The steam which passes through the automatic stage valves an

Produced by Chris Curnow, David Cortesi, Brett Fishburne,

Nikolay Fishburne and the Online Distributed Proofreading

Team at https://www.pgdp.net

STEAM TURBINES

A BOOK OF INSTRUCTION

FOR THE ADJUSTMENT AND OPERATION OF

THE PRINCIPAL TYPES OF THIS

CLASS OF PRIME MOVERS

COMPILED AND WRITTEN

BY

HUBERT E. COLLINS

FIRST EDITION

Second Impression

McGRAW-HILL BOOK COMPANY, Inc.

239 WEST 39TH STREET, NEW YORK

6 BOUVERIE STREET, LONDON, E. C.

Copyright, 1909, by the Hill Publishing Company

All rights reserved

TRANSCRIBER'S NOTES

The authors of this book used the spellings "aline," "gage," and "hight"

for the conventional spellings "align," "gauge," and "height." As they

are used consistently and do not affect the sense, they have been left

unchanged. Obvious typos and misspellings that did not affect the sense

have been silently corrected. The following substantive typographical

errors have also been corrected: "being" to "bearing" (p. 68); "FIG. 50"

to "FIG. 56" (p. 91), and "Fig. 2" to "Fig. 73" (p. 159). Two other

likely errors have been left as transcriber queries: lead/load on p. 142

and beating/heating on p. 177.

Superscript numbers are indicated with carets: B^1. Subscript numbers

are indicated with curly braces: P{1} for P-sub-1.

INTRODUCTION

This issue of the Power Handbook attempts to give a compact manual for

the engineer who feels the need of acquainting himself with steam

turbines. To accomplish this within the limits of space allowed, it has

been necessary to confine the work to the description of a few standard

types, prepared with the assistance of the builders. Following this the

practical experience of successful engineers, gathered from the columns

of _Power_, is given. It is hoped that the book will prove of value to

all engineers handling turbines, whether of the described types or not.

Hubert E. Collins.

New York, April, 1909.

CONTENTS

CHAP. PAGE

I The Curtis Steam Turbine in Practice 1

II Setting the Valves of the Curtis Turbine 31

III Allis-Chalmers Steam Turbine 41

IV Westinghouse-Parsons Turbine 58

V Proper Method of Testing a Steam Turbine 112

VI Testing a Steam Turbine 137

VII Auxiliaries for Steam Turbines 154

VIII Trouble with Steam Turbine Auxiliaries 172

I. THE CURTIS STEAM TURBINE IN PRACTICE[1]

[1] Contributed to _Power_ by Fred L. Johnson.

"Of the making of books there is no end." This seems especially true of

steam-turbine books, but the book which really appeals to the operating

engineer, the man who may have a turbine unloaded, set up, put in

operation, and the builders' representative out of reach before the man

who is to operate it fully realizes that he has a new type of prime

mover on his hands, with which he has little or no acquaintance, has not

been written. There has been much published, both descriptive and

theoretical, about the turbine, but so far as the writer knows, there is

nothing in print that tells the man on the job about the details of the

turbine in plain language, and how to handle these details when they

need handling. The operating engineer does not care why the moving

buckets are made of a certain curvature, but he does care about the

distance between the moving bucket and the stationary one, and he wants

to know how to measure that distance, how to alter the clearance, if

necessary, to prevent rubbing. He doesn't care anything about the area

of the step-bearing, but he does want to know the way to get at the

bearing to take it down and put it up again, etc.

The lack of literature along this line is the writer's apology for what

follows. The Curtis 1500-kilowatt steam turbine will be taken first and

treated "from the ground up."

On entering a turbine plant on the ground floor, the attention is at

once attracted by a multiplicity of pumps, accumulators and piping.

These are called "auxiliaries" and will be passed for the present to be

taken up later, for though of standard types their use is comparatively

new in power-plant practice, and the engineer will find that more

interruptions of service will come from the auxiliaries than from the

turbine itself.

Builders' Foundation Plans Incomplete

It is impractical for the manufacturers to make complete foundation

drawings, as they are not familiar with the lay-out of pipes and the

relative position of other apparatus in the station. All that the

manufacturers' drawing is intended to do is to show the customer where

it will be necessary for him to locate his foundation bolts and opening

for access to the step-bearing.

[Illustration: FIG. 1]

Fig. 1 shows the builders' foundation drawing, with the addition of

several horizontal and radial tubes introduced to give passage for the

various pipes which must go to the middle of the foundation. Entering

through the sides of the masonry they do not block the passage, which

must be as free as possible when any work is to be done on the

step-bearing, or lower guide-bearing. Entering the passage in the

foundation, a large screw is seen passing up through a circular block

of cast iron with a 3/4-inch pipe passing through it. This is the

step-supporting screw. It supports the lower half of the step-bearing,

which in turn supports the entire revolving part of the machine. It is

used to hold the wheels at a proper hight in the casing, and adjust the

clearance between the moving and stationary buckets. The large block

which with its threaded bronze bushing forms the nut for the screw is

called the cover-plate, and is held to the base of the machine by eight

1-1/2-inch cap-screws. On the upper side are two dowel-pins which enter

the lower step and keep it from turning. (See Figs. 2 and 3.)

