=330. Artificial Harbor at Greytown.=—The preceding observations are

mostly of a general character, and give but little consideration to

the engineering features of the canal construction. In considering

the canal as a carrier of ocean traffic probably the first inquiry

will be that relating to harbors. In reality there is no natural

harbor at either end of the Nicaragua route. Fifty years ago there

was an excellent harbor at Greytown into which ships drawing as much

as 30 feet found ready entrance, and within which was afforded a

well-protected anchorage. As early as that date, however, a point of

land or sand-pit was already pushing its way northward in consequence

of the movement of the sand along the beach in that direction, and

in 1865 it had nearly closed the entrance to the harbor. For many

years that entrance has been entirely closed, and now what was

once the protected harbor of Greytown is a shallow body of water,

completely closed, and known as the Greytown Lagoon. There is a narrow,

circuitous, and shallow channel leading from it out to an opening in

the sand-bar, which may be navigated by boats drawing not more than 2

or 3 feet, and by means of which freight and passengers are taken from

steamers, which are obliged to anchor in the offing. Occasionally heavy

storms break through this strip of sand between Greytown Lagoon and

the ocean, and for a short time form a shallow entrance to the former.

The sand movement in that vicinity northward or westward is so active

that it is but a short time before such openings are again closed.

The deepest water in the lagoon probably does not exceed 8 or 10 feet

at the present time, and the most of it is much shallower. The tidal

action at Greytown is almost nothing, as the range of tide between high

and low is less than 1 foot. The mean level of the Caribbean Sea is the

same as that of the Pacific Ocean.

Under these circumstances it is necessary to create what is practically

a new harbor at Greytown, and that work is contemplated in the plans

of the Isthmian Canal Commission. The canal line is found entering the

lagoon about 1 mile northwest of Greytown, where a harbor is planned

having a length of 2500 feet and a width of 500 feet, increased at

the inner end to 800 feet to provide a turning-basin. The entrance to

this harbor from the ocean will be dredged to a width of 500 feet at

the bottom, and it will be protected outside of the beach-line by two

jetties, the easterly about 3000 feet long, and the westerly somewhat

shorter. These jetties would “be built of loose stone of irregular

shape and size, resting on a suitable foundation,” the largest,

constituting the covering, weighing not less than 10 to 15 tons each.

These jetties would be carried 6 feet above high water and have a top

width of 20 feet. The trade winds, which blow from the easterly and

northeasterly, would have a direction approximately at right angles to

that of the easterly jetty, and ships making the entrance of the canal

would consequently be protected against them while between the jetties.

The easterly of these jetties would act as an obstruction against the

westerly movement of the sand, but it is practically certain that a

considerable amount of the latter would be swept into the channel,

and possibly to some extent into the harbor, necessitating dredging

a considerable portion of the time. The commission estimates that

the maintenance of the entrance and harbor would require an annual

expenditure of $100,000.

=331. Artificial Harbor at Brito.=—The harbor at Brito presents a

problem of a different kind. There is absolutely no semblance of a

harbor there at the present time (1902); it is simply a location on the

sandy beach of the ocean protected against swells from the west by a

projecting rocky point called Brito Head, the Rio Grande River emptying

into the ocean just at the foot of Brito Head, between it and the canal

terminus. The entire harbor and its entrance would be excavated in

the low ground of that vicinity, composed mostly of sand and silt,

although there would be a little rock excavation. The entrance to the

harbor would be dredged 500 feet wide at the bottom, and be protected

by a single jetty on the southeasterly side. The harbor itself would

be excavated back of the present beach; it would have a length of 2200

feet and a width of 800 feet. As the depth of water increases rather

rapidly off shore, the 10-fathom curve is found at about 2200 feet from

low-water mark, hence the jetty would not need to be more than probably

1800 to 2000 feet long. In this vicinity the water is usually smooth;

indeed but few storms annually visit this part of the coast. The

conditions are quite similar to those found on the coast of Southern

California. There is little sand movement in this vicinity, and the

annual expenditures for maintenance of the harbor and entrance would be

relatively small; the commission has estimated them at $50,000.

=332. From Greytown Harbor to Lock No. 2.=—The canal line, on leaving

the harbor at Greytown, is found in low marshy ground for a distance of

about 7 miles, the excavation being mainly through the sand, silt, mud,

and vegetable matter characteristic of that location. Throughout almost

this entire distance the natural surface is but little above sea-level.

The first ground elevated much above this marshy country is known as

the Misterioso Hills, in which Lock No. 1 is founded, having a lift

of 36½ feet and raising the water surface in the canal by that amount

above sea-level. Another stretch of marshy country, but not quite so

wet as the preceding, follows for a distance of about 11 miles, when

the Rio Negro Hills rise abruptly to an elevation of a little over 150

feet above sea-level. At this point is located Lock No. 2, with a lift

of 18½ feet. This lock is about 21 miles from the 6-fathom line off

Greytown. The canal line here practically reaches the San Juan River,

the latter lying a considerable distance easterly of the canal, between

this point and the ocean. Between Greytown and Lock No. 2 embankments,

never reaching a greater height than 10 to 15 feet, are required to

keep the water in the canal at various locations along the low ground.

These embankments do not necessarily follow parallel to the centre

line of the canal route, but are planned to connect hills, or rather

high ground, so as to reduce their length and give them a more stable

character than if they were located close to the canal excavation.

While some embankments will still be found above Lock No. 2, they are

few, and even lower than those already noticed. From Lock No. 2 to Lake

Nicaragua the route of the canal lies practically along the San Juan

River, the chief exception to that statement being the cut-off in the

vicinity of the Conchuda dam.

[Illustration: Lock No. 1, Nicaragua Route, about Seven Miles from

Greytown.]

[Illustration: Telegraph Office at Ochoa on the San Juan River.]

=333. From Lock No. 2 to the Lake.=—Inasmuch as both the Serapiqui and

San Carlos rivers flow from Costa Rican territory into the San Juan,

that is, from its right bank, the canal line necessarily is located

along the northerly or left bank of that river. At a distance of 23

miles from the ocean the canal line cuts through what are called the

Serapiqui Hills opposite the mouth of the river of that name, and at

a distance of a little over 26 miles from the ocean it pierces the

Tamborcito Ridge, where is found the deepest cutting on the entire

route. The total length of cut through this ridge is about 3000 feet,

but its greatest depth is 297 feet, and it consists largely of hard,

basaltic rock. The next lock, or Lock No. 3, is found about 17 miles

from Lock No. 2, or 38 miles from the sea, and it has, like Lock No. 2,

a lift of 18½ feet, raising the surface of the water in the canal to an

elevation of 73½ feet above the sea. Continuous heavy cutting through

what are called the Machado Hills brings the line to Lock No. 4, at

a distance of a little less than 41 miles from the ocean. This lock

has a lift varying from 30.5 to 36.5 feet, inasmuch as it raises the

surface of the water in the canal to the summit level in the lake. The

maximum lift of 36.5 feet would be required when the lake level stands

at an elevation of 110 feet above the sea, and 30.5 feet when the same

surface stands at an elevation of 104 feet above the sea. Although the

water surface in the canal level above this lock is identical with the

summit level in the lake, the canal line again runs through continuous

heavy cutting for a distance of 5 miles before it reaches the canalized

San Juan. This portion of the line between Lock No. 4 and the San Juan

River is called the Conchuda cut-off, for the reason that the point

called Conchuda, where the great dam is located, is but 3 miles down

the river from the point where the canal enters it. From Conchuda

to the lake, as has already been stated, the canal line follows the

course of the San Juan River, which must be canalized by considerable

excavation of earth and rock, both along the bed and in cut-offs. The

greater part of this cutting must obviously be on that portion of the

river toward the lake, as that is the highest part of the river-bed in

its natural condition.

=334. Fort San Carlos to Brito.=—The distance from the point of

entrance of the canal into the San Juan River near Conchuda to Fort

San Carlos on the shore of Lake Nicaragua is about 50 miles, while the

distance across the lake on the canal line is 70.5 miles, which brings

the line to Las Lajas on the southwesterly shore of the lake.

There is considerable heavy cutting through the continental divide

between the lake and the first lock westerly of it, i.e., Lock No. 5.

The maximum cutting is but 76 feet in depth, and the average is but

little less than that for nearly 3 miles. This lock is located a little

less than 10 miles from the lake and nearly 176 miles from the 6-fathom

line off Greytown. The place at which this lock is located is known as

Buen Retiro. The lift of Lock No. 5 varies from 28½ feet as a maximum

to the minimum of 22½ feet, bringing the water surface in the canal

down to 81½ feet above mean ocean level. Lock No. 6 is located but

about 2 miles west of Lock No. 5, and also has a lift of 28½ feet. The

line now runs along the course of the Rio Grande to the ocean, Lock No.

7 being also 2 miles west of Lock No. 6, again with a lift of 28½ feet.

The last lock on the line, or Lock No. 8, but a mile from the Pacific

Ocean, and about 182 miles from the Caribbean Sea, has a maximum lift

of 28½ feet, and a minimum lift of 20½ feet, the range of tide in the

Pacific Ocean being but 8 feet at Brito. There are thus four locks

between the lake and the Pacific Ocean, each having a possible lift of

28½ feet.

[Illustration: Surveying Party of the Isthmian Canal Commission on the

San Juan River.]

The entire distance between the 6-fathom lines in the two oceans is

183.66 miles.

=335. Examinations by Borings.=—Obviously it is of the greatest

importance that such structures as the locks and dams required in

connection with this canal route should be founded on bed-rock. In

order to determine not only such questions, but the character of all

materials to be excavated from one end of the route to the other, a

great number of borings were made along the canal line, not only by the

water-jet process, but also with the diamond drill. By means of the

latter, whenever it was so desired, cores or circular pieces could be

taken out of the bed-rock so as to show precisely its character at all

depths. These borings, both through earthy material by the jet and into

bed-rock by the diamond drill, were made at suitable distances apart

along the centre line of the canal, and in considerable numbers, closer

together at proposed lock and dam sites. By these means every lock on

the line has certainly been located on bed-rock, as well as the great

dam at Conchuda. In addition to this the commission has been able to

classify the material to be excavated, so that if the canal should be

built every contractor would know precisely the character and quantity

of the various materials which he would have to deal with.

=336. Classification and Estimate of Quantities.=—The following table

is arranged to exhibit a few only of the principal items of excavation,

so as to give an approximate idea at least of the magnitude of the work

to be done:

Dredging 130,920,905 cu. yds.

Dry earth 47,440,316 ”

Soft rock 14,029,170 ”

Hard rock 24,151,214 ”

Rock under water 2,780,040 ”

Embankment and back-filling 8,389,960 ”

Clearing 6,831 acres.

Stone-pitching 250,089 sq. yds.

Concrete, excluding retaining-walls 3,400,840 cu. yds.

Concrete in retaining-walls 424,321 ”

Cut-stone 22,272 ”

Steel and iron,

excluding cast-iron culvert lining 61,735,230 lbs.

Cast-iron culvert lining 19,286,000 ”

Brick culvert lining 34,542 cu. yds.

Cost of lock machinery $1,600,000

Excavation in coffer-dam 9,907 cu. yds.

Pneumatic work 145,557 ”

Piling 415,600 lin. ft.

Rock fill in jetties 451,500 cu. yds.

