the main oil pump is found to be working properly, it

should be possible to take this pump out of service, and start it again

only when the turbine is about to be shut down.

If possible, the load should be thrown on gradually to obviate a sudden,

heavy demand upon the boiler, with its sometimes attendant priming and

rush of water into the steam pipe, which is very apt to take place if

the load is thrown on too suddenly. A slug of water will have the effect

of slowing down the turbine to a considerable extent, causing some

annoyance. There is not likely to be the danger of the damage that is

almost sure to occur in the reciprocating engine, but at the same time

it is well to avoid this as much as possible. A slug of water is

obviously more dangerous when superheated steam is being employed, owing

to the extreme temperature changes possible.

Running

While the turbine is running, it should have a certain amount of careful

attention. This, of course, does not mean that the engineer must stand

over it every minute of the day, but he must frequently inspect such

parts as the lubricators, the oiling system, the water supply to the

glands and the oil-cooling coil, the pilot valve, etc. He must see that

the oil is up in the reservoir and showing in the gage glass provided

for that purpose, and that the oil is flowing freely through the

bearings, by opening the pet cocks in the top of the bearing covers. An

ample supply of oil should always be in the machine to keep the suction

in the tank covered.

Care must be taken that the pump does not draw too much air. This can

usually be discovered by the bubbling up of the air in the governor

case, when more oil should be added.

It is well to note from time to time the temperature of the bearings,

but no alarm need be occasioned because they feel warm to the touch; in

fact, a bearing is all right as long as the hand can be borne upon it

even momentarily. The oil coming from the bearings should be preferably

about 120 degrees Fahrenheit and never exceed 160 degrees.

It should generally be seen that the oil-cooling coil is effective in

keeping the oil cool. Sometimes the cooling water deposits mud on the

cooling surface, as well as the oil depositing a vaseline-like

substance, which interferes with the cooling effect. The bearing may

become unduly heated because of this, when the coil should be taken out

at the first opportunity and cleaned on the outside and blown out by

steam on the inside, if this latter is possible. If this does not reduce

the temperature, either the oil has been in use too long without being

filtered, or the quality of the oil is not good.

Should a bearing give trouble, the first symptom will be burning oil

which will smoke and give off dense white fumes which can be very

readily seen and smelled. However, trouble with the bearings is one of

the most unlikely things to be encountered, and, if it occurs, it is due

to some radical cause, such as the bearings being pinched by their caps,

or grit and foreign matter being allowed to get into the oil.

If a bearing gets hot, be assured that there is some very radical cause

for it which should be immediately discovered and removed. Never, under

any circumstances, imagine that you can nurse a bearing, that has

heated, into good behavior. Turbine bearings are either all right or all

wrong. There are no halfway measures.

The oil strainer should also be occasionally taken apart and thoroughly

cleaned, which operation may be performed, if necessary, while the

turbine is in operation. The screens should be cleaned by being removed

from their case and thoroughly blown out with steam. In the case of a

new machine, this may have to be done every two or three hours. In

course of time, this need only be repeated perhaps once a week. The

amount of dirt found will be an indication of the frequency with which

this cleaning is necessary.

The proper water pressure, about five pounds per square inch, must be

maintained at the glands. Any failure of this will mean that there is

some big leak in the piping, or that the water is not flowing properly.

The pilot valve must be working freely, causing but little kick on the

governor, and should be lubricated from time to time with good oil.

Should it become necessary, while operating, to shut down the condenser

and change over to non-condensing operation, particular care should be

observed that the change is not made too suddenly to non-condensing, as

all the low-pressure sections of the turbine must be raised to a much

higher temperature. While this may not cause an accident, it is well to

avoid the stresses which necessarily result from the sudden change of

temperature. The same reasons, of course, do not hold good in changing

from non-condensing to condensing.

Shutting Down

When shutting down the turbine the load may be taken off before closing

the throttle; or, as in the case of a generator operating on an

independent load, the throttle may be closed first, allowing the load to

act as a brake, bringing the turbine to rest quickly. In most cases,

however, the former method will have to be used, as the turbine

generally will have been operating in parallel with one or more other

generators. When this is the case, partially close the throttle just

before the load is to be thrown off, and if the turbine is to run

without load for some time, shut off the steam almost entirely in order

to prevent any chance of the turbine running away. There is no danger of

this unless the main valve has been damaged by the water when wet steam

has been used, or held open by some foreign substance, when, in either

case, there may be sufficient leakage to run the turbine above speed,

while running light. At the same time, danger is well guarded against by

the automatic stop valve, but it is always well to avoid a possible

danger. As soon as the throttle is shut, stop the condenser, or, in the

case where one condenser is used for two or more turbines, close the

valve between the turbine and the condenser. Also open the drains from

the steam strainer, etc. This will considerably reduce the time the

turbine requires to come to rest. Still more time may be saved by

leaving the field current on the generator.

Care should be taken, when the vacuum falls and the turbine slows down,

to see that the water is shut off from the glands for fear it may leak

out to such an extent as to let the water into the bearings and impair

the lubricating qualities of the oil.

Inspection

At regular intervals thorough inspection should be made of all parts of

the turbine. As often as it appears necessary from the temperature of

the oil, depending on the quality of the oil and the use of the turbine,

remove the oil-cooling coil and clean it both on the inside and outside

as previously directed; also clean out the chamber in which it is kept.

Put in a fresh supply of oil. This need not necessarily be new, but may

be oil that has been in use before but has been filtered. We recommend

that an oil filter be kept for this purpose. Entirely new oil need only

be put into the turbine when the old oil shows marked deterioration.