[Illustration: FIG. 2]

[Illustration: FIG. 3]

The step-blocks are very common-looking chunks of cast iron, as will be

seen by reference to Fig. 4. The block with straight sides (the lower

one in the illustration) has the two dowel holes to match the pins

spoken of, with a hole through the center threaded for 3/4-inch pipe.

The step-lubricant is forced up through this hole and out between the

raised edges in a film, floating the rotating parts of the machine on a

frictionless disk of oil or water. The upper step-block has two

dowel-pins, also a key which fits into a slot across the bottom end of

the shaft.

[Illustration: FIG. 4]

The upper side of the top block is counterbored to fit the end of the

shaft. The counterbore centers the block. The dowel-pins steer the key

into the key-way across the end of the shaft, and the key compels the

block to turn with the shaft. There is also a threaded hole in the under

side of the top block. This is for the introduction of a screw which

is used to pull the top block off the end of the shaft. If taken off at

all it must be pulled, for the dowel-pins, key and counterbore are close

fits. Two long bolts with threads the whole length are used if it

becomes necessary to take down the step or other parts of the bottom of

the machine. Two of the bolts holding the cover-plate in place are

removed, these long bolts put in their places and the nuts screwed up

against the plate to hold it while the remaining bolts are removed.

How to Lower Step-Bearings to Examine Them

Now, suppose it is intended to take down the step-bearings for

examination. The first thing to do is to provide some way of holding the

shaft up in its place while we take its regular support from under it.

In some machines, inside the base, there is what is called a "jacking

ring." It is simply a loose collar on the shaft, which covers the holes

into which four plugs are screwed. These are taken out and in their

places are put four hexagonal-headed screws provided for the purpose,

which are screwed up. This brings the ring against a shoulder on the

shaft and then the cover-plate and step may be taken down.

While all the machines have the same general appearance, there are some

differences in detail which may be interesting. One difference is due to

the sub-base which is used with the oil-lubricated step-bearings. This

style of machine has the jacking ring spoken of, while others have

neither sub-base nor jacking ring, and when necessary to take down the

step a different arrangement is used.

[Illustration: FIG. 5]

A piece of iron that looks like a big horseshoe (Fig. 5) is used to hold

the shaft up. The flange that covers the entrance to the exhaust base is

taken off and a man goes in with the horseshoe-shaped shim and an

electric light. Other men take a long-handled wrench and turn up the

step-screw until the man inside the base can push the horseshoe shim

between the shoulder on the shaft and the guide-bearing casing. The men

on the wrench then back off and the horseshoe shim supports the weight

of the machine. When the shim is in place, or the jacking ring set up,

whichever the case may be, the cover-plate bolts may be taken out, the

nuts on the long screws holding the cover in place.

The 3/4-inch pipe which passes up through the step-screw is taken down

and, by means of the nuts on the long screws, the cover-plate is lowered

about 2 inches. Then through the hole in the step-screw a 3/4-inch rod

with threads on both ends is passed and screwed into the top step; then

the cover-plate is blocked so it cannot rise and, with a nut on the

lower end of the 3/4-inch rod, the top step is pulled down as far as it

will come. The cover-plate is let down by means of the two nuts, and the

top step-block follows. When it is lowered to a convenient hight it can

be examined, and the lower end of the shaft and guide-bearing will be

exposed to view.

[Illustration: FIG. 6]

The lower guide-bearing (Fig. 6) is simply a sleeve flanged at one end,

babbitted on the inside, and slightly tapered on the outside where it

fits into the base. The flange is held securely in the base by eight

3/4-inch cap-screws. Between the cap-screw holes are eight holes tapped

to 3/4-inch, and when it is desired to take the bearing down the

cap-screws are taken out of the base and screwed into the threaded holes

and used as jacks to force the guide-bearing downward. Some provision

should be made to prevent the bearing from coming down "on the run," for

being a taper fit it has only to be moved about one-half inch to be

free. Two bolts, about 8 inches long, screwed into the holes that the

cap-screws are taken from, answer nicely, as a drop that distance will

not do any harm, and the bearing can be lowered by hand, although it

weighs about 200 pounds.

The lower end of the shaft is covered by a removable bushing which is

easily inspected after the guide-bearing has been taken down. If it is

necessary to take off this bushing it is easily done by screwing four

5/8-inch bolts, each about 2 feet long, into the tapped holes in the

lower end of the bushing, and then pulling it off with a jack. (See Fig.

7.)

Each pipe that enters the passage in the foundation should be connected

by two unions, one as close to the machine as possible and the other

close to the foundation. This allows the taking down of all piping in

the passage completely and quickly without disturbing either threads or

lengths.

[Illustration: FIG. 7]

Studying the Blueprints

Fig. 8 shows an elevation and part-sectional view of a 1500-kilowatt

Curtis steam turbine. If one should go into the exhaust base of one of

these turbines, all that could be seen would be the under side of the

lower or fourth-stage wheel, with a few threaded holes for the

balancing plugs which are sometimes used. The internal arrangement is

clearly indicated by the illustration, Fig. 8. It will be noticed that

each of the four wheels has an upper and a lower row of buckets and that

there is a set of stationary buckets for each wheel between the two rows

of moving buckets. These stationary buckets are called intermediates,

and are counterparts of the moving buckets. Their sole office is to

redirect the steam which has passed through the upper buckets into the

lower ones at the proper angle.