Clay puddle, bottom and side 936,800 ”

=337. Classification and Unit Prices.=—The classification of the

material to be excavated, both on the Nicaragua and Panama routes, was

one to which the commission gave very thoughtful study no less than to

the prices to be used in making the estimates. The following table,

taken from pages 67 and 68 of the commission’s report, exhibits the

classification and the prices adopted by the commission for purposes of

its estimates:

Removal of hard rock, per cu. yd. $1.15

Removal of soft rock, per cu. yd. .80

Removal of earth, not handled by dredge, per cu. yd. .45

Removal of dredgable material, per cu. yd. .20

Removal of rock, under water, per cu. yd. 4.75

Embankments and back-filling, per cu. yd. .60

Rock in jetty construction, per cu. yd. 2.50

Stone-pitching, including necessary backing, per sq. yd. 2.00

Clearing and grubbing in swamp sections of Nicaragua,

per acre 200.00

Other clearing and grubbing on both routes, per acre 100.00

Concrete, in place, per cu. yd. 8.00

Finished granite, per cu. yd. 60.00

Brick in culvert lining, per cu. yd. 15.00

All metal in locks, exclusive of machinery and culvert

linings, per lb. .075

All metal in sluices, per lb. .075

Cast-iron in culvert lining, per lb. .04

Allowance for each lock-chamber for operating machinery 50,000.00

Additional allowance for each group of locks

for power-plant 100,000.00

Price of timber in locks, per M B. M 100.00

Sheet-piling in spillways, per M B. M 75.00

Bearing piles in spillways, per lin. ft. .50

Average price of pneumatic work for the Bohio dam, below

elevation—30, per cu. yd. 29.50

Caisson work for the Conchuda dam, in place, per cu. yd. 20.00

Single-track railroad complete with switches, stations,

and rolling stock, per mile of main line 75,000.00

There are evidently other more or less uncertain expenditures,

depending upon all possible conditions affecting the cost of such work,

including those of climate, police, and sanitation. In order to cover

such expenditure the commission determined to add 20 per cent to all

its estimates of cost on both routes, and that percentage was so added

in all cases.

=338. Curvature of the Route.=—Among the engineering features of

a ship-canal line it is evident that curvature is one of great

importance. Small steam-vessels may easily navigate almost any

tortuous channel, but it is not so with great ocean steamships. On the

other hand, it may require very deep and expensive cutting to reduce

the curvature of the route, as curves are usually introduced to carry

the line around some high ground. It is necessary, therefore, to make

a careful and judicious balance between these opposing considerations.

The commission wisely decided to incur even heavy cutting at some

points for the purpose of avoiding troublesome curvature on the

Nicaragua route. The table on page 415, taken from page 135 of the

commission’s report, gives all the elements of curvature for the entire

line.

[Illustration: Boring Party of the Isthmian Canal Commission on a Raft

in the San Juan River.]

From the description of the line as given, it is evident that much

curvature must be found in spite of the most judicious efforts to avoid

it, and the table indicates that condition. Yet the amount of curvature

may be considered moderate for a location through such a country as

Nicaragua. The smallest radius is seen to be a little over 4000 feet.

The result may be considered satisfactory for such a difficult canal

country, although the total amount of curvature is rather formidable.

+-----------+---------+---------+------------------+

| Number of | Radius. | Length. | Total Degrees of |

| Curves. | | | Curve. |

+-----------+---------+---------+------------------+

| | Feet. | Miles. | ° ′ ″ |

| 2 | 17,189 | 1.53 | 26 51 10 |

| 8 | 11,459 | 6.80 | 179 31 50 |

| 4 | 8,594 | 4.31 | 151 40 50 |

| 1 | 8,385 | 1.43 | 51 44 30 |

| 2 | 7,814 | 1.90 | 73 28 30 |

| 1 | 7,759 | 1.73 | 67 16 50 |

| 5 | 6,876 | 4.64 | 204 34 40 |

| 2 | 5,927 | 2.40 | 122 41 20 |

| 16 | 5,730 | 11.08 | 584 47 40 |

| 2 | 5,289 | 2.27 | 129 45 50 |

| 1 | 5,209 | 1.15 | 66 38 30 |

| 2 | 5,056 | 1.22 | 73 17 40 |

| 1 | 4,982 | .82 | 49 49 00 |

| 3 | 4,911 | 2.75 | 169 36 00 |

| 1 | 4,297 | .63 | 44 19 50 |

| 1 | 4,175 | .81 | 58 20 40 |

| 4 | 4,045 | 3.82 | 285 25 40 |

+-----------+---------+---------+------------------+

| 56 | | 49.29 | 2,339 50 30 |

+-----------+---------+---------+------------------+

=339. The Conchuda Dam and Wasteway.=—The most important single

engineering feature of the whole plan is the dam at Conchuda. The

ordinary low-water elevation in the river at the dam site may be taken

at about 55 feet above the sea. Inasmuch as the greatest elevation of

the water in the lake is supposed to be about 110 feet, it will be

seen that its surface will be but 55 feet above the present elevation,

making its maximum depth at that point about 105 feet if there should

be no fill on the up-stream side of the dam, inasmuch as the present

depth of water in the river at the stage assumed is about 50 feet.

This dam would be a structure of concrete masonry with cut-stone facing

only at a few points where it would be advisable to use that material.

A large part of the flood discharge, or the discharge of other surplus

water, would be made over a properly designed crest of the dam; hence

its outline would be that shown in the accompanying figure, shaped

so as to prevent the overflowing sheet of water from damaging the

structure. This dam will be founded upon pneumatic caissons, and the

borings made by the commission show that the deepest of them would

reach satisfactory bed-rock at no greater depth than 25 feet below

sea-level, or about 80 feet below the ordinary stage of water in the

river. The construction of this dam therefore would involve no unusual

operations, but it would all be performed within the more usual and

easy limits of the pneumatic process of constructing foundations. The

masonry crest of this dam would be finished at the elevation of 97

feet above sea-level, or about 13 feet below the highest elevation of

water in the lake. The length of that part of this masonry dam, located

on pneumatic caissons, would be 731 feet, but the total length of the

entire masonry structure would be 1310 feet. The total length of crest,

including the masonry piers on it, over which the surplus waters would

flow, would be 810 feet, but there are twenty piers 9 feet thick, so

that the net length of crest available for overflow of waste-waters

would be about 630 feet. The piers to which reference is made are those

required for the support of the movable gates of the Stoney type which

would be employed to regulate the discharge over the dam. The maximum

elevation of the tops of these piers required for the support and

operation of the Stoney gates is 132 feet above sea-level. The masonry

dam thus furnished with movable gates can be used in times of flood

to prevent the water of the lake rising above about 110 feet above

sea-level. In times of low rainfall or during the dry season the gates

would prevent the escape of water needed for storage.

[Illustration: Castillo Viejo, on the San Juan River, about

thirty-seven miles from the lake and at the Castillo Rapids. The old

fort is shown on the right at the summit of the hill.]

The total available length of crest on this masonry dam is not

sufficient to exercise all the control that is needed to keep the lake

within desired limits, and the commission was obliged to avail itself

of a low depression or saddle between the hills less than a half-mile

easterly of the dam site. The depression affords an additional total

length of crest of 1239 feet, or, taking out thirty-one piers, each 9

feet wide, a net available length of 960 feet, making in combination

with the crest of the main dam a total net available length of 1590

feet. The total wastage over these two structures, i.e., the main dam

at Conchuda and the Conchuda wasteway on the Costa Rican side of the

river, may be at the rate of 100,000 cubic feet per second, with a

maximum depth over the crest of 7 feet, which is sufficient to meet the

demands of the heaviest rainfall in the lake basin.

The plans and elevations on pages 421, 423, and 424 show all the main

features of both the Conchuda dam and wasteway as designed by the

commission.

=340. Regulation of the Lake Level.=—One of the most important

engineering questions connected with the consideration of the Nicaragua

route is that of the regulation or control of the surface of the water

in Lake Nicaragua constituting the summit level of the canal.

As has already been stated, the drainage-basin of the lake, about

12,000 square miles in area, is subjected to an annual wet season

extending from about the middle of May to the middle of December,

the dry season extending over the remaining portion of the year. The

average annual rainfall over the entire lake basin is not accurately

known, although the Isthmian Canal Commission maintained rainfall

records at several points on the lake shore and at other points in the

basin during periods of 1½ to 2 years, and records running back over

periods of perhaps 12 to 15 years are available from Rivas, Granada,

and Masaya. Fortunately, also, both the Nicaragua and the Isthmian

Canal Commissions maintained gauging-stations at various points on the

San Juan throughout the periods of service of these commissions, so

that the discharges of the river could be known from accurate measures

at various seasons for at least two or three years. These observations,

although not as extended as could be desired, yield sufficient data

for a comparatively thorough treatment of the subject of lake-surface

control.

Obviously throughout the rainy season of the year, except during years

of low rainfall, some water would necessarily be wasted from the lake

because its retention would raise the surface of the lake too high,

causing damage, floods, or injurious overflows at various places around

the lake shore. On the other hand, unless some water were stored from

the rainy periods or wet seasons there would not be sufficient in

the lake to supply during the dry period of the year, or during low

rainfall years, the requisite quantity for the wastage of evaporation

from its surface and for the operation of the canal, and at the same

time maintain the minimum depth of water of 35 feet required in the

canal. It was necessary, therefore, to design at least the general

features of such regulating-works as would prevent the lake from rising

too high in wet periods, and from falling too low in dry periods or low

rainfall years.

[Illustration: Village of Fort San Carlos at Entrance to the San Juan

River. Lake Nicaragua is on the right and San Juan River in the middle

ground.]

=341. Evaporation and Lockage.=—The observations of both commissions

show conclusively that the average evaporation from the surface of Lake

Nicaragua is about 60 inches or 5 feet per year, varying from perhaps a

maximum of 6 inches per month to a minimum of possibly about 4 inches

per month. Furthermore, careful estimates of the quantity of water

required for the purposes of the canal, on the supposition that about

10,000,000 tons of traffic would pass through it annually, including

lockage, leakage through the gates of the locks, evaporation, power

purposes, and other incidentals, show that about 1000 cubic feet of

water per second must be provided. Whatever may be the character of the

season, therefore, there must be at least sufficient water stored in

the lake to provide for the wastage of evaporation from the lake and

canal surfaces and for the proper operation of all the locks throughout

the length of the canal. The superficial area of Lake Nicaragua is but

little less than 3000 square miles. The quantity of water required for

the operation of the canal, amounting to 1000 cubic feet per second,

would, for the entire year, make a layer of water over the lake surface

of less than 5 inches in thickness. In other words, the operation of

the canal, for a traffic of about 10,000,000 tons annually, requires an

amount of water less than one twelfth of that which would be evaporated

from the lake surface during the same period.

=342. The Required Slope of the Canalized River Surface.=—The dam

located at Conchuda and fitted with suitable movable gates affords

means of accomplishing the entire lake-surface control. That dam is

located, however, nearly 53 miles from the lake, and in order that the

requisite discharge may take place over it during the rainy season

there must be considerable slope of the water surface in the canalized

river from the lake down to the dam. It was necessary, therefore, to

compute that slope, from data secured by the commission, with the

lake surface at various elevations between the minimum and maximum

permitted. These slopes were found to be such that the difference in

elevations of the surface of the water at the dam and in the lake might

vary from about 6 to 9 feet, those figures representing the total fall

for the distance of 53 miles.

=343. All Surplus Water to be Discharged over the Conchuda Dam.=—The

Nicaragua Commission contemplated the construction of dams not only on

the San Juan River at Boca San Carlos, about 6 miles below Conchuda,

but also another a few miles west of the lake at La Flor, so as to

discharge the surplus waters at both points, but by far the largest

part over the dam at Boca San Carlos. The Isthmian Canal Commission,

however, decided to build no dam on the west side of the lake, but to

discharge all the surplus waters over the dam at Conchuda.

[Illustration: The Active Volcano Ometepe in Lake Nicaragua, showing

Clouds on Leeward Side of the Summit. The crater is nearly eleven miles

from the canal line.]

=344. Control of the Surface Elevation of the Lake.=—The rainfall

records in the lake basin have shown that a dry season beginning

as early as November may be followed by an extremely low rainfall

period, which in turn would be followed by a dry season in natural

sequence, lasting as late as June. It may happen, therefore, that

from November until a year from the succeeding June, constituting a

period of nineteen months, there will be a very meagre rainfall in the

lake basin, during which the precipitation of the seven low rainfall

wet months may not be sufficient even to make good the depletion of

evaporation alone during the same period. It would be necessary, then,

at the end of any wet season whatever, i.e., during the first half of

any December, or in November, to make sure of sufficient storage in the

lake to meet the requirements of the driest nineteen months that can

be anticipated. That condition was assumed by the commission, and the

elements of control of the lake surface, in its plans, are such as to

afford resources to meet precisely those low-water conditions.