With a first-class oil this will probably be a very infrequent

necessity, as some new oil has to be put in from time to time to make up

the losses from leakage and waste.

Clean out the oil strainer, blowing steam through the wire gauze to

remove any accumulation of dirt. Every six months to a year take off the

bearing covers, remove the bearings, and take them apart and clean out

thoroughly. Even the best oil will deposit more or less solid matter

upon hot surfaces in time, which will tend to prevent the free

circulation of the oil through the bearings and effectively stop the

cushioning effect on the bearings. Take apart the main and secondary

valves and clean thoroughly, seeing that all parts are in good working

order. Clean and inspect the governor and the valve-gear, wiping out any

accumulation of oil and dirt that may appear. Be sure to clean out the

drains from the glands so that any water that may pass out of them will

run off freely and will not get into the bearings.

At the end of the first three months, and after that about once a year,

take off the cylinder cover and remove the spindle. When the turbine is

first started up, there is very apt to be considerable foreign matter

come over in the steam, such as balls of red lead or small pieces of

gasket too small to be stopped by the strainer. These get into the guide

blades in the cylinder and quite effectively stop them up. Therefore,

the blades should be gone over very carefully, and any such additional

accumulation removed. Examine the glands and equilibrium ports for any

dirt or broken parts. Particularly examine the glands for any deposit of

scale. All the scale should be chipped off the gland parts, as, besides

preventing the glands from properly packing, this accumulation will

cause mechanical contact and perhaps cause vibration of the machine due

to lack of freedom of the parts. The amount of scale found after the

first few inspections will be an indication of how frequently the

cleaning should be done. As is discussed later, any water that is

unsuitable for boiler feed should not be used in the glands.

In reassembling the spindle and cover, very great care must be taken

that no blades are damaged and that nothing gets into the blades. Nearly

all the damage that has been done to blades has resulted from

carelessness in this respect; in fact, it is impossible to be too

careful. Particular care is also to be taken in assembling all the

parts and in handling them, as slight injury may cause serious trouble.

In no case should a damaged part be put back until the injury has been

repaired.

If for any reason damaged blades cannot be repaired at the time, they

can be easily removed and the turbine run again without them until it is

convenient to put in new ones; in fact, machines have been run at full

load with only three-quarters of the total number of blades. In such an

event remove the corresponding stationary blades as well as the moving

blades, so as not to disturb the balance of the end thrust.

Conditions Conducive to Successful Operation

In the operation of the turbine and the conditions of the steam, both

live and exhaust play a very important part. It has been found by

expensive experimenting that moisture in the steam has a very decided

effect on the economy of operation; or considerably more so than in the

case of the reciprocating engine. In the latter engine, 2 per cent. of

moisture will mean very close to 2 per cent. increase in the amount of

water supplied to the engine for a given power. On the other hand, in

the turbine 2 per cent. moisture will cause an addition of more nearly 4

per cent. It is therefore readily seen that the drier the entering

steam, the better will be the appearance of the coal bill.

By judicious use of first-class separators in connection with a suitable

draining system, such as the Holly system which returns the moisture

separated from the steam, back to the boilers, a high degree of quality

may be obtained at the turbine with practically no extra expense during

operation. Frequent attention should be given the separators and traps

to insure their proper operation. The quality of the steam may be

determined from time to time by the use of a throttling calorimeter. Dry

steam, to a great extent, depends upon the good and judicious design of

steam piping.

Superheated steam is of great value where it can be produced

economically, as even a slight degree insures the benefits to be derived

from the use of dry steam. The higher superheats have been found to

increase the economy to a considerable extent.

When superheat of a high degree (100 degrees Fahrenheit or above) is

used special care must be exercised to prevent a sudden rise of the

superheat of any amount. The greatest source of trouble in this respect

is when a sudden demand is made for a large increase in the amount of

steam used by the engine, as when the turbine is started up and the

superheater has been in operation for some time before, the full load is

suddenly thrown on. It will be readily seen that with the turbine

running light and the superheater operating, there is a very small

amount of steam passing through; in fact, practically none, and this may

become very highly heated in the superheater, but loses nearly all its

superheat in passing slowly to the turbine; then, when a sudden demand

is made, this very high temperature steam is drawn into the turbine.

This may usually be guarded against where a separately fired superheater

is used, by keeping the fire low until the load comes on, or, in the

case where the superheater is part of the boiler, by either not starting

up the superheater until after load comes on, or else keeping the

superheat down by mixing saturated steam with that which has been

superheated. After the plant has been started up there is little danger

from this source, but such precautions should be taken as seem best in

the particular cases.

Taking up the exhaust end of the turbine, we have a much more striking

departure from the conditions familiar in the reciprocating engine. Due

to the limits imposed upon the volume of the cylinder of the engine, any

increase in the vacuum over 23 or 24 inches, in the case, for instance,

of a compound-condensing engine, has very little, if any, effect on the

economy of the engine. With the turbine, on the other hand, any increase

of vacuum, even up to the highest limits, increases the economy to a

very considerable extent and, moreover, the higher the vacuum the

greater will be the increase in the economy for a given addition to the

vacuum. Thus, raising the vacuum from 27 to 28 inches has a greater

effect than from 23 to 24 inches. For this reason the engineer will

readily perceive the great desirability of maintaining the vacuum at the

highest possible point consistent with the satisfactory and economical

operation of the condenser.

Steam Turbines A Book of Instruction for the Adjustment and Operation of the Principal Types of this Class of Prime Movers · 第 3 / 8 段