[Illustration: FIG. 8. ELEVATION AND PART-SECTIONAL VIEW OF A

1500-KILOWATT CURTIS TURBINE]

The wheels are kept the proper distance apart by the length of hub, and

all are held together by the large nut on the shaft above the upper

wheel. Each wheel is in a separate chamber formed by the diaphragms

which rest on ledges on the inside of the wheel-case, their weight and

steam pressure on the upper side holding them firmly in place and making

a steam-tight joint where they rest. At the center, where the hubs pass

through them, there is provided a self-centering packing ring (Fig. 9),

which is free to move sidewise, but is prevented from turning, by

suitable lugs. This packing is a close running fit on the hubs of the

wheel and is provided with grooves (plainly shown in Fig. 9) which break

up and diminish the leakage of steam around each hub from one stage to

the next lower. Each diaphragm, with the exception of the top one,

carries the expanding nozzles for the wheel immediately below.

[Illustration: FIG. 9]

The expanding nozzles and moving buckets constantly increase in size and

number from the top toward the bottom. This is because the steam volume

increases progressively from the admission to the exhaust and the entire

expansion is carried out in the separate sets of nozzles, very much as

if it were one continuous nozzle; but with this difference, not all of

the energy is taken out of the steam in any one set of nozzles. The idea

is to keep the velocity of the steam in each stage as nearly constant as

possible. The nozzles in the diaphragms and the intermediates do not,

except in the lowest stage, take up the entire circumference, but are

proportioned to the progressive expansion of steam as it descends toward

the condenser.

Clearance

While the machine is running it is imperative that there be no rubbing

contact between the revolving and stationary parts, and this is provided

for by the clearance between the rows of moving buckets and the

intermediates. Into each stage of the machine a 2-inch pipe hole is

drilled and tapped. Sometimes this opening is made directly opposite a

row of moving buckets as in Fig. 10, and sometimes it is made opposite

the intermediate. When opposite a row of buckets, it will allow one to

see the amount of clearance between the buckets and the intermediates,

and between the buckets and the nozzles. When drilled opposite the

intermediates, the clearance is shown top and bottom between the buckets

and intermediates. (See Fig. 11.) This clearance is not the same in all

stages, but is greatest in the fourth stage and least in the first. The

clearances in each stage are nearly as follows: First stage, 0.060 to

0.080; second stage, 0.080 to 0.100; third stage, 0.080 to 0.100; fourth

stage, 0.080 to 0.200. These clearances are measured by what are called

clearance gages, which are simply taper slips of steel about 1/2-inch

wide accurately ground and graduated, like a jeweler's ring gage, by

marks about 1/2-inch apart; the difference in thickness of the gage is

one-thousandth of an inch from one mark to the next.

[Illustration: FIG. 10]

[Illustration: FIG. 11]

To determine whether the clearance is right, one of the 2-inch plugs is

taken out and some marking material, such as red lead or anything that

would be used on a surface plate or bearing to mark the high spots is

rubbed on the taper gage, and it is pushed into the gap between the

buckets and intermediates as far as it will go, and then pulled out, the

marking on the gage showing just how far in it went, and the nearest

mark giving in thousandths of an inch the clearance. This is noted, the

marking spread again, and the gage tried on the other side, the

difference on the gage showing whether the wheel is high or low.

Whichever may be the case the hight is corrected by the step-bearing

screw. The wheels should be placed as nearly in the middle of the

clearance space as possible. By some operators the clearance is adjusted

while running, in the following manner: With the machine running at full

speed the step-bearing screw is turned until the wheels are felt or

heard to rub lightly. The screw is marked and then turned in the

opposite direction until the wheel rubs again. Another mark is made on

the screw and it is then turned back midway between the two marks.

Either method is safe if practiced by a skilful engineer. In measuring

the clearance by the first method, the gage should be used with care, as

it is possible by using too much pressure to swing the buckets and get

readings which could be misleading. To an inexperienced man the taper

gages would seem preferable. In the hands of a man who knows what he is

doing and how to do it, a tapered pine stick will give as satisfactory

results as the most elaborate set of hardened and ground clearance

gages.

Referring back to Fig. 11, at A is shown one of the peep-holes opposite

the intermediate in the third stage wheel for the inspection of

clearance. The taper clearance gage is inserted through this hole both

above and below the intermediate, and the distance which it enters

registers the clearance on that side. This sketch also shows plainly how

the shrouding on the buckets and the intermediates extends beyond the

sharp edges of the buckets, protecting them from damage in case of

slight rubbing. In a very few cases wheels have been known to warp to

such an extent from causes that were not discovered until too late, that

adjustment would not stop the rubbing. In such cases the shrouding has

been turned or faced off by a cutting-off tool used through the

peep-hole.

Carbon Packing Used

Where the shaft passes through the upper head of the wheel-case some

provision must be made to prevent steam from the first stage escaping.