[Illustration: Plan of Conchuda Dam Site, showing Location of Boring.]

The commission’s study of these features of the Nicaragua Canal problem

resulted in plans of works to prevent the surface of the lake ever

falling below 104 feet above sea-level, or rarely if ever rising higher

than the elevation of 110 feet above the same level, thus making the

possible range of the lake surface about 6 feet between its lowest and

its highest position.

Obviously at the end of a dry season the gates at the dam will always

be found closed, and there will be no water escaping from the lake

except by evaporation and to supply the needs of canal operation. It

is equally evident that the gates will also remain closed so as to

permit no wastage during the early part of the wet season. As the wet

season proceeds the surface of the lake will rise toward, and generally

quite to its maximum elevation; the operation of wasting over the

weirs will then commence. The time of beginning of this wastage will

depend upon the amount and distribution of the rainfall during the

wet period. Indeed no wastage whatever would be permitted during such

a low-water wet season as that shown by the records of 1890, which

was almost phenomenal in its low precipitation. The rainfall for the

entire drainage-basin would be impounded in the lake in that case, and

it would then fall short of restoring the depletion resulting from

evaporation and requirements of the canal. On the other hand, during

such a wet season as that of 1897 wastage would begin at an early date.

In general it may be said that neither the rate nor the law of the rise

of water surface in the lake can be predicted. There will be years when

no wastage will be permitted, but generally considerable wastage will

be necessary in order to prevent the lake rising above the permissible

highest stage.

[Illustration: Profile of Site of Conchuda Dam showing Borings.]

Detailed computations based upon the statistics of actual rainfall

records in the basin of Lake Nicaragua may be found by referring to

pages 147 to 152 of the Report of the Isthmian Canal Commission, and

they need not be repeated here. Those computations show among other

things that October is often a month of excessive rainfall, and that

the greatest elevation of the lake surface is likely to follow the

precipitation of that month. Hence the greatest discharge of surplus

waters over the Conchuda dam may be expected in consequence of the

resulting run-off or inflow into the lake. Those computations also

show that at long intervals of time the lake surface might reach an

elevation of nearly 112 feet above sea-level for short periods, causing

the discharge in the canalized river or over the Conchuda dam to reach

possibly 76,000 cubic feet per second, the elevation of the water at

the dam being 104 feet above sea-level. Furthermore, the Sabalos River

and one or two other small streams, emptying into the San Juan above

the dam, might concurrently be in flood for at least a few hours and

augment the discharge over the dam to 100,000 cubic feet per second.

The regulating-works at the dam, consisting of the movable (Stoney)

gates, were devised by the commission to afford that rate of discharge,

an aggregate net or available length of overflow crest at the dam and

wasteway of 1590 feet being necessary for that purpose with a depth of

water on the crest not exceeding 7 feet.

[Illustration: CONCHUDA DAM. SECTION SHOWING CAISSONS]

[Illustration: CONCHUDA DAM. DIAGRAM SHOWING ARRANGEMENT OF SLUICE GATE]

The commission states on page 156 of its report:

“While, therefore, no detailed instructions can be set

forth regarding the condition of the sluices at the

wasteway on specified dates, the general lines of their

operation should be stated below, viz.:

“1. A full lake with surface probably a little above

110 feet on December 1.

“2. Wasteway sluices closed at least from about

December 1 to some date in the early portion of the

succeeding rainy season, or throughout that season if

it be one of unusually low precipitation.

“3. A variable opening of wasteway sluices, if

necessary, during the intermediate portion of the rainy

season, so as to maintain the lake surface elevation

but little, if any, below 110 at the beginning of

October.

“4. The operation of wasteway sluices during October

and November so as to reach the 1st of December with a

full lake, or lake elevation probably a little above

110 feet.”

It is thus seen that while the measures for control and regulation are

entirely feasible, they are not sharply defined, nor so simple that

some experience in their operation might not be needful for the most

satisfactory results.

=345. Greatest Velocities in Canalized River.=—It is necessary to

ascertain whether the velocities induced in the canalized portions

of the San Juan River would not be too high for the convenience of

traffic during the highest rainfall season. The following table and the

succeeding paragraph, taken from the commission’s report, show that no

sensible difficulty of this kind would exist.

--------------+-------------------------+----------------------

| Elevation of Water at Dam.

Elevation of +-------------------------+----------------------

Lake. | 103 Feet. | 104 Feet.

--------------+------------+------------+-----------+-----------

| Feet per | Miles per | Feet per | Miles per

Feet. | Second. | Hour. | Second. | Hour.

110 | 4.16 | 2.8 | 3.9 | 2.7

111 | 4.51 | 3.1 | 4.2 | 2.9

112 | 4.85 | 3.3 | 4.5 | 3.1

--------------+------------+------------+-----------+----------

“The discharge of the river corresponding to the velocity of 2.7 miles

per hour is 63,200 cubic feet per second; while that corresponding to

3.3 miles per hour is 77,000 cubic feet per second. These estimated

high velocities will occur but rarely, and they will not sensibly

inconvenience navigation. In reality they are too high, for the reason

that while the overflow at the minimum river section materially

increases the areas of those sections, it has been neglected in this

discussion.”

[Illustration]

[Illustration: Brito, at the Pacific Terminus of the Nicaragua Route,

showing the mouth of the Rio Grande on the left and the easterly side

of Brito Head.]

=346. Wasteways or Overflows.=—At a number of places on the route

there are some small streams which must be taken into the canal, and

which when in flood require that certain wasteways or overflows from

the canal prism should be provided at or near where such streams are

received. These wasteways are simply overfall-weirs with the crests

at the elevation of the lowest water surface in the canal prism. The

principal works of this kind are on the east side of the lake and

involve a total drainage area or area of watershed of about 107 square

miles. Ample provision has been made by the commission for all such

structural features.

=347. Temporary Harbors and Service Railroad.=—Before actual work

could be begun at either end of the Nicaragua route temporary harbors

would have to be constructed both at Greytown and at Brito to enable

contractors to land plant and supplies or other material. These

temporary harbors would probably require no greater depth of water

than 18 feet, but they would be works of considerable magnitude, and

provision was made for them in the commission’s estimate of cost.

Again, a service railroad of substantial character would have to be

built from Greytown up to Sabalos, approximately half-way between the

Conchuda dam and Fort San Carlos, as well as from the west shore of the

lake to Brito, making a total line of about 100 miles. The commission

estimated the cost of this railroad and its rolling stock at $75,000

per mile.

=348. Itemized Statement of Length and Cost.=—The following table gives

the lengths of the various portions of the canal and the principal

items of its cost, so arranged as to show the classification of the

various items of the total sum to be expended for all purposes during

the construction of the entire work.

The commission estimated the total time required in preparing for and

performing the actual construction of the work at eight years, but the

writer believes that at least two years more should be allowed for the

work.

------------------------------------------------+------+------------

|Miles.| Cost.

------------------------------------------------+------+------------

Greytown harbor and entrance | 2.15| $2,198,860

Section from Greytown harbor to lock No. 1, | |

including approach-wall to lock | 7.44| 4,899,887

Diversion of Lower San Juan | | 40,100

Diversion of San Juanillo | | 116,760

Lock No. 1, including excavation | .20| 5,719,689

Section from lock No. 1 to lock No. 2, including| |

approach-walls, embankments, and wasteway | 10.96| 6,296,632

Lock No. 2, including excavation | .20| 4,050,270

Section from lock No. 2 to lock No. 3, including| |

approach-walls, embankments, and wasteway | 16.75| 19,330,654

Lock No. 3, including excavation | .20| 3,832,745

Section from lock No. 3 to lock No. 4, including| |

approach-walls, embankments, and wasteway | 2.77| 4,310,580

Lock No. 4, including excavation | .20| 5,655,871

Section from lock No. 4 to San Juan River, | |

including approach-wall and embankments | 5.30| 8,579,431

Conchuda dam, including sluices and machinery | | 4,017,650

Auxiliary wasteway, including sluices, | |

machinery, and approach-channels | | 2,045,322

San Juan River section | 49.64| 23,155,670

Lake Nicaragua section | 70.51| 7,877,611

Lake Nicaragua to lock No. 5, including | |

approach-wall to lock and receiving-basins for| |

the Rio Grande and Chocolata | 9.09| 19,566,575

Diversion of the Las Lajas | | 199,382

Lock No. 5, including excavation | .20| 4,913,512

Dam near Buen Retiro | | 125,591

Section from lock No. 5 to lock No. 6, including| |

approach-walls and wasteway | 2.04| 3,259,283

Lock No. 6, including excavation | .20| 4,368,667

Section from lock No. 6 to lock No. 7, including| |

approach-walls, embankments, and wasteway | 1.83| 2,309,710

Diversion of Rio Grande | | 176,180

Lock No. 7, including excavation | .20| 4,709,502

Section from lock No. 7 to lock No. 8, including| |

approach-walls, embankments, and wasteway | 2.43| 1,787,496

Diversion of Rio Grande | | 117,580

Lock No. 8, including excavation | .20| 4,920,899

Section from lock No. 8 to Brito harbor, | |

including approach-wall | .23| 553,476

Brito harbor and entrance, including jetty | .92| 1,509,470

Railroad, including branch line to Conchuda | |

dam site, at $75,000 per mile | | 7,575,000

Engineering, police, sanitation, and general | |

contingencies, 20 per cent. | | 1,644,010

+------+------------

Aggregate |183.66|$189,864,062

------------------------------------------------+------+------------

PART VI.

_THE PANAMA ROUTE FOR A SHIP-CANAL._

=349. The First Panama Transit Line.=—The Panama route as a line

of transit across the isthmus was established, as near as can be

determined, between 1517 and 1520. The first settlement, at the site

of the town of old Panama, 6 or 7 miles easterly of the present city

of that name, was begun in August, 1517. This was the Pacific end of

the line. The Atlantic end was finally established in 1519 at Nombre

de Dios, the more easterly port of Acla, where Balboa was tried and

executed, having first been selected but subsequently rejected.

The old town of Panama was made a city by royal decree from the throne

of Spain in September, 1521. At the same time it was given a coat of

arms and special privileges were conferred upon it. The course of

travel then established ran by a road well known at the present time

through a small place called Cruces on the river Chagres, about 17

miles distant from Panama. It must have been an excellent road for

those days. Bridges were even laid across streams and the surface was

paved, although probably rather crudely. According to some accounts it

was only wide enough for use by beasts of burden, but some have stated

that it was wide enough to enable two carts to pass each other.

=350. Harbor of Porto Bello Established in 1597.=—The harbor of

the Atlantic terminus at Nombre de Dios did not prove entirely

satisfactory, and Porto Bello, westerly of the former point, was made

the Atlantic port in 1597 for this isthmian line of transit. The harbor

of Porto Bello is excellent, and the location was more healthful,

although Porto Bello itself was subsequently abandoned, largely on

account of its unhealthfulness.

[Illustration: PROFILE OF PANAMA ROUTE]

[Illustration: PROFILE OF NICARAGUA ROUTE

Profiles of the two Canal Routes. The horizontal scales are different,

but the vertical scales are the same.]

=351. First Traffic along the Chagres River, and the Importance of the

Isthmian Commerce.=—As early as 1534, or soon after that date, boats

began to pass up and down the Chagres River between Cruces and its

mouth on the Caribbean shore, and thence along the coast to Nombre de

Dios and subsequently to Porto Bello. The importance of the commerce

which sprang up across the isthmus and in connection with this isthmian

route is well set forth in the last paragraph on page 28 of the report

of the Isthmian Canal Commission:

“The commerce of the isthmus increased during the century and Panama

became a place of great mercantile importance, with a profitable trade

extending to the Spice Islands and the Asiatic coast. It was at the

height of its prosperity in 1585, and was called with good reason

the toll-gate between western Europe and eastern Asia. Meanwhile the

commerce whose tolls only brought such benefits to Panama enriched

Spain, and her people were generously rewarded for the aid given by

Ferdinand and Isabella in the effort to open a direct route westward to

Cathay, notwithstanding the disadvantages of the isthmian transit.”

