IV

Bids for restoring the Casa Grande ruins:

First. Removing débris from interior of the ruins, 320 cubic yards,

more or less, $1 per yard; 140 cubic yards from exterior of the

ruins, at 60 cents per yard.

Second. Eight hundred cubic feet of brick masonry underpinning, more

or less, at $1.30 per cubic foot.

Third. One thousand cubic feet, more or less, of brick masonry to

fill in cavities, at $1.40 per cubic foot.

Fourth. Bracing walls, as per plans, $120.

Fifth. Five hundred lineal feet of 2 by 4 square timber at 8 cents

per foot, lumber measure.

(Signed) C. D. Henry.

V

Phoenix, Arizona, _February 11, 1891_.

Cosmos Mindeleff, Esq.,

_Tempe, Arizona_.

Dear Sir: I hereby submit for your consideration, in reference to

the plans and specifications for the preservation of the Casa Grande

ruins of Arizona, bids upon the following propositions, to wit:

First. "Cleaning out the débris." For the removal of 470 cubic yards

of material, more or less, at $2.65 per cubic yard.

Second. "Underpinning walls." For 800 cubic feet of brick masonry,

more or less, laid and plastered as specified, at $4.25 per cubic

foot.

Third. "Filling in openings." For filling in cavities in walls and

restoring lintels of openings, as specified, 1,000 cubic feet, more

or less, at $2.25 per cubic foot.

Fourth. "Bracing walls." For bracing walls, $85.30.

Fifth. "Wire fencing." Twenty-five dollars and twenty-five cents per

100 feet of completed fence.

Sixth. "Roofing." As per specifications, $4,722.

Respectfully submitted.

(Signed) M. E. Clauton.

The Repair of Casa Grande Ruin, Arizona, in 1891 Fifteenth Annual Report of the Bureau of Ethnology to the Secretary of the Smithsonian Institution, 1893-94, Government Printing Office, Washington, 1897, pages 315-348 · 第 32 / 42 题