This is provided for by carbon packing (Fig. 12), which consists of

blocks of carbon in sets in a packing case bolted to the top head of the

wheel-case. There are three sets of these blocks, and each set is made

of two rings of three segments each. One ring of segments breaks joints

with its mate in the case, and each set is separated from the others by

a flange in the case in which it is held. In some cases the packing is

kept from turning by means of a link, one end of which is fastened to

the case and the other to the packing holder. Sometimes light springs

are used to hold the packing against the shaft and in some the pressure

of steam in the case does this. There is a pipe, also shown in Fig. 12,

leading from the main line to the packing case, the pressure in the pipe

being reduced. The space between the two upper sets of rings is drained

to the third stage by means of a three-way cock, which keeps the balance

between the atmosphere and packing-case pressure. The carbon rings are

fitted to the shaft with a slight clearance to start with, and very soon

get a smooth finish, which is not only practically steam-tight but

frictionless.

[Illustration: FIG. 12]

The carbon ring shown in Fig. 12 is the older design. The segments are

held against the flat bearing surface of the case by spiral springs set

in brass ferrules. The circle is held together by a bronze strap screwed

and drawn together at the ends by springs. Still other springs press

the straps against the surface upon which the carbon bears, cutting off

leaks through joints and across horizontal surfaces of the carbon. The

whole ring is prevented from turning by a connecting-rod which engages a

pin in the hole, like those provided for the springs.

[Illustration: FIG. 13]

[Illustration: FIG. 14]

[Illustration: FIG. 15]

[Illustration: FIG. 16]

The Safety-stop

There are several designs of safety-stop or speed-limit devices used

with these turbines, the simplest being of the ring type shown in Fig.

13. This consists of a flat ring placed around the shaft between the

turbine and generator. The ring-type emergencies are now all adjusted so

that they normally run concentric with the shaft, but weighted so that

the center of gravity is slightly displaced from the center. The

centrifugal strain due to this is balanced by helical springs. But when

the speed increases the centrifugal force moves the ring into an

eccentric position, when it strikes a trigger and releases a weight

which, falling, closes the throttle and shuts off the steam supply. The

basic principle upon which all these stops are designed is the same--the

centrifugal force of a weight balanced by a spring at normal speed.

Figs. 14, 15, and 16 show three other types.

The Mechanical Valve-Gear

Fig. 17 shows plainly the operation of the mechanical valve-gear. The

valves are located in the steam chests, which are bolted to the top of

the casing directly over the first sets of expansion nozzles. The

chests, two in number, are on opposite sides of the machine. The

valve-stems extend upward through ordinary stuffing-boxes, and are

attached to the notched cross-heads by means of a threaded end which is

prevented from screwing in or out by a compression nut on the lower end

of the cross-head. Each cross-head is actuated by a pair of

reciprocating pawls, or dogs (shown more plainly in the enlarged view,

Fig. 18), one of which opens the valve and the other closes it. The

several pairs of pawls are hung on a common shaft which receives a

rocking motion from a crank driven from a worm and worm-wheel by the

turbine shaft. The cross-heads have notches milled in the side in

which the pawls engage to open or close the valve, this engagement

being determined by what are called shield-plates, A (Fig. 18), which

are controlled by the governor. These plates are set, one a little

ahead of the other, to obtain successive opening or closing of the

valves. When more steam is required the shield plate allows the proper

pawl to fall into its notch in the cross-head and lift the valve from

its seat. If less steam is wanted the shield-plate rises and allows the

lower pawl to close the valve on the down stroke.

[Illustration: FIG. 17]

[Illustration: FIG. 18]

The valves, as can easily be seen, are very simple affairs, the steam

pressure in the steam chest holding the valve either open or shut until

it is moved by the pawl on the rock-shaft. The amount of travel on the

rock-shaft is fixed by the design, but the proportionate travel above

and below the horizontal is controlled by the length of the

connecting-rods from the crank to the rock-shaft. There are besides the

mechanical valve-gear the electric and hydraulic, but these will be left

for a future article.

The Governor

The speed of the machine is controlled by the automatic opening and

closing of the admission valves under the control of a governor (Fig.

19), of the spring-weighted type attached directly to the top end of the

turbine shaft. The action of the governor depends on the balance of

force exerted by the spring, and the centrifugal effort of the

rectangular-shaped weights at the lower end; the moving weights acting

through the knife-edge suspension tend to pull down the lever against

the resistance of the heavy helical spring. The governor is provided

with an auxiliary spring on the outside of the governor dome for varying

the speed while synchronizing. The tension of the auxiliary spring is

regulated by a small motor wired to the switchboard. This spring should

be used only to correct slight changes in speed. Any marked change

should be corrected by the use of the large hexagonal nut in the upper

plate of the governor frame. This nut is screwed down to increase the

speed, and upward to decrease it.

[Illustration: FIG. 19]

The Stage Valves

Fig. 20 represents one of the several designs of stage valve, sometimes

called the overload valve, the office of which is to prevent too high

pressure in the first stage in case of a sudden overload, and to

transfer a part of the steam to a special set of expanding nozzles over

the second-stage wheel. This valve is balanced by a spring of adjustable

tension, and is, or can be, set to open and close within a very small

predetermined range of first-stage pressure. The valve is _intended_ to

open and close instantly, and to supply or cut off steam from the second

stage, without affecting the speed regulation or economy of operation.