=352. First Survey for Isthmian Canal Ordered in 1520.=—This commercial

prosperity suggested to those interested in it, and soon after its

beginning, the possibility of a ship-canal to connect the waters of the

two oceans. It is stated even that Charles V. directed that a survey

should be made for the purpose of determining the feasibility of such

a work as early as 1520. “The governor, Pascual Andagoya, reported

that such a work was impracticable and that no king, however powerful

he might be, was capable of forming a junction of the two seas or of

furnishing the means of carrying out such an undertaking.”

=353. Old Panama Sacked by Morgan and the Present City Founded.=—From

that time on the city of Panama increased in wealth and population in

consequence of its commercial importance. Trade was established with

the west coast of South America and with the ports on the Pacific

coast of Central America. In spite of the fact that it was made by

the Spaniards a fortress second in strength in America only to old

Cartagena, it was sacked and burned by Morgan’s buccaneers in February,

1671. The new city, that is the present city, was founded in 1673, it

not being considered advisable to rebuild on the old site.

[Illustration: View of the Harbor of Colon.]

=354. The Beginnings of the French Enterprise.=—The project of a

canal on this route was kept alive for more than three centuries by

agitation sometimes active and sometimes apparently dying out for

long periods, until there was organized in Paris, in 1876, a company

entitled “Société Civile Internationale du Canal Interocéanique,” with

Gen. Etienne Türr as president, for the purpose of making surveys and

explorations for a ship-canal between the two oceans on this route.

=355. The Wyse Concession and International Congress of 1879.=—The work

on the isthmus for this company was prosecuted under the direction

of Lieut. L. N. B. Wyse, a French naval officer, and he obtained for

his company in 1878 a concession from the Colombian Government,

conferring the requisite rights and privileges for the construction of

a ship-canal on the Panama route and the authority to do such other

things as might be necessary or advisable in connection with that

project. This concession is ordinarily known as the Wyse concession.

A general plan for this transisthmian canal was the subject of

consideration at an international scientific congress convened in Paris

in May, 1879, and composed of 135 delegates from France, Germany, Great

Britain, the United States, and other countries, but the majority of

whom were French. This congress was convened under the auspices of

Ferdinand de Lesseps, and after remaining in session for two weeks a

decision, not unanimous, was reached that an international canal ought

to be located on the Panama route, and that it should be a sea-level

canal without locks. The fact was apparently overlooked that the range

between high and low tides in the Bay of Panama, about 20 feet, was so

great as to require a tidal lock at that terminus.

=356. The Plan without Locks of the Old Panama Canal Company.=—A

company entitled “Compagnie Universelle du Canal Interocéanique”

was organized, with Ferdinand de Lesseps as president, immediately

after the adjournment of the international congress. The purpose of

this company was the construction and operation of the canal, and it

purchased the Wyse concession from the original company for the sum

of 10,000,000 francs. An immediate but unsuccessful attempt was made

to finance the company in August, 1879. This necessitated a second

attempt, which was made in December, 1880, with success, as the entire

issue of 600,000 shares of 500 francs each was sold. Two years were

then devoted to examinations and surveys and preliminary work upon the

canal, but it was 1883 before operations upon a large scale were begun.

The plan adopted and followed by this company was that of a sea-level

canal, affording a depth of 29.5 feet and a bottom width of 72 feet. It

was estimated that the necessary excavation would amount to 157,000,000

cubic yards.

The Atlantic terminus of this canal route was located at Colon,

and at Panama on the Pacific side. The line passed through the low

grounds just north of Monkey Hill to Gatun, 6 miles from the Atlantic

terminus, and where it first met the Chagres River. For a distance

of 21 miles it followed the general course of the Chagres to Obispo,

but left it at the latter point and passing up the valley of a small

tributary cut through the continental divide at Culebra, and descended

thence by the valley of the Rio Grande to the mouth of that river where

it enters Panama Bay. The total length of this line from 30 feet depth

in the Atlantic to the same depth in the Pacific was about 47 miles.

The maximum height of the continental divide on the centre line of the

canal in the Culebra cut was about 333 feet above the sea, which is a

little higher than the lowest point of the divide in that vicinity.

Important considerations in connection with the adjacent alignment made

it advisable to cut the divide at a point not its lowest.

[Illustration: Old Dredges near Colon.]

=357. The Control of the Floods in the Chagres.=—Various schemes were

proposed for the purpose of controlling the floods of the Chagres

River, the suddenness and magnitude of which were at once recognized as

among the greatest difficulties to be encountered in the construction

of the work. Although it was seriously proposed at one time to control

this difficulty by building a dam across the Chagres at Gamboa, that

plan was never adopted, and the problem of control of the Chagres

floods remained unsolved for a long period.

=358. Estimate of Time and Cost—Appointment of Liquidators.=—It was

estimated by de Lesseps in 1880 that eight years would be required for

the completion of the canal, and that its cost would be $127,600,000.

The company prosecuted its work with activity until the latter part of

1887, when it became evident that the sea-level plan of canal was not

feasible with the resources at its command. Changes were soon made in

the plans, and it was concluded to expedite the completion of the canal

by the introduction of locks, deferring the change to a sea-level canal

until some period when conditions would be sufficiently favorable to

enable the company to attain that end. Work was prosecuted under this

modified plan until 1889, when the company became bankrupt and was

dissolved by judgment of the French court called the Tribunal Civil

de la Seine, on February 4, 1889. An officer, called the liquidator,

corresponding quite closely to a receiver in this country, was

appointed by the court to take charge of the company’s affairs. At

no time was the project of completing the canal abandoned, but the

liquidator gradually curtailed operations and finally suspended the

work on May 15, 1889.

=359. The “Commission d’Etude.”=—He determined to take into careful

consideration the feasibility of the project, and to that end appointed

a “commission d’études,” composed of eleven French and foreign

engineers, headed by Inspector-General Guillemain, director of the

_Ecole Nationale des Ponts et Chaussées_. This commission visited

the isthmus and made a careful study of the entire enterprise, and

subsequently submitted a plan for the canal involving locks. The cost

of completing the entire work was estimated to be $112,500,000, but

the sum of $62,100,000 more was added to cover administration and

financing, making a total of $174,600,000. This commission also gave

an approximate estimate of the value of the work done and of the plant

at $87,300,000, to which some have attached much more importance than

did the commission itself. The latter appears simply to have made the

“estimate” one half of the total cost of completing the work added to

that of financing and administration, as a loose approximation, calling

it an “intuitive estimate”; in other words, it was simply a guess

based upon such information as had been gained in connection with the

work done on the isthmus.

[Illustration: The Partially Completed Panama Canal, about eight miles

from Colon.]

=360. Extensions of Time for Completion.=—By this time the period

specified for completion under the original Wyse concession had nearly

expired. The liquidator then sought from the Colombian Government an

extension of ten years, which was granted under the Colombian law dated

December 26, 1890. This extension was based upon the provision that a

new company should be formed and work on the canal resumed not later

than February 28, 1893. The latter condition was not fulfilled, and a

second extension was obtained on April 4, 1893, which provided that the

ten-year extension of time granted in 1890 might begin to run at any

time prior to October 31, 1894, but not later than that date. When it

became apparent that the provisions of this last extension would not

be carried out an agreement between the Colombian Government and the

new Panama Company was entered into on April 26, 1900, which extended

the time of completion to October 31, 1910. The validity of this last

extension of time has been questioned.

=361. Organization of the New Panama Canal Company, 1894.=—A new

company, commonly known as the new Panama Canal Company, was organized

on the 20th of October, 1894, with a capital stock of 650,000 shares

of 100 francs each. Under the provisions of the agreement of December

26, 1890, authorizing an extension of time for the construction of

the canal, 50,000 shares passed as full-paid stock to the Colombian

Government, leaving the actual working capital of the new Panama

Company at 60,000,000 francs, that amount having been subscribed in

cash. The most of this capital stock was subscribed for by certain

loan associations, administrator, contractors, and others against whom

suits had been brought in consequence of the financial difficulties

of the old company, it having been charged in the scandals attending

bankruptcy proceedings that they had profited illegally. Those suits

were discontinued under agreements to subscribe by the parties

interested to the capital stock of the new company. The sums thus

obtained constituted more than two thirds of the 60,000,000 francs

remaining of the share capital of the new company after the Colombian

Government received its 50,000 shares. The old company had raised by

the sale of stock and bond not far from $246,000,000, and the number

of persons holding the securities thus sold has been estimated at over

200,000.

=362. Priority of the Panama Railroad Concession.=—The Panama Railroad

Company holds a concession from the Colombian Government giving it

rights prior to those of the Wyse concession, so that the latter could

not become effective without the concurrence of the Panama Railroad

Company. This is shown by the language of Article III of the Wyse

concession, which reads as follows:

“If the line of the canal to be constructed from sea to sea should

pass to the west and to the north of the imaginary straight line which

joins Cape Tiburon with Garachine Point, the grantees must enter into

some amicable arrangement with the Panama Railroad Company or pay an

indemnity, which shall be established in accordance with the provisions

of Law 46 of August 16, 1867, ‘approving the contract celebration on

July 5, 1867, reformatory of the contract of April 15, 1850, for the

construction of an iron railroad from one ocean to the other through

the Isthmus of Panama.’” It became necessary, therefore, in order to

control this feature of the situation, for the old Panama Company

to secure at least a majority of the stock of the Panama Railroad

Company. As a matter of fact the old Panama Canal Company purchased

nearly 69,000 out of the 70,000 shares of the Panama Railroad Company,

each such share having a par value of $100. These shares of Panama

railroad stock are now held in trust for the benefit of the new Panama

Canal Company. A part of the expenditures of the old company therefore

covered the cost of the Panama Railroad Company’s shares, now held in

trust for the benefit of the new company.

=363. Resumption of Work by the New Company—The Engineering Commission

and the Comité Technique.=—Immediately after its organization the new

Panama Canal Company resumed the work of excavation in the Emperador

and Culebra cuts with a force of men which has been reported as

varying between 1900 and 3600. It also gave thorough consideration

to the subject of the best plan for the completion of the canal. The

company’s charter provided for the appointment of a special engineering

commission of five members by the company and the liquidator to report

upon the work done and the conclusions to be drawn from its study. This

report was to be rendered when the amount expended by the new company

should reach about one half of its capital. At the same time the

company also appointed a “Comité Technique,” constituted of fourteen

eminent European and American engineers, to make a study of the entire

project, which was to avail itself of existing data and the results of

such other additional surveys and examinations as it might consider

necessary. The report rendered by this committee was elaborate, and it

was made November 16, 1898. It was referred to the statutory commission

of five to which reference has already been made, which commission

reported in 1899 that the canal could be constructed within the limits

of time and money estimated. On December 30, 1899, a special meeting

of the stockholders of the new company was called, but the liquidator,

who was one of the largest stockholders, declined to take part in it,

and the report consequently has not received the required statutory

consideration.

[Illustration: The Excavation at the Bohio Lock Site.]

=364. Plan of the New Company.=—The plan adopted by the company placed

the minimum elevation of the summit level of the canal at 97½ feet

above the sea, and a maximum at 102½ feet above the same datum. It

provided for a depth of 29½ feet of water and a bottom width of canal

prism of about 98 feet, except at special places where this width was

increased. A dam was to be built near Bohio, which would thus form an

artificial lake with its surface varying from 52.5 to 65.6 feet above

the sea. Under this plan there would be a flight of two locks at

Bohio, about 16 miles from the Atlantic end of the canal, and another

flight of two locks at Obispo about 14 miles from Bohio, thus reaching

the summit level, a single lock at Paraiso, between 6 and 7 miles from

Obispo, a flight of two locks at Pedro Miguel about 1.25 miles from

Paraiso, and finally a single lock at Miraflores, a mile and a quarter

from Pedro Miguel, bringing the canal down to the ocean elevation.

The location of this line was practically the same as that of the

old company. The available length of each lock-chamber was 738 feet,

while the available width was 82 feet, the depth in the clear being

32 feet 10 inches. The lifts were to vary from 26 to 33 feet. It was

estimated that the cost of finishing the canal on this plan would be

$101,850,000, exclusive of administration and financing.

In order to control the floods of the Chagres River, and to furnish a

supply of water for the summit level of the canal, a dam was planned to

be built at a point called Alhajuela, about 12 miles from Obispo, from

which a feeder about 10 miles long, partly an open canal and partly in

tunnels or pipe, would conduct the water from the reservoir thus formed

to the summit level.

=365. Alternative Plan of the New Panama Canal Company.=—Although

the plan as described was adopted, the “Comité Technique” apparently

favored a modification by which a much deeper excavation through

Culebra Hill would be made, thus omitting the locks at both Obispo and

Paraiso, and making the level of the artificial Lake Bohio the summit

level of the canal. In this modified plan the bottom of the summit

level would be about 32 feet above the sea, and the minimum elevation

of the summit level 61.5 feet above the sea. This modification of plan

had the material advantage of eliminating both the Obispo and Paraiso

locks. The total estimated cost of completing the canal under this plan

was about $105,500,000. Although the Alhajuela feeder would be omitted,

the Alhajuela reservoir would be retained as an agent for controlling

the Chagres floods and to form a reserve water-supply. The difference

in cost of these two plans was comparatively small, but the additional

time required to complete that with the lower summit level was probably

one of the main considerations in its rejection by the committee having

it under consideration.

=366. The Isthmian Canal Commission and its Work.=—This brings

the project up to the time when the Isthmian Canal Commission was

created in 1899 and when the forces of the new Panama Canal Company

were employed either in taking care of the enormous amount of plant

bequeathed to it by the old company or in the great excavation at

Emperador and Culebra. The total excavation of all classes, made up to

the time when that commission rendered its report, amounted to about

77,000,000 cubic yards.

The work of the commission consisted of a comprehensive and detailed

examination of the entire project and all its accessories, as

contemplated by the new Panama Canal Company, and any modifications of

its plans, either as to alignment, elevations, or subsidiary works,

which it might determine advisable to recommend. In the execution of

this work it was necessary, among other things, to send engineering

parties on the line of the Panama route for the purpose of making

surveys and examinations necessary to confirm estimates of the new

Panama Canal Company as to quantities, elevations, or other physical

features of the line selected, or required in modifications of

alignment or plans. In order to accomplish this portion of its work the

commission placed five working parties on the Panama route with twenty

engineers and other assistants and forty-one laborers.

[Illustration: The French Location for the Bohio Dam.]

=367. The Route of the Isthmian Canal Commission that of the New

Panama Canal Company.=—The commission adopted for the purposes of

its plans and estimates the route selected by the new Panama Canal

Company, which is essentially that of the old company. Starting from

the 6-fathom contour in the harbor of Colon, the line follows the low

marshy ground adjoining the Bay of Limon to its intersection with the

Mindi River; thence through the low ground continuing to Gatun, about

6 miles from Colon, where it first meets the Chagres River. From this

point to Obispo the canal line follows practically the general course

of the Chagres River, although at one point in the marshes below Bohio

it is nearly 2 miles from the farthest bend in the river, at a small

place called Ahorca Lagarto. Bohio is about 17 miles from the Atlantic

terminus, and Obispo about 30 miles. At the latter point the course of

the Chagres River, passing up-stream, lies to the northeast, while the

general direction of the canal line is southeast toward Panama, the

latter leaving the former at this location. The canal route follows up

the general course of a small stream called the Camacho for a distance

of nearly 5 miles where the continental divide is found, and in which

the great Culebra cut is located, about 36 miles from Colon and 13

miles from the Panama terminus. After passing through the Culebra cut

the canal route follows the course of the Rio Grande River to its mouth

at Panama Bay. The mouth of the Rio Grande, where the canal line is

located, is about a mile and a half westerly of the city of Panama. The

Rio Grande is a small, sluggish stream throughout the last 6 miles of

its course, and for that distance the canal excavation would be made

mostly in soft silt or mud.

Although the line selected by the French company is that adopted by the

Isthmian Canal Company for its purposes, a number of most important

features of the general plan have been materially modified by the

commission, as will be easily understood from what has already been

stated in connection with the French plans.

=368. Plan for a Sea-level Canal.=—The feasibility of a sea-level

canal, but with a tidal lock at the Panama end, was carefully

considered by the commission, and an approximate estimate of the

cost of completing the work on that plan was made. In round numbers

this estimated cost was about $250,000,000, and the time required to

complete the work would probably be nearly or quite twice that needed

for the construction of a canal with locks. The commission therefore

adopted a project for the canal with locks. Both plans and estimates

were carefully developed in accordance therewith.

=369. Colon Harbor and Canal Entrance.=—The harbor of Colon has been

fairly satisfactory for the commerce of that port, but it is open to

the north, and there are probably two or three days in every year

during which northers blow into the harbor with such intensity that

ships anchored there must put to sea in order to escape damage.

The western limit of this harbor is an artificial point of land

formed by material deposited by the old Panama Canal Company; it

is called Christoph Colon, and near its extreme end are two large

frame residences built for de Lesseps. The entrance to the canal is

immediately south of this artificial point. The commission projected a

canal entrance from the 6-fathom contour in the Bay of Limon, in which

the harbor of Colon is found, swinging on a gentle curve, 6560 feet

radius, to the left around behind the artificial point just mentioned

and then across the shore line to the right into the lowland southerly

of Colon. This channel has a width of 500 feet at the bottom, with

side slopes of 1 on 3, except on the second curve, which is somewhat

sharper than the first, where the bottom width is made 800 feet for a

length of 800 feet for the purpose of a turning-basin. This brings the

line into the canal proper, forming a well-protected harbor for nearly

a mile inside of the shore line. The distance from the 6-fathom line to

this interior harbor is about 2 miles. The total cost of constructing

the channel into the harbor and the harbor itself is $8,057,707, and

the annual cost of maintenance is placed at $30,000. The harbor would

be perfectly protected from the northers which occasionally blow with

such intensity in the Bay of Limon, and it could readily be made in all

weathers by vessels seeking it.

=370. Panama Harbor and Entrance to Canal.=—The harbor at the Pacific

end of the channel where it joins Panama Bay is of an entirely

different character in some respects. The Bay of Panama is a place

of light winds. Indeed it has been asserted that the difficulties

sometimes experienced by sailing-vessels in finding wind enough to

take them out of Panama Bay are so serious as to constitute a material

objection to the location for a ship-canal on the Panama route. This

difficulty undoubtedly exists at times, but the simple fact is to be

remembered that Panama was a port for sailing-ships for more than two

hundred years before a steamship was known. The harbor of Panama, as

it now exists, is a large area of water at the extreme northern limit

of the bay, immediately adjacent to the city of Panama, protected from

the south by the three islands of Perico, Naos, and Culebra. It has

been called a roadstead. There is good anchorage for heavy-draft ships,

but for the most part the water is shallow. With the commission’s

requirement of a minimum depth of water of 35 feet, a channel about 4

miles long from the mouth of the Rio Grande to the 6-fathom line in

Panama Bay must be excavated. This channel would have a bottom width

of 200 feet with side slopes of 1 on 3 where the material is soft.

Considerable rock would have to be excavated in this channel. At 4.41

miles from the 6-fathom line is located a wharf at the point called La

Boca. A branch of the Panama Railroad Company runs to this wharf, and

at the present time deep-draft ships lie up alongside of it to take on

and discharge cargo. The wharf is a steel frame structure, founded upon

steel cylinders, carried down to bed-rock by the pneumatic process.

Its cost was about $1,284,000. The total cost of the excavated channel

leading from Panama harbor to the pier at La Boca is estimated by the

commission at $1,464,513. As the harbor at Panama is considered an open

roadstead, it requires no estimate for annual cost of maintenance.

[Illustration: The Bohio Dam Site.]

=371. The Route from Colon to Bohio.=—Starting from the harbor of

Colon, the prism of the canal is excavated through the low and for the

most part marshy ground to the little village called Bohio. The prism

would cut the Chagres River at a number of points, and would require a

diversion-channel for that river for a distance of about 5 miles on the

westerly side of the canal. Levees, or protective embankments, would

also be required on the same side of the canal between Bohio and Gatun,

the Chagres River leaving the canal line at the latter point on its way

to the sea.

=372. The Bohio Dam.=—The principal engineering feature of the entire

route is found at Bohio; it is the great dam across the Chagres River

at that point, forming Lake Bohio, the summit level of the canal. The

new Panama Canal Company located this dam at a point about 17 miles

from Colon, and designed to make it an earth structure suitably paved

on its faces, but without any other masonry feature. Some borings had

been made along the site, and test-pits were also dug by the French

engineers. It was the conviction of the Isthmian Canal Commission,

however, that the character of the proposed dam might be affected

by a further examination of the subsurface material at the site.

Consequently the boring parties of the Commission sunk a large number

of bore-holes at six different sections or possible sites along the

river in the vicinity of the French location. These borings revealed

great irregularity in the character and disposition of the material

below the bed and banks of the river. In some places the upper stratum

of material was almost clear clay, and in other places clear sand,

while all degrees of admixture of clay and sand were also found. At

the French site the bed-rock at the deepest point is 143 feet below

sea-level, with large masses of pervious and semi-pervious sand,

gravel, and mixtures of those materials with clay. Apparently there is

a geological valley in the rock along the general course of the Chagres

River in this vicinity filled with sand, gravel, and clay, irregularly

distributed and with all degrees of admixture, large masses in all

cases being of open texture and pervious to water. The site adopted by

the commission for the purposes of its plans and estimates is located

nearly half a mile down the course of the river from that selected by

the new Panama Canal Company. The geological valley is nearly 2000 feet

wide at this location, but the deepest rock disclosed by the borings

of the commission is but 128 feet below sea-level. The actual channel

of the river is not more than 150 feet wide and lies on the extreme

easterly side of the valley. The easterly or right bank of the river at

this place is clean rock and rises abruptly to an elevation of about 40

feet above the river surface at ordinary stages. The left or westerly

bank of the river is compacted clay and sand, and rises equally as

abruptly as the rocky bank of the other side, and to about the same

elevation. From the top of the abrupt sandy clay bank a plateau of

rather remarkable uniformity of elevation extends for about 1200 feet

in a southwesterly direction to the rocky hill in which the Bohio

locks would be located. The rock slope on the easterly or northerly

bank of the river runs down under the sandy river-bed, but at such an

inclination that within the limits of the channel the deepest rock is

less than 100 feet below sea-level.

[Illustration]

[Illustration]

[Illustration: Profile of Bohio Dam Site, selected for Plans and

Estimate, with section of Dam.]

After the completion of all its examinations and after a careful study

of the data disclosed by them, the commission deemed it advisable to

plan such a dam as would cut off absolutely all possible subsurface

flow or seepage through the sand and gravel below the river surface.

It is to be observed that such a subsurface flow might either disturb

the stability of an earth dam or endanger the water-supply of the

summit level of the canal or both. The plan of dam finally adopted

by the commission for the purposes of its estimates is shown by the

accompanying plans and sections. A heavy core-wall of concrete masonry

extends from bed-rock across the entire geological valley to the top

of the structure, or to an elevation of 100 feet above sea-level, thus

absolutely closing the entire valley against any possible flow. The

thickness of this wall at the bottom is 30 feet, but at an elevation

of 30 feet below sea-level its sides begin to batter at such a rate as

to make the thickness of the wall 8 feet at its top. On either side of

this wall are heavy masses of earth embankment of selected material

properly deposited in layers with surface slopes of 1 on 3. As shown

by the plans, the lower portions of the core-wall of this dam would

be sunk to bed-rock by the pneumatic process, the joints between the

caissons being closed and sealed by cylinders sunk in recesses or

wells, also as shown by the plans.