If any leaking occurs past the valve it is taken care of by a drip-pipe

to the third stage.

[Illustration: FIG. 20]

The steam which passes through the automatic stage valves and is

admitted to the extra set of nozzles above the second-stage wheel acts

upon this wheel just the same as the steam which passes through the

regular second-stage nozzles; i.e., all the steam which goes through the

machine tends to hasten its speed, or, more accurately, does work and

_maintains_ the speed of the machine.

II. SETTING THE VALVES OF THE CURTIS TURBINE[2]

[2] Contributed to _Power_ by F. L. Johnson.

Under some conditions of service the stage valve in the Curtis turbine

will not do what it is designed to do. It is usually attached to the

machine in such manner that it will operate with, or a little behind, in

the matter of time, the sixth valve. The machine is intended to carry

full load with only the first bank of five valves in operation, with

proper steam pressure and vacuum. If the steam pressure is under 150

pounds, or the vacuum is less than 28 inches, the sixth valve may

operate at or near full load, and also open the stage valve and allow

steam to pass to the second-stage nozzles at a much higher rate of speed

than the steam which has already done some work in the first-stage

wheel. The tendency is to accelerate unduly the speed of the machine.

This is corrected by the governor, but the correction is usually carried

too far and the machine slows down. With the stage valve in operation,

at a critical point the regulation is uncertain and irregular, and its

use has to be abandoned. The excess first-stage pressure will then be

taken care of by the relief valve, which is an ordinary spring safety

valve (not pop) which allows the steam to blow into the atmosphere.

The mechanical valve-gear does not often get out of order, but sometimes

the unexpected happens. The shop man may not have properly set up the

nuts on the valve-stems; or may have fitted the distance bushings

between the shield plates too closely; the superheat of the steam may

distort the steam chest slightly and produce friction that will

interfere with the regulation. If any of the valve-stems should become

loose in the cross-heads they may screw themselves either in or out. If

screwed out too far, the valve-stem becomes too long and the pawl in

descending will, after the valve is seated, continue downward until it

has broken something. If screwed in, the cross-head will be too low for

the upper pawl to engage and the valve will not be opened. This second

condition is not dangerous, but should be corrected. The valve-stems

should be made the right length, and all check-nuts set up firmly. If

for any purpose it becomes necessary to "set the valves" on a

1500-kilowatt mechanical gear, the operator should proceed in the

following manner.

Setting the Valves of a 1500-Kilowatt Curtis Turbine

We will consider what is known as the "mechanical" valve-gear, with two

sets of valves, one set of five valves being located on each side of the

machine.

[Illustration: FIG. 21]

In setting the valves we should first "throw out" all pawls to avoid

breakage in case the rods are not already of proper length, holding the

pawls out by slipping the ends of the pawl springs over the points of

the pawls, as seen in Fig. 21. Then turn the machine slowly by hand

until the pawls on one set of valves are at their highest point of

travel, then with the valves wide open adjust the drive-rods, i.e., the

rods extending from the crank to the rock-shaft, so that there is 1/32

of an inch clearance (shown dotted in Fig. 17, Chap. I) at the point of

opening of the pawls when they are "in." (See Fig. 22.) Then set up the

check-nuts on the drive-rod. Turn the machine slowly, until the pawls

are at their lowest point of travel. Then, with the valves closed,

adjust each _valve-stem_ to give 1/32 of an inch clearance at the point

of closing of the pawls when they are "in," securely locking the

check-nut as each valve is set. Repeat this operation on the other side

of the machine and we are ready to adjust the governor-rods. (Valves

cannot be set on both sides of the machine at the same time, as the

pawls will not be in the same relative position, due to the angularity

of the drive-rods.)

[Illustration: FIG. 22]

Next, with the turbine running, and the synchronizing spring in

mid-position, adjust the governor-rods so that the turbine will run at

the normal speed of 900 revolutions per minute when working on the fifth

valve, and carrying full load. The governor-rods for the other side of

the turbine (controlling valves Nos. 6 to 10) should be so adjusted that

the speed change between the fifth and sixth valves will not be more

than three or four revolutions per minute.

The valves of these turbines are all set during the shop test and the

rods trammed with an 8-inch tram. Governors are adjusted for a speed

range of 2 per cent. between no load and full load (1500 kilowatt), or 4

per cent. between the mean speeds of the first and tenth valves (no load

to full overload capacity).

The rods which connect the governor with the valve-gear have ordinary

brass ends or heads and are adjusted by right-and-left threads and

secured by lock-nuts. They are free fits on the pins which pass through

the heads, and no friction is likely to occur which will interfere with

the regulation, but too close work on the shield-plate bushings, or a

slight warping of the steam chest, will often produce friction which

will seriously impair the regulation. If it is noticed that the

shield-plate shaft has any tendency to oscillate in unison with the

rock-shaft which carries the pawls, it is a sure indication that the

shield-plates are not as free as they should be, and should be attended

to. The governor-rod should be disconnected, the pawls thrown out and

the pawl strings hooked over the ends.