=373. Variation in Surface Elevation of Lake.=—The profile of this

route shows that the summit level would have an ordinary elevation of

85 feet above the sea, but it may be drawn down for uses of the canal

to a minimum elevation of 82 feet above the same datum. On the other

hand, under circumstances to be discussed later, it may rise during

the floods of the Chagres to an elevation of 90 or possibly 91 or 92

feet above the level of the sea. The top of the dam therefore would be

from 8 to 10 feet above the highest possible water surface in the lake,

which is sufficient to guard against wash or overtopping of the dam by

waves. The total width of the dam at its top would be 20 feet, and the

entire inner slope would be paved with heavy riprap suitably placed and

bedded.

=374. Extent of Lake Bohio and the Canal Line in It.=—This dam would

create an artificial lake having a superficial area during high water

of about 40 square miles. The water would be backed up to a point

called Alhajuela, about 25 miles up the river from Bohio. For a

distance of nearly 14 miles, i.e., from Bohio to Obispo, the route of

the canal would lie in this lake. Although the water would be from 80

to 90 feet deep at the dam for several miles below Obispo, it would

be necessary to make some excavation along the general course of

the Chagres in order to secure the minimum depth of 35 feet for the

navigable channel.

[Illustration: Location of the Proposed Alhajuela Dam on the Upper

Chagres.]

=375. The Floods of the Chagres.=—The feature of Lake Bohio of the

greatest importance to the safe and convenient operation of the canal

is that by which the floods of the river Chagres are controlled or

regulated. That river is but little less than 150 miles long, and its

drainage area as nearly as can be estimated, contains about 875 square

miles. Above Bohio its current moves some sand and a little silt in

times of flood, but usually it is a clear-water stream. In low water

its discharge may fall to 350 cubic feet per second.

As is well known, the floods of the Chagres have at times been regarded

as almost if not quite insurmountable obstacles to the construction

of a canal on this line. The greatest flood of which there is any

semblance of a reliable record is one which occurred in 1879. No direct

measurements were made, but it is stated with apparent authority that

the flood elevation at Bohio was 39.3 feet above low water. If the

total channel through which the flood flowed at that time had been as

large as at present, actual gaugings or measurements of subsequent

floods show that the maximum discharge in 1879 might have been at the

rate of 136,000 cubic feet per second. As a matter of fact the total

channel section in that year was less than it is at the present time.

Hence if it be assumed that a flood of 140,000 cubic feet per second

must be controlled, an error on the safe side will be committed. Other

great floods of which there are reliable records are as follows:

1885 Height at Bohio 33.8 feet above low water.

1888: ” ” ” 34.7 ” ” ” ”

1890: ” ” ” 32.1 ” ” ” ”

1893: ” ” ” 28.5 ” ” ” ”

The maximum measured rate of the 1890 flood was 74,998 cubic feet per

second, and that of 1893, 48,975 cubic feet per second. It is clear,

therefore, that a flood-flow of 75,000 cubic feet per second is very

rare, and that a flood of 140,000 cubic feet per second exceeds that of

which we have any record for practically forty years.

=376. The Gigante Spillway or Waste-weir.=—It is obvious that the dam,

as designed by the commission, is of such character that no water must

be permitted to flow over its crest, or even in immediate proximity to

the down-stream embankment. Indeed it is not intended by the commission

that there shall be any wasteway or discharge anywhere near the dam. At

a point about 3 miles southwest of the site of the dam at Bohio is a

low saddle or notch in the hills near the head-waters of a small stream

called the Gigante River. The elevation of this saddle or notch is such

that a solid masonry weir with a crest 2000 feet long may readily be

constructed with its foundations on bed-rock without deep excavation.

This structure is called the Gigante spillway, and all surplus

flood-waters from the Chagres would flow over it. The waters discharged

would flow down to and through some large marshes, one called Peña

Blanca and another Agua Clara, before rejoining the Chagres. Inasmuch

as the canal line runs just easterly of those marshes, it would be

necessary to protect it with the levees or embankments to which

allusion has already been made. These embankments are neither much

extended nor very costly for such a project. The protection of the

canal would be further aided by a short artificial channel between the

two marshes, Peña Blanca and Agua Clara, for which provision is made

in the estimates of the commission. After the surplus waters from the

Gigante spillway pass these marshes they again enter the Chagres River

or flow over the low, half-submerged country along its borders, and

thence through its mouth to the sea near the town of Chagres, about 6

miles northwest of Gatun.

=377. Storage in Lake Bohio for Driest Dry Season.=—The masonry crest

of the Gigante spillway would be placed at an elevation of 85 feet

above the sea, identically the same as that which may be called the

normal summit level of the canal. It is estimated that the total uses

of water in the canal added to the loss by evaporation, taken at six

inches in depth per month, from the surface of the lake will amount

to about 1070 cubic feet per second if the traffic through the canal

should amount to 10,000,000 tons per annum in ships of ordinary size.

This draft per second is the sum of 406 cubic feet per second for

lockage, 207 for evaporation, 250 for leakage at lock-gates, and 200

for power and other purposes, making a total of 1063, which has been

taken as 1070 cubic feet per second. The amount of storage in Lake

Bohio between the elevations of 85 and 82 feet above sea-level, as

designed, is sufficient to supply the needs of that traffic in excess

of the smallest recorded low-water flow of the Chagres River during the

dry season of a low rainfall year. The lowest monthly average flow of

the Chagres on record at Bohio is 600 cubic feet per second for March,

1891, and for the purposes of this computation that minimum flow has

been supposed to continue for three months. This includes a sensible

margin of safety. In not even the driest year, therefore, can it be

reasonably expected that the summit level of the canal would fall below

the elevation of 82 feet until the total traffic of the canal carried

in ships of the present ordinary size shall exceed 10,000,000 tons.

If the average size of ships continues to increase, as will probably

be the case, less water in proportion to tonnage will be required for

the purposes of lockage. This follows from the fact that with a given

tonnage the greater the capacity of the ships the less the number

required, and consequently the less will be the number of lockages made.

[Illustration: The Eastern Face of the Culebra Cut.]

=378. Lake Bohio as a Flood controller.=—On the other hand it can be

shown that with a depth of 5 feet of water on the crest of the Gigante

spillway the discharge of that weir 2000 feet long will be at the rate

of 78,260 cubic feet per second. If the flood-waters of the Chagres

should flow into Lake Bohio until the head of water on the crest of

the Gigante weir rises to 7½ feet, the rate of discharge over that

weir would be 140,000 cubic feet per second, which, as already shown,

exceeds at least by a little the highest flood-rate on record. The

operation of Lake Bohio as a flood controller or regulator is therefore

exceedingly simple. The flood-waters of the Chagres would pour into the

lake and immediately begin to flow over the Gigante weir, and continue

to do so at an increasing rate as the flood continues. The discharge

of the weir is augmented by the increasing flood, and decreases only

after the passage of the crest of the flood-wave. No flood even as

great as the greatest supposable flood on record can increase the

elevation of the lake more than 92 to 92½ feet above sea-level, and

it will only be at long intervals of time when floods will raise that

elevation more than about 90 feet above sea-level. The control is

automatic and unfailingly certain. It prevents absolutely any damage

from the highest supposable floods of the Chagres, and reserves in

Lake Bohio all that is required for the purposes of the canal and

for wastage by evaporation through the lowest rainfall season. The

floods of the Chagres, therefore, instead of constituting the obstacle

to construction and convenient maintenance of the canal heretofore

supposed, are deprived of all their prejudicial effects and transformed

into beneficial agents for the operation of the waterway.

=379. Effect of Highest Floods on Current in Channel in Lake

Bohio.=—The highest floods are of short duration, and it can be stated

as a general law that the higher the flood the shorter its duration.

The great floods which it is necessary to consider in connection

with the maintenance and operation of this canal would last but a

comparatively few hours only. The great flood-flow of 140,000 cubic

feet per second would increase the current in the narrowest part of

the canal below Obispo to possibly 5 feet per second for a few hours

only, but that is the only inconvenience which would result from

such a flood discharge. That velocity could be reduced by additional

excavation.

=380. Alhajuela Reservoir not Needed at Opening of Canal.=—Inasmuch

as this system of control, devised and adopted by the Isthmian Canal

Commission, is completely effective in regulating the Chagres floods;

the reservoir proposed to be constructed by the new Panama Canal

Company at Alhajuela on the Chagres about 11 miles above Obispo is not

required, and the cost of its construction would be avoided. It could,

however, as a project be held in reserve. If the traffic of the canal

should increase to such an extent that more water would be needed for

feeding the summit level, the dam could be built at Alhajuela so as to

impound enough additional water to accommodate, with that stored in

Lake Bohio, at least five times the 10,000,000 annual traffic already

considered. Its existence would at the same time act with substantial

effect in controlling the Chagres floods and relieve the Gigante

spillway of a corresponding amount of duty.

=381. Locks on Panama Route.=—The locks on the Panama route are

designed to have the same dimensions as those in Nicaragua, as was

stated in the lecture on that route. The usable length is 740 feet

and the clear width 84 feet. They would be built chiefly of concrete

masonry, while the gates would be of steel and of the mitre type.

=382. The Bohio Locks.=—The great dam at Bohio raises the water

surface in the canal from sea-level in the Atlantic maritime section

to an ordinary maximum of 90 feet above sea-level; in other words,

the maximum ordinary total lift would be 90 feet. This total lift is

divided into two parts of 45 feet each. There is therefore a flight

of two locks at Bohio; indeed there are two flights side by side, as

the twin arrangement is designed to be used at all lock sites on both

routes. The typical dimensions and arrangements of these locks, with

the requisite culverts and other features, are shown in the plans and

sections between pages 396 and 397, Part V. They are not essentially

different from other great modern ship-canal locks. The excavation for

the Bohio locks is made in a rocky hill against which the southwesterly

end of the proposed Bohio dam rests, and they are less than 1000 feet

from it.

=383. The Pedro Miguel and Miraflores Locks.=—After leaving Bohio

Lake at Obispo a flight of two locks is found at Pedro Miguel, about

7.9 miles from the former or 21½ miles from Bohio. These locks have a

total ordinary maximum lift of 60 feet, divided into two lifts of 30

feet each. The fifth and last lock on the route is at Miraflores. The

average elevation of water between Pedro Miguel and Miraflores is 30

feet above mean sea-level. Inasmuch as the range of tide between high

and low in Panama Bay is about 20 feet, the maximum lift at Miraflores

is 40 feet and the minimum about 20. The twin locks at Miraflores bring

the canal surface down to the Pacific Ocean level, the distance from

those locks to the 6-fathom curve in Panama Bay being 8.54 miles. There

are therefore five locks on the Panama route, all arranged on the twin

plan, and, as on the Nicaragua route, all are founded on rock.

=384. Guard-gates near Obispo.=—Near Obispo a pair of guard-gates are

arranged “so that if it should become necessary to draw off the water

from the summit cut the level of Lake Bohio would not be affected.”

=385. Character and Stability of the Culebra Cut.=—An unprecedented

concentration of heavy cutting is found between Obispo and Pedro

Miguel. This is practically one cut, although the northwesterly end

toward Obispo is called the Emperador, while the deepest part at the

other end, about 3 miles from Pedro Miguel, is the great Culebra cut

with a maximum depth on the centre line of the canal of 286 ft. On page

93 of the Isthmian Canal Commission’s report is the following reference

to the material in this cut: “There is a little very hard rock at the

eastern end of this section, and the western 2 miles are in ordinary

materials. The remainder consists of a hard indurated clay, with some

softer material at the top and some strata and dikes of hard rock. In

fixing the price it has been rated as soft rock, but it must be given

slopes equivalent to those in earth. This cut has been estimated on

the basis of a bottom width of 150 feet, with side slopes of 1 on 1.”

When the old Panama Canal Company began its excavation in this cut

considerable difficulty was experienced by the slipping of the material

outside of the limits of the cut into the excavation, and the marks of

that action can be seen plainly at the present time. This experience

has given an impression that much of the material in this cut is

unstable, but that impression is erroneous. The clay which slipped

in the early days of the work was not drained, and like wet clay in

numerous places in this country it slipped down into the excavation.

This material is now drained and is perfectly stable. There is no

reason to anticipate any future difficulty if reasonable conditions

of drainage are maintained. The high faces of the cut will probably

weather to some extent, although experience with such clay faces on the

isthmus indicates that the amount of such action will be small. As a

matter of fact the material in which the Culebra cut is made is stable

and will give no sensible difficulty in maintenance.

[Illustration: The Culebra Cut.]

=386. Small Diversion-channels.=—Throughout the most of the distance

between Colon and Bohio on the easterly side of the canal the French

plan contemplated an excavated channel to receive a portion of the

waters of the Chagres as well as the flow of two smaller rivers,

the Gatuncillo and the Mindi, so as to conduct them into the Bay

of Manzanillo, immediately to the east of Colon. That so-called

diversion-channel was nearly completed. Under the plan of the

commission it would receive none of the Chagres flow, but it would be

available for intercepting the drainage of the high ground easterly

of the canal line and the flow of the two small rivers named, so that

these waters would not find their way into the canal. There are a few

other small works of similar character in different portions of the

line, all of which were recognized and provided for by the commission.

=387. Length and Curvature.=—The total length of the Panama route from

the 6-fathom curve at Colon to the same curve in Panama Bay is 49.09

miles. The general direction of the route in passing from Colon to

Panama is from northwest to southeast, the latter point being about

22 miles east of the Atlantic terminus. The depression through which

the line is laid is one of easy topography except at the continental

divide in the Culebra cut. As a consequence there is little heavy

work of excavation, as such matters go except in that cut. A further

consequence of such topography is a comparatively easy alignment, that

is, one in which the amount of curvature is not high. The smallest

radius of curvature is 3281 feet at the entrance to the inner harbor at

the Colon end of the route, and where the width is 800 feet. The radii

of the remaining curves range from 6234 feet to 19,629 feet.

The following table gives all the elements of curvature on the route

and indicates that it is not excessive:

+-----------------+-------+-------+----------------+

|Number of Curves.|Length.|Radius.|Total Curvature.|

+-----------------+-------+-------+----------------+

| | Miles | Feet. | ° ′ |

| 1 | 0.88 |19,629 | 14 17 |

| 1 | .48 |13,123 | 11 04 |

| 4 | 4.22 |11,483 | 111 32 |

| 15 | 11.61 | 9,842 | 355 50 |

| 4 | 2.44 | 8,202 | 90 20 |

| 2 | 1.67 | 6,562 | 77 00 |

| 1 | .73 | 6,234 | 35 45 |

| 1 | .82 | 3,281 | 75 51 |

| +-------+-------+----------------+

| | 22.85 | | 771 39 |

+-----------------+-------+-------+----------------+

=388. Principal Items of Work to be Performed.=—The principal items

of the total amount of work to be performed in completing the Panama

Canal, under the plan of the commission, can be classified as shown in

the following table:

Dredging 27,659,540 cu. yds.

Dry earth 14,386,954 ”

Soft rock 39,893,235 ”

Hard rock 8,806,340 ”

Rock under water 4,891,667 ”

Embankment and back-filling 1,802,753 ”

----------

Total 97,440,489 ”

Concrete 3,762,175 cu. yds.

Granite 13,820 ”

Iron and steel 65,248,900 lbs.

Excavation in coffer-dam 7,260 cu. yds.

Pneumatic work 108,410 ”

=389. Lengths of Sections and Elements of Total Cost.=—The lengths of

the various sections of this route and the costs of completing the work

upon them are fully set forth in the following table, taken from the

commission’s report, as were the two preceding:

TOTAL ESTIMATED COST.

--------------------------------------------+---------+------------

| Miles. | Cost.

--------------------------------------------+---------+------------

Colon entrance and harbor | 2.39 | $8,057,707

Harbor to Bohio locks, including levees | 14.42 | 11,099,839

Bohio locks, including excavation | .35 | 11,567,275

Lake Bohio | 13.61 | 2,952,154

Obispo gates | | 295,434

Culebra section | 7.91 | 44,414,460

Pedro Miguel locks, including excavation | |

and dam | .35 | 9,081,321

Pedro Miguel level | 1.33 | 1,192,286

Miraflores locks, including excavation | |

and spillway | .20 | 5,781,401

Pacific level | 8.53 | 12,427,971

Bohio dam | | 6,369,640

Gigante spillway | | 1,209,419

Peña Blanca outlet | | 2,448,076

Chagres diversion | | 1,929,982

Gatun diversion | | 100,000

Panama Railroad diversion | | 1,267,500

+---------+------------

Total | 49.09 | 120,194,465

Engineering, police, sanitation, and general| |

contingencies, 20 per cent. | | 24,038,893

+---------+------------

Aggregate | |$144,233,358

--------------------------------------------+---------+------------

The item in this table called Panama Railroad diversion affords

provision for the reconstruction of the railroad necessitated by the

formation of Lake Bohio. That lake would submerge the present location

of the railroad for 14 or 15 miles.

[Illustration: The Culebra Cut with Steamer Deutschland in it.]

=390. The Twenty Per Cent Allowances for Exigencies.=—It will

be observed that in the estimates of cost of the canal on both

the Nicaragua and the Panama routes, 20 per cent is allowed for

“engineering, police, sanitation, and general contingencies.” For the

purposes of comparison the same percentage to cover these items was

used on both routes. As a matter of fact the large amount of work

which has already been performed on the Panama route removes many

uncertainties as to the character of material and other features of

difficulty which would be disclosed only after the beginning of the

work in Nicaragua. It has therefore been contended with considerable

basis of reason that a less percentage to cover these uncertainties

should be employed in connection with the Panama estimates than in

connection with those for the Nicaragua route. Indeed it might be

maintained that the exigencies which increase cost should be made

proportional to the length of route and the untried features. On the

other hand, both Panama and Colon are comparatively large centres

of population, and, furthermore, there is a considerable population

stretched along the line of the Panama Railroad between those points.

The climate and the unsanitary condition of practically every centre

of population in Central America and on the isthmus contribute to the

continual presence of tropical fevers, and other diseases contingent

upon the existing conditions of life. It is probable, among other

things, that yellow fever is always present on the isthmus. Inasmuch as

the Nicaragua route is practically without population, the amount of

disease existing along it is exceedingly small, there being practically

no people to be sick. The initial expenditure for the sanitation of

the cities at the extremities of the Panama route, as well as for

the country between, would be far greater for that route than on the

Nicaragua. This fact compensates, to a substantial extent at least,

for the physical uncertainties on the Nicaragua line. Indeed a careful

examination of all the conditions existing on both routes indicates the

reasonableness of applying the same 20 per cent to both total estimates

of cost.

=391. Value of Plant, Property, and Rights on the Isthmus.=—The

preceding estimated cost of $144,233,358 for completing the Panama

Canal must be increased by the amount necessary to be paid for all the

property and rights of the new Panama Canal Company on the isthmus. A

large amount of excavation has been performed, amounting to 77,000,000

cubic yards of all classes of materials, and nearly all the right of

way has been purchased. The new Panama Canal Company furnished the

commission with a detailed inventory of its entire properties, which

the latter classified as follows:

1. Lands not built on.

2. Buildings, 2431 in number, divided among 47

subclassifications.

3. Furniture and stable outfit, with 17 subclassifications.

4. Floating plant and spare parts, with 24

subclassifications.

5. Rolling plant and spare parts, with 17 subclassifications.

6. Plant, stationary and semi-stationary, and spare parts,

with 25 subclassifications.

7. Small material and spare parts, with 4 subclassifications.

8. Surgical and medical outfit.

9. Medical stores.

10. Office supplies, stationery.

11. Miscellaneous supplies, with 740 subclassifications.

The commission did not estimate any value for the vast amount of plant

along the line of the canal, as its condition in relation to actual use

is uncertain, and the most of it would not be available for efficient

and economical execution of the work by modern American methods.

Again, a considerable amount of excavated material along some portions

of the line has been deposited in spoil-banks immediately adjacent to

the excavation from which it was taken, and would have to be rehandled

in forming the increased size of prism contemplated in the commission’s

plan.

In view of all the conditions affecting it, the commission made the

following estimate of the value of the property of the new Panama Canal

Company, as it is now found on the Panama route:

Canal excavation $21,020,386

Chagres diversion 178,186

Gatun diversion 1,396,456

Railroad diversion (4 miles) 300,000

-----------

22,895,028

Contingencies, 20 per cent 4,579,005

-----------

Aggregate 27,474,033

Panama Railroad stock at par 6,850,000

Maps, drawings, and records 2,000,000

-----------

$36,324,033

The commission added 10 per cent to this total “to cover omissions,

making the total valuation of the” property and rights as now existing,

$40,000,000.

In computing the value of the channel excavation in the above

tabulation it was estimated that “the total quantity of excavation

which will be of value in the new plan is 39,586,332 cubic yards.”

=392. Offer of New Panama Canal Company to Sell for $40,000,000.=—In

January, 1902, the new Panama Canal Company offered to sell and

transfer to the United States Government all its property and rights on

the isthmus of every description for the estimate of the commission,

viz., $40,000,000. In order to make a proper comparison between the

total costs of constructing the canal on the two routes it is necessary

to add this $40,000,000 to the preceding aggregate of $144,233,358,

making the total cost of the Panama Canal $184,233,358. It will be

remembered that the corresponding total cost of the Nicaragua Canal

would be $189,864,062.

[Illustration: The Railroad Pier at La Boca, the Panama end of the

Canal.]

=393. Annual Costs of Operation and Maintenance.=—It is obvious that

the cost of operating and maintaining a ship-canal across the American

isthmus would be an annual charge of large amount. A large organized

force would be requisite, and no small amount of material and work

of various kinds and grades would be needed to maintain the works in

suitable condition. The commission made very careful and thorough

studies to ascertain as nearly as practicable what these comparative

costs would be. In doing this it gave careful consideration to the

annual expenditures made in maintaining the various ship-canals of

the world, including the Suez, Manchester, Kiel, and St. Mary’s Falls

canals. The conclusion reached was that the estimated annual costs of

maintenance and operation could reasonably be taken as follows:

For the Nicaragua Canal $3,300,000

For the Panama Canal 2,000,000

----------

Difference in favor of Panama $1,300,000

=394. Volcanoes and Earthquakes.=—Much has been written regarding the

comparative liability to damage of canal works along these two routes

by volcanic or seismic agencies. As is well known, the entire Central

American isthmus is a volcanic region, and in the past a considerable

number of destructive volcanic eruptions have taken place at a number

of points. There is a line of live volcanoes extending southeasterly

through Nicaragua and Costa Rica. Many earthquake shocks have occurred

throughout Nicaragua, Costa Rica, and the State of Panama, some

of which have done more or less damage in large portions of those

districts. At the same time many buildings which have been injured have

not been substantially built. In fact that has generally been the case.

Both routes lie in districts that are doubtless subject to earthquake

shocks, but there is little probability that the substantial structures

of a canal along either line would be essentially injured by them. The

conclusions of the commission as to this feature of the matter are

concisely stated in three paragraphs at the top of page 170 of its

report:

“It is possible and even probable that the more accurately fitting

portions of the canal, such as the lock-gates, may at times be

distorted by earthquakes, and some inconvenience may result therefrom.

That contingency may be classed with the accidental collision of ships

with the gates, and is to be provided for in the same way, by duplicate

gates.

“It is possible also that a fissure might open which would drain the

canal, and, if it remained open, might destroy it. This possibility

should not be erected by the fancy into a threatening danger. If

a timorous imagination is to be the guide, no great work can be

undertaken anywhere. This risk may be classed with that of a great

conflagration in a city like that of Chicago in 1871, or Boston in 1872.