The plates should then be rocked up and down by hand and the friction at

different points noted. The horizontal rod at the back of the valve-gear

may be loosened and the amount of end play of each individual

shield-plate noticed and compared with the bushings on the horizontal

rod at the back which binds the shield-plates together. If the plates

separately are found to be perfectly free they may be each one pushed

hard over to the right or left and wedged; then each bushing tried in

the space between the tail-pieces of the plates. It will probably be

found that the bushings are not of the right length, due to the

alteration of the form of the steam chest by heat. It will generally be

found also that the bushings are too short, and that the length can be

corrected by very thin washers of sheet metal. It has been found in some

instances that the thin bands coming with sectional pipe covering were

of the right thickness.

After the length of the bushings is corrected the shield-plates may be

assembled, made fast and tested by rocking them up and down, searching

for signs of sticking. If none occurs, the work has been correctly done,

and there will be no trouble from poor regulation due to friction of the

shield-plates.

The Baffler

The water which goes to the step-bearing passes through a baffler, the

latest type of which is shown by Fig. 23. It is a device for

restricting the flow of water or oil to the step- and guide-bearing. The

amount of water necessary to float the machine and lubricate the

guide-bearing having been determined by calculation and experiment, the

plug is set at that point which will give the desired flow. The plug is

a square-threaded worm, the length of which and the distance which it

enters the barrel of the baffler determining the amount of flow. The

greater the number of turns which the water must pass through in the

worm the less will flow against the step-pressure.

[Illustration: FIG. 23]

The engineers who have settled upon the flow and the pressure decided

that a flow of from 4-1/2 to 5-1/2 gallons per minute and a

step-pressure of from 425 to 450 pounds is correct. These factors are so

dependent upon each other and upon the conditions of the step-bearing

itself that they are sometimes difficult to realize in every-day work;

nor is it necessary. If the machine turns freely with a lower pressure

than that prescribed by the engineers, there is no reason for raising

this pressure; and there is only one way of doing it without reducing

the area of the step-bearing, and that is by obstructing the flow of

water in the step-bearing itself.

A very common method used is that of grinding. The machine is run at

about one-third speed and the step-water shut off for 15 or 20 seconds.

This causes grooves and ridges on the faces of the step-bearing blocks,

due to their grinding on each other, which obstruct the flow of water

between the faces and thus raises the pressure. It seems a brutal way of

getting a scientific result, if the result desired can be called

scientific. The grooving and cutting of the step-blocks will not do any

harm, and in fact they will aid in keeping the revolving parts of the

machine turning about its mechanical center.

The operating engineer will be very slow to see the utility of the

baffler, and when he learns, as he will sometime, that the turbine will

operate equally well with a plug out as with it in the baffler, he will

be inclined to remove the baffler. It is true that with one machine

operating on its own pump it is possible to run without the baffler,

and it is also possible that in some particular case two machines having

identical step-bearing pressures might be so operated. The baffler,

however, serves a very important function, as described more fully as

follows: It tends to steady the flow from the pump, to maintain a

constant oil film as the pressure varies with the load, and when several

machines are operating on the same step-bearing system it is the only

means which fixes the flow to the different machines and prevents one

machine from robbing the others. Therefore, even if an engineer felt

inclined to remove the baffler he would be most liable to regret taking

such a step.

If the water supply should fail from any cause and the step-bearing

blocks rub together, no great amount of damage will result. The machine

will stop if operated long under these conditions, for if steam pressure

is maintained the machine will continue in operation until the buckets

come into contact, and if the step-blocks are not welded together the

machine may be started as soon as the water is obtained. If vibration

occurs it will probably be due to the rough treatment of the

step-blocks, and may be cured by homeopathic repeat-doses of grinding,

say about 15 seconds each. If the step-blocks are welded a new pair

should be substituted and the damaged ones refaced.

Some few experimental steps of spherical form, called "saucer" steps,

have been installed with success (see Fig. 24). They seem to aid the

lower guide-bearing in keeping the machine rotating about the mechanical

center and reduce the wear on the guide-bearing. In some instances,

too, cast-iron bushings have been substituted for bronze, with marked

success. There seems to be much less wear between cast-iron and babbitt

metal than between bronze and babbitt metal. The matter is really worth

a thorough investigation.

[Illustration: FIG. 24]

III. ALLIS-CHALMERS COMPANY STEAM TURBINE

In Fig. 25 may be seen the interior construction of the steam turbine

built by Allis-Chalmers Co., of Milwaukee, Wis., which is, in general,

the same as the well-known Parsons type. This is a plan view showing the

rotor resting in position in the lower half of its casing.

[Illustration: FIG. 25]

Fig. 26 is a longitudinal cross-section cut of rotor and both lower and

upper casing. Referring to Fig. 26 the steam comes in from the

steam-pipe at C and passes through the main throttle or regulating valve

D, which is a balanced valve operated by the governor. Steam enters the

cylinder through the passage E.

Turning in the direction of the bearing A, it passes through alternate

stationary and revolving rows of blades, finally emerging at F and

going out by way of G to the condenser or to atmosphere. H, J, and K

represent three stages of blading. L, M, and Z are the balance pistons

which counterbalance the thrust on the stages H, J, and K. O and Q are

equalizing pipes, and for the low-pressure balance piston similar

provision is made by means of passages (not shown) through the body of

the spindle.

[Illustration: FIG. 26]

R indicates a small adjustable collar placed inside the housing of the

main bearing B to hold the spindle in a position where there will be

such a clearance between the rings of the balance pistons and those of

the cylinder as to reduce the leakage of steam to a minimum and at the

same time prevent actual contact under varying temperature.

At S and T are glands which provide a water seal against the inleakage

of air and the outleakage of steam. U represents the flexible coupling

to the generator. V is the overload or by-pass valve used for admitting

steam to intermediate stage of the turbine. W is the supplementary

cylinder to contain the low-pressure balance piston. X and Y are

reference letters used in text of this chapter to refer to equalizing of

steam pressure on the low-pressure stage of the turbine. The first point

to study in this construction is the arrangement of "dummies" L, M, and

Z. These dummy rings serve as baffles to prevent steam leakage past the

pistons, and their contact at high velocity means not only their own

destruction, but also damage to or the wrecking of surrounding parts. A

simple but effective method of eliminating this difficulty is found in

the arrangement illustrated in this figure. The two smaller balance

pistons, L and M, are allowed to remain on the high-pressure end; but

the largest piston, Z, is placed upon the low-pressure end of the rotor

immediately behind the last ring of blades, and working inside of the

supplementary cylinder W. Being backed up by the body of the spindle,

there is ample stiffness to prevent warping. This balance piston, which

may also be plainly seen in Fig. 25, receives its steam pressure from

the same point as the piston M, but the steam pressure, equalized with

that on the third stage of the blading, X, is through holes in the webs

of the blade-carrying rings. Entrance to these holes is through the

small annular opening in the rotor, visible in Fig. 25 between the

second and third barrels. As, in consequence of varying temperatures,

there is an appreciable difference in the endwise expansion of the

spindle and cylinder, the baffling rings in the low-pressure balance

piston are so made as to allow for this difference. The high-pressure

end of the spindle being held by the collar bearing, the difference in

expansion manifests itself at the low-pressure end. The labyrinth

packing of the high-pressure and intermediate pistons has a small axial

and large radial clearance, whereas the labyrinth packing of the piston

Z has, vice versa, a small radial and large axial clearance. Elimination

of causes of trouble with the low-pressure balance piston not only makes

it possible to reduce the diameter of the cylinder, and prevent

distortion, but enables the entire spindle to be run with sufficiently

small clearance to obviate any excessive leakage of steam.

Detail of Blade Construction

In this construction the blades are cut from drawn stock, so that at its

root it is of angular dovetail shape, while at its tip there is a

projection. To hold the roots of the blades firmly, a foundation ring is

provided, as shown at A in Fig. 27. This foundation ring is first formed

to a circle of the proper diameter, and then slots are cut in it. These

slots are accurately spaced and inclined to give the right pitch and

angle to the blades (Fig. 28), and are of dovetail shape to receive the

roots of the blades. The tips of the blades are substantially bound

together and protected by means of a channel-shaped shroud ring,

illustrated in Fig. 31 and at B in Fig. 27. Fig. 31 shows the cylinder

blading separate, and Fig. 27 shows both with the shrouding. In these,

holes are punched to receive the projections on the tips of the

blades, which are rivetted over pneumatically.

[Illustration: FIG. 27]

The foundation rings themselves are of dovetail shape in cross-section,

and, after receiving the roots of the blades, are inserted in dovetailed

grooves in the cylinder and rotor, where they are firmly held in place

by keypieces, as may be seen at C in Fig. 27. Each keypiece, when driven

in place, is upset into an undercut groove, indicated by D in Fig. 27,

thereby positively locking the whole structure together. Each separate

blade is firmly secured by the dovetail shape of the root, which is held

between the corresponding dovetailed slot in the foundation ring and the

undercut side of the groove.

[Illustration: FIG. 28]

Fig. 29, from a photograph of blading fitted in a turbine, illustrates

the construction, besides showing the uniform spacing and angles of the

blades.

[Illustration: FIG. 29]

The obviously thin flanges of the shroud rings are purposely made in

that way, so that, in case of accidental contact between revolving and

stationary parts, they will wear away enough to prevent the blades

from being ripped out. This protection, however, is such that to rip

them out a whole half ring of blades must be sheared off at the roots.

The strength of the blading, therefore, depends not upon the strength of

an individual blade, but upon the combined shearing strength of an

entire ring of blades.

[Illustration: FIG. 30]

The blading is made up and inserted in half rings, and Fig. 30 shows two

rings of different sizes ready to be put in place. Fig. 31 shows a

number of rows of blading inserted in the cylinder of an Allis-Chalmers

steam turbine, and Fig. 32 gives view of blading in the same turbine

after nearly three years' running.