“It is the opinion of the commission that such danger as exists from

earthquakes is essentially the same for both the Nicaragua and Panama

routes, and that in neither case is it sufficient to prevent the

construction of the canal.”

The Nicaragua route crosses the line of live volcanoes running from

northwest to southeast through Central America, and the crater of

Ometepe in Lake Nicaragua is about 11 miles only from the line. The

eruptions of Pelée and Soufriere show that such proximity of possible

volcanic action may be a source of great danger, although even the

destruction by them does not certainly indicate damage either to

navigation or to canal structures at the distance of 11 miles. Whatever

volcanic danger may exist lies on the Nicaragua route, for there is no

volcano nearer than 175 miles to the Panama route.

=395. Hygienic Conditions on the Two Routes.=—The relative

healthfulness of the two routes has already been touched upon. There

is undoubtedly at the present time a vast amount of unhealthfulness

on the Panama route, and practically none on the Nicaragua route, but

this is accounted for when it is remembered, as has also been stated,

that there is practically no population on the Nicaragua route and

a comparatively large population along the Panama line. There is a

wide-spread, popular impression that the Central American countries

are necessarily intensely unhealthful. This is an error, in spite of

the facts that the construction of the Panama Railroad was attended

with an appalling amount of sickness and loss of life, and that records

of many epidemics at other times and in other places exist in nearly

all of these countries. There are the best of good reasons to believe

that with the enforcement of sanitary regulations, which are now well

understood and completely available, the Central American countries

would be as healthful as our Southern States. A proper recognition of

hygienic conditions of life suitable to a tropical climate would work

wonders in Central America in reducing the death-rate. At the present

time the domestic administration of most of the cities and towns of

Nicaragua and Panama, as well as the generality of Central American

cities, is characterized by the absence of practically everything which

makes for public health, and by the presence of nearly every agency

working for the diseases which flourish in tropical climates. When

the United States Government reaches the point of actual construction

of an isthmian canal the sanitary features of that work should be

administered and enforced in every detail with the rigor of the

most exacting military discipline. Under such conditions, epidemics

could either be avoided or reduced to manageable dimensions, but

not otherwise. The commission concluded that “Existing conditions

indicate hygienic advantages for the Nicaragua route, although it is

probable that no less effective sanitary measures must be taken during

construction in the one case than in the other.”

=396. Time of Passage through the Canal.=—The time required for

passing through a transisthmian canal is affected by the length, by

the number of locks, by the number of curves, and by the sharpness

of curvature. The speed of a ship, and consequently the time of

passage, is also affected by the depth of water under its keel. It

is well known that the same power applied to a ship in deep water

of unlimited width will produce a much higher rate of movement than

the same power applied to the same ship in a restricted waterway,

especially when the draft of the ship is but little less than the

depth of water. These considerations have important bearings both upon

the dimensions of a ship-canal and upon the time required to pass

through it. They were most carefully considered by the commission, as

were also such other matters as the delay incurred in passing through

the locks on each line, the latter including the delay of slowing or

approaching the lock and of increasing speed after passing it, the

time of opening and closing the gates, and the time of emptying and

filling the locks. It is also evident that ships of various sizes will

require different times for their passage. After giving due weight

to all these considerations it was found that what may be called an

average ship would require twelve hours for passing through the Panama

Canal and thirty-three hours for passing through the Nicaragua Canal.

Approximately speaking, therefore, it may be stated that an average

passage through the former waterway will require but one third the time

needed for the latter.

[Illustration: A Street in Panama.]

=397. Time for Completion on the Two Routes.=—The time in which an

isthmian canal may be completed and ready for traffic is an element of

the problem of much importance. There are two features of the work to

be done at Panama, each of which is of sufficient magnitude to affect

to a controlling extent the time required for the construction of the

canal, viz., the Bohio dam and the Culebra cut. Both of these portions

of the work may, however, be prosecuted concurrently and with entire

independence of each other. There are no such features on the Nicaragua

route, although the cut through the divide west of the lake is probably

the largest single work on that route. In considering this feature of

the matter it is well to observe that the total amount of excavation

and embankment of all grades on the Nicaragua route is practically

228,000,000 cubic yards, while that remaining to be done on the Panama

route is but little more than 97,000,000 cubic yards, or 43 per cent

of the former. The accompanying figures show the relative quantities of

total excavation, concrete, iron, and steel required in construction

along the two routes, as well also as the total amounts and radii of

curvature.

[Illustration: Diagrams comparing some of the main Elements of the two

Routes.]

The commission has estimated ten years for the completion of the

canal on the Panama route and eight years for the Nicaragua route,

including in both cases the time required for preparation and that

consumed by unforeseen delays. The writer believes that the actual

circumstances attending work on the two routes would justify an

exchange of these time relations. There is great concentration of

work in the Culebra-Emperador cut on the Panama route, covering about

45 per cent of the total excavation of all grades (43,000,000 cubic

yards), which is distributed over a distance of about 7 miles, with

the location of greatest intensity at Culebra. This demands efficient

organization and special plant so administered as to reduce the

working force to an absolute minimum by the employment of machinery

to the greatest possible extent. A judicious, effective organization

and plant would transform the execution of this work into what may be

called a manufactory of excavation with all the intensity of direction

and efficiency of well designed and administered machinery which

characterizes the concentration of labor and mechanical appliances in

great manufacturing establishments. Such a successful installation

would involve scarcely more advance in contract operations than was

exhibited, in its day, in the execution of the work on the Chicago

Drainage-canal. By such means only can the peculiar difficulties

attendant upon the execution of great works in the tropics be reduced

to controllable dimensions. The same general observations may be

applied to the construction of the Bohio dam, even should a no more

favorable site be found.

The greatest concentration of excavation on the Nicaragua route is

between the lake and the Pacific, but it constitutes only 10 per cent

of the total excavation of all grades, and it can be completed in far

less time than the great cut on the Panama route. If this were the

only great feature of work besides the dam, the time for completion

of work on this route would be materially less than that required for

the Panama crossing. As a matter of fact, there are a succession of

features of equivalent magnitude, or very nearly so, from Greytown

nearly to Brito, extending over a distance of at least 175 miles,

requiring the construction of a substantial service railroad over a

considerable portion of the distance prior to the beginning of work.

This attenuation of work requires the larger features to be executed in

succession to a considerable extent, or much duplication of plant and

the employment of a great force of laborers, practically all of whom

must be foreigners, housed, organized, and maintained in a practically

uninhabited tropical country where many serious difficulties reach a

maximum. It is not within the experience of civil engineers to execute

by any practicable means that kind of a programme on schedule time.

The weight of this observation is much increased when it is remembered

that the total volume of work may be taken nearly twice as great in

Nicaragua as at Panama, and that large portions between Lake Nicaragua

and the Caribbean Sea must be executed in a region of continual and

enormous rainfall. It would seem more reasonable to the writer to

estimate eight years for the completion of the Panama Canal and ten

years for the completion of the Nicaragua Canal.

=398. Industrial and Commercial Value of the Canal.=—The prospective

industrial and commercial value of the canal also occupied the

attention of the commission in a broad and careful study of the

elements which enter that part of the problem. It is difficult if not

impossible to predict just what the effect of a transisthmian canal

would be either upon the ocean commerce of the United States or of

other parts of the world, but it seems reasonable to suppose from the

result of the commission’s examinations that had the canal been in

existence in 1899 at least 5,000,000 tons of the actual traffic of

that year would have been accommodated by it. The opening of such a

waterway, like the opening of all other traffic routes, induces the

creation of new traffic to an extent that cannot be estimated, but it

would appear to be reasonable to suppose that within ten years from the

date of its opening the vessel tonnage using it would not be less than

10,000,000 tons.

[Illustration: View of Panama.]

The Nicaragua route would favor in distance the traffic between our

Atlantic (including Gulf) and Pacific ports. The distances between

our Atlantic ports and San Francisco would be about 378 nautical

miles less than by Panama. Between New Orleans and San Francisco

this difference in favor of the route by Greytown and Brito would be

580 nautical miles. It must be remembered, however, that the greater

time by at least twenty-four hours required for passage through the

Nicaragua Canal practically obliterates this advantage, and in some

cases would throw the advantage in favor of the Panama waterway. This

last observation would hold with particular force if for any reason

a vessel should not continue her passage, or should continue it at a

reduced speed during hours of darkness, which could not be escaped on

the Nicaragua Canal, but might be avoided at Panama. For all traffic

between the Atlantic (including Gulf) ports and the west coast of

South America the Panama crossing would be the most advantageous. As a

matter of fact, while there may be some small advantage in miles by one

route or the other for the traffic between some particular points, on

the whole neither route would have any very great advantage over the

other in point of distance or time; either would serve efficiently the

purposes of all ocean traffic in which the ports of the United States

are directly interested.

The effect of this ship waterway upon the well-being of the United

States is not altogether of a commercial character. As indicated by

the commission, this additional bond between the two portions of the

country will have a beneficial effect upon the unity of the political

interests as well as upon the commercial welfare of the country. Indeed

it is the judgment of many well-informed people that the commercial

advantages resulting from a closer touch between the Atlantic and

Pacific coasts of the country are of less consequence than the unifying

of political interests.

In a final comparison between the two routes it is to be remembered

that the concession under which the new Panama Company has been and

is now prosecuting its work is practically valueless for the purposes

of this country. It will therefore be necessary to secure from the

republic of Colombia, for the Panama route, as well as from the

republics of Nicaragua and Costa Rica, for the Nicaragua route, such

new concessions as may be adequate for all the purposes of the United

States in the construction of this transisthmian canal. The cost of

those concessions in either case must be added to the estimated total

cost of the work, as set forth, in order to reach the total cost of the

canal along either route.

=399. Comparison of Routes.=—Concisely stating the situation, its main

features may be expressed somewhat as follows:

Both routes are entirely “practicable and feasible.”

Neither route has any material commercial advantage over the other as

to time, although the distance between our Atlantic (including Gulf)

and Pacific ports is less by the Nicaragua route.

The Panama route has about one fourth the length of that in Nicaragua;

it has less locks, less elevation of summit level, and far less

curvature, all contributing to correspondingly decreased risks peculiar

to the passage through a canal. The estimated annual cost of operation

and maintenance of the Panama route is but six tenths that for the

Nicaragua route.

The harbor features may be made adequate for all the needs of a canal

by either route, with such little preponderance of advantage as may

exist in favor of the Panama crossing.

The commission estimated ten years for the completion of the Panama

Canal and eight years for the Nicaragua waterway, but the writer

believes that these relations should be exchanged, or at least that the

time of completion for the Panama route should not be estimated greater

than for the Nicaragua.

The water-supply is practically unlimited on both routes, but the

controlling or regulating works, being automatic, are much simpler and

more easily operated and maintained on the Panama route.

The Nicaragua route is practically uninhabited, and consequently

practically no sickness exists there. On the Panama route, on the

contrary, there is a considerable population extending along the entire

line, among which yellow fever and other tropical diseases are probably

always found. Initial sanitary works of much larger magnitude would be

required on the Panama route than on the Nicaragua, although probably

as rigorous sanitary measures would be required during the construction

of the canal on one route as on the other.

The railroad on the Panama route and other facilities offered by a

considerable existing population render the beginning of work and the

housing and organization of the requisite labor force less difficult

and more prompt than on the Nicaragua route.

The greater amount of work on the Nicaragua route, and its distribution

over a far greater length of line, involve the employment of a

correspondingly greater force of laborers, with greater attendant

difficulties, for an equally prompt completion of the work.

The relative seismic conditions of the two routes cannot be

quantitatively stated with accuracy, but in neither case are they of

sufficient gravity to cause anxiety as to the effects upon completed

canal structures.

Concessions and treaties require to be secured and negotiated for the

construction of the canal on either route, and under the conditions

created by the $40,000,000 offer of the new Panama Canal Company

this feature of both routes appears to possess about the same

characteristics, although the Nicaragua route is, perhaps, freer from

the complicating shadows of prior rights and concessions.

Ancient and modern engineering and the Isthmian canal · 第 13 / 13 章