[Illustration: FIG. 31]

[Illustration: FIG. 32]

The Governor

Next in importance to the difference in blading and balance piston

construction, is the governing mechanism used with these machines. This

follows the well-known Hartung type, which has been brought into

prominence, heretofore largely in connection with hydraulic turbines;

and the governor, driven directly from the turbine shaft by means of cut

gears working in an oil bath, is required to operate the small, balanced

oil relay-valve only, while the two steam valves, main and by-pass (or

overload), are controlled by an oil pressure of about 20 pounds per

square inch, acting upon a piston of suitable size. In view of the fact

that a turbine by-pass valve opens only when the unit is required to

develop overload, or the vacuum fails, a good feature of this governing

mechanism is that the valve referred to can be kept constantly in

motion, thereby preventing sticking in an emergency, even though it be

actually called into action only at long intervals. Another feature of

importance is that the oil supply to the bearings, as well as that to

the governor, can be interconnected so that the governor will

automatically shut off the steam if the oil supply fails and endangers

the bearings. This mechanism is also so proportioned that, while

responding quickly to variations in load, its sensitiveness is kept

within such bounds as to secure the best results in the parallel

operation of alternators. The governor can be adjusted for speed while

the turbine is in operation, thereby facilitating the synchronizing of

alternators and dividing the load as may be desired.

In order to provide for any possible accidental derangement of the main

governing mechanism, an entirely separate safety or over-speed governor

is furnished. This governor is driven directly by the turbine shaft

without the intervention of gearing, and is so arranged and adjusted

that, if the turbine should reach a predetermined speed above that for

which the main governor is set, the safety governor will come into

action and trip a valve which entirely shuts off the steam supply,

bringing the turbine to a stop.

Lubrication

Lubrication of the four bearings, which are of the self-adjusting, ball

and socket pattern, is effected by supplying an abundance of oil to the

middle of each bearing and allowing it to flow out at the ends. The oil

is passed through a tubular cooler, having water circulation, and pumped

back to the bearings. Fig. 33 shows the entire arrangement graphically

and much more clearly than can be explained in words. The oil is

circulated by a pump directly operated from the turbine, except where

the power-house is provided with a central oiling system. Particular

stress is laid by the builders upon the fact that it is not necessary to

supply the bearings with oil under pressure, but only at a head

sufficient to enable it to run to and through the bearings; this head

never exceeding a few feet. With each turbine is installed a separate

direct-acting steam pump for circulating oil for starting up. This will

be referred to again under the head of operating.

[Illustration: FIG. 33]

Generator

The turbo-generator, which constitutes the electrical end of this unit,

is totally enclosed to provide for noiseless operation, and forced

ventilation is secured by means of a small fan carried by the shaft on

each end of the rotor. The air is taken in at the ends of the generator,

passes through the fans and is discharged over the end connections of

the armature coils into the bottom of the machine, whence it passes

through the ventilating ducts of the core to an opening at the top. The

field core is, according to size, built up either of steel disks, each

in one piece, or of steel forgings, so as to give high magnetic

permeability and great strength. The coils are placed in radial slots,

thereby avoiding side pressure on the slot insulation and the complex

stresses resulting from centrifugal force, which, in these rotors, acts

normal to the flat surface of the strip windings.

Operation

As practically no adjustments are necessary when these units are in

operation, the greater part of the attention required by them is

involved in starting up and shutting down, which may be described in

detail as follows:

_To Start Up_

First, the auxiliary oil pump is set going, and this is speeded up until

the oil pressure shows a hight sufficient to lift the inlet valve and

oil is flowing steadily at the vents on all bearings. The oil pressure

then shows about 20 to 25 pounds on the "Relay Oil" gage, and 2 to 4

pounds on the "Bearing Oil" gage. Next the throttle is opened, without

admitting sufficient steam to the turbine to cause the spindle to turn,

and it is seen that the steam exhausts freely into the atmosphere, also

that the high-pressure end of the turbine expands freely in its guides.

Water having been allowed to blow out through the steam-chest drains,

the drains are closed and steam is permitted to continue flowing through

the turbine not less than a half an hour (unless the turbine is warm to

start with, when this period may be reduced) still without turning the

spindle. After this it is advisable to shut off steam and let the

turbine stand ten minutes, so as to warm thoroughly, during which time

the governor parts may be oiled and any air which may have accumulated

in the oil cylinder above the inlet valve blown off. Then the throttle

should be opened sufficiently to start the turbine spindle to revolving

very slowly and the machine allowed to run in this way for five

minutes.

Successive operations may be mentioned briefly as admitting water to the

oil cooler; bringing the turbine up to speed, at the same time slowing

down the auxiliary oil pump and watching that the oil pressures are kept

up by the rotary oil pump on the turbine; turning the water on to the

glands very gradually and, before putting on vacuum, making sure that

there is just enough water to seal these glands properly; and starting

the vacuum gradually just before putting on the load. These conditions

having been complied with, the operator next turns his attention to the

generator, putting on the field current, synchronizing carefully and

building up the load on the unit gradually.

The principal precautions to be observed are not to start without

warming up properly, to make sure that oil is flowing freely through the

bearings, that vacuum is not put on until the water glands seal, and to

avoid running on vacuum without load on the turbine.

Steam Turbines A Book of Instruction for the Adjustment and Operation of the Principal Types of this Class of Prime Movers · 第 1 / 